Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8827 CONSULTING ENGINEERING SERVICES WATER TREATMENT FACILITY DESIGN AND CONSTRUCTION FOR CAPITAL IMPROVEMENTS (2)Utilities Work Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND SERVICE PROVIDER'S NAME WORK ORDER NUMBER: WQS-2019-01 PROJECT TITLE: Lead and Copper Rule Compliance Assessment ORIGINAL BID/RFP NUMBER & NAME: 8827, Consulting Engineering Services Water Treatment Facility Design and Construction for Capital Improvements MASTER AGREEMENT EFFECTIVE DATE: 02/20/19 ARCHITECT/ENGINEER: HDR Engineering, Inc. OWNER’S REPRESENTATIVE: Jill Oropeza WORK ORDER COMMENCEMENT DATE: January 21, 2020 WORK ORDER COMPLETION DATE: May 29, 2020 MAXIMUM FEE: (time and reimbursable direct costs): $33,110 PROJECT DESCRIPTION/SCOPE OF SERVICES: HDR to conduct an assessment of compliance with recently proposed revisions to the Federal Drinking Water Lead and Copper Rule, including a gap assessment and identification and prioritization of strategies to comply with the proposed revised rule Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of ( ) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: HDR Engineering, Inc. By: Date: Name: Title: DocuSign Envelope ID: 38A00011-E902-4627-A977-B40E81E2416A Brad Martin Senior Vice President 12/23/2019 Utilities Work Order Form Official Purchasing Form Last updated 10/2017 OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Contract Documents are hereby accepted and incorporated herein by this reference. ACCEPTANCE: Date: Jill Oropeza, Project Manager REVIEWED: Date: Name, Buyer or Senior Buyer APPROVED AS TO FORM: Date: Name,City Attorney's Title (if greater than $1,000,000) ACCEPTANCE: Date: Carol Webb, Deputy Director, Water Resources & Treatment Operations ACCEPTANCE: Date: Name, Title ACCEPTANCE: Date: Kevin Gertig, Utilities Executive Director (if greater than $1,000,000) ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) ACCEPTANCE: Date: Darin Atteberry, City Manager (if greater than $1,000,000) ATTEST: Date: City Clerk (if greater than $1,000,000) DocuSign Envelope ID: 38A00011-E902-4627-A977-B40E81E2416A Marisa Donegon 12/23/2019 12/23/2019 12/23/2019 Acting Deputy Director Mark Kempton for CW Mark Kempton Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT A WORK ORDER SCOPE OF SERVICES DocuSign Envelope ID: 38A00011-E902-4627-A977-B40E81E2416A Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT B WORK ORDER COST DETAIL DocuSign Envelope ID: 38A00011-E902-4627-A977-B40E81E2416A Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT C CERTIFICATE OF INSURANCE CONTRACTOR shall submit Certificate of Insurance in compliance with the Contract Documents. DocuSign Envelope ID: 38A00011-E902-4627-A977-B40E81E2416A December 19, 2019 Ms. Carol Webb Deputy Director, Water Resources & Treatment Operations Fort Collins Utilities 700 Wood Street Fort Collins, CO 80521 Re: Fort Collins Utilities Lead and Copper Rule Compliance Assessment Scope of Services and Fee Estimate Dear Ms. Webb: Thank you for the opportunity to present this scope of services and fee proposal to support the City of Fort Collins and Fort Collins Utilities as it attempts to assess compliance with recently proposed revisions to the Lead and Copper Rule. We are excited to assist you in this area and will bring our team’s expertise in helping other cities assess compliance with these proposed revisions. Specifically, we have prepared a scope of services to accomplish the following tasks related to this project:  Task 1: Project Management and Administration  Task 2: Perform Gap Assessment of Compliance with Revised Lead and Copper Rule  Task 3: Identification and Prioritization of Strategies to Comply with the Revised LCR We propose to complete this scope of services on a time and materials basis under HDR’s master service agreement 8827 with the City of Fort Collins for a fee not to exceed $33,110. We propose to start work the week of January 20th, 2020, and complete the work by May 29th, 2020. Should you have any questions about any of the information included herein, please contact me at your earliest convenience. Sincerely, Chris Parton, P.E. Project Manager DocuSign Envelope ID: 38A00011-E902-4627-A977-B40E81E2416A Exhibit A Scope of Services DocuSign Envelope ID: 38A00011-E902-4627-A977-B40E81E2416A Background The City of Fort Collins (City) has identified the need to conduct a comprehensive assessment of current Utilities operations to ensure compliance with the recently proposed revisions to the Lead and Copper Rule (LCR) from the United States Environmental Protection Agency (USEPA) issued for public comment in October 2019. HDR has prepared this scope of work to assist the City with this effort. Specifically, HDR will assist the City with the following tasks:  Perform Gap Assessment of Compliance with the 2019 proposed revisions to the LCR Requirements  Peer review of similar cities’ practices relating to lead goosenecks in their distribution system.  Review and recommendation of Strategies and Tactics to Comply with Revised LCR The following assumptions were used in preparation of the scope and the associated engineering fee: 1. The project duration will be 4 months. 2. The City will provide best available information on service line materials in its distribution system. 3. The City will provide information on current management practices related to compliance with the lead and copper rule. 4. City staff will be available for interviews when needed. 5. The City does not own any full lead service lines in its distribution system; therefore, the peer review of similar cities will be limited to those cities that have lead goosenecks in their distribution system. 6. HDR staff from offices outside of Colorado will travel to Fort Collins for one workshop with City staff. Approach Task Series 100 – Project Management and Administration HDR will conduct project management activities including coordination, direction, and management of scope, budget, project accounting, invoicing, scheduling, communications, and preparation of monthly reports to be issued to the City updating project scope, schedule, and budget status. Task 101 – Prepare Project Management Plan HDR will develop a Project Management Plan (PMP) to include a communication plan, Quality Assurance and Quality Control (QA/QC) plan, and health and safety plan. Templates for deliverables, invoices and progress reports, and logs to track action items, decisions, and change management will also be prepared or updated as part of this task. DocuSign Envelope ID: 38A00011-E902-4627-A977-B40E81E2416A Task 102 – Project Status and Reporting HDR will monitor project progress, including work completed, work remaining, budget expended, schedule, estimated cost of work remaining, estimated cost at completion, earned value, and out of scope items. HDR will manage activities within the project budget, process invoices, and prepare monthly progress memorandums to be included with invoices. Task 103 – Quality Assurance and Quality Control (QA/QC) HDR will complete QC reviews and address comments prior to submission of project deliverables. Ongoing QA activities include routine internal meetings to monitor project progress and address issues as they arise, including senior staff throughout project development, and use of standard tools and templates. Hours for QA/QC are included in individual tasks for deliverables. Overall coordination of QA/QC will be in accordance with the PMP. Task 104 – Project Initiation A kickoff workshop will be held at the beginning of the project to review project goals, scope, and schedule. The workshop will be attended by 4 members of the HDR team, one in person and the rest via phone. The meeting is anticipated to be 2 hours in length. Task Series 100 Deliverables The following deliverables will be prepared as part of Task Series 100:  Monthly Invoices and Progress Reports  Project initiation meeting agenda and minutes Task 200 – Perform Gap Assessment of Compliance with Revised Lead and Copper Rule OBJECTIVE: The objective of this task is to perform a gap assessment of Fort Collins Utilities’ current practices around how it manages water service lines with lead goosenecks. HDR will perform the following services under this task:  Interview City staff about current practices related to LCR compliance, including corrosion control, distribution system operation and maintenance, and monitoring and reporting requirements.  Summarize best practices for lead gooseneck management as required by the LCR.  Identify gaps between current and best practice and recommend ways to close gaps.  Research and document how similar utilities manage lead goosenecks in their distribution system. Task Series 200 Deliverables The following deliverables will be prepared as part of Task Series 200:  Meeting minutes from staff interviews. DocuSign Envelope ID: 38A00011-E902-4627-A977-B40E81E2416A Task 300 – Identification and Prioritization of Strategies to Comply with the Revised LCR OBJECTIVE: The objective of this task is to identify and evaluate strategies and tactics that FCU can employ to aid in closing gaps identified in task 200 and complying with the revised LCR.  Identify different strategies and tactics to comply with the revised LCR. These strategies are expected to focus on the areas identified in task 200 and will include: o Corrosion control programs o Monitoring and reporting requirements o Distribution system operation and maintenance  Hold a workshop with City staff to: o Review risks associated with each strategy o Evaluate the pros and cons of each strategy o Identify and prioritize tactics under each strategy  Prepare a technical memorandum summarizing recommendations for complying with the revised LCR, revising as needed per City comments. Task Series 300 Deliverables The following deliverables will be prepared as part of Task Series 200:  Meeting minutes from staff workshop  Technical memorandum summarizing strategies for compliance with revised LCR. DocuSign Envelope ID: 38A00011-E902-4627-A977-B40E81E2416A Exhibit B Fee Estimate DocuSign Envelope ID: 38A00011-E902-4627-A977-B40E81E2416A WORK BREAKDOWN STRUCTURE Fee Estimate for: Fort Collins Utilities Lead and Copper Rule Compliance Assessment Date: December 19, 2019 Firm Name: HDR Engineering, Inc. Chris Parton Project Manager Rich Thornton Principal in Charge Pierre Kwan SeniorTechnical Advisor Trina Collier-McGuire Communications Lead Elizabeth Fuller Project Accountant Donna Velasquez Admin Support Total Labor (Hours) Total Labor ($) Subconsultants Total Expenses ($) Total Labor & Expenses ($) Hourly Rate $240.00 $260.00 $260.00 $190.00 $125.00 $95.00 Task 100 - Project Management and Administration 16 0 2 0 8 2 28 $5,550.00 $0.00 $0.00 $5,550.00 Project Initiation (PMP, QA/QC Plan, Health & Safety Plan) 2 2 2 6 $920.00 $0.00 $920.00 Project Status and Reporting 6 4 10 $1,940.00 $0.00 $1,940.00 Project Closeout 2 2 4 $730.00 $0.00 $730.00 Project initiation meeting agenda and prep 2 2 $480.00 $0.00 $480.00 Project initiation meeting 2 2 4 $1,000.00 $0.00 $1,000.00 Prepare meeting minutes 2 2 $480.00 $0.00 $480.00 Task 200 - Perform Gap Assessment of Compliance with Revised Lead and Copper Rule 11 0 11 0 0 0 22 $5,500.00 $0.00 $0.00 $5,500.00 Interview City staff about current practices related to LCR compliance, including corrosion control, distribution system operation and maintenance, and monitoring and reporting requirements. 4 4 8 $2,000.00 $0.00 $2,000.00 Summarize best practices as required by the LCR. 2 2 4 $1,000.00 $0.00 $1,000.00 Identify gaps between current and best practice. 2 2 4 $1,000.00 $0.00 $1,000.00 Research and document how similar utilities manage lead goosenecks in their distribution system. 3 3 6 $1,500.00 $0.00 $1,500.00 Task 300 - Identification and Prioritization of Strategies to Comply with the Revised LCR 56 2 20 10 0 0 88 $21,060.00 $0.00 $1,000.00 $22,060.00 Identify different strategies and tactics to comply with the revised LCR. 2 2 2 6 $1,380.00 $0.00 $1,380.00 Workshop prep 2 2 2 6 $1,380.00 $0.00 $1,380.00 Hold a workshop with City staff to review strategies and tactics and identify and evaluate risks associated with each. 4 4 4 12 $2,760.00 $0.00 $1,000.00 $3,760.00 Prepare a technical memorandum summarizing recommendations for complying with the revised LCR, revising as needed per City comments. 48 2 12 2 64 $15,540.00 $0.00 $15,540.00 0 $0.00 $0.00 $0.00 TOTAL HOURS 83 2 33 10 8 2 138 TOTAL LABOR $19,920 $520 $8,580 $1,900 $1,000 $190 $32,110 $0 $1,000 $33,110 Task Project Team Labor and Expenses DocuSign Envelope ID: 38A00011-E902-4627-A977-B40E81E2416A