ADDENDUM NO. 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of RFP 8786: Bunker Gear Inspection, Cleaning & Repair Services
OPENING DATE: 3:00 PM (Our Clock) August 24, 2018
To all prospective bidders under the specifications and contract documents described above,
the following changes/additions are hereby made and detailed in the following sections of this
addendum:
Exhibit 1 – Questions & Answers
Please contact Beth Diven, Buyer, at (970) 221-6216 or bdiven@fcgov.com.with any questions
regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN
RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
Addendum 1 Page 2 of 2
EXHIBIT 1 – QUESTIONS & ANSWERS
1. Q1: Section III.E.2 states:
Certificates or verification of training from manufacturer(s) for all employees who may
perform work under this Agreement.
NFPA 1851 – 2014 edition does not require manufacturer training for ISP employee who
service their equipment. As a result, manufacturers do not / cannot offer NFPA 1851
training to ISPs. Instead, NFPA 1851 – 2014 edition requires 3rd Party Verification of an
ISP’s ability to perform advanced cleaning, advanced inspection, and all repairs. To meet
the requirements of this section, is it permissible to submit NFPA 1851 – 2014 edition 3rd
Party Verification Certificate?
Yes, this is acceptable.
2. Is submitted pricing fixed for the length of the contract? If pricing is not fixed, please provide
details for yearly increase percentage allowance.
The submitted pricing will be fixed for the initial 1-year agreement term. Any
pricing increases may be negotiated annually at the time of contract renewal. The
City does not guarantee a set annual percentage increase and will not consider
any increase that exceeds the rates set forth in the Denver/Boulder CPI-U.
3. Q3: Section III.H.3 requests a time and materials fee schedule for all services. Because
time and materials can vary by:
a. Age of garment in need of repair
b. Location of repair
c. Overall construction method(s) deployed by the OEM
d. Is it permissible for vendor to provide a fixed price list detailing all facets of services
provided to satisfy the requirement of section III.H.3?
Yes, this is acceptable.
4. Q4: Section III.F.1 - Please define “necessary timeframe” expectation of vendor to complete
work.
Turn-around time should be no longer than 15 days unless an extension is
granted by the Poudre Fire Authority.
5. PFA’s previous answer states “15-day turnaround”. Does the “15 days” refer to calendar or
business days?
15 calendar days.
6. Will PFA share question(s) & answers posed from other potential vendors? If so, where /
how will we be able to view them?
Yes. All questions and answers will be posted to the Rocky Mountain E-
Purchasing System (Bidnet) in the form of an addendum after the questions
deadline.