WORK ORDER
PURSUANT TO A MASTER AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
HYDRO CONSTRUCTION, INC.
WORK ORDER NUMBER: UH-WRF-2019-17
PROJECT TITLE: UDWRF Primary Biofilter Media Replacement
ORIGINAL BID/RFP NUMBER & NAME: U8286, Construction Contractor for Projects at the
Water and Wastewater Treatment Facilities
MASTER AGREEMENT EFFECTIVE DATE: U06/20/2016
ARCHITECT/ENGINEER: UNA
OWNER’S REPRESENTATIVE: ULink Mueller
WORK ORDER COMMENCEMENT DATE: U11/21/2019
WORK ORDER COMPLETION DATE: U03/31/2020
MAXIMUM FEE: (time and reimbursable direct costs): U$ 64,690.00
PROJECT DESCRIPTION/SCOPE OF SERVICES: URemove media from DWRF Primary
Biofilters and load onto media vendor trucks. Remove floor, clean and replace. Load media in
accordance with biofilter specifications. See attached supporting documentation.
Service Provider agrees to perform the services identified above and on the attached forms in
accordance with the terms and conditions contained herein and in the Master Agreement between
the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement
and this Work Order (including the attached forms) the Master Agreement shall control.
The attached forms consisting of UfiveU (5) pages are hereby accepted and incorporated herein, by
this reference, and Notice to Proceed is hereby given after all parties have signed this document.
SERVICE PROVIDER: Hydro Construction, Inc.
By: Date:
Name: Title:
Page 1 of 10
DocuSign Envelope ID: 23B3E57B-1B7E-48FA-821C-37501D8955C3
Project Manager
December 9, 2019
John Podeyn
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
OWNER’S ACCEPTANCE & EXECUTION:
This Work Order and the attached Contract Documents are hereby accepted and incorporated
herein by this reference.
ACCEPTANCE: Date:
Link Mueller, Civil Engineer III
REVIEWED: Date:
Pat Johnson, Senior Buyer
REQUISITION ENTERED: Date:
ACCEPTANCE: Date:
Jason Graham, Director, Water Reclamation & Biosolids
ACCEPTANCE: Date:
Matt Fater, Director, Civil Engineering
ACCEPTANCE: Date:
Carol Webb, Deputy Director, Water Resources & Treatment Operations
ACCEPTANCE: Date:
Theresa Connor, Deputy Director, Water Engineering & Field Services
ACCEPTANCE: Date:
Kevin Gertig, Utilities Executive Director
(if greater than $1,000,000)
ACCEPTANCE: Date:
Gerry Paul, Purchasing Director
(if greater than $60,000)
ACCEPTANCE: Date:
Darin Atteberry, City Manager
(if greater than $1,000,000)
ATTEST: Date:
City Clerk
(if greater than $1,000,000)
Page 2 of 10
DocuSign Envelope ID: 23B3E57B-1B7E-48FA-821C-37501D8955C3
Coordinator, Finance
12/5/19
Melissa Walker
December 6, 2019
December 6, 2019
December 9, 2019
December 9, 2019
December 10, 2019
December 13, 2019
December 13, 2019
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT A
WORK ORDER SCOPE OF SERVICES
Page 3 of 10
DocuSign Envelope ID: 23B3E57B-1B7E-48FA-821C-37501D8955C3
Scope of Work
Hydro Workorder for DWRF Primary Biofilter Media Replacement
Organic Biofilter
1. These reactors are 3 - 40-foot x 50 foot by 8-foot tall uncovered reactors. Access
to the media is through a 12-foot-wide opening on the front sealed with FRP
stoplogs.
2. Only 2 reactors can be off-line at one time.
3. Remove stop logs and set aside. Care should be taken to not damage neoprene
seals.
4. Remove and load of spent organic media into Biomedia vendors trucks. Material
consists of decomposed wood chips and some compost and can be taken to a
composting facility. Floor of biofilter is covered with “Bac-T” air distribution blocks
and care must be taken not to damage floor during spent media removal
5. Remove Bac-T floors and clean out debris underneath. Replace floor and any
spaces removed in the same order as removed.
6. Make any necessary repairs to the biofilter irrigation piping. Piping is 1-inch
Schedule 80.
7. Install organic biofilter media provided by Bio-media vendor in accordance with
attached specification.
8. Reinstall stoplogs
9. Clean up site upon completion
Page 4 of 10
DocuSign Envelope ID: 23B3E57B-1B7E-48FA-821C-37501D8955C3
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT B
WORK ORDER COST DETAILS
Page 5 of 10
DocuSign Envelope ID: 23B3E57B-1B7E-48FA-821C-37501D8955C3
Hydro Construction DWRF - Primary Biofilter Media Replacement Page 1
Estimate Includes Removal and Installation Only - Material and Trucking Provoded by COFC 10/24/2019 1:09 PM
Page 6 of 10
DocuSign Envelope ID: 23B3E57B-1B7E-48FA-821C-37501D8955C3
Hydro Construction DWRF - Primary Biofilter Media Replacement Page 2
Estimate Includes Removal and Installation Only - Material and Trucking Provoded by COFC 10/24/2019 1:09 PM
Item Description Takeoff Qty
Labor
Amount
Material
Amount
Subcontract
Amount Name
Equipment
Amount
Other
Amount
Total
Amount
1000.000 GENERAL CONDITIONS
1060.100 Contigency
10 Contingency 1.00 ls - 0 - - - 0
Contigency 0 0
1260.100 Utilities
20 Temporary Toilets 2.00 mo - 0 - - 1,217 1,217
Utilities 1,217 1,217
1270.100 OSHA & Safety
10 Safety Officer 16.00 hr 2,047 - - - - 2,047
14 Safety Equipment 1.00 ls - - - 1,217 1,217
OSHA & Safety 2,047 1,217 3,264
32.00 Labor hours
1622.100 Fuels
10 Fuels - Gas 1.50 mo - - - 1,825 1,825
Fuels 1,825 1,825
GENERAL CONDITIONS 2,047 0 0 0 4,259 6,306
32.00 Labor hours
1900.000 OWNED EQUIPMENT
1900.100 Skidsteers
10 Skidsteer 1.50 mo - - - 4,929 - 4,929
Skidsteers 4,929 4,929
1900.105 Backhoe/Loaders
10 Loader 1.50 mo - - 7,302 - 7,302
Backhoe/Loaders 7,302 7,302
1.50 Labor hours
1900.140 Pick-up Trucks
10 Jobsite Truck 1.50 mo - - - 2,191 - 2,191
Pick-up Trucks 2,191 2,191
OWNED EQUIPMENT 0 0 0 14,421 0 14,421
1.50 Labor hours
2000.000 SITEWORK
2370.150 Temp Erosion Control
200 Stone Check Dams 1.00 ls 609 0 - - 304 913
Page 7 of 10
DocuSign Envelope ID: 23B3E57B-1B7E-48FA-821C-37501D8955C3
Hydro Construction DWRF - Primary Biofilter Media Replacement Page 3
Estimate Includes Removal and Installation Only - Material and Trucking Provoded by COFC 10/24/2019 1:09 PM
Item Description Takeoff Qty
Labor
Amount
Material
Amount
Subcontract
Amount Name
Equipment
Amount
Other
Amount
Total
Amount
Temp Erosion Control 609 304 913
8.00 Labor hours
SITEWORK 609 0 0 0 304 913
8.00 Labor hours
13000.000 SPECIAL CONSTRUCTION
13220.200 Filter Media
400 Remove Biofilter Media 9,600.00 cf 5,483 - - 913 6,395
400 Install Biofilter Media - Loader Method 11,200.00 cf 10,965 - - 1,217 12,182
400 Install Biofilter Media - Conveyer Method 5,600.00 cf 1,828 4,229 - 608 6,665
Filter Media 18,275 4,229 2,738 25,243
560.00 Labor hours
13222.100 Filter Bottoms
100 Clean Biofilter Tiles and Plenum 3.00 ea 4,569 857 - - 548 5,974
Filter Bottoms 4,569 857 548 5,974
160.00 Labor hours
13230.300 Biofilter Cover Fiberglass
20 Remove/Reinstall Biofilter Stop Logs 3.00 ea 1,371 - 913 2,283
Biofilter Cover Fiberglass 1,371 913 2,283
60.00 Labor hours
3.00 Equipment hours
SPECIAL CONSTRUCTION 24,215 857 4,229 0 4,199 33,500
780.00 Labor hours
3.00 Equipment hours
15000.000 MECHANICAL
15215.102 PVC Pipe Sch 80
15 Irrigation Pipe Repair Allowance 3.00 ea 3,350 1,714 - - - 5,065
PVC Pipe Sch 80 3,350 1,714 5,065
160.00 Labor hours
MECHANICAL 3,350 1,714 0 0 0 5,065
160.00 Labor hours
Page 8 of 10
DocuSign Envelope ID: 23B3E57B-1B7E-48FA-821C-37501D8955C3
Hydro Construction DWRF - Primary Biofilter Media Replacement Page 4
Estimate Includes Removal and Installation Only - Material and Trucking Provoded by COFC 10/24/2019 1:09 PM
Estimate Totals
Description Amount Totals Hours Rate Cost Basis Cost per Unit Percent of Total
Labor 30,222 981.500 hrs 46.72%
Material 2,572 3.98%
Subcontract 4,229 6.54%
Equipment 14,421 3.000 hrs 22.29%
Other 8,762 13.54%
60,206 60,206 93.07%
Contingency 4,484 10.000 % T
4,484 64,690
6.93%
6.93%
Total 64,690
Page 9 of 10
DocuSign Envelope ID: 23B3E57B-1B7E-48FA-821C-37501D8955C3
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT C
CERTIFICATE OF INSURANCE
CONTRACTOR shall submit Certificate of Insurance in compliance with the Contract Documents.
Page 10 of 10
DocuSign Envelope ID: 23B3E57B-1B7E-48FA-821C-37501D8955C3
12/09/2019
Flood and Peterson
PO Box 578
Greeley CO 80632
Dana Stewart, CIC, CISR
(970) 266-7149 (970) 506-6845
DStewart@floodpeterson.com
Hydro Construction Company Inc.
77 NW Frontage Road
Fort Collins CO 80524
Phoenix Insurance Company 25623
Charter Oak Fire Insurance Company 25615
Travelers Property Casualty Company of America 25674
Pinnacol Assurance 41190
GL/AU/XS/WC x4/2020
A Y DT-CO-8G990899-PHX-19 04/01/2019 04/01/2020
1,000,000
300,000
10,000
1,000,000
2,000,000
2,000,000
B Y 810-9L108491-19-26-G 04/01/2019 04/01/2020
1,000,000
C
10,000
Y CUP-2J40080A-19-26 04/01/2019 04/01/2020
10,000,000
10,000,000
D Y 2091550 04/01/2019 04/01/2020
1,000,000
1,000,000
1,000,000
RE: 20-01-595
H-WRF-2019-17 DWRF Primary Biofilter Media Replacement
City of Fort Collins is included as Additional Insured on the General, Automobile, and Umbrella Liability Policies if required by written contract or agreement
and with respect to work performed by Insured subject to the policy terms and conditions.
City of Fort Collins
700 Wood Street
Fort Collins CO 80521-1945
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
INSURER(S) AFFORDING COVERAGE
INSURER F :
INSURER E :
INSURER D :
INSURER C :
INSURER B :
INSURER A :
NAIC #
NAME:
CONTACT
(A/C, No):
FAX
E-MAIL
ADDRESS:
PRODUCER
(A/C, No, Ext):
PHONE
INSURED
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
$
$
$
PROPERTY DAMAGE $
BODILY INJURY (Per accident)
BODILY INJURY (Per person)
COMBINED SINGLE LIMIT
AUTOS ONLY
AUTOS ONLY AUTOS
NON-OWNED
OWNED SCHEDULED
ANY AUTO
AUTOMOBILE LIABILITY
Y / N
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under
ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER
OTH-
STATUTE
PER
(MM/DD/YYYY) LIMITS
POLICY EXP
(MM/DD/YYYY)
POLICY EFF
LTR TYPE OF INSURANCE POLICY NUMBER
INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
EXCESS LIAB
UMBRELLA LIAB
EACH OCCURRENCE $
AGGREGATE $
$
OCCUR
CLAIMS-MADE
DED RETENTION $
PRODUCTS - COMP/OP AGG $
GENERAL AGGREGATE $
PERSONAL & ADV INJURY $
MED EXP (Any one person) $
EACH OCCURRENCE $
DAMAGE TO RENTED
PREMISES (Ea occurrence) $
COMMERCIAL GENERAL LIABILITY
CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY
PRO-
JECT LOC
CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
CANCELLATION
AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.
CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED
AUTOS ONLY
DocuSign Envelope ID: 23B3E57B-1B7E-48FA-821C-37501D8955C3