WORK ORDER
PURSUANT TO A MASTER AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
HYDRO CONSTRUCTION, INC.
WORK ORDER NUMBER: UH-WRF-2019-16
PROJECT TITLE: UMWRF Biofilter and GAC Filter Media Replacement
ORIGINAL BID/RFP NUMBER & NAME: U8286, Construction Contractor for Projects at
the Water and Wastewater Treatment
Facilities
MASTER AGREEMENT EFFECTIVE DATE: U06/20/2016
ARCHITECT/ENGINEER: UNA
OWNER’S REPRESENTATIVE: ULink Mueller
WORK ORDER COMMENCEMENT DATE: U11/13/2019
WORK ORDER COMPLETION DATE: U04/30/2020
MAXIMUM FEE: (time and reimbursable direct costs): U$ 83,990.00
PROJECT DESCRIPTION/SCOPE OF SERVICES: URemoval of spent media from both MWRF's
biofilter and granular activated carbon (GAC) filter. Disposing of spent GAC. Replacement of
biofilter and GAC filter media with media procured by City. See attached supporting
documentation.
Service Provider agrees to perform the services identified above and on the attached forms in
accordance with the terms and conditions contained herein and in the Master Agreement between
the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement
and this Work Order (including the attached forms) the Master Agreement shall control.
The attached forms consisting of UfourU (4) pages are hereby accepted and incorporated herein, by
this reference, and Notice to Proceed is hereby given after all parties have signed this document.
SERVICE PROVIDER: Hydro Construction, Inc.
By: Date:
Name: Title:
Page 1 of 9
DocuSign Envelope ID: ACD4C307-6092-45C2-A964-4DA09F768E86
John Podeyn
December 6, 2019
Project Manager
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
OWNER’S ACCEPTANCE & EXECUTION:
This Work Order and the attached Contract Documents are hereby accepted and incorporated
herein by this reference.
ACCEPTANCE: Date:
Link Mueller, Civil Engineer III
REVIEWED: Date:
Pat Johnson, Senior Buyer
REQUISITION ENTERED: Date:
ACCEPTANCE: Date:
Jason Graham, Director, Water Reclamation & Biosolids
ACCEPTANCE: Date:
Matt Fater, Director, Civil Engineering
ACCEPTANCE: Date:
Carol Webb, Deputy Director, Water Resources & Treatment Operations
ACCEPTANCE: Date:
Theresa Connor, Deputy Director, Water Engineering & Field Services
ACCEPTANCE: Date:
Kevin Gertig, Utilities Executive Director
(if greater than $1,000,000)
ACCEPTANCE: Date:
Gerry Paul, Purchasing Director
(if greater than $60,000)
ACCEPTANCE: Date:
Darin Atteberry, City Manager
(if greater than $1,000,000)
ATTEST: Date:
City Clerk
(if greater than $1,000,000)
Page 2 of 9
DocuSign Envelope ID: ACD4C307-6092-45C2-A964-4DA09F768E86
Melissa Walker Coordinator, Finance
12/5/19
December 5, 2019
December 6, 2019
December 10, 2019
December 6, 2019
December 10, 2019
December 13, 2019
December 13, 2019
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT A
WORK ORDER SCOPE OF SERVICES
Page 3 of 9
DocuSign Envelope ID: ACD4C307-6092-45C2-A964-4DA09F768E86
Scope of Work
Hydro Workorder for Biofilter and GAC Filter Media Replacement
Organic Biofilter
1. This reactor is 40-foot x 20 foot by 8-foot tall covered with a domed FRP roof.
Access to the media is through a 12-foot-wide opening on the front sealed with
FRP stoplogs.
2. Remove front cap of FRP cover.
3. Remove stop logs and set aside. Care should be taken to not damage neoprene
seals.
4. Remove and load spent organic media into Bio-media vendors trucks. Material
consists of decomposed wood chips and some compost and can be taken to a
composting facility. Floor of biofilter is covered with “Bac-T” air distribution blocks
and care must be taken not to damage floor during spent media removal
5. Remove Bac-T floor and clean out debris underneath. Replace floor and any
spaces removed in the same order as removed.
6. Make any necessary repairs to the biofilter irrigation piping. Piping is 1-inch
Schedule 80.
7. Install organic biofilter media provided by Bio-media vendor in accordance with
attached specification.
8. Reinstall stoplogs and seal gap using closed-cell insulation
9. Replace front cap of cover
10. Clean up site upon completion
Granular Activated Carbon Odor Control Filter
1. This reactor is a 14-foot diameter, 33-foot long horizontal FRP vessel. Activated
carbon is placed in 4 vertical cells approximately 3.5 feet wide such that odorous
air passes horizontally through them. Four access hatches on the top of the
vessel provide access to these cells.
2. Remove spent activated carbon from the cells and dispose of in a landfill. There
is approximately 2,200 cubic feet of spent carbon in the reactor. It is anticipated
that the contractor will utilize a Vactor truck to remove this material.
3. A small delay of no more than 1 week is required for City staff to inspect and
repair any damage to the cell containment material
4. Utilizing a crane or similar device, carefully load approximately 60 supersacks
weighing approximately 1000 lbs a piece into the 4 cells until the chambers
between the cells are sealed off.
5. Remove all construction debris and clean up site upon completion
Page 4 of 9
DocuSign Envelope ID: ACD4C307-6092-45C2-A964-4DA09F768E86
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT B
WORK ORDER COST DETAILS
Page 5 of 9
DocuSign Envelope ID: ACD4C307-6092-45C2-A964-4DA09F768E86
Hydro Construction MWRF Odor Control Media Replacement Page 1
Carbon Filter/Biofilter Media Replacement
Labor and equipment for media removal and replacement only. City will provide hauling and disposal of spent material and supply new material.
Project name MWRF - Biofilter - Carbon Filter - Media Replacement 2019
Labor rate table Labor - Bare
Equipment rate table Equipment
Report format Sorted by 'Phase'
'Detail' summary
Page 6 of 9
DocuSign Envelope ID: ACD4C307-6092-45C2-A964-4DA09F768E86
Hydro Construction MWRF Odor Control Media Replacement Page 2
Carbon Filter/Biofilter Media Replacement
Labor and equipment for media removal and replacement only. City will provide hauling and disposal of spent material and supply new material.
Phase Description Takeoff Quantity Labor Price Labor Amount Material Price Material Amount Sub Price Sub Amount Equip Price Equip Amount Other Price Other Amount Total Amount
1260.100 Utilities
Temporary Toilets 1.00 mo - - 0.00 /mo 0 - - - - 500.00 /mo 500 500
1270.100 OSHA & Safety
Safety Officer 16.00 hr 42.00 /mh 1,344 - - - - - - - - 1,344
Safety Equipment 1.00 ls - - - - - - /ls 1,000.00 /ls 1,000 1,000
1622.100 Fuels
Fuels - Gas 1.00 mo - - /mo - - - - 1,000.00 /mo 1,000 1,000
1900.100 Skidsteers
Skidsteer 1.00 mo - - - - - - 2,700.00 /mo 2,700 - - 2,700
1900.105 Backhoe/Loaders
Loader 1.00 mo /hr - - - - 3,000.00 /mo 3,000 - - 3,000
1900.140 Pick-up Trucks
Jobsite Truck 1.00 mo - - - - - - 1,200.00 /mo 1,200 - - 1,200
2370.150 Temp Erosion Control
Stone Check Dams 1.00 ls 50.00 /ch 400 0.00 /ls 0 - - - - 250.00 /ls 250 650
13220.200 Filter Media
Remove Carbon Filter Media 2,200.00 cf 50.00 /ch 2,500 /cf 28,000.00 /ls 28,000 2,200.00 /ls 2,200 - - 32,700
Install Carbon Filter Media 2,200.00 cf 90.00 /ch 3,600 /cf - - 5,000.00 /ls 5,000 250.00 /ls 250 8,850
Remove Biofilter Media 3,200.00 cf 90.00 /ch 3,600 /cf - - - - 250.00 /ls 250 3,850
Install Biofilter Media 5,600.00 cf 90.00 /ch 3,600 /cf - - - - 500.00 /ls 500 4,100
13222.100 Filter Bottoms
Clean Biofilter Tiles and Plenum 1.00 ls 75.00 /ch 2,250 250.00 /ls 250 - - - - 150.00 /ls 150 2,650
13230.300 Biofilter Cover Fiberglass
Remove/Reinstall Biofilter Front Cover & Stop Logs 1.00 ls 75.00 /ch 1,500 /ls - - /mh 250.00 /ls 250 1,750
15215.102 PVC Pipe Sch 80
Irrigation Pipe Repair Allowance 1.00 ls 50.00 /ch 1,000 454.55 /ls 500 - - - - - - 1,500
Estimate Totals
Hydro Construction MWRF Odor Control Media Replacement Page 2A
Carbon Filter/Biofilter Media Replacement
Labor and equipment for media removal and replacement only. City will provide hauling and disposal of spent material and supply new material.
Description Amount Totals Hours Rate Cost Basis Cost per Unit Percent of Total
Labor 19,794 ####### hrs 23.57%
Material 750 0.89%
Subcontract 28,000 33.34%
Equipment 14,100 1.000 hrs 16.79%
Other 4,150 4.94%
66,794 66,794 79.53% ####
Sales Tax 1,351 7.400 % C 1.61%
Labor Burden 7,522 38.000 % C 8.96%
8,873 75,667 10.56% ####
Profit & Overhead 8,323 11.000 % T 9.91%
8,323 83,990 9.91% ####
Total 83,990
Page 7 of 9
DocuSign Envelope ID: ACD4C307-6092-45C2-A964-4DA09F768E86
7440 East I-25 Frontage Rd. • Frederick, CO 80516
(303) 772-4577 • (303) 442-6829 • Fax (303) 442-5706
Proposal Submitted to: Kenny Samsel Proposal No.: HY1019-01
Hyrdo Construction Company, Inc. October 1, 2019
77 NW Frontage Road UWork to be performed at:
Fort Collins CO 80524 Fort Collins Wastewater Plant
Phone: 970-566-0042 918 E Mulberry St
Email: 28TUksamsel@hydroconstruction.comU28T Fort Collins CO 80524
ENVIRONMENTAL VACUUM SERVICES
Scope of work: Vacuuming and cleaning of biofilter media
Vac Truck: $250.00 per hour port to port
Includes Driver and Laborer
Vacuum Box: $120.00 per hour port to port
Hotsy (if needed) $95.00 per hour port to port
Confined Space (if needed): $95.00 per hour port to port
One 100’ 6” Flex Hose: $275.00
Disposal: $43.50 per ton
Approximate time for Completion: 4-6 Days
With payments to be made as follows: NET 10
Any alteration or deviation from above specifications involving extra costs, will become an extra charge.
Respectfully submitted by MCDONALD FARMS ENTERPRISES INC.
Per_______________________________________
MARK E. MCDONALD/General Manager
Note-This proposal may be withdrawn by us if not accepted within____30____days.
ACCEPTANCE OF PROPOSAL
The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified.
Payment will be made as outlined above.
Date______________________ Signature______________________________________
Date______________________ Signature______________________________________
Page 8 of 9
DocuSign Envelope ID: ACD4C307-6092-45C2-A964-4DA09F768E86
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT C
CERTIFICATE OF INSURANCE
CONTRACTOR shall submit Certificate of Insurance in compliance with the Contract Documents.
Page 9 of 9
DocuSign Envelope ID: ACD4C307-6092-45C2-A964-4DA09F768E86
12/06/2019
Flood and Peterson
PO Box 578
Greeley CO 80632
Dana Stewart, CIC, CISR
(970) 266-7149 (970) 506-6845
DStewart@floodpeterson.com
Hydro Construction Company Inc.
77 NW Frontage Road
Fort Collins CO 80524
Phoenix Insurance Company 25623
Charter Oak Fire Insurance Company 25615
Travelers Property Casualty Company of America 25674
Pinnacol Assurance 41190
GL/AU/XS/WC x4/2020
A Y DT-CO-8G990899-PHX-19 04/01/2019 04/01/2020
1,000,000
300,000
10,000
1,000,000
2,000,000
2,000,000
B 810-9L108491-19-26-G 04/01/2019 04/01/2020
1,000,000
C
10,000
CUP-2J40080A-19-26 04/01/2019 04/01/2020
10,000,000
10,000,000
D Y 2091550 04/01/2019 04/01/2020
1,000,000
1,000,000
1,000,000
RE: MWRF Biofilter & GAC Filter Media Replacement
City of Fort Collins is included as Additional Insured on the General, Automobile, and Umbrella Liability Policies if required by written contract or agreement
and with respect to work performed by Insured subject to the policy terms and conditions.
City of Fort Collins
700 Wood Street
Fort Collins CO 80521-1945
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
INSURER(S) AFFORDING COVERAGE
INSURER F :
INSURER E :
INSURER D :
INSURER C :
INSURER B :
INSURER A :
NAIC #
NAME:
CONTACT
(A/C, No):
FAX
E-MAIL
ADDRESS:
PRODUCER
(A/C, No, Ext):
PHONE
INSURED
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
$
$
$
PROPERTY DAMAGE $
BODILY INJURY (Per accident)
BODILY INJURY (Per person)
COMBINED SINGLE LIMIT
AUTOS ONLY
AUTOS ONLY AUTOS
NON-OWNED
OWNED SCHEDULED
ANY AUTO
AUTOMOBILE LIABILITY
Y / N
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under
ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER
OTH-
STATUTE
PER
(MM/DD/YYYY) LIMITS
POLICY EXP
(MM/DD/YYYY)
POLICY EFF
LTR TYPE OF INSURANCE POLICY NUMBER
INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
EXCESS LIAB
UMBRELLA LIAB EACH OCCURRENCE $
AGGREGATE $
$
OCCUR
CLAIMS-MADE
DED RETENTION $
PRODUCTS - COMP/OP AGG $
GENERAL AGGREGATE $
PERSONAL & ADV INJURY $
MED EXP (Any one person) $
EACH OCCURRENCE $
DAMAGE TO RENTED
PREMISES (Ea occurrence) $
COMMERCIAL GENERAL LIABILITY
CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY
PRO-
JECT LOC
CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
CANCELLATION
AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.
CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED
AUTOS ONLY
DocuSign Envelope ID: ACD4C307-6092-45C2-A964-4DA09F768E86