Loading...
HomeMy WebLinkAboutRFP - 9093 ARCHITECTURAL & ENGINEERING SERVICES FOR FORT COLLINS DDA 2020 ALLEY PROJECTSREQUEST FOR PROPOSAL 9093 ARCHITECTURAL AND ENGINEERING SERVICES FOR FORT COLLINS DDA 2020 ALLEY RENOVATIONS RFP DUE: 3:00 PM MST (our clock), February 27, 2020 The City of Fort Collins, on behalf of the Fort Collins Downtown Development Authority (the DDA), is requesting proposals from qualified firms to provide a full range of architectural and engineering services. The work is expected to be delivered in three phases - Schematic design, Design Development and Construction Documents. The DDA expects the Consultant to design to the available construction budget, for each alley, which will be provided to the successful design firm. Submit eight (8) written proposal copies and one (1) electronic copy (Microsoft Word or PDF format) on a flash drive to: Fort Collins Downtown Development Authority Attn: Todd Dangerfield, Project Manager 19 Old Town Square, Suite 230 Fort Collins, CO 80524 A MANDATORY pre-proposal meeting will be held at 1:30 PM MST, on February 12, 2020, in the DDA Offices located at 19 Old Town Square, Suite 230, Fort Collins. All questions should be submitted, in writing via email, to Todd Dangerfield, Project Manager, at tdangerfield@fcgov.com, with a copy to Elliot Dale, Senior Buyer at edale@fcgov.com, no later than 5:00 PM MST (our clock) of February 18, 2020. Please format your e-mail to include: RFP 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations in the subject line. Questions received after this deadline may not be answered. Responses to all questions submitted before the deadline will be addressed in an addendum and posted on the Rocky Mountain E-Purchasing System webpage. Rocky Mountain E-Purchasing System hosted by Bidnet A copy of the RFP may be obtained at http://www.bidnetdirect.com/colorado/city-of-fort-collins. Prohibition of Unlawful Discrimination: The City of Fort Collins, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d- 4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The City strictly prohibits unlawful discrimination based on an individual’s gender (regardless of gender identity or gender expression), race, color, religion, creed, national origin, ancestry, age 40 years or older, marital status, disability, sexual orientation, genetic information, or other characteristics protected by law. For the purpose of this policy “sexual orientation” means a person’s actual or perceived orientation toward heterosexuality, homosexuality, and bisexuality. The City also strictly prohibits unlawful harassment in the workplace, including sexual Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 1 of 125 harassment. Further, the City strictly prohibits unlawful retaliation against a person who engages in protected activity. Protected activity includes an employee complaining that he or she has been discriminated against in violation of the above policy or participating in an employment discrimination proceeding. The City requires its vendors to comply with the City’s policy for equal employment opportunity and to prohibit unlawful discrimination, harassment and retaliation. This requirement applies to all third-party vendors and their subcontractors at every tier. Public Viewing Copy: The City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any proposals submitted hereunder are subject to public disclosure by the City pursuant to CORA and City ordinances. Vendors may submit one (1) additional complete proposal clearly marked “FOR PUBLIC VIEWING.” In this version of the proposal, the Vendor may redact text and/or data that it deems confidential or proprietary pursuant to CORA. Such statement does not necessarily exempt such documentation from public disclosure if required by CORA, by order of a court of appropriate jurisdiction, or other applicable law. Generally, under CORA trade secrets, confidential commercial and financial data information is not required to be disclosed by the City. Proposals may not be marked “Confidential” or ‘Proprietary’ in their entirety. All provisions of any contract resulting from this request for proposal will be public information. New Vendors: The City requires new Vendors receiving awards from the City to fill out and submit an IRS form W-9 and to register for Direct Deposit (Electronic) payment. If needed, the W-9 form and the Vendor Direct Deposit Authorization Form can be found on the City’s Purchasing website at www.fcgov.com/purchasing under Vendor Reference Documents. Please do not submit with your proposal. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. Collusive or Sham Proposals: Any proposal deemed to be collusive or a sham proposal will be rejected and reported to authorities as such. Your authorized signature of this proposal assures that such proposal is genuine and is not a collusive or sham proposal. The City of Fort Collins reserves the right to reject any and all proposals and to waive any irregularities or informalities. Utilization of Award by Other Agencies: The City of Fort Collins reserves the right to allow other state and local governmental agencies, political subdivisions, and/or school districts to utilize the resulting award under all terms and conditions specified and upon agreement by all parties. Usage by any other entity shall not have a negative impact on the City of Fort Collins in the current term or in any future terms. 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 2 of 125 The selected Vendor shall be expected to sign the DDA’s standard Professional Services Agreement prior to commencing Services (see sample attached to this Proposal). Sincerely, Gerry Paul Purchasing Director 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 3 of 125 Request for Proposals 2020-2021 Phase 1 Alley Enhancement Program Tenney Court North & West Oak Street Alleys Architectural and Engineering Services Issue date: February 6, 2020 Owner: Downtown Development Authority 19 Old Town Square, Suite 230 Fort Collins, CO 80524 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 4 of 125 Contents I. Introduction ................................................................................................................................ 6 II. Purpose ...................................................................................................................................... 6 III. Scope of Services .......................................................................................................................... 7 IV. Instructions to Consultants ........................................................................................................... 12 V. Selection Criteria and Method....................................................................................................... 13 VI. Terms and Conditions .................................................................................................................. 13 Attachments A. Professional Services Agreement B. 2008 Fort Collins Downtown Alleys Masterplan Report C. Project Schedule for Alleys D. 2020 Alley Program Renovation Maps E. DDA Board Retreat Enhanced Alley Design/Construction Priority 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 5 of 125 I. Introduction The Fort Collins Downtown Development Authority (DDA) is an economic development organization formed to focus redevelopment efforts into the City of Fort Collins’ downtown central business district through the use of tax increment financing. The DDA also sponsors projects that improve the downtown experience adding to the vitality, excitement, activity, vibrancy, diversity and attractiveness of our entire community. Recent DDA public revitalization projects include Dalzell, Montezuma Fuller and Old Firehouse Alleys; Seckner Alley, the Elks Lodge deconstruction; funding for the Library Park Master Plan; Old Town Square, West Mountain Alley and tax increment investments in private developments such as the Woodward Governor Corporate Campus, (777 East Lincoln Avenue), Uncommon (310 South College Avenue), Ginger and Baker (359 Linden Street) and the Poudre Garage (148 Remington Street). Such reinvestment in Downtown Fort Collins has reinforced it as the historic, specialty commercial, cultural and governmental center of the City and Larimer County. Fort Collins is vibrant and successful as a major community center. The Downtown district typically generates approximately 11 to 14 percent of the city’s total annual sales tax revenues, with a market share of approximately 26 percent of total restaurant sales in 2018. II. Purpose In 2006, the DDA initiated a pilot project which included improving the pedestrian-only Trimble Court Alley (connecting College Avenue and Old Town Square) and Tenney Court Alley (connecting Mountain Avenue with the Civic Center Parking Structure). The DDA’s goal in initiating this project was to enhance the alleys aesthetically and to stimulate increased economic vitality and use of these spaces. In 2008, the DDA engaged local design firm Russell+Mills Studios to create a master plan of the alleys (see Attachment B 2008 Fort Collins Downtown Alleys Master Plan Report) between CSU, Downtown and the River District. Beginning in 2010, the first phase of alley enhancements began with the construction of two alleys: Montezuma Fuller and Old Firehouse Alleys. These two installations were followed in 2011 by the construction of the Dalzell Alley (formerly West Myrtle Alley) enhancements. Two additional square blocks of enhanced alleyways at Old Firehouse Alley East and Godinez/Beardmore/Reidhead Alleys (formerly West Mountain Avenue Alleys) were constructed in 2018. The original master plan established a prioritized order of alleys to be enhanced. In 2019 the DDA Board reviewed the ten remaining alleys identified for enhancement, reexamined the relevancy of the order and made a few adjustments as well as establishing a model for “bundling” the remaining alleys into five separate phases for design and construction beginning in 2020 and continuing through 2029 (see attached 2019 DDA Board Retreat Enhanced Alley Design/Construction Priority in Attachment E). The DDA Board established a finance plan for Phase 1 consisting of an additional two square blocks of enhanced alleyways identified as Tenney Court North and West Oak Street alleys (see Attachment D Alley Renovation Maps and Enhanced Alley Design/Construction Priority list). A 2020-2021 timeline for design and construction of the Phase 1 alleys was also developed (see Attachment C). 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 6 of 125 The purpose of this request for proposals is to engage the services of an architectural and engineering team to integrate into the DDA’s overall design team to continue alley renovation design, building on prior projects and experiences through implementation of the Alley Masterplan. Specifically, design services are sought for Tenney Court North alleys (two alley legs east of North Mason Street to Opera Galleria building north to LaPorte Avenue) and West Oak Street alley (West Oak Street south to West Olive Street) The DDA’s goal is to renovate and enhance the alleys to represent the current and future use trends with a keen eye towards the operational and maintenance characteristics. The intent is to accomplish this overarching goal within the DDA’s mission while maintaining the project’s goals. “The DDA’s mission is to build public and private investment partnerships that foster economic, cultural and social growth in the Fort Collins central business district.” Project Goals: • Create an equal or more exciting project than past alley projects. • Complete a project that will create an experience that the business owners will support by having the following reaction “I’d endure that construction again for a similar outcome”. • Complete the project is a staged manner over the next several years. • Assist adjacent owners with private improvements. • Highlight entrances to the alleys. • Demonstrate proactive, best practices for project delivery that set a local example. • Improve storm water conveyance and drainage. • Utilize the DDA’s Standards Book as a baseline for all improvements (to be released in a future Addendum). III. Scope of Services The services requested under this request for proposal will generally consist of the following. A. Requirements The selected Consultant will be expected to provide a full range of architectural and engineering services as described below. The work is expected to be delivered in three phases – Schematic Design, Design Development and Construction Documents. The DDA expects the Consultant to design to the available construction budget, for each alley, which will be provided to the successful design firm. Schematic Design (SD) Based from the findings and the general recommendations in the Alley Masterplan, the Consultant shall prepare schematic design drawings and concepts. Schematic design work shall include, but not be limited to, the following: • Generate multiple design concepts for the alley renovations including plan and isometric schematics to simulate future built conditions. The Consultant will be expected to present these plans to various stakeholders or groups to gain feedback. 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 7 of 125 For the purposes of this RFP, the Consultant shall assume that a minimum of two (2) overall schematic plan layouts will be required and a minimum of two (2) elevation isometric schematics will be required per alley. The Consultant shall incorporate or adhere to Old Town Historic District Design Standards or River District Design Guidelines as may be applicable to the alleys within those areas. • Develop a final schematic plan based on DDA and stakeholder input from the 2 concepts generated per alley. Develop final isometric elevation drawings based on the final plan. • Develop an architectural palette. Include options for paving, materials, walls, seating and other elements. • Present final plan and schematic elevations in multiple electronic and hardcopy formats. It is expected that all schematic design components will be completed in color and in a reproducible format. • Coordinate with the DDA’s Construction Manager, Ditesco Construction Services, to develop early cost estimates for the improvements to ensure the built project will be within the DDA’s budgetary constraints. The Construction Manager will prepare all cost estimates at each phase of the project design. • Throughout schematic design, attend regular design review/progress meetings to present and gather information from the DDA team and other stakeholders. The progress meetings shall be assumed to occur on a regular, bi-weekly interval. The Consultant shall also assume a minimum of five (5) meetings to coordinate schematic design efforts or make presentations. The Consultant shall make all sub-consultants available for meetings at the DDA’s request. Design Development (DD) Design development of the Alley Renovation project is defined as the phase which takes the final design concept developed through schematic design and creates working construction drawings that are 60-70% complete. This phase is anticipated to include multiple submittals of work products to both the DDA and the City of Fort Collins. • The DDA will be using an internal review process with the City of Fort Collins by which City staff could participate in design meetings; internally coordinate design reviews and summarize departmental comments to ensure the City’s requirements are addressed. The project will not be reviewed as a standard development application, but rather as an internal City Capital Project review process. The Capital Review process with the City is supported by code and will be the defined review process for this project. The Consultant will be expected to participate in this process, which will be managed by the Construction Manager and assist DDA project management with work products that will be required (e.g. plans, drawings, calculations, palettes, samples, etc.). • During DD, the Consultant shall produce at least two (2) complete sets of drawings for review. One set of drawings shall be produced at the 30% design level. A second set shall be produced at the 60% design level. Each set of drawings shall be routed for DDA and City review. The Consultant shall incorporate comments from each review 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 8 of 125 and maintain a comment log that shows the status and disposition of each review comment. At the DDA’s sole discretion, a Bluebeam Studio session may be developed for on-line review of each plan set. • Drawings produced throughout DD are expected to include efforts from each trade sub-consultant. This will include mechanical, electrical, civil, structural and other trade sub-consultants as needed. • The Consultant shall work cooperatively with the Construction Manager to develop 60% cost estimates. All cost estimating on this project will be performed by the Construction Manager with input from the Consultant. • The Consultant shall submit draft technical specifications in CSI format at the 60% plan submittal stage. It is expected that the Construction Manager will have significant input into the development and creation of the technical specifications. The Consultant should be aware and accepting of this approach to provide high quality technical specifications that are used for bidding. • For West Oak Street Alleys, complete and submit a drainage memorandum outlining runoff, flow routing and written recommendations for drainage improvements consistent with City requirements and plans developed at the 30% and 60% completion levels. It is not anticipated that the site drainage improvements will be developed to convey the 100-yr return period. 10-yr return period conveyance is expected including collection and routing of adjacent roof drains from buildings along the alleys. For Tenney Court North, the City of Fort Collins will supply drainage design. • Complete a site topographic survey for each alley including identification of all property lines and right of ways. Subsurface utility engineering plans will be completed by the Construction Manager. This work shall be incorporated into the Consultant’s base mapping and design work. Incorporate all property boundary information and identify easement acquisition as needed. • Complete any required geotechnical investigation to support pavement, drainage and structural design efforts. • Throughout design development, attend regular design review/progress meetings to present and gather information from the DDA team. The progress meetings shall be assumed to occur on a regular, bi-weekly interval. The Consultant shall also assume a minimum of six (6) meetings to coordinate DD efforts with DDA and/or City staff. The Consultant shall make all sub-consultants available for meetings at the DDA’s request. Construction Documents (CD) The Construction Document phase of the Alley Renovation project is defined as the phase which completes the DD drawings to a final, build-able set of working drawings. This phase is anticipated to include a single submittal to the DDA and City of Fort Collins for final review and approval before issuance for construction. The Consultants should note that a strong focus on construction phasing and business owner impact will be present during the CD phase. It is expected that the drawings will 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 9 of 125 contain multiple phasing scenarios developed by the DDA team to ensure business owner impact is minimized. • The Consultant should expect a shortened CD phase as the DD phase is anticipated to be robust and thorough. At approximately 90% drawing completeness, the Consultant shall submit a final submittal to the DDA and City. • Drawings produced throughout construction document phase are expected to include efforts from each trade sub-consultant. This will include mechanical, electrical, civil, structural, landscaping, lighting, irrigation and other trades as needed. • The Consultant will be expected to produce final “issued for construction” plans and specifications after receiving final comments from both the DDA and City. • The Consultant shall coordinate with the Construction Manager to produce a final construction cost estimate. • The Consultant shall submit technical specifications in CSI format at the 90% plan submittal stage. • The DDA team and Construction Manager will assemble, create and develop final contract documents for construction contractor procurement through the City Purchasing Department. Procurement of the construction contractor is expected to utilize a CM/GC delivery model. The intent is to select the general contractor between the 60% completion phase of design development and beginning of the construction document phase. • Throughout CD phase, attend regular design review/progress meetings to present and gather information from the DDA team. The progress meetings shall be assumed to occur on a regular, bi-weekly interval. The Consultant shall assume a minimum of eight (8) meetings to coordinate CD efforts with DDA or City staff. The Consultant shall make all sub-consultants available for meetings at the DDA’s request. Additional Services Construction Administration services are not currently requested as part of this solicitation. Should the DDA desire to retain the Consultant, a change order or contract amendment will be processed at that time. Sustainable Design The DDA supports sustainable design in all its projects. Renewable products, material reuse, water quality and construction quality are important components of the design. The Consultant shall include an appropriate level of analysis for products and materials selected during SD (as part of the architectural palette) and further into design development and construction document phases to ensure these goals are addressed. Project Delivery The DDA envisions this project being delivered/constructed using a CM/GC delivery process whereby the best qualified construction contractor is awarded the contract. The contract documents shall represent the appropriate level of detail to address this delivery model. 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 10 of 125 The DDA also uses expertise from a Construction Manager acting as Owner’s Agent. Ditesco has been engaged to provide this service. The Consultant will be expected to coordinate, receive comments, take direction and work collaboratively with the Construction Manager throughout the project delivery. B. Project Schedule Event Date RFP Released to Consultants: February 6, 2020 Pre-proposal Meeting (Mandatory): Meeting Location: DDA Offices, 19 Old Town Square, Suite 230, Fort Collins, CO February 12, 2020; 1:30 pm Final Day for Questions: February 18, 2020 (5:00 pm) Proposals Due: February 27, 2020 (3:00 pm) Shortlist by: March 3, 2020 Interviews: March 10, 2020 (times TBD) Staff Recommendation to Board of Directors: by March 12, 2020 The project schedule dates listed in italics above are approximate and may change. After the selection process is complete, the DDA anticipates SD, DD and CD phases to last through fall of 2020. CM/GC contractor selection is expected in late summer 2020 with construction expected to begin in spring 2021. 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 11 of 125 IV. Instructions to Consultants A. Submittal Requirements Qualified consultants interested in performing the work described in this RFP should submit the following information. The information listed below is in no specific order of importance or organization. 1. Provide an original, signed cover letter identifying your interest and desire to work on this project. The letter must be signed by an officer of the firm. 2. Qualifications of your firm and staff proposed, as well as key consultant team members identified to perform work on this project. This should include resumes of staff and any recommendation/commendation letters received for past projects. Please include full availability of your key team members to perform work tasks outlined in this RFP. Outline how many architects and engineers on your team are licensed to practice in the State of Colorado. 3. A list of similar projects your firm has completed with the key personnel proposed for this project. Please provide at least five (5) complete references with full contact information. The DDA will contact one or more of your references as part of the selection process. 4. Provide sample concept plans as an indication of your creativity and work product. Sample sizes for this RFP can be 8.5”x11” up to 11”x17”. 5. Detail experience your firm has with design of public spaces in an urban context such as the Downtown Alleys. Highlight projects where your firm has coordinated with many diverse stakeholder groups to gain consensus on design concepts. Discuss how this was achieved and the overall success of the process. Discuss what makes a successful project for your firm. Discuss how success is measured. For the projects highlighted above, limit to a sampling of 4 projects spanning the last 5 years. 6. Discuss your project approach to designing the Alley Enhancements, discuss what you see to be the challenges and opportunities in the design and discuss what measures will need to be implemented to address the challenges. 7. Provide a summary (spreadsheet format suggested) of your estimated costs to perform the Scope of Services outlined in Part III above. The summary shall outline the activities for each of the three phases, indicate the cost per phase, total of hours per estimated labor category, reimbursables and the total contract cost. Assume all schedule and work products as outlined in this RFP. 8. Discuss your willingness to enter into the Professional Services Agreement included as part of this RFP and list any exceptions your firm may have to the Agreement. 9. Limit the total length of your proposal to a maximum of 20 pages double sided (excluding covers and dividers). 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 12 of 125 10. Submit eight (8) written proposal copies and one (1) electronic copy (Microsoft Word or PDF format) on a flash drive to: Fort Collins Downtown Development Authority Attn: Todd Dangerfield, Project Manager 19 Old Town Square, Suite 230 Fort Collins, CO 80524 (970) 484-2020 11. Proposals must be received no later than February 27, 2020 (3:00 pm, MST). B. Contacts Submit all questions in writing by 5:00 p.m. on February 18, 2020 to: Todd Dangerfield Project Manager Fort Collins Downtown Development Authority (970) 419-8254 tdangerfield@fcgov.com V. Selection Criteria and Method Attached to this document is the Selection Criteria to be used during proposal evaluations and interviews. The DDA reserves the right to accept or reject any proposal and waive any irregularities or informalities presented in the proposals received. The DDA also reserves the right to award this contract to multiple Consultants which may provide benefit in design coordination with other adjacent projects. If chosen by the DDA, multiple Consultants may also offer an acceleration of design and approval efforts through the City of Fort Collins. VI. Terms and Conditions The payment for services, as described under the Scope of Services, shall be based upon hourly rates provided in the Scope of Services billed up to a guaranteed maximum; hourly, not-to- exceed amount. Any changes in scope to the original contract will be treated as a negotiated change order to the contract. 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 13 of 125 Selection Criteria Firms will be evaluated on the following criteria. These criteria will be the basis for review of the written proposals and interview session. The rating scale shall be from 1 to 5, with 1 being a poor rating, 3 being an average rating, and 5 being an outstanding rating. WEIGHTING FACTOR QUALIFICATION STANDARD 2.0 Scope of Proposal Does the proposal show an understanding of the contract objective, methodology to be used and results that are desired from the contract? 2.0 Assigned Personnel Do the persons who will be working on the project have the necessary skills? Are sufficient people of the requisite skills assigned to the contract? 1.0 Availability Can the firm provide flexibility to work on this type of contract? Are other qualified personnel available to assist in meeting project schedules if required? Is the project team available to attend meetings as required? 1.0 Sustainability Does the firm have sustainability practices built into its work? Do they have comparable projects where sustainability has been implemented and used throughout design and construction? 2.0 Firm Capability Does the firm have the support capabilities that the assigned personnel require? Has the firm designed and held previous contracts of this type and scope? 2.0 Cost Is the overall cost for the phase presented within the project manager’s budget? Are the labor unit costs reasonable and relative to current market rates? 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 14 of 125 Reference evaluation (Top Ranked Firm) The Project Manager will check references using the following criteria. The evaluation rankings will be labeled Satisfactory/Unsatisfactory. QUALIFICATION STANDARD Overall Performance Would you hire this Professional again? Did they show the skills required by this project? Timetable Was the original Scope of Work completed within the specified time? Were interim deadlines met in a timely manner? Completeness Was the Professional responsive to client needs; did the Professional anticipate problems? Were problems resolved quickly and effectively? Budget Was the original Scope of Work completed within the project budget? Job Knowledge a) If a study, did it meet the Scope of Work? b) If Professional administered a construction contract, was the project functional upon completion and did it operate properly? Were problems corrected quickly and effectively? 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 15 of 125 ATTACHMENT A AGREEMENT FOR PROFESSIONAL SERVICES 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 16 of 125 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 17 of 125 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 18 of 125 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 19 of 125 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 20 of 125 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 21 of 125 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 22 of 125 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 23 of 125 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 24 of 125 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 25 of 125 ATTACHMENT B 2008 ALLEY MASTER PLAN REPORT 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 26 of 125 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n r e P o r t D e C e M B e r 1 1 , 2 0 0 8 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 27 of 125 “The DDA’s alleyway renovation project is the greatest thing to happen since 1905 when Trimble Court was originally paved. Trimble Court Artisans Coop was established at 118 Trimble Court in 1971 and has earned its place in Old Town Fort Collins as a treasured heirloom. I became a coop member in 1976 and our future has never looked brighter. Since 2005 our sales have increased 60%, no doubt in great part due to the alleyway enhancements. Because of this positive change we are able to remain true to and realize our goals as an artists’ cooperative. We are delighted to distribute yearly dividends to our members and in spring of 2008 we were actually able to lower our member’s commission rate. Apart from the obvious financial gains, we have experienced a heightened sense of community and a joy in our surroundings that is truly inspirational. We celebrate Trimble Court as a friendly and inviting place that feels like home. We just plain love it and we thank you.” Diane Findley President Trimble Court Artisans Coop, Inc. Before After 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 28 of 125 s e C t i o n 1 5 Project Background, Process and Goals s e C t i o n 2 9 Project Extent and Existing Conditions s e C t i o n 3 1 5 Preferred Alley Network Analysis s e C t i o n 4 2 7 Recommendations Creative Solution for Trash & Recycling 2 9 Alley Recommendations 3 2 Concept Diagrams 3 5 Design Concepts & Illustrations 4 3 s e C t i o n 5 6 7 Cost Estimates Key Implementation Steps s e C t i o n 6 7 5 Acknowledgements A P P e n D i x 7 9 Visual Preferencing Exercise Results 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  t A B l e o F C o n t e n t s 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 29 of 125 i n t e n t i o n A l l y B l A n k 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 30 of 125 s e C t i o n 1 Project Background, Process and Goals 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 31 of 125 i n t e n t i o n A l l y B l A n k 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 32 of 125 Task 1 approx. 8 monThs Task 7 H i s t o r y A n D C o n t e x t In 00, the Fort Collins Downtown Strategic Plan identified as a “pedestrian strategy,” a concept to integrate pedestrian infrastructure by dramatically enhancing alleyways that connect prominent destinations such as parking structures and Old Town Square Plaza. As a result, in 00 the DDA funded and constructed the Trimble Court Alley and Tenney Court Alley improvements. These alley improvements integrated urban design features that significantly enhanced the visual pedestrian experience, improved safety and cleanliness, stimulated businesses to build storefronts opening to the alleys, and provided the framework and template for future alley enhancements in the downtown. In 007, the Community Foundation of Northern Colorado convened UniverCity Connections, a process that brought more than 100 citizen stakeholders together to develop a vision to guide “connections” between CSU, the Downtown, and the Cache La Poudre River. These connections, both physical and programmatic in nature, have been embodied in an action plan prepared by eight task groups. The UniverCity Connections Transit & Mobility task group deemed that getting there should be as much fun as being there, and outlined actions for creating an exciting mobility system that would enhance the unfolding cultural milieu of the city by connecting the Downtown River District to Old Town; connecting the University with downtown; and connecting all to the Mason Corridor. The task force recommended expansion of the DDA’s downtown alleyway enhancement program to create the vibrant and interesting pedestrian linkages envisioned for the UniverCity Connections study area. This Master Plan provides the vision for converting key alleys into a system of vibrant, engaging walkways that stimulate business activity and further differentiate Downtown Fort Collins as the urban center of Northern Colorado. Quite possibly, this signature Fort Collins project may be the first-of-its-kind ‘place making’ effort in the nation specifically focusing on a network of alleys as enhanced public spaces. P r o C e s s A comprehensive design process was employed for this master plan that included a detailed analysis and public process that identified alley challenges and opportunities prior to conceptual design. The public process also entailed a public workshop and a public open house that welcomed a variety of feedback and involvement from all interested groups and individuals. This thorough process was critical in forming design recommendations and concepts for the ten alleys that were identified for the initial conceptual design phase for this master plan. The design process is listed below as a series of tasks that formed the outline of the project schedule. P r o j e C t s C H e D u l e REPORT PRODUCTION Workshop #1 Workshop #2 - open house ANALyzING PEDESTRIAN LINKAGES & ALTERNATIVES IDENTIFyING ASSETS, OPPORTUNITIES AND ChALLENGES CREATIVE SOLUTIONS FOR TRASh/ RECyCLING RECOMMEN- DATIONS CONCEPTUAL DESIGN - SKETChES AND VISUALIzATION COST ESTIMATING M A s t e r P l A n i n t e n t The designs and illustrations in this report are a visual gesture of possibilities and opportunities for both the public rights-of- way and privately owned land internal to these city blocks. The designs are rooted in the ideas and suggestions provided by business/building owners at the public workshop and in private meetings where character design preferences and the functional needs of individual businesses were expressed. Future collaboration with building owners and businesses will be necessary to realize implementation of this vision, and such collaboration will need to be done on an alley-by-alley basis before, during, and after construction. i n t e n t i o n A l l y B l A n k 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 34 of 125 s e C t i o n 2 Project Extent & Existing Conditions 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 35 of 125 i n t e n t i o n A l l y B l A n k 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 10 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 36 of 125 P r o j e C t e x t e n t & e x i s t i n G C o n D i t i o n s As outlined in the project background, this master plan provides a strategy for creating an integrated network of alley connections from Colorado State University (CSU) and the River District via downtown Fort Collins. These connections can create safe pedestrian and bikeway travel while enhancing business and livability of downtown Fort Collins. The extent of the study area for this master plan corresponds with the Downtown Development Authority boundary. The southern extents lies on Laurel Avenue and extend one half block east and west of College Avenue. The northern extent for the study is the River District edge which is Jefferson St on the eastern side of College Avenue and Cherry Street on the western side. Within this zone each alley right-of-way was mapped to clearly identify the alleys that could comprise an integrated and connected system. This is illustrated on the Existing Alley Right-of-Way Network plan (see p. 1). In this plan, the alleys within the study zone are shown in context, with major roads, historic landmarks, landmark program boundary and the downtown Fort Collins National historic Boundary. Each alley within the study zone is shown as either a pedestrian-only alley or a shared vehicle/ pedestrian/bicycle alley. Currently, there are four alleys within the study zone that do not have space for vehicles or vehicles are not permitted. The other alleys allow for vehicles, bicycles and pedestrians and are therefore classified in the existing plan as shared alleys. The proposed Mason Street Corridor Bus Rapid Transit (BRT) stops are also shown on this plan. e x i s t i n G l A n D u s e s It is also important to understand the differences in land use within the study area. Each area is considerably different and responds to the adjacent land use. The Land Use Designation plan (see p. 1), assigns titles of areas to reflect observed land uses. For instance, the alleys from Laurel to Mulberry transect an area that predominantly caters to CSU students. This area has been titled CSU/Retail District. Moving north is a section of downtown commercial uses which includes banks, post office and professional offices. Further north is the Downtown Business area, a combination of retail, offices, restaurants and bars. The Civic District to the west includes the Courthouse, Justice Center and City of Fort Collins buildings. At the north lies the historic Old Town within the National historic District, the Northwest Mixed Use area, and River District. t r A s H , V e H i C l e s A n D P A r k i n G In order to understand the trash storage, vehicle circulation and parking demands within each alley, an existing conditions inventory was undertaken. The results of this inventory is displayed on the Vehicle Access, Parking and Dumpster Count plan (see p. 1). Parking counts refer to parking located adjacent to the alley Right-of-Way in privately or public owned surface parking lots. 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 11 P r o j e C t e x t e n t / e x i s t i n G C o n D i t i o n s 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 37 of 125 0 0 0 10’ l e G e n D CherrY sT mapLe sT LaporTe aVe W mounTaIn aVe W oak sT W oLIVe sT W maGnoLIa sT W muLBerrY sT W LaureL CanYon aVe JeFFerson sT LInDen sT WaLnuT sT n mason sT n hoWes sT n meLDrum sT n sherWooD s mason sT s hoWes sT s meLDrum sT W mYrTLe sT remInGTon sT s CoLLeGe aVe maTheWs sT e mounTaIn aVe e oak sT e oLIVe sT e maGnoLIa sT e muLBerrY sT e mYrTLe sT e LaureL WILLoW sT peTerson sT ShARED ALLEyS PEDESTRIAN ALLEyS ROADS MASON STREET COORIDOR STOPS DDA BOUNDARy LANDMARKS LANDMARK PROGRAM NATIONAL hISTORIC DISTRICT 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 1 e x i s t i n G A l l e y r . o . w . n e t w o r k 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 38 of 125 CherrY sT mapLe sT LaporTe aVe W mounTaIn aVe W oak sT W oLIVe sT W maGnoLIa sT W muLBerrY sT W LaureL CanYon aVe JeFFerson sT LInDen sT WaLnuT sT n mason sT n hoWes sT n meLDrum sT n sherWooD s mason sT s hoWes sT s meLDrum sT W mYrTLe sT remInGTon sT s CoLLeGe aVe maTheWs sT peTerson sT e mounTaIn aVe e oak sT e oLIVe sT e maGnoLIa sT e muLBerrY sT e mYrTLe sT e LaureL WILLoW sT Csu Csu / reTaIL DoWnToWn CommerCIaL DoWnToWn BusIness hIsTorIC oLD ToWn rIVer DIsTrICT norTh-WesT mIxeD use CIVIC DIsTrICT 0 0 0 10’ l e G e n D ROADS DDA BOUNDARy 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 1 l A n D u s e D e s i G n A t i o n s 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 39 of 125 0 0 0 10’ l e G e n D MAJOR ROADS DDA BOUNDARy PARKING VEhICLE ACCESS DUMPSTERS 50 38 17 8 132 14 136 14 0 2 10 4 74 10 137 22 42 8 68 37 36 10 mapLe sT LaporTe aVe W mounTaIn aVe W oak sT W oLIVe sT W maGnoLIa sT W muLBerrY sT W LaureL CanYon aVe JeFFerson sT LInDen sT WaLnuT sT n mason sT n hoWes sT n meLDrum sT n sherWooD s mason sT s hoWes sT s meLDrum sT W mYrTLe sT remInGTon sT s CoLLeGe aVe maTheWs sT peTerson sT e mounTaIn aVe e oak sT e oLIVe sT e maGnoLIa sT e muLBerrY sT e mYrTLe sT e LaureL s e C t i o n 3 Preferred Alley Network Analysis 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 1 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 41 of 125 P r e F e r r e D A l l e y n e t w o r k A n A l y s i s Prior to any design, the various alleys within the study area required analysis to determine a preferred network route and to establish the opportunities and constraints of each alley. The detailed analysis examined the following: • Analyzing pedestrian/bicycle linkage alternatives for possible north-south and east-west connections, primary and secondary routes. • Identifying assets, opportunities and challenges per alley. • Physical limitations - vehicular access, trash services and parking. • Public workshop to gather consensus on analysis results, input on design aesthetics and stakeholder input for individual alleys. l i n k A G e A n A l y s i s The first step in analyzing potential linkages in the alley network was to identify the major roads, key public destinations and future transit stops. Major roads include College Avenue and Mason Street, which are critical north-south routes in the downtown. The proposed Mason Corridor transit stops are also depicted for their effect on a future integrated system of pedestrian and bicycle routes. Destinations such as Oak Street Plaza, Old Town Square, and Library Park were identified. Future developments such as the amphitheater and community marketplace are proposed for downtown, but sites are not yet final at the time this report was prepared. The linkage assessment look at north-south alleyways within the DDA boundary that could be enhanced as part of the network connection from CSU to the River District. These alleys are identified in the Plan as Primary Connections. Additional alleys in the Old Town area that serve as primary east-west connections are also identified. As illustrated by the analysis, the major break in the north-south connection occurs at the intersection of College Avenue and Mulberry Street. The northeast, northwest and southwest corners of the intersection are occupied by full block developments without alleys. At these points the southern and northern alleys are disconnected and terminate at the street interface. The terminated alleys present the most challenging aspect for creating a connected system. There is a need for any users of the proposed network to navigate via College Avenue, Mason Street or Remington Street to reconnect with the projected north- south alley route. The interim solution, provided in the Plan, proposes “Streetscape Enhancements” that clearly identify a route for a person to follow when they reach the junction of the terminated alleys. Future development should be encouraged to recreate this north-south route and reconnect the alley network. Secondary connections were also analyzed for system linkage. These connections provide important links to side streets, key destinations or corridors. Some of the connections lie outside the DDA boundary, but serve as important parts in the overall network. The final piece in the network of integrated walkways are the east-west connections. In all instances, the east-west connections are existing streets. The east-west connections shown on existing streets are still critical connections for the integrated network. These routes enable all users to connect to main corridors, destinations and the north-south alleyway network. The culmination of all these elements comprise the “Preferred Alley Network” that is further analyzed in more detail and presented in the following section. 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 1 P r e F e r r e D A l l e y n e t w o r k A n A l y s i s 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 42 of 125 CherrY sT mapLe sT LaporTe aVe W oak sT W oLIVe sT W maGnoLIa sT W LaureL CanYon aVe JeFFerson sT LInDen sT n hoWes sT n meLDrum sT N ShERWOOD s hoWes sT s meLDrum sT W mYrTLe sT remInGTon sT maTheWs sT peTerson sT e oak sT e oLIVe sT e maGnoLIa sT e mYrTLe sT e LaureL WILLoW sT oak sT pLaZa oLD ToWn sQuare reFer To rIVer DIsTrICT sTraTeGIC pLan For FuTure ConneCTIons e mounTaIn aVe W mounTaIn aVe n mason sT s CoLLeGe aVe s mason sT e muLBerrY sT W muLBerrY sT WaLnuT sT Csu rIVer DIsTrICT 0 0 0 10’ l e G e n D MAJOR DESTINATIONS ROADS DDA BOUNDARy PUBLIC DESTINATIONS MASON STREET COORIDOR STOPS 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 17 P r e F e r r e D A l l e y n e t w o r k - D e s t i n A t i o n s 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 43 of 125 CherrY sT mapLe sT LaporTe aVe W oak sT W oLIVe sT W maGnoLIa sT W LaureL CanYon aVe JeFFerson sT LInDen sT n hoWes sT n meLDrum sT n sherWooD s hoWes sT s meLDrum sT W mYrTLe sT remInGTon sT maTheWs sT peTerson sT e oak sT e oLIVe sT e maGnoLIa sT e mYrTLe sT e LaureL WILLoW sT oak sT pLaZa reFer To rIVer DIsTrICT sTraTeGIC pLan For FuTure ConneCTIons e mounTaIn aVe W mounTaIn aVe n mason sT s CoLLeGe aVe s mason sT e muLBerrY sT W muLBerrY sT WaLnuT sT oLD ToWn sQuare Csu rIVer DIsTrICT 0 0 0 10’ l e G e n D MAJOR DESTINATIONS ROADS DDA BOUNDARy PUBLIC DESTINATIONS MASON STREET COORIDOR STOPS PRIMARy ALLEy CONNECTION 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 1 P r e F e r r e D A l l e y n e t w o r k - P r i M A r y A l l e y C o n n e C t i o n s CherrY sT mapLe sT LaporTe aVe W oak sT W oLIVe sT W maGnoLIa sT W LaureL CanYon aVe JeFFerson sT LInDen sT n hoWes sT n meLDrum sT n sherWooD s hoWes sT s meLDrum sT W mYrTLe sT remInGTon sT maTheWs sT peTerson sT e oak sT e oLIVe sT e maGnoLIa sT e mYrTLe sT e LaureL WILLoW sT oak sT pLaZa oLD ToWn sQuare reFer To rIVer DIsTrICT sTraTeGIC pLan For FuTure ConneCTIons e mounTaIn aVe W mounTaIn aVe n mason sT s CoLLeGe aVe s mason sT e muLBerrY W muLBerrY sT P r e F e r r e D A l l e y n e t w o r k - P o t e n t i A l r e D e V e l o P M e n t A r e A s WaLnuT sT Csu rIVer DIsTrICT MAJOR DESTINATIONS ROADS DDA BOUNDARy PUBLIC DESTINATIONS MASON STREET COORIDOR STOPS PRIMARy ALLEy CONNECTION FUTURE POSSIBLE CONNECTIONS POTENTIAL REDEVELOPMENT AREAS STREETSCAPE ENhANCEMENT 0 0 0 10’ CherrY sT mapLe sT LaporTe aVe W oak sT W oLIVe sT W maGnoLIa sT W LaureL CanYon aVe JeFFerson sT LInDen sT n hoWes sT n meLDrum sT n sherWooD s hoWes sT s meLDrum sT W mYrTLe sT remInGTon sT maTheWs sT peTerson sT e oak sT e oLIVe sT e maGnoLIa sT e mYrTLe sT e LaureL WILLoW sT oak sT pLaZa W mounTaIn aVe e muLBerrY sT W muLBerrY sT oLD ToWn sQuare P r e F e r r e D A l l e y n e t w o r k - s e C o n D A r y A l l e y C o n n e C t i o n s ConneCTIon To marTIneZ park ConneCTIon To pouDre rIVer park WaLnuT sT e mounTaIn aVe s mason sT n mason sT s CoLLeGe aVe Csu MAJOR DESTINATIONS ROADS DDA BOUNDARy PUBLIC DESTINATIONS MASON STREET COORIDOR STOPS PRIMARy ALLEy CONNECTION FUTURE POSSIBLE CONNECTIONS POTENTIAL REDEVELOPMENT AREAS STREETSCAPE ENhANCEMENT P r e F e r r e D A l l e y n e t w o r k - e A s t / w e s t C o n n e C t i o n s MAJOR DESTINATIONS ROADS DDA BOUNDARy PUBLIC DESTINATIONS MASON STREET COORIDOR STOPS PRIMARy ALLEy CONNECTION FUTURE POSSIBLE CONNECTIONS POTENTIAL REDEVELOPMENT AREAS STREETSCAPE ENhANCEMENT SECONDARy ALLEy CONNECTION EAST-WEST CONNECTION 0 0 0 10’ l e G e n D CherrY sT mapLe sT LaporTe aVe W oak sT W oLIVe sT W maGnoLIa sT W LaureL CanYon aVe JeFFerson sT LInDen sT n hoWes sT n meLDrum sT n sherWooD s hoWes sT s meLDrum sT W mYrTLe sT remInGTon sT maTheWs sT peTerson sT e oak sT e oLIVe sT e maGnoLIa sT e mYrTLe sT e LaureL WILLoW sT oak sT pLaZa W mounTaIn aVe e muLBerrY sT W muLBerrY sT oLD ToWn sQuare ConneCTIon To marTIneZ park ConneCTIon To pouDre rIVer i D e n t i F y i n G A s s e t s , o P P o r t u n i t i e s A n D C H A l l e n G e s The Preferred Alley Network plan was used as the basis to examine each alley for opportunities and challenges. As shown on the following page, alleys were organized into clusters and given an alphabetical label. Each label cluster was then analyzed for opportunities and challenges using criteria established by the consultant team and DDA staff. A l l e y s C o r e C A r D - P u B l i C w A l k t H r o u G H Interested stakeholders, including business owners and City staff were invited to participate in an alley walk-through that required a full day of field observation and analysis. Each participant was provided an alley scorecard to rate the assets, opportunities and challenges each alley contributes to the future network. At the completion of the walk-through scorecards were tallied to create an overall score for each alley. The results were mapped on the “Alley Scorecard Summary” and show the alleys with the most potential and greatest challenges for creating the future network. Most of the alleys that scored high for greatest assets and opportunities also scored equally as high for challenging conditions. l i s t o F A l l e y s B y r A n k e D s C o r e ( H i G H e s t t o l o w e s t s C o r e B y A s s e t s ) Alley Assets & Challenges Opportunities Score Score D .  A   J  . h .7 . F . . C . . K .1 . I .1 . G   B  . E .  114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  P r e F e r r e D A l l e y n e t w o r k A n A l y s i s 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 48 of 125 AREA A CRITERIA RANKING Contributing to retail/commercial business 4.75 Potential for redevelopment/infill 3.77 Connection to east/west attractions 3.78 Unique character 3.86 Shared street potential 3.48 Need for alternative waste disposal 4.21 Problematic vehicular access 3.65 AREA B CRITERIA RANKING Contributing to retail/commercial business 2.78 Potential for redevelopment/infill 4.73 Connection to east/west attractions 2.49 Unique character 1.65 Shared street potential 3.4 Need for alternative waste disposal 3.32 Problematic vehicular access 2.4 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.5 3.9 3.8 3.8 4.8 Need for alternative waste disposal Problematic vehicular access 3.7 4.2 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.4 1.7 2.5 4.7 2.8 Need for alternative waste disposal Problematic vehicular access 2.4 3.3 AVG. AREA A CRITERIA RANKING Contributing to retail/commercial business 4.75 Potential for redevelopment/infill 3.77 Connection to east/west attractions 3.78 Unique character 3.86 Shared street potential 3.48 Need for alternative waste disposal 4.21 Problematic vehicular access 3.65 AREA B CRITERIA RANKING Contributing to retail/commercial business 2.78 Potential for redevelopment/infill 4.73 Connection to east/west attractions 2.49 Unique character 1.65 Shared street potential 3.4 Need for alternative waste disposal 3.32 ALLEY Scorecard Avg. Assets/ Opportunities Assets Opportunities Scorecard Avg. Challenges Challenges A 4.0 • Strong interface w/future hotel and convention center • Connections to Old Town Square and Oak St. Plaza • Strong contribution to retail business • Strong urban vista to Old Town Square • Retail courtyards/plazas • Retail parking can be displaced into hotel on-grade parking • Partial closure for pedestrian only zones • Create alley accessed retail corridor • Activate alley entries at Oak St., Mountain Ave. and Olive St. • Showcase alley for sustainable strategies (dovetail w/hotel) 4.0 • Extensive trash service needs • Areas w/problematic vehicular access/narrow corridors • Drainage problems/ice in winter B 3.0 • Prime location for future redevelopment • Strong east/west connection to adjacent residential areas • Redevelopment can capitalize on hotel location and central downtown location • Immediate pedestrian corridor w/streetscape enhancements along Mulberry 2.9 • Functions as obstacle to continuous alley network to Downtown • Safeway property lacks alley access • Property between Magnolia/Olive lacks retail/ commercial C 3.2 • Extensive retail frontage to alley on east side • Wide corridor allows flexibility w/design • Low building heights create sunny environment • Potential for shared street (wide corridor) • Courtyards/patios within articulated building footprints along alley • On-alley business entries throughout • Parking consolidation and organization • Relatively simple trash/dumpster consolidation • Activate alley entries/destinations at intersections w/Laurel and Mulberry • Unique theme/character • Sustainable storm water strategies 2.5 • Residential focus on east side of alley • Overhead utility lines detract from visual quality D 4.3 • Extensive retail frontage to alley throughout • Existing in-alley structure provides interior destination • Wide corridor and extensive open areas create flexibility • Existing tree groves provide shade and create park-like setting • Strong connections w/Mason Corridor • Primary connection to CSU • Potential for shared street (wide corridor) • Potential for courtyards/patios and plazas to complement business uses • On-alley business entries/improvements throughout • Parking consolidation and organization • Relatively simple trash/dumpster consolidation • Activate alley entries/destinations at intersection w/Laurel • Opportunities for unique theme/character • Enhance connections to Mason Corridor and transit stop @Mulberry • Sustainable storm water strategies • Implement CIty parking cooperative program 3.0 • Residential focus at north end of alley 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 51 of 125 P u B l i C w o r k s H o P # 1 On April , 00, the first of two public meetings for downtown business owners and interested parties was held. The first workshop was held at Stonehouse Grill and was attended by approximately seventy people. The objectives for the workshops were: 1. Obtain consensus on overall direction, . Feedback from Stakeholders on aesthetics, and . Obtain Stakeholders’ input on recommendations for individual alleys. The workshop format was as follows: Present the existing conditions analysis and the proposed alley routes that would connect CSU to downtown and the River District. Discuss trash and recycling alternatives. Open questions and discussion. Visual preferencing exercise where participants voted with green or red dots on a variety of images. Discussion about visual preferencing results Small group breakout to discuss issues and opportunities of each alley. Presentation of results by breakout groups. • • • • • • • 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  P u B l i C w o r k s H o P # 1 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 52 of 125 s e C t i o n 4 Recommendations 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 7 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 53 of 125 i n t e n t i o n A l l y B l A n k 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 54 of 125 C r e A t i V e s o l u t i o n F o r t r A s H & r e C y C l i n G t r A s H P i C k - u P One of the primary concerns for any prospective improvements to alleys is the current trash and recycling conditions. While there are ample dumpsters for trash there is little recycling occurring or being provided for downtown businesses. Additionally, the quantity of trash dumpsters are problematic on many fronts for potential shared improved alleyways. Currently, a total of three trash collection companies regularly pick up trash in the alleys. The conditions that exist today reflect a typical arrangement of one trash dumpster per building and occasionally an additional dumpster for recycling. In several alleys, there may be buildings with more than one business housed within and a trash dumpster for each. In any case, the resulting effect is a trash and recycling schedule far more complicated than is necessary and with far more trash vessels than is necessary to satisfy demand. The situation is not conducive to the desired strategy to elevate the pedestrian and bicyclist experience in a ‘shared street’ context. The recommended strategy of this Plan is to reduce the number of trash/recycling dumpsters and collection of grey water through more efficient means. There are a number of ways to achieve this reduction: create one downtown trash district in which local trash companies compete for the service contract; or create trash/recycling cooperatives on the block or half-block scale with neighboring businesses soliciting services from a single trash hauler much like a hOA. t r A s H / r e C y C l i n G C o n s o l i D A t i o n A number of trash companies contributed to discussions regarding the best alternatives to centralize trash/recycling collection areas and issues of odor reduction in the alleys. After these meetings, analysis and discussion with stakeholders, the recommendation is to create central consolidated trash locations. This concept is contingent on selection of one trash company for each enhanced alley. The concept would create a key trash collection location within the alley or through partnerships between the DDA and owners on private land immediately adjacent. These areas would be enclosed and through DDA investment and potentially Art in Public Places, enlivened as an asset to the alley. The enclosure would house a shared trash dumpster and a recycling center for commingled recycling and space for specific recycling such as glass, and aluminum using specific focused recycling companies. The ideal commingled recycling vessel would be no larger than a three cubic yard compactor. The compactor could effectively accommodate almost nine cubic yards of recycling per pickup. Compactors have come under considerable criticism recently when used for wet trash collection. Excessive odors from wet trash created by downtown restaurants and infrequent collection schedules for compactors contribute heavily to odor concerns. This Plan recommends use of smaller compactors for recycling, and all other trash types placed in the dumpsters for daily collection. This concept also creates a recycling option for downtown business owners located on the enhanced alleys. To facilitate and encourage the use of the centralized trash locations by businesses, wheeled trash containers are recommended. By using fewer dumpsters for all non-recycled trash, the trash hauler can clean and replace dumpsters more frequently, thereby further reducing odor. The results of this recommendation include greater opportunity for recycling, cleaner, more organized alleys, reduced trash traffic, and reduced noise impact to upper floor building residents. • • 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  r e C o M M e n D A t i o n s - t r A s H A n D r e C y C l i n G 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 55 of 125 ” W ” h 3 CuBIC YarDs Alley A (between E. Oak St. and Olive St.) currently houses (1)  cubic yard dumpsters. If the alley were to be at full capacity for waste there would be 7 cubic yards of waste. t y P i C A l A l l e y D i A G r A M e x i s t i n G 3 C u B i C y A r D D u M P s t e r s Existing conditions= (1)  cubic yard receptacles N.T.S 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 0 t r A s H A n A l y s i s - e x i s t i n G A l l e y s C e n A r i o 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 56 of 125 ” h ” W 3 CuBIC YarD CompaCTor ” W ” h 3 CuBIC YarDs 90 GaL r e C y C l i n G C o M P A C t o r In this scenario the compactor will be enclosed and used for recycling only. The compactor should supplement the need for individual business to require their own receptacle. e x i s t i n G D u M P s t e r The existing dumpsters will be reduced in number due to the proposed daily pick up. For supplemental storage the dumpster could have an “arm” for lifting heavy 0 gal containers. All dumpsters will be surrounded by enclosures and strategically placed within each alley. 9 0 G A l . t r A s H r e C e P t A C l e Enclosures will be strategically placed to accommodate 0 gal disposal for all buildings. t y P i C A l A l l e y D i A G r A M C o M B i n A t i o n o F w A s t e r e C e P t A C l e s Existing conditions = (1)  cubic yard receptacles Proposed = (1)  cubic yard recycling compactor (1)  cubic yard receptacle Approx. (10) 0 Gal. Receptacles N.T.S 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 1 t r A s H A n A l y s i s - r e C o M M e n D e D s C e n A r i o 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 57 of 125 fort collins downtown alleys concept design report 4 18 o the alleys one of the easiest solutions would be a hanging pots and window planter boxes that could hold a scading plants. The following images are examples of this june 2004 18 Planters To bring vegetation into the alleys one of the easiest solutions would be a combination of vines, hanging pots and window planter boxes that could hold a variety of plants or cascading plants. The following images are examples of this element. june 2004 18 To bring vegetation into the alleys one of the easiest solutions would be a combination of vines, hanging pots and window planter boxes that could hold a variety of plants or cascading plants. The following images are examples of this element. P A V i n G P l A n t i n G A r t i n P u B l i C P l A C e s P A t i o s & s H A D e A l l e y r e C o M M e n D A t i o n s Refer to the Design Concepts and illustrations section (p -) for illustrative examples of the items listed below. primary alley network - The primary alley network consists of direct connections from CSU campus to Downtown and the River District by way of alleys located half-block east or west of College Avenue, and alleys that parallel Jefferson Street between Pine and Chestnut Streets. The alleys comprising the primary network all provide functional access to commercial, retail and residential uses in what this Plan refers to as the Downtown District (north of Mulberry Avenue), the CSU District (between Mulberry Avenue and Laurel Street), and Old Town District. The overall design recommendations for all alleys are listed below. Gateways and Entries - Alleys should be immediately recognizable as pedestrian environments at the entry on intersecting street. Where possible, mid-block street crossings that link alleys together should be clearly identified through common pedestrian crosswalk striping techniques. • Paving treatment - Pedestrian alley paving (pavers) should extend into intersecting sidewalks to the back of curb to clearly identify these spaces as a transition between existing sidewalks and the enhanced alley environment. • Wayfinding and I.D. - Identification and wayfinding signage should have a relatively subdued presence at alley gateways. The signage should be employed in the form of paving inserts to identify the alley, and directional arrows attached to light-posts to provide direction to businesses and other significant destinations. • Gateway Lighting - Gateway lighting should consist of overhead strand lighting overhead and light posts consistent with Downtown District alley lighting or CSU District alley lighting. • Planter Pots - Planters clearly identify alleys as pedestrian spaces by providing a human scale element. They should be arranged at building corners in clusters or groups to create a visual presence. Paving - Paving should consist of concrete pavers of a mottled color to minimize the effects of staining from vehicles and trash collection activities. The pavers should be distinct in size, color and texture to identify pedestrian travel zones and vehicular zones. Where plazas occur, paving should delineate the plaza boundaries and create a cohesive appearance and contribute to the aesthetic impression of the plaza. Varied paving patterns will also change the hierarchy of the alley from a predominant vehicular-use area to a pedestrian or bicycle use area. This technique will help create safe, shared environments. Lighting - Lighting should help provide a regimented structure in the alleys. Lighting fixtures should be spaced so that the alleys are not excessively illuminated, yet still safe. Full cut-off fixtures which limit light pollution by focusing light direction are recommended, and fixtures should be consistent to the CSU district or Downtown District. Pole mounted pedestrian light posts should provide the majority of lighting, with complementary accent lighting provided by wall sconces on private buildings. Planting - Planting should contribute to softening the appearance of the alley and providing color, texture, and human scale interest. Trees in plaza spaces should be placed in areas near seating to provide shade. year round planting should be considered. Winter planting could consist of adding pine boughs and dogwood twigs, etc. to planting areas. Drip irrigation should be a component of all planting areas. • Planter Pots and hanging Baskets - Planter pots are a unifying feature that add a human scale to the alleys and help identify alley entries. Planters should be used as a feature to provide structure and accents to the overall environment. Drip irrigation lines eliminate intensive hand-watering requirements.. • Storm Water Bio-swales - Bio-swales slow down and filter storm-water runoff from paved areas and roofs before june 2004 17 w o o n e r F s ( V e H i C l e / P e D e s t r i A n / B i C y C l e s H A r e D s P A C e s ) A l t e r n A t i V e e n e r G y - w i n D s e A t i n G A l l e y B u i l D i n G e n t r A n C e s used in the bio-swales to control drip irrigation which is necessary for plant establishment and periods of drought. Art - A variety of opportunities exists to integrate art into alleys. When selecting art for alleys, consideration of physical placement is important to prevent damage to the art, but also to avoid impediment to pedestrian or vehicular movement. Murals, embossed or sandblasted pavers, and sculpture are appropriate forms of art well suited for the enhanced alleys, as is the continuation of the Art in Public Places programs, such as the Transformer Art and Kids Pavers examples. Other art options should be considered so long as the basic criteria for physical placement is observed. Plazas - Plazas and courtyards should be considered at major nodes where ample space exists. Plazas are an important component of successful alley design and help activate the spaces and create destinations and environs for enjoyment. Plazas and courtyards can be flexible, shared public space or private in nature depending on conditions and needs of business/building owners. In most cases, the space available for plaza features exists on private land and will require working collaboratively with owners to understand their individual needs. Opportunities to create plaza features are outlined in the Concept Diagrams and Design Concepts and Illustrations sections. (p. -) Seating - Seating should be accommodated along alley corridors in the form of dispersed benches surrounded by planting or in plaza/courtyard settings. Moveable chairs and tables should be considered where possible, as well as seat-walls in public spaces. Building Entrances - On-alley building entrances are key components to activate the spaces and create a destination within the alleys. Entries should be visible from the corridors and compatible with the existing architectural themes within the alleys. Important considerations include lighting, doorway and entry treatments, signage and human scale features such as planting and awnings. Three scenarios for entries are illustrated at the end of this section and represent guidelines for alley building entries. Vehicular Access and Parking - In general, the alleys will continue to require vehicle access to facilitate parking, trash service, maintenance and deliveries. There are a few exceptions, such as where three or more intersections of public rights-of-way may allow for a segment to be designed as pedestrian only. Vehicular access is envisioned as one-way to eliminate situations where two vehicles must pass each other, thereby creating congestion, safety issues and potential damage to alley features. In general, the City of Fort Collins is in agreement with this proposal, but transportation studies must be undertaken on an alley-by-alley basis before final design and construction documents are produced. The goal for these alleys is to emulate the Dutch model of Woonerfs, where vehicles, pedestrians and bicycles share the spaces. The design of the spaces give priority to pedestrians and non-motorized vehicles, thereby ensuring vehicles operate at safe speeds. Energy Generation - In some alleys it is possible to apply strategies for alternative energy generation to power alley lighting. Several of the alleys closer to Colorado State University experience good solar access, and photo-voltaic panels can be used atop shelters to also generate power. In the downtown area where older buildings sit immediately adjacent to the alley, a wind tunnel effect has been observed. The wind velocity in these corridors may be substantial enough to harness energy and drive small generators that power accent lighting. 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 59 of 125 secondary alley network - The secondary Alley Network consists of alleys that provide the east/west connection to the Primary Alley Netork. In general, treatments should be consistent with the Primary Alleys, but less intensive in nature. The main design recommendations are broken out and listed below. Gateways - Gateways to Secondary Alleys should be clearly identified as pedestrian spaces with paving treatments extending out into the intersecting sidewalk, lighting, and planter pots. Paving - Pavers should be used in Secondary Alleys, which is consistent with the Primary Alley pavers. In most cases, sufficient room for pedestrian/vehicular paving distinction doesn’t exist in the Secondary Alley network. Lighting - Lighting should be consistent with Downtown or CSU District lighting standards. Planting - Planting in Secondary Alleys should consist primarily of planter pots/hanging baskets and storm-water bio- swales. Art - Art opportunities are similar to those in the Primary Alley Network. Building Entrances - On-alley building entrances should be encouraged within the Secondary Alley network under the same parameters as the Primary Alley Network. streetscape enhancement - Pedestrian walkways are an important component in creating a cohesive network of pathways connecting the network of alleys with major destinations including stops along the Mason Corridor, the Civic District, parking garages, and other significant destinations such as Library Park and the future amphitheater site. The typical streetscape environment should be redeveloped in conjunction with new infill or redevelopment projects. Other enhancements should include widening sidewalks that are too narrow to effectively allow movement of people from destinations such as Mason Corridor transit stops. These walkways should be designed to match existing streetscape standards and should address context as well as creating an effective link to the alley network. Walkways - Detached walks of ’ minimum should be created to allow two people to comfortably walk abreast. Wider walkways with grated trees that are a minimum of 1’ wide from back of curb to building edges are also encouraged. Paving treatments at intersections should include ADA ramps and facilitate effective street crossings. Planting - Planting should at a minimum include street trees in accordance with Streetscape Design Standards. Planter pots and other human scale elements should be included where possible. C o n C e P t D i A G r A M s A conceptual diagram study of ten priority alleys was prepared based upon results of the Preferred Alley analysis, Alley Scoring Summary, and public workshop. The recommendations for each alley are shown on the following plans in diagrammatic form. The design ideas are expressed as line types and shapes. Each plan has a summary of recommendations with common design principles and elements shown in the legend. 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 60 of 125 Tr Tr poTenTIaL paTIos/ CourTYarDs FuTure reDeVeLopmenT FuTure reDeVeLopmenT poTenTIaL paTIos/ CourTYarDs poTenTIaL reorGanIZeD parkInG sTaLLs FuTure reDeVeLopmenT poTenTIaL FuTure reDeVeLopmenT poTenTIaL paTIos/ CourTYarDs “saFe harBor” Zone In meDIan poTenTIaL FaCaDe aDDITIon/ enhanCemenT ImproVeD sTreeTsCape ImproVeD sTreeTsCape NOTE: These diagrams are purely conceptual are not intended to provide specific planning guidance for adjacent areas to Fort Collins alleys. s u M M A r y r e C o M M e n D A t i o n s / w o r k s H o P i n P u t • Shared trash/recycling stations • Address ice issues in winter • Lighting is critical • Reduce hiding spaces • Truck pull-outs • Underground utilities • Possible one way vehicle • Improve storm water conditions from rooftops 0 1 0 0’ l e G e n D DESIGNATED hISTORIC LANDMARK TRASh/RECyCLING WITh ENCLOSURE PEDESTRIAN ONLy zONE ShARED ALLEy zONE IMPROVED STREETSCAPE ShARED ALLEy ENTRy PLAzA PEDESTRIAN ENTRy PLAzA TRUCK DELIVERy PARKING Tr Tr poTenTIaL FuTure reDeVeLopmenT poTenTIaL FuTure reDeVeLopmenT poTenTIaL parkInG CooperaTIVe Zone poTenTIaL parkInG CooperaTIVe Zone possIBLe CourTYarDs anD on aLLeY aCCess possIBLe CourTYarD anD on aLLeY aCCess possIBLe peDesTrIan sIDeWaLk proVIDInG unIFormeD aCCess possIBLe peDesTrIan sIDeWaLk proVIDInG unIFormeD aCCess proTeCT CarrIaGe house Zone s u M M A r y r e C o M M e n D A t i o n s / w o r k s H o P i n P u t • Shared trash/recycling stations • Provide access to rear entries & outdoor plazas • Consolidate parking into one organized cooperative parking areas to increase quantity and provide organized areas and a unified retail precinct • Bike racks • Underground utilities 0 1 0 0’ l e G e n D DESIGNATED hISTORIC LANDMARK TRASh/RECyCLING WITh ENCLOSURE PEDESTRIAN ONLy zONE ShARED ALLEy zONE IMPROVED STREETSCAPE ShARED ALLEy ENTRy PLAzA PEDESTRIAN ENTRy PLAzA TRUCK DELIVERy PARKING PARKING COOPERATIVE Tr NOTE: These diagrams are purely conceptual are not intended to provide specific planning guidance for adjacent areas to Fort Collins alleys. CoLLeGe aVe. muLBerrY sT. LaureL remInGTon sT. 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  e A s t M u l B e r r y s t . t H r o u G H e A s t l A u r e l poTenTIaL InFILL opporTunITY possIBLe paTIo poTenTIaL parkInG CooperaTIVe possIBLe parkInG reorGanIZaTIon To ImproVe eFFICIenCY poTenTIaL To CreaTe sIDeWaLk ConneCTIon From CoLLeGe To aLLeY VIa exIsTInG shop FronTaGe possIBLe parkInG reorGanIZaTIon To ImproVe eFFICIenCY DeFIne parkInG area To InCrease eFFICIenCY anD reDuCe aLLeY InTerFaCe poTenTIaL To CreaTe sIDeWaLk To CreaTe unIFIeD reTaIL area possIBLe pLaZa W/FLexIBLe DInInG paTIo possIBLe paTIos/ Tr Tr s u M M A r y r e C o M M e n D A t i o n s / w o r k s H o P i n P u t • Shared trash/recycling stations • Consolidate parking into one organized cooperative parking areas to increase quantity and provide organized areas and a unified retail precinct. • Reorganize private parking - separate from alley connection to Mason St and College Ave. • Bike racks • Maintain/enhance storrmwater treatment • Underground utilities 0 1 0 0’ l e G e n D DESIGNATED hISTORIC LANDMARK TRASh/RECyCLING WITh ENCLOSURE PEDESTRIAN ONLy zONE ShARED ALLEy zONE IMPROVED STREETSCAPE ShARED ALLEy ENTRy PLAzA PEDESTRIAN ENTRy PLAzA TRUCK DELIVERy w e s t o A k s t . t H r o u G H w e s t M o u n t A i n A V e . oak sT. pLaZa Tr Tr Tr Tr ImproVeD sTreeTsCape s u M M A r y r e C o M M e n D A t i o n s / w o r k s H o P i n P u t • Shared trash/recycling stations • Artistic theme/organic • Entertainment space/plaza - outdoor movies, music, etc. • Bike racks • Consider timed deliveries • Possible one-way vehicle access possIBLe parkInG GaraGe WITh reTaIL aT GrounD -LeVeL possIBLe BuILDInG expansIon InFILL poTenTIaL W/reTaIL pLaZa W/ FLexIBLe DInInG paTIo poTenTIaL InFILL W/CaFe To aDDress oak sT. pLaZa possIBLe FuTure reDeVeLopmenT poTenTIaL FaCaDe TreaTmenT enhanCemenT poTenTIaL DInInG paTIo poTenTIaL paTIos/ CourTYarDs aDJaCenT To rIo GranDe poTenTIaL FaCaDe TreaTmenT 0 1 0 0’ l e G e n D DESIGNATED hISTORIC LANDMARK TRASh/RECyCLING WITh ENCLOSURE PEDESTRIAN ONLy zONE ShARED ALLEy zONE IMPROVED STREETSCAPE ShARED ALLEy ENTRy PLAzA PEDESTRIAN l A P o r t e A V e . t H r o u G H w e s t M o u n t A i n A V e Tr Tr CoLLeGe aVe. mounTaIn aVe mason sT LaporTe aVe s u M M A r y r e C o M M e n D A t i o n s / w o r k s H o P i n P u t • Shared trash/recycling stations • Address ice issues in winter • Lighting is critical • Reduce hiding spaces • Truck pull-outs • Possible one way vehicle • Possible alley infill poTenTIaL FuTure InFILL TenneY CourT - exIsTInG aLLeY ImproVemenT 0 1 0 0’ l e G e n D DESIGNATED hISTORIC LANDMARK TRASh/RECyCLING WITh ENCLOSURE PEDESTRIAN ONLy zONE ShARED ALLEy zONE IMPROVED STREETSCAPE ShARED ALLEy ENTRy PLAzA PEDESTRIAN ENTRy PLAzA TRUCK DELIVERy PARKING Tr NOTE: These diagrams are purely conceptual are not intended to provide specific planning guidance for adjacent areas to Fort Collins alleys. 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 65 of 125 l i n D e n A n D P i n e exIsTInG TrImBLe CT ImproVeD aLLeY poTenTIaL InFILL DeVeLopmenT DInInG paTIo poTenTIaL parkInG CooperaTIVe To CreaTe eFFICIenT parkInG area peDesTrIan Zone, sIDeWaLk/pLaZas/ CourTYarDs/BuILDInG enTranCes poTenTIaL InFILL DeVeLopmenT Tr s u M M A r y r e C o M M e n D A t i o n s / w o r k s H o P i n P u t • Shared trash/recycling stations • Code enforcement • Potential row houses infill • Address drainage - stormwater gardens • Business entrances from parking area • Potential cooperative parking scenario 0 1 0 0’ l e G e n D DESIGNATED hISTORIC LANDMARK TRASh/RECyCLING WITh ENCLOSURE PEDESTRIAN ONLy zONE ShARED ALLEy zONE IMPROVED STREETSCAPE ShARED ALLEy ENTRy PLAzA PEDESTRIAN ENTRy PLAzA TRUCK DELIVERy PARKING Tr NOTE: These diagrams are purely conceptual are not intended to provide specific planning guidance for adjacent areas to Fort Collins alleys. LInDen sT. CreaTe orGanIZeD parkInG area JeFFerson sT. pIne sT. possIBLe pLaZa/paTIo CreaTe orGanIZeD parkInG area CoLLeGe aVe. WaLnuT sT. Tr FuTure reDeVeLopmenT s u M M A r y r e C o M M e n D A t i o n s / w o r k s H o P i n P u t • Shared trash/recycling stations • Code enforcement • Pedestrian only connections from Walnut to Jefferson St • Plaza area behind Elliot’s shareD pLaZa paTIo For possIBLe CaFe 0 1 0 0’ l e G e n D DESIGNATED hISTORIC LANDMARK TRASh/RECyCLING WITh ENCLOSURE PEDESTRIAN ONLy zONE ShARED ALLEy zONE IMPROVED STREETSCAPE ShARED ALLEy ENTRy PLAzA PEDESTRIAN ENTRy PLAzA TRUCK DELIVERy PARKING Tr mounTaIn aVe. JeFFerson sT. LInDen sT. WaLnuT sT. NOTE: These diagrams are purely conceptual are not intended to provide specific planning guidance for adjacent areas to Fort Collins alleys. 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 1 w A l n u t A n D l i n D i n 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 67 of 125 i n t e n t i o n A l l y B l A n k 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 68 of 125 D e s i G n C o n C e P t s A n D i l l u s t r A t i o n s The following design concepts are intended to illustrate opportunities and character of individual alleys. The designs are conceptual in nature and will require additional input from building owners, City representatives and others before final design and construction documents are prepared. The concepts reflect input and feedback obtained at a public workshop from business/building owners, City representatives, and downtown residents. This workshop included work-sessions where breakout groups addressed individual conditions and preferences for design. Following the workshop, the concepts were refined by consultant and DDA staff, the DDA Board, and input from individual downtown business and building owners. Upon refinement of the designs, the consultant team and DDA staff hosted an open house to present the proposed concepts. On the following pages, alley concepts are presented with an annotated plan and eye-level illustration to depict overall character, scale and proposed materials. 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  D e s i G n C o n C e P t s A n D i l l u s t r A t i o n s 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 69 of 125 CENTRALIzED TRASh POINT - RECyCLABLE COMPACTOR AND DUMPSTERS. BUSINESSES PROVIDED WhEELED TRASh CONTAINER POTENTIAL REDEVELOPMENT PROPOSED hOTEL & PLAzA (DESIGN By hOTEL DESIGN TEAM) remInGTon sT oak sT PROPOSED INTERIM SURFACE PARKING POTENTIAL DINING PATIO POTENTIAL ShARED PATIO SEATING CROWN PUB PATIO WITh POTENTIAL ACCESS OFF ALLEy WIND TURBINE SCULPTURE AS FOCAL POINT OF CENTRAL PLAzA TO PROVIDE POWER ALLEy LIGhTING ShARED ALLEy WITh POTENTIAL ONE WAy VEhICULAR TRAFFIC, LARGE POTS & ChANGE IN PAVING hELP DEFINE BOUNDARy ALLEy ENTRANCE TREATMENT WITh OVERhEAD LIGhTING ThAT MATChES TRIMBLE COURT ALLEy ENTRANCE TREATMENT mounTaIn aVe ShARED ALLEy WITh POTENTIAL ONE WAy VEhICULAR ROUTE ShARED CENTRAL PLAzA SPACE- POTENTIAL TO CREATE FACADE IMPROVEMENTS, AND ACCESS TO EXISTING AND FUTURE DEVELOPMENT ONE WAy SAFER PEDESTRIAN ROUTE VIA DEFINED PAVEMENT, AND FLOWERING POTS POTENTIAL PATIO SPACE & UPGRADED ACCESS FOR TENANTS POTENTIAL RAIN GARDENS & BIOSWALES FOR STORM WATER ALONG ALLEy CoLLeGe aVe COLORED CONCRETE PAVERS AS LONG TERM DURABLE SOLUTION LAPORTE MOUNTAIN OAK COLLEGE MASON WALNUT LINDEN JEFFERSON INFILL OPPORTUNITIES ACTIVATE ALLEy WIND TURBINE - PROVIDES ENERGy AND ACTS AS KINETIC SCULPTURE OPPORTUNITIES FOR PRIVATE COURTyARDS ThAT CONTRIBUTE TO PUBLIC PLAzA STORMWATER BIOSWALES CONSISTENT LIGhT STANDARDS SEATWALL PLAzA EDGE 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  e A s t M o u n t A i n A V e . t H r o u G H e A s t o A k s t . 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 71 of 125 LAPORTE MOUNTAIN OAK COLLEGE MASON WALNUT LINDEN JEFFERSON MULBERRy MAGNOLIA OLIVE LAUREL MyRTLE REMINGTON CSU k e y P l A n CENTRALIzED TRASh POINT - RECyCLABLE COMPACTOR AND DUMPSTERS. BUSINESSES PROVIDED WhEELED TRASh CONTAINER CoLLeGe aVe oak sT oLIVe sT PROPOSED hOTEL & PLAzA (DESIGN By hOTEL DESIGN TEAM) - PARKING BENEATh PROPOSED COMMERCIAL (DESIGN By hOTEL DESIGN TEAM) - PARKING BENEATh POTENTIAL PATIO AND ENTRy OFF ALLEy FOR TENANTS AND CUSTOMERS POTENTIAL PATIO AND ENTRy OFF ALLEy FOR TENANTS AND CUSTOMERS IMPROVE CONNECTION TO COLLEGE AVE WITh POTS, LIGhTING, PAVEMENT AND POTENTIAL WALL MOUNTED SCULPTURE POTENTIAL CENTRAL PLAzA CONNECTING ThE PROPOSED hOTEL WITh COLLEGE AVE BUSINESSES - PATIO SPACE FOR FOOD ESTABLIShMENTS WIND TURBINE SCULPTURE TO POWER LIGhTING OF ALLEy POTENTIAL ShARED PARKING FOR IN/OUT TENANTS hOTEL PLAzA By hOTEL DESIGN TEAM POTENTIAL PATIO FOR EXISTING ESTABLIShMENT POTENTIAL FACADE IMPROVEMENT ShARED ALLEy WITh POTENTIAL ONE WAy VEhICULAR TRAFFIC, LARGE POTS & ChANGE IN PAVING hELP DEFINE BOUNDARy KINETIC SCULPTURE CONTRIBUTES TO FACADE TREATMENT OPPORTUNITIES FOR PATIO SEATING WIND TURBINE - PROVIDES ENERGy AND ACTS AS KINETIC SCULPTURE UPPER LEVEL PRIVATE PATIO PROPOSED hOTEL EXISTING ShADE TREES STORMWATER BIO-SWALE 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 7 e A s t o A k A V e . t H r o u G H e A s t o l i V e s t . 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 73 of 125 i n t e n t i o n A l l y B l A n k 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 74 of 125 e A s t M u l B e r r y s t . t H r o u G H e A s t M y r t l e CoLLeGe aVe muLBerrY sT mYrTLe sT ALLEy ENTRy TREATMENT (BOTh ENDS) WITh OVERhEAD LIGhTING GATEWAy - LIGhTING TO BE MIN 1’ hEIGhT FOR TRUCK CLEARANCE TWO WAy ShARED ALLEy WITh CONCRETE PAVER TREATMENT FOR LONG TERM DURABILITy. PEDESTRIAN SAFE zONE ALONG EDGE FLUSh PAVER WITh DIFFERENT COLOR BIO-SWALES & RAIN GARDENS FOR STORM WATER TREATMENT ALONG ALLEy EDGE POTENTIAL SOLAR PANEL ShELTER - POWER TO LIGhT ALLEy & PATIO LIGhTING POTENTIAL ShARED PLAzA & LAWN POTENTIAL ShARED PLAzA POTENTIAL COOPERATIVE PARKING AREA - CREATE ONE UNIFIED LOT WITh SIDEWALK ACCESS TO ALL BUSINESSES. NET GAIN OF 10 PARKING SPACES. ONE WAy ONE WAy TWO WAy CENTRALIzED TRASh POINT - RECyCLABLE COMPACTOR AND DUMPSTER. BUSINESSES PROVIDED WhEELED TRASh CONTAINER POTENTIAL RAIN GARDENS POTENTIAL ENhANCED SIDEWALK CONNECTIONS TO COLLEGE AVE POTENTIAL COOPERATIVE PARKING AREA - CREATE ONE UNIFIED LOT WITh SIDEWALK ACCESS TO ALL BUSINESSES. NET GAIN OF  PARKING SPACES. LAPORTE MOUNTAIN OAK COLLEGE MASON WALNUT LINDEN JEFFERSON MULBERRy MAGNOLIA OLIVE LAUREL MyRTLE REMINGTON CoLLeGe aVe LaureL sT ALLEy ENTRy TREATMENT (BOTh ENDS) WITh OVERhEAD LIGhTING GATEWAy - LIGhTING TO BE MIN 1’ hEIGhT FOR TRUCK CLEARANCE TWO WAy ShARED ALLEy WITh CONCRETE PAVER TREATMENT FOR LONG TERM DURABILITy. PEDESTRIAN SAFE zONE ALONG EDGE. BIO-SWALES & RAIN GARDENS FOR STORM WATER TREATMENT ALONG ALLEy EDGE POTENTIAL SOLAR PANEL ShELTER - OVER PATIO POWER TO POWER ALLEy & PATIO LIGhTING POTENTIAL PLAzA AREA POTENTIAL ShARED PATIO POTENTIAL COOPERATIVE PARKING AREA - CREATE ONE UNIFIED LOT WITh SIDEWALK ACCESS TO ALL BUSINESSES. NET GAIN OF  PARKING SPACES. ONE WAy TWO WAy CENTRALIzED TRASh POINT - RECyCLABLE COMPACTOR AND DUMPSTERS. BUSINESSES PROVIDED WhEELED TRASh CONTAINER POTENTIAL COOPERATIVE PARKING AREA - CREATE ONE UNIFIED LOT WITh SIDEWALK ACCESS TO ALL BUSINESSES. NET GAIN OF 7 PARKING SPACES. CENTRALIzED TRASh POINT - RECyCLABLE COMPACTOR AND DUMPSTERS. BUSINESSES PROVIDED WhEELED TRASh CONTAINER POTENTIAL ShARED PLAzA TWO WAy POTENTIAL SOLAR PANEL ShELTER - OVER PATIO POWER TO POWER ALLEy & PATIO LIGhTING POTENTIAL BIO-SWALES & RAIN GARDENS FOR STORM WATER TREATMENT ALONG ALLEy EDGE mYrTLe sT LAPORTE MOUNTAIN OAK COLLEGE MASON WALNUT LINDEN JEFFERSON MULBERRy CSU DISTRICT LIGhTING STANDARD STORMWATER BIO-SWALE COLLECTS RUN-OFF FROM PARKING WIDE CORRIDOR ALLOWS FLEXIBILITy IN EDGE TREATMENT SOLAR PANEL ShADE STRUCTURE PROVIDES ENERGy FOR ALLEy LIGhTING SCULPTURAL VINE TRELLIS AS FACADE TREATMENT OPPORTUNITy FOR SMALL LAWN AREAS EXISTING RESIDENTIAL GARAGES 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 1 e A s t M y r t l e s t . t H r o u G H e A s t l A u r e l 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 77 of 125 VIEW DIRECTION ALLEy ENTRy TREATMENT WITh OVERhEAD LIGhTING GATEWAy - LIGhTING TO BE MIN 1’ hEIGhT FOR TRUCK CLEARANCE BIO-SWALES & RAIN GARDENS FOR STORM WATER TREATMENT ALONG ALLEy EDGE POTENTIAL COOPERATIVE PARKING AREA - CREATE ONE UNIFIED LOT WITh SIDEWALK ACCESS TO ALL BUSINESSES. NET GAIN OF 1 PARKING SPACES. ONE WAy CENTRALIzED TRASh POINT - RECyCLABLE COMPACTOR AND DUMPSTERS. TWO WAy POTENTIAL SOLAR PANEL ShELTER -TO POWER ALLEy & PATIO LIGhTING IN GRASSED CENTRAL PLAzA SPACE i n s e t - C e n t r A l A r e A w i t H P o t e n t i A l i n F i l l D e V e l o P M e n t POTENTIAL COOPERATIVE PARKING AREA - CREATE ONE UNIFIED LOT WITh SIDEWALK ACCESS TO ALL BUSINESSES. NET GAIN OF 1 PARKING SPACES. FORMALIzE PARKING AREA POTENTIAL ADJACENT ShARED CONTEMPLATIVE GARDEN FORMALIzE PARKING AREA WITh SIDEWALKS POTENTIAL ShARED PATIOS AREA ADJACENT TO ALLEy POTENTIAL ShARED PATIO AREA TWO WAy ShARED ALLEy WITh CONCRETE PAVER TREATMENT FOR LONG TERM DURABILITy. POTENTIAL INFILL DEVELOPMENT POTENTIAL INFILL DEVELOPMENT POTENTIAL INFILL DEVELOPMENT CoLLeGe aVe mason sT LaureL sT mYrTLe sT ONE WAy CSU DISTRICT LIGhTING STANDARD SOLAR PANEL ShADE STRUCTURE PROVIDES ENERGy FOR ALLEy LIGhTING RE-ORGANIzED PARKING W/NET GAIN OF SPACES ShARED COURTyARD/PLAzA OPPORTUNITIES FOR SCULPTURAL SITE FEATURES - REFLECT INDEPENDENT SPIRIT FOUND IN ALLEy 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  w e s t l A u r e l t H r o u G H w e s t M y r t l e s t 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 79 of 125 mason sT CoLLeGe sT W oak sT W oLIVe sT ALLEy TREATMENT EXTEND TO MASON ST SIDEWALK PEDESTRIAN CONNECTION TO MASON STREET WITh RAIN GARDENS, FLOWERING POTS, AND ORNAMENTAL TREES POTENTIAL DINING PATIO WITh FEATURE ShADE STRUCTURE, PLANTED GARDEN WITh FENCE SEPARATOR ALLEy TREATMENT TO EXTEND INTO OAK ST SIDEWALK POTENTIAL ONE WAy ALLEy WITh DESIGNATED SAFE PEDESTRIAN zONE ON EDGE. POTENTIAL REDEVELOPMENT POTENTIAL REDEVELOPMENT POTENTIAL ShARED COMPACTOR POTENTIAL CENTRAL TRASh SERVICES POTENTIAL BIO-SWALE ALONG ALLEy EDGE ONE WAy LAPORTE MOUNTAIN OAK COLLEGE MASON WALNUT LINDEN JEFFERSON MULBERRy MAGNOLIA OLIVE LAUREL MyRTLE REMINGTON CSU k e y P l A n VIEW DIRECTION 0 10 0 0’ 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  w e s t o l i V e t H r o u G H w e s t o A k s t 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 80 of 125 OPPORTUNITIES FOR PRIVATE COURTyARDS TENSILE ShADE STRUCTURES CONSISTENT DOWNTOWN LIGhT STANDARDS PEDESTRIAN zONE SEPARATION POTENTIAL INFILL STORMWATER BIO-SWALE ORGANIzED PARKING EDGE TRASh COMPACTOR /RECyCLING/ DUMPSTER ENCLOSURE 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  w e s t o l i V e t H r o u G H w e s t o A k s t 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 81 of 125 ONE WAy POTENTIAL PARKING STRUCTURE WITh RETAIL ON BOTTOM EDGE, RESIDENTIAL OR OFFICES TOP FLOORS POTENTIAL INFILL DEVELOPMENT POTENTIAL INFILL DEVELOPMENT PEDESTRIAN ONLy zONE WITh CENTRAL PLAzA AREA • SCULPTURAL ShADE STRUCTURES • ShARED PATIOS SEATING • PUBLIC ART DISPLAy • RAIN GARDENS • LARGE FLOWERING POTS • POTENTIAL OFF ALLEy ACCESS TO BUSINESSES • WIND TURBINE SCULPTURE TO POWER LIGhTING • AREA FOR FESTIVALS, MARKETS, STALLS POTENTIAL RAIN GARDENS ALONG ALLEy AND BUILDING EDGE FOR STORM WATER COLLECTION CANOPy ENTRANCES POTENTIAL PATIO SPACE FOR BUSINESSES CENTRAL TRASh SERVICES - RECyCLABLE COMPACTOR - DUMPSTER SMALL PARKING AREA FOR BUSINESSES CENTRAL TRASh SERVICES • RECyCLABLE COMPACTOR • DUMPSTER mason sT mounTaIn aVe oak sT LAPORTE MOUNTAIN OAK COLLEGE MASON WALNUT LINDEN JEFFERSON MULBERRy MAGNOLIA OLIVE LAUREL MyRTLE REMINGTON CSU OPPORTUNITy FOR TENSILE ShADE STRUCTURES FESTIVALS/MARKETS POTENTIAL MIXED-USE PLAy SCULPTURE INFILL POTENTIAL PARKING STRUCTURE 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 7 w e s t o A k t H r o u G H w e s t M o u n t A i n A V e 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 83 of 125 ART WALK W/STORy- TELLING PLAy SCUPLTURES PARKING STRUCTURE W/ GROUND FLOOR RETAIL ShARED PLAzA POTENTIAL MIXED-USE INFILL 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  w e s t o A k t H r o u G H w e s t M o u n t A i n A V e 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 84 of 125 w e s t M o u n t A i n A V e t H r o u G H l A P o r t e A V e POTENTIAL PATIO WITh ALLEy ACCESS POTENTIAL REDEVELOPMENT WITh PATIOS ON MASON ST AND INTO ALLEy RAIN GARDENS ALONG EDGE OF PARKING DECK CONTINUE TENNEy COURT CONCRETE PAVEMENT TREATMENT ALONG ALLEy CENTRAL TRASh FACILITy WITh RECyCLABLE COMPACTOR POTENTIAL INFILL POTENTIAL INFILL DEVELOPMENT WITh ACCESS FROM ALLEy PATIOS POTENTIAL PATIO SPACE FOR OPERA GALLERIA TENANTS & CUSTOMERS POTENTIAL DINING PATIO AT CORNER OF ALLEy ENTRANCE POTENTIAL AREA FOR MARKET OR VENDORS DURING FESTIVALS OR OThER EVENTS CENTRAL TRASh FACILITy WITh RECyCLABLE COMPACTOR ONE WAy mason sT mounTaIn aVe LaporTe aVe EXISTING PARKING GARAGE LAPORTE MOUNTAIN OAK COLLEGE MASON WALNUT LINDEN JEFFERSON MULBERRy MAGNOLIA OLIVE LAUREL MyRTLE REMINGTON CSU k e y P l A n 0 10 0 0’ 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 85 of 125 PEDESTRIAN ONLy ALLEy WITh OVERhEAD LIGhTING AND FLOWERING POTS POTENTIAL FORMALIzE PARKING AREA AND ENhANCE ACCESS POTENTIAL BIO-SWALES POTENTIAL BACK PATIO AND ENTRy ENhANCEMENTS TO BUSINESSES POTENTIAL LARGER DINING PATIO WITh FORMAL ENTRy & ACCESS POTENTIAL FORMALIzED PARKING WITh RAIN GARDENS ADJACENT & SIDEWALK CENTRALIzED TRASh FACILITy CENTRALIzED TRASh FACILITy POTENTIAL CO-OPERATIVE PARKING AREA WITh IMPROVED ACCESS TO ADJACENT BUSINESSES VIA SIDEWALKS. PARKING AREA TO hAVE BIO-SWALES TO CAPTURE STORM WATER RUN-OFF. NET PARKING GAIN 0 SPACES BIOSWALE BIOSWALE POTENTIAL PATIO ShARED ONE WAy ALLEy WITh SAFE PEDESTRIAN zONE ALONG ONE EDGE. COLORED CONCRETE PAVERS FOR LONG TERM DURABILITy PEDESTRIAN ONLy ALLEy WITh OVERhEAD LIGhTING AND FLOWERING POTS POTENTIAL PATIOS BEhIND EXISTING BUSINESSES ONE WAy POTENTIAL INFILL DEVELOPMENT WITh PARKING BENEATh o P t i o n 2 - P o t e n t i A l o n A l l e y i n F i l l D e V e l o P M e n t o P t i o n 3 - C o - o P P A r k i n G w i t H e x i s t i n G o n A l l e y s t r u C t u r e r e t A i n e D EXISTING ON ALLEy STRUCTURE LInDen sT pIne sT JeFFerson sT 0 10 0 0’ LAPORTE MOUNTAIN OAK COLLEGE MASON POTENTIAL RESIDENTIAL INFILL PEDESTRIAN zONE ART IN PUBLIC PLACES PAVERS TELL hISTORy OF ALLEy STRING LIGhTING VINE TRELLIS AS FACADE TREATMENT ATTAChED MURALS AS FACADE TREATMENT EXISTING PAINTED TRANSFORMER CABINET 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 1 P i n e s t t H r o u G H l i n D e n s t 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 87 of 125 ONE WAy PEDESTRIAN ONLy ALLEy WITh OVERhEAD LIGhTING AND FLOWERING POTS POTENTIAL FORMALIzE PARKING AREA POTENTIAL FORMALIzED PARKING & ADJACENT ENhANCEMENTS CENTRALIzED TRASh FACILITy POTENTIAL PATIO ShARED ONE WAy ALLEy WITh SAFE PEDESTRIAN zONE ALONG ONE EDGE. COLORED CONCRETE PAVERS FOR LONG TERM DURABILITy POTENTIAL PATIOS FUTURE REDEVELOPMENT POTENTIAL CENTRAL PLAzA SPACE WITh LARGE ShARED PATIO AREA, RAIN GARDENS AND SCULPTURAL WIND TURBINE TO PROVIDE LOCAL POWER POTENTIAL ON ALLEy ADAPTIVE REUSE WITh PATIO ALLEy ENTRANCE WITh OVERhEAD LIGhTING AND FLOWERING POTS LInDen sT ChesTnuT sT WaLnuT sT JeFFerson sT VIEW DIRECTION LAPORTE MOUNTAIN OAK COLLEGE MASON WALNUT LINDEN JEFFERSON MULBERRy MAGNOLIA OLIVE LAUREL MyRTLE REMINGTON CSU k e y P l A n 0 10 0 0’ 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  DIRECTIONAL/WAyFINDING SIGNAGE TyPICAL AT ALLEy ENTRIES ART IN PUBLIC PLACES PAVERS TELL hISTORy OF ALLEy STRING LIGhTING STORMWATER BIO-SWALE 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  l i n D e n s t t H r o u G H C H e s t n u t s t 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 89 of 125 NEW FACADE LIGhTING NEW FABRIC AWNINGS APPROPRIATE TO SCALE AND DETAILING OF EXISTING DOORS AND WINDOWS NEW ALLEy SIGNAGE NEW RETRACTABLE FABRIC AWNINGS AT ENhANCED ENTRIES ENhANCE ALLEy ENTRANCES WITh NEW DOORS AND WINDOWS FLOWER POTS TO ENLIVEN ALLEy RETAIN hISTORIC CORNICE AND WINDOW hOOD DETAILS RETAIN hISTORIC BRICK FACADES RETAIN hISTORIC UPPER LEVEL WINDOWS AND DOORS ENCOURAGE NEW RAILING DESIGNS TO COMPLEMENT hISTORIC DETAILING ADD NEW WINDOWS WhERE APPROPRIATE AND COMPLEMENT hISTORIC DETAILING 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  A l l e y B u i l D i n G e n t r i e s e x A M P l e 1 - H i s t o r i C B u i l D i n G 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 90 of 125 RETAIN hISTORIC CORNICE AND WINDOW hEADER DETAILS NEW FACADE LIGhTING ADD NEW WINDOWS WhERE APPROPRIATE ENhANCE ALLEy AMBIANCE WITh LANDSCAPE MATERIALS NEW FACADE LIGhTING NEW ALLEy SIGNAGE NEW RETRACTABLE FABRIC AWNINGS NEW COURTyARD ENTRy ELEMENT OR GATE CREATE NEW REAR COURTyARD OR FORECOURT WITh DESIGN ELEMENTS ThAT COMPLIMENT ThE ORIGINAL ENhANCE ALLEy ENTRANCES WITh NEW OR ENLARGED DOORS AND WINDOWS NEW FACADE LIGhTING NEW MASONRy SCREEN WALLS TO SCREEN UTILITy BOXES (WhERE POSSIBLE) RETAIN EXISTING hISTORIC TRANSOM WINDOWS AND GLAzING CONTEMPORARy STEEL CANOPy WITh SIGNAGE AS APPROPRIATE TO FACADE DESIGN ADD NEW WINDOWS WhERE APPROPRIATE NEW MASONRy PLANTER TO BALANCE UTILITy SCREEN WALL 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  e x A M P l e 2 - s i n G l e s t o r y B u i l D i n G w i t H C o u r t y A r D A l l e y B u i l D i n G e n t r i e s e x A M P l e 3 - o F F A l l e y e n t r A n C e - r e t A i l 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 91 of 125 i n t e n t i o n A l l y B l A n k 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 92 of 125 s e C t i o n 5 Cost Estimates 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 7 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 93 of 125 C o s t e s t i M A t e s The following pages provide order of magnitude cost estimates for the top ten proposed alley right-of-way. Many of the design concepts previously shown demonstrate potential upgrades and improvements outside of the right- of-way on private property. These costs are not included in the following estimates. Costs for improvements in privately owned areas would need to be assessed on a case-by-case basis and in collaboration with interested building owners. The cost estimates are from the conceptual plans and include twenty-five percent contingency, and as each alley gets developed these costs will be refined as more detail emerges through the final construction design and bidding process. ALLEY R.O.W. TOTALS SECTION A (Mountain Ave. through Oak St.) TOTAL SECTION A (Oak Ave. through Olive St.) TOTAL SECTION C (E. Myrtle St. through E. Laurel St.) TOTAL SECTION C (Mulberry St. through Myrtle St.) TOTAL SECTION D (W. Laurel St. through W. Myrtle St.) TOTAL SECTION G (W. Olive St. through W. Oak St.) TOTAL SECTION H (W. Oak St. through W. Mountain Ave.) TOTAL SECTION I (W. Mountain Ave. through LaPorte St.) TOTAL SECTION J (Pine St. through Linden St.) TOTAL SECTION K (Linden St. through Chestnut St.) TOTAL ALLEY R.O.W. GRAND TOTAL SQUARE FOOT COSTS ALLEY SECTION SECTION A (Mountain Ave. through Oak St.) TOTAL SECTION A (Oak Ave. through Olive St.) TOTAL SECTION C (E. Myrtle St. through E. Laurel St.) TOTAL SECTION C (Mulberry St. through Myrtle St.) TOTAL SECTION D (W. Laurel St. through W. Myrtle St.) TOTAL SECTION G (W. Olive St. through W. Oak St.) TOTAL SECTION H (W. Oak St. through W. Mountain Ave.) TOTAL SECTION I (W. Mountain Ave. through LaPorte St.) TOTAL SECTION J (Pine St. through Linden St.) TOTAL SECTION K (Linden St. through Chestnut St.) TOTAL $888,898.90 $651,247.29 $709,537.50 $501,050.00 $1,269,991.85 $586,120.38 SECTION H (W. Oak St. through W. Mountain Ave.) TOTAL $840,379.53 SECTION I (W. Mountain Ave. through LaPorte St.) TOTAL $661,083.80 $725,009.48 $780,384.88 $7,613,703.59 TOTAL S.F. COST/S.F. 18,775 $47.34 13,930 $46.75 20,430 $34.73 13,130 $38.16 44,455 $28.57 11,110 $52.76 SECTION H (W. Oak St. through W. Mountain Ave.) TOTAL 25,195 $33.36 SECTION I (W. Mountain Ave. through LaPorte St.) TOTAL 17,985 $36.76 16,705 $43.40 20,450 $38.16 FORT COLLINS DOWNTOWN ALLEYS R.O.W. MASTER PLAN ESTIMATE OF PROBABLE COSTS Plan Date: September 3, 2008 Prepared by: Russell + Mills Studios R.O.W. Only ITEM UNIT UNIT FORT COLLINS DOWNTOWN ALLEYS R.O.W. MASTER PLAN ESTIMATE OF PROBABLE COSTS Plan Date: September 3, 2008 Prepared by: Russell + Mills Studios R.O.W. Only ITEM UNIT UNIT COST QTY. EXTENDED COST NOTES SECTION A (Oak Ave. through Olive St.) CONSTRUCTION Mobilization ALLOW $5,000.00 1 $5,000.00 Inlets, Catch Basins & Connecting to Storm ALLOW $20,000.00 1 $20,000.00 CATEGORY SUBTOTAL $25,000.00 DEMOLITION Concrete and Asphalt S.F. $2.00 13,200 $26,400.00 CATEGORY SUBTOTAL $26,400.00 SITE WORK Concrete Edge L.F. $10.00 70 $700.00 6” width against all existing building edges Unit Pavers on Concrete Base S.F. $16.00 13,200 $211,200.00 CATEGORY SUBTOTAL $211,900.00 PLANTING Soil Prep - Compost and fertilizer as required S.F. $0.05 $0.00 1.5” Ornamental Tree EA. $350.00 $0.00 Annual Plantings for Planter Pots - Large EA. $118.35 11 $1,301.85 Annual Plantings for Planter Pots - Small EA. $88.10 3 $264.30 Rain Gardens S.F. $7.40 730 $5,402.00 shrubs, perennials, mulch CATEGORY SUBTOTAL $6,968.15 SITE LIGHTING AND ELECTRICAL Undergrounding Electrical ALLOW $100,000.00 1 $100,000.00 Electrical Distribution ALLOW $5,000.00 1 $5,000.00 Transformer ALLOW $30,000.00 1 $30,000.00 Light Post EA. $6,000.00 11 $66,000.00 Overhead Strand Lighting L.F. $35.30 $0.00 CATEGORY SUBTOTAL $201,000.00 FURNISHINGS AND ARCHITECTURE Wind Turbine Sculpture EA. $15,000.00 1 $15,000.00 Includes Installation Planter Pots - Large EA. $1,554.20 11 $17,096.20 Planter Pots - Small EA. $1,201.20 3 $3,603.60 Trash Receptacle EA. $1,250.00 3 $3,750.00 6’ Bench EA. $1,500.00 5 $7,500.00 Surface mount Trash and Recycling Compactor Enclosure EA. $15,000.00 $0.00 CATEGORY SUBTOTAL $46,949.80 IRRIGATION Planter Pots EA. $91.67 14 $1,283.38 Netafim Dripline S.F. $2.05 730 $1,496.50 CATEGORY SUBTOTAL $2,779.88 SECTION A (Oak Ave. through Olive St.) SUBTOTAL $520,997.83 25% Master Plan Contingency $130,249.46 SECTION A (Oak Ave. through Olive St.) TOTAL $651,247.29 FORT COLLINS DOWNTOWN ALLEYS R.O.W. MASTER PLAN ESTIMATE OF PROBABLE COSTS Plan Date: September 3, 2008 Prepared by: Russell + Mills Studios R.O.W. Only ITEM UNIT UNIT COST QTY. EXTENDED COST FORT COLLINS DOWNTOWN ALLEYS R.O.W. MASTER PLAN ESTIMATE OF PROBABLE COSTS Plan Date: September 3, 2008 Prepared by: Russell + Mills Studios R.O.W. Only ITEM UNIT UNIT COST QTY. EXTENDED COST NOTES SECTION C (Mulberry St. through Myrtle St.) CONSTRUCTION Mobilization ALLOW $5,000.00 1 $5,000.00 Inlets, Catch Basins & Connecting to Storm ALLOW $20,000.00 1 $20,000.00 CATEGORY SUBTOTAL $5,000.00 DEMOLITION Concrete and Asphalt S.F. $2.00 13,130 $26,260.00 CATEGORY SUBTOTAL $26,260.00 SITE WORK Concrete Edge L.F. $10.00 100 $1,000.00 6” width against all existing building edges Unit Pavers on Concrete Base S.F. $16.00 13,130 $210,080.00 CATEGORY SUBTOTAL $211,080.00 PLANTING Soil Prep - Compost and fertilizer as required S.F. $0.05 $0.00 1.5” Ornamental Tree EA. $350.00 $0.00 Shrub/Perennial Beds S.F. $7.00 $0.00 shrubs, perennials, mulch Annual Plantings for Planter Pots - Large EA. $118.35 $0.00 Annual Plantings for Planter Pots - Small EA. $88.10 $0.00 Rain Gardens S.F. $7.40 $0.00 CATEGORY SUBTOTAL $0.00 SITE LIGHTING AND ELECTRICAL Undergrounding Electrical ALLOW $100,000.00 1 $100,000.00 Electrical Distribution ALLOW $5,000.00 1 $5,000.00 Transformer ALLOW $30,000.00 1 $30,000.00 Light Post EA. $6,000.00 $0.00 Overhead Strand Lighting L.F. $35.30 $0.00 CATEGORY SUBTOTAL $135,000.00 FURNISHINGS AND ARCHITECTURE Wind Turbine Sculpture EA. $15,000.00 $0.00 Includes Installation Planter Pots - Large EA. $1,554.20 $0.00 Planter Pots - Small EA. $1,201.20 $0.00 Trash Receptacle EA. $1,250.00 6 $7,500.00 6’ Bench EA. $1,500.00 4 $6,000.00 Surface mount Trash and Recycling Compactor Enclosure EA. $15,000.00 $0.00 CATEGORY SUBTOTAL $13,500.00 IRRIGATION Planter Pots EA. $91.67 $0.00 See architectural estimate for details Netafim Dripline S.F. $2.05 $0.00 CATEGORY SUBTOTAL $0.00 SECTION C (Mulberry St. through Myrtle St.) SUBTOTAL $400,840.00 25% Master Plan Contingency $100,210.00 SECTION C (Mulberry St. through Myrtle St.) TOTAL $501,050.00 FORT COLLINS DOWNTOWN ALLEYS R.O.W. MASTER PLAN ESTIMATE OF PROBABLE COSTS Plan Date: September 3, 2008 Prepared by: Russell + Mills Studios R.O.W. Only ITEM UNIT UNIT COST QTY. EXTENDED FORT COLLINS DOWNTOWN ALLEYS R.O.W. MASTER PLAN ESTIMATE OF PROBABLE COSTS Plan Date: September 3, 2008 Prepared by: Russell + Mills Studios R.O.W. Only ITEM UNIT UNIT COST QTY. EXTENDED COST NOTES SECTION G (W. Olive St. through W. Oak St.) CONSTRUCTION Mobilization ALLOW $5,000.00 1 $5,000.00 Inlets, Catch Basins & Connecting to Storm ALLOW $20,000.00 1 $20,000.00 CATEGORY SUBTOTAL $25,000.00 DEMOLITION Concrete and Asphalt S.F. $2.00 10,545 $21,090.00 CATEGORY SUBTOTAL $21,090.00 SITE WORK Concrete Edge L.F. $10.00 240 $2,400.00 6” width against all existing building edges Unit Pavers on Concrete Base S.F. $16.00 10,545 $168,720.00 CATEGORY SUBTOTAL $171,120.00 PLANTING Soil Prep - Compost and fertilizer as required S.F. $0.05 565 $28.25 1.5” Ornamental Tree EA. $350.00 $0.00 Annual Plantings for Planter Pots - Large EA. $118.35 40 $4,734.00 Annual Plantings for Planter Pots - Small EA. $88.10 $0.00 Rain Gardens S.F. $7.40 565 $4,181.00 shrubs, perennials, mulch CATEGORY SUBTOTAL $8,943.25 SITE LIGHTING AND ELECTRICAL Undergrounding Electrical ALLOW $100,000.00 1 $100,000.00 Electrical Distribution ALLOW $5,000.00 1 $5,000.00 Transformer ALLOW $30,000.00 1 $30,000.00 Light Post EA. $6,000.00 5 $30,000.00 Overhead Strand Lighting L.F. $35.30 $0.00 CATEGORY SUBTOTAL $165,000.00 FURNISHINGS AND ARCHITECTURE Wind Turbine Sculpture EA. $15,000.00 $0.00 Includes Installation Planter Pots - Large EA. $1,554.20 40 $62,168.00 Planter Pots - Small EA. $1,201.20 $0.00 Trash Receptacle EA. $1,250.00 5 $6,250.00 6’ Bench EA. $1,500.00 3 $4,500.00 Surface mount Trash and Recycling Compactor Enclosure EA. $15,000.00 $0.00 CATEGORY SUBTOTAL $72,918.00 IRRIGATION Planter Pots EA. $91.67 40 $3,666.80 Netafim Dripline S.F. $2.05 565 $1,158.25 CATEGORY SUBTOTAL $4,825.05 SECTION G (W. Olive St. through W. Oak St.) SUBTOTAL $468,896.30 25% Master Plan Contingency $117,224.08 SECTION G (W. Olive St. through W. Oak St.) TOTAL $586,120.38 FORT COLLINS DOWNTOWN ALLEYS R.O.W. MASTER PLAN ESTIMATE OF PROBABLE COSTS Plan Date: September 3, 2008 Prepared by: Russell + Mills Studios R.O.W. Only ITEM UNIT UNIT COST QTY. EXTENDED COST FORT COLLINS DOWNTOWN ALLEYS R.O.W. MASTER PLAN ESTIMATE OF PROBABLE COSTS Plan Date: September 3, 2008 Prepared by: Russell + Mills Studios R.O.W. Only ITEM UNIT UNIT COST QTY. EXTENDED COST NOTES SECTION I (W. Mountain Ave. through Laporte Ave.) CONSTRUCTION Mobilization ALLOW $5,000.00 1 $5,000.00 Inlets, Catch Basins & Connecting to Storm ALLOW $20,000.00 1 $20,000.00 CATEGORY SUBTOTAL $25,000.00 DEMOLITION Concrete and Asphalt S.F. $2.00 16,960 $33,920.00 CATEGORY SUBTOTAL $33,920.00 SITE WORK Concrete Edge L.F. $10.00 700 $7,000.00 6” width against all existing building edges Unit Pavers on Concrete Base S.F. $16.00 16,960 $271,360.00 CATEGORY SUBTOTAL $278,360.00 PLANTING Soil Prep - Compost and fertilizer as required S.F. $0.05 1,025 $51.25 1.5” Ornamental Tree EA. $350.00 $0.00 Annual Plantings for Planter Pots - Large EA. $118.35 7 $828.45 Annual Plantings for Planter Pots - Small EA. $88.10 $0.00 Rain Gardens S.F. $7.40 1,025 $7,585.00 shrubs, perennials, mulch CATEGORY SUBTOTAL $8,464.70 SITE LIGHTING AND ELECTRICAL Undergrounding Electrical ALLOW $100,000.00 1 $100,000.00 Electrical Distribution ALLOW $5,000.00 1 $5,000.00 Transformer ALLOW $30,000.00 1 $30,000.00 Light Post EA. $6,000.00 $0.00 Overhead Strand Lighting L.F. $35.30 $0.00 CATEGORY SUBTOTAL $135,000.00 FURNISHINGS AND ARCHITECTURE Wind Turbine Sculpture EA. $15,000.00 $0.00 Includes Installation Planter Pots - Large EA. $1,554.20 7 $10,879.40 Planter Pots - Small EA. $1,201.20 $0.00 Trash Receptacle EA. $1,250.00 6 $7,500.00 6’ Bench EA. $1,500.00 8 $12,000.00 Surface mount Removable Bollard EA. $1,500.00 $0.00 Trash and Recycling Compactor Enclosure EA. $15,000.00 1 $15,000.00 CATEGORY SUBTOTAL $45,379.40 IRRIGATION Planter Pots EA. $91.67 7 $641.69 Netafim Dripline S.F. $2.05 1,025 $2,101.25 CATEGORY SUBTOTAL $2,742.94 SECTION I (W. Moutain Ave. through LaPorte St.) SUBTOTAL $528,867.04 25% Master Plan Contingency $132,216.76 SECTION I (W. Mountain Ave. through LaPorte St.) TOTAL $661,083.80 FORT COLLINS DOWNTOWN ALLEYS R.O.W. MASTER PLAN ESTIMATE OF PROBABLE COSTS Plan Date: September 3, 2008 Prepared by: Russell + Mills Studios R.O.W. Only ITEM UNIT UNIT COST QTY. EXTENDED FORT COLLINS DOWNTOWN ALLEYS R.O.W. MASTER PLAN ESTIMATE OF PROBABLE COSTS Plan Date: September 3, 2008 Prepared by: Russell + Mills Studios R.O.W. Only ITEM UNIT UNIT COST QTY. EXTENDED COST NOTES SECTION K (Linden St. through Chestnut St.) CONSTRUCTION Mobilization ALLOW $5,000.00 1 $5,000.00 Inlets, Catch Basins & Connecting to Storm ALLOW $20,000.00 1 $20,000.00 CATEGORY SUBTOTAL $25,000.00 DEMOLITION Concrete and Asphalt S.F. $2.00 20,010 $40,020.00 CATEGORY SUBTOTAL $40,020.00 SITE WORK Concrete Edge L.F. $10.00 250 $2,500.00 6” width against all existing building edges Unit Pavers on Concrete Base S.F. $16.00 20,010 $320,160.00 CATEGORY SUBTOTAL $322,660.00 PLANTING Soil Prep - Compost and fertilizer as required S.F. $0.05 440 $22.00 1.5” Ornamental Tree EA. $350.00 $0.00 Annual Plantings for Planter Pots - Large EA. $118.35 $0.00 Annual Plantings for Planter Pots - Small EA. $88.10 20 $1,762.00 Rain Gardens S.F. $7.40 440 $3,256.00 shrubs, perennials, mulch CATEGORY SUBTOTAL $5,040.00 SITE LIGHTING AND ELECTRICAL Undergrounding Electrical ALLOW $100,000.00 1 $100,000.00 Electrical Distribution ALLOW $5,000.00 1 $5,000.00 Transformer ALLOW $30,000.00 1 $30,000.00 Light Post EA. $6,000.00 $0.00 Overhead Strand Lighting L.F. $35.30 845 $29,828.50 CATEGORY SUBTOTAL $164,828.50 FURNISHINGS AND ARCHITECTURE Wind Turbine Sculpture EA. $15,000.00 $0.00 Includes Installation Planter Pots - Large EA. $1,554.20 $0.00 Planter Pots - Small EA. $1,201.20 20 $24,024.00 Trash Receptacle EA. $1,250.00 8 $10,000.00 6’ Bench EA. $1,500.00 10 $15,000.00 Surface mount Removable Bollard EA. $1,500.00 $0.00 Trash and Recycling Compactor Enclosure EA. $15,000.00 1 $15,000.00 CATEGORY SUBTOTAL $64,024.00 IRRIGATION Planter Pots EA. $91.67 20 $1,833.40 Netafim Dripline S.F. $2.05 440 $902.00 CATEGORY SUBTOTAL $2,735.40 SECTION K (Linden St. through Chestnut St.) SUBTOTAL $624,307.90 25% Master Plan Contingency $156,076.98 SECTION K (Linden St. through Chestnut St.) TOTAL $780,384.88 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 7 C o s t e s t i M A t e s 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 99 of 125 k e y i M P l e M e n t A t i o n s t e P s Key Implementation Steps DDA DDA Partners (City) Building/Business Owners Pursue coordinated development of alley construction drawings. • Analyze proposed one-way alley conversions for regulatory compliance and functionality. • • Explore revision to City signage code to address future needs for alley store front signage. • • Develop framework for joint solicitation of trash/recycling services in individual alleys. • • • Develop framework for cooperative parking areas as identified. • • • 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 7 k e y i M P l e M e n t A t i o n s t e P s 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 100 of 125 s e C t i o n 7 Acknowledgments 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 7 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 101 of 125 i n t e n t i o n A l l y B l A n k 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 7 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 102 of 125 A C k n o w l e D G e M e n t s Fort Collins Downtown Development Association Board Fort Collins Downtown Development Association Staff City of Fort Collins UniverCity Connections Workshop Attendees and participants as listed below w o r k s H o P 1 A t t e n D e e s ( F r o M s i G n - i n s H e e t ) name affiliation Mike Poudre Valley Appliance John Arnolfo Silver Grill Anne Aspen City of FC Jim Ballinger Vici Ballinger Michael Bello Urban Development Partners Jim Benest The Collective Gallery Robert Bisetti Bisetti’s Kevin Buecher Old Town Art Wall Christine Dianni CSU Landscape Architecture Al Dunton Centennial Galleries Lynn Dunton Centennial Galleries Carolyn Early Bean Cycle Dave Edwards Resident Paula Edwards Resident Matt Evans Fort Collins Real Estate Mike Freeman City of FC Bud Frick W.J. Frick DG, PC Carl Glaser Advocate Const. Jill Glaser Remax Realtors Tom hacker NCBR Maggie hallidy R & M Studios David hejde Astride A Starship Ted hill Al’s Newsstand Blue hovatter Resident Doug Johnson UniverCity Connections Kevin Jones Locators Architectural Salvage Ryan Keiffer A Train Marketing Julie Keith Artist/Resident Charles Klamm Algiers Steve Levenger The Armstrong hotel Dave Lingle Aller Lingle Archictects Marianne Lorenz FC MOCA Clark Mapes City of FC Alyson McGee City of FC Karen McWilliams City of FC Paul Mills Russell+Mills Studios Pam Orzell Al’s Newsstand Kelly Peters City of FC Jim Power Iasis Christ Fellowship Chris Ray Block One Rick Reider hBC Inc. Marilyn Roberts Resident Garth Rogers Resident Earen Russell EDAW/LPC Craig Russell Russell+Mills Studios Kim Sewald Wear It Again Sam Rick Shannon Pinnacle Sam Sheldon Poudre Valley Appliance Don Skaggs Wally Walberg Resident i n t e n t i o n A l l y B l A n k 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 7 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 104 of 125 A P P e n D i x Visual Preferencing Exercise Results 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 7 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 105 of 125 i n t e n t i o n A l l y B l A n k 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 0 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 106 of 125 e x A M P l e i M A G e s - s H A r e D s t r e e t s 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 1 NOTE: Example images are meant to speak to the character and experience of the various elements that make liveable, walkable, vibrant spaces. They are not meant to be considered as exact replications of design directions. 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 107 of 125 e x A M P l e i M A G e s - s H A r e D s t r e e t s 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 108 of 125 june 2004 16 Pavement Unit pavers promote a comfortable and vibrant pedestrian environment and allow for a variety of patterns and forms. They can withstand heavy loads from service vehicles due to their density and they make a great material for shared pedestrian-vehicular environments. Pavers used should either be dark in color or sealed with ‘Addiment’ acrylic paver seal or equal to prevent staining. The following examples show a variety of forms, color and patterns. crushed limestone and granite together, duplicating the forces of nature and producing a naturally beautiful Reconstructed Stone™ Paver. High compressive strength and density give the product the durability and low water absorption comparable to stone. Hanover® can provide complete flexibility for color selection. Custom color and aggregate blends have become our trademark and offer the designer endless specification opportunities. A wide range of standard sizes are available from a nominal 12” x 12” to a nominal 36” x 36”. A custom sizing service gives even more flexibility to the designer, making the selection of the paving pattern almost limitless. Right Photo: R/D Facility, Building #6, Wilmington, MA Architect, Landscape Architect and Engineer: Symmes, Maini & McKee Associates, Inc., Cambridge, MA Size & Color: 113 /4” x 11 3/4 ” x 2”, 113 /4” x 11 3/4 ” x 3”, Charcoal, Glacier White, #M1025 Finish: Tudor® prest® pavers for on-grade applications Natural stone, particularly granite, has long been considered the first choice for buildings and walkways. Hanover’s Architectural Concrete Paver line has the characteristics and the performance of natural stone, but can offer the project an economical alternative. Using extreme hydraulic pressure, Hanover® bonds crushed limestone and granite together, duplicating the forces of nature and producing a naturally beautiful Reconstructed Stone™ Paver. High compressive strength and density give the product the durability and low water absorption comparable to stone. Hanover® can provide complete flexibility for color selection. Custom color and aggregate blends have become our trademark and offer the designer endless specification opportunities. A wide range of standard sizes are available from a nominal 12” x 12” to a nominal 36” x 36”. A custom sizing service gives even more flexibility to the designer, making the selection of the paving pattern almost limitless. Above and Below Left Photos: Hudson River Park, Manhattan, NY; Landscape Architects - Site Planners: Abel Bainnson Butz, LLP, New York, NY; Size & Color: 11 7/8” x 11 7/8” x 2”, 23 7/8” x 23 7/8” x 2”, 23 1 /2” x 35 5/8” x 2”, #M2055, #M2335, #M2310, #M2337; Finish: #12, Tudor ® 4 e x A M P l e i M A G e s - PAVinG 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 109 of 125 june 2004 18 To bring vegetation into the alleys one of the easiest solutions would be a combination of vines, hanging pots and window planter boxes that could hold a variety of plants or cascading plants. The following images are examples of this element. e x A M P l e i M A G e s - P l A n t i n G 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 110 of 125 e x A M P l e i M A G e s - P l A n t i n G 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 111 of 125 june 2004 17 Clearance for emergency vehicles would take this space into account. For Trimble Court, this could take the form of the Old Town Square suite of furniture to include smaller cafe style foldable tables and chairs. Furniture could part of art in public places and become functioning art installation, some examples of sculptural outdoor furniture are below. s e AtinG 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 112 of 125 o n - A l l e y B u i l D i n G e n t r i e s 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 7 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 113 of 125 PAtio s e AtinG 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 114 of 125 june 2004 19 Awnings with varied designs and colors and signs have the ability to turn ordinary doorways and windows into colorful gateways to adjacent uses, as well as adding excitement and visual interest along the alley as shown in the examples below. A w n i n G s 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 115 of 125 fort collins downtown alleys concept design report june 2004 21 Lighting Lighting of any space plays a crucial role in how that space is used at night. Lighting is critical for pedestrian environments to ensure the area feels safe at night and to transform spaces from daytime to night time use. The example images below display how lighting creates safe pedestrian environments while also creating dynamic places. Pedestrian Safety Alleys are often perceived as unsafe environments and places where pedestrians should not venture, especially at night. This is likely due to the fact that alleys are frequently poorly lit, and isolated environments. There are a number of strategies that can be employed to counter this for the downtown alleys in Fort Collins. The first would be to provide a well lit environment that provides clear views of the entire alley. This would include illuminating all recessed doorways and other alcoves that could provide places to hide. On-alley building entrances and increasing the number of on-alley residential units would also increase the perception of a safe environment while providing additional surveillance. A final way to help in the reassurance of a pedestrian’s safety would be the introduction of safety surveillance cameras. Vehicular traffic can make alleys feel unsafe as well. Service and personal vehicles should perceive the alleys as pedestrian oriented spaces through design cues. The confines of the alleys inherently reduce possible dangerous speeds. Through design, shared spaces will help create a safer environment. fort collins downtown alleys concept design report june 2004 20 Regional History Ecclectic Humorous Murals There are a number of blank facades in our downtown alleys that could be energized with murals. Examples of public murals are shown below including Trompe l’oeil murals which use techniques of faux finishing to create illusions of depth and extended space. Trompe l’oeil l i G H t i n G & M u r A l s Lighting Strategies Murals 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 0 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 116 of 125 Sculptural Wind Turbines Shade Structures s H A D e s t r u C t u r e s & w i n D t u r B i n e s 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 1 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 117 of 125 Rain Drums A r t i s t i C e l e M e n t s 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 118 of 125 A r t i n P u B l i C P l A C e s APP Transformer Cabinet/Trash Can Murals APP Pedestrian Pavers 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 119 of 125 C o n s u l t A n t t e A M M A s t e r P l A n n e r Russell + Mills Studios Inc A r C H i t e C t Aller-Lingle-Massey Architects e n G i n e e r TST Inc 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 120 of 125 ATTACHMENT C PROJECT SCHEDULE 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 121 of 125 ATTACHMENT D 2020 ALLEY RENOVATION MAPS 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 122 of 125 Fort Collins Downtown Development Authority 2020 Alley Program – Phase 1 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 123 of 125 ATTACHMENT E 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 124 of 125 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 125 of 125 Mark Williams Alley Cat Lisa Wilson Novello Photography Jack Wolfe DDA Board Ellen zibell Perennial Gardner/Sense of Place Ted zibell Perennial Gardner/Sense of Place w o r k s H o P 2 A t t e n D e e s ( F r o M s i G n i n s H e e t ) name affiliation John Arnolfo Silver Grill Anne Aspen City of FC Nick Aceto CSU -LA Jay Burgess CSU -LA Sondra Carson Landmark Preservation James Shaffer Streetscapes Dave Lingle Aller-Lingle Arch. Charles Klamm Algiers Mark Williams Alley Cat Emmanuel Didier EDAW Cherie Willey Cupboard Cathy Farmer Cupboard Garth Rogers Resident Michael Bello Urban Development Partners Jared Smith CSU -LA Nora hill Kilwins Rod Grabb Kilwins Michael Stanley CSU -LA Chris Olson CSU Ben Manvel City Council Christine Dianni CSU Margie/Steve Brown helen/Less Garrigues Jennifer Tan CSU Rick Reider property owner Robin MacDonald City Jack Wolfe DDA Board Jason Rusek CSU Anna Cawrsi CSU Troy Outman CSU Julie Keith Artist/Resident Carl Glaser Building Owner Nick haws Northern Engineering Shannon Wilson Pendleton/DBA zuzaba Trojadora CSU Jill Glaser Building Owner Joey Perez CSU Ryan Sand CSU Barb Wilkins City Drug Sam Poudre Valley Appliance Mike Jensen Fort Collins Real Estate Denise Weston City - Transportation Elizabeth Neal CSU/Bisetti’s Cynthia Winch CSU Eli Rufe CSU James Long CSU_LA Bill Whirty City of Fort Collins Rene Liebow Resident name affiliation name affiliation C o n s u l t A n t t e A M M A s t e r P l A n n e r Russell + Mills Studios Inc A r C H i t e C t Aller-Lingle-Massey Architects e n G i n e e r TST Inc 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 77 A C k n o w l e D e M e n t s 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 103 of 125 COST NOTES SECTION J (Pine St. through Linden St.) CONSTRUCTION Mobilization ALLOW $5,000.00 1 $5,000.00 Inlets, Catch Basins & Connecting to Storm ALLOW $20,000.00 1 $20,000.00 CATEGORY SUBTOTAL $25,000.00 DEMOLITION Concrete and Asphalt S.F. $2.00 16,585 $33,170.00 CATEGORY SUBTOTAL $33,170.00 SITE WORK Concrete Edge L.F. $10.00 375 $3,750.00 6” width against all existing building edges Unit Pavers on Concrete Base S.F. $16.00 16,585 $265,360.00 CATEGORY SUBTOTAL $269,110.00 PLANTING Soil Prep - Compost and fertilizer as required S.F. $0.05 120 $6.00 1.5” Ornamental Tree EA. $350.00 $0.00 Annual Plantings for Planter Pots - Large EA. $118.35 14 $1,656.90 Annual Plantings for Planter Pots - Small EA. $88.10 $0.00 Rain Gardens S.F. $7.40 120 $888.00 shrubs, perennials, mulch CATEGORY SUBTOTAL $2,550.90 SITE LIGHTING AND ELECTRICAL Undergrounding Electrical ALLOW $100,000.00 1 $100,000.00 Electrical Distribution ALLOW $5,000.00 1 $5,000.00 Transformer ALLOW $30,000.00 1 $30,000.00 Light Post EA. $6,000.00 $0.00 Overhead Strand Lighting L.F. $35.30 1,045 $36,888.50 CATEGORY SUBTOTAL $171,888.50 FURNISHINGS AND ARCHITECTURE Wind Turbine Sculpture EA. $15,000.00 $0.00 Includes Installation Planter Pots - Large EA. $1,554.20 14 $21,758.80 Planter Pots - Small EA. $1,201.20 $0.00 Trash Receptacle EA. $1,250.00 8 $10,000.00 6’ Bench EA. $1,500.00 10 $15,000.00 Surface mount Removable Bollard EA. $1,500.00 $0.00 Trash and Recycling Compactor Enclosure EA. $15,000.00 2 $30,000.00 CATEGORY SUBTOTAL $76,758.80 IRRIGATION Planter Pots EA. $91.67 14 $1,283.38 Netafim Dripline S.F. $2.05 120 $246.00 CATEGORY SUBTOTAL $1,529.38 SECTION J (Pine St. through Linden St.) SUBTOTAL $580,007.58 25% Master Plan Contingency $145,001.90 SECTION J (Pine St. through Linden St.) TOTAL $725,009.48 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 7 C o s t e s t i M A t e s 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 98 of 125 NOTES SECTION H (W. Oak St. through W. Mountain Ave.) CONSTRUCTION Mobilization ALLOW $5,000.00 1 $5,000.00 Inlets, Catch Basins & Connecting to Storm ALLOW $20,000.00 1 $20,000.00 CATEGORY SUBTOTAL $25,000.00 DEMOLITION Concrete and Asphalt S.F. $2.00 23,465 $46,930.00 CATEGORY SUBTOTAL $46,930.00 SITE WORK Concrete Edge L.F. $10.00 295 $2,950.00 6” width against all existing building edges Unit Pavers on Concrete Base S.F. $16.00 23,465 $375,440.00 CATEGORY SUBTOTAL $378,390.00 PLANTING Soil Prep - Compost and fertilizer as required S.F. $0.05 1,730 $86.50 1.5” Ornamental Tree EA. $350.00 $0.00 Annual Plantings for Planter Pots - Large EA. $118.35 21 $2,485.35 Annual Plantings for Planter Pots - Small EA. $88.10 $0.00 Rain Gardens S.F. $7.40 1,730 $12,802.00 shrubs, perennials, mulch CATEGORY SUBTOTAL $15,373.85 SITE LIGHTING AND ELECTRICAL Undergrounding Electrical ALLOW $100,000.00 1 $100,000.00 Electrical Distribution ALLOW $5,000.00 1 $5,000.00 Transformer ALLOW $30,000.00 1 $30,000.00 Light Post EA. $6,000.00 $0.00 Overhead Strand Lighting L.F. $35.30 $0.00 CATEGORY SUBTOTAL $135,000.00 FURNISHINGS AND ARCHITECTURE Wind Turbine Sculpture EA. $15,000.00 $0.00 Includes Installation Planter Pots - Large EA. $1,554.20 21 $32,638.20 Planter Pots - Small EA. $1,201.20 $0.00 Trash Receptacle EA. $1,250.00 4 $5,000.00 6’ Bench EA. $1,500.00 6 $9,000.00 Surface mount Removable Bollard EA. $1,500.00 3 $4,500.00 Trash and Recycling Compactor Enclosure EA. $15,000.00 1 $15,000.00 CATEGORY SUBTOTAL $66,138.20 IRRIGATION Planter Pots EA. $91.67 21 $1,925.07 Netafim Dripline S.F. $2.05 1,730 $3,546.50 CATEGORY SUBTOTAL $5,471.57 SECTION H (W. Oak St. through W. Mountain Ave.) SUBTOTAL $672,303.62 25% Master Plan Contingency $168,075.91 SECTION H (W. Oak St. through W. Mountain Ave.) TOTAL $840,379.53 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 71 C o s t e s t i M A t e s 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 97 of 125 COST NOTES SECTION D (W. Laurel St. through W. Myrtle St.) CONSTRUCTION Mobilization ALLOW $5,000.00 1 $5,000.00 Inlets, Catch Basins & Connecting to Storm ALLOW $20,000.00 1 $20,000.00 CATEGORY SUBTOTAL $25,000.00 DEMOLITION Concrete and Asphalt S.F. $2.00 44,455 $88,910.00 CATEGORY SUBTOTAL $88,910.00 SITE WORK Concrete Edge L.F. $10.00 325 $3,250.00 6” width against all existing building edges Unit Pavers on Concrete Base S.F. $16.00 44,455 $711,280.00 CATEGORY SUBTOTAL $714,530.00 PLANTING Soil Prep - Compost and fertilizer as required S.F. $0.05 $0.00 1.5” Ornamental Tree EA. $350.00 1 $350.00 Annual Plantings for Planter Pots - Large EA. $118.35 9 $1,065.15 Annual Plantings for Planter Pots - Small EA. $88.10 $0.00 Rain Gardens S.F. $7.40 $0.00 CATEGORY SUBTOTAL $1,415.15 SITE LIGHTING AND ELECTRICAL Undergrounding Electrical ALLOW $100,000.00 1 $100,000.00 Electrical Distribution ALLOW $5,000.00 1 $5,000.00 Transformer ALLOW $30,000.00 1 $30,000.00 Light Post EA. $6,000.00 $0.00 Overhead Strand Lighting L.F. $35.30 335 $11,825.50 CATEGORY SUBTOTAL $146,825.50 FURNISHINGS AND ARCHITECTURE Wind Turbine Sculpture EA. $15,000.00 $0.00 Includes Installation Planter Pots - Large EA. $1,554.20 9 $13,987.80 Planter Pots - Small EA. $1,201.20 $0.00 Trash Receptacle EA. $1,250.00 10 $12,500.00 6’ Bench EA. $1,500.00 8 $12,000.00 Surface mount Trash and Recycling Compactor Enclosure EA. $15,000.00 $0.00 CATEGORY SUBTOTAL $38,487.80 IRRIGATION Planter Pots EA. $91.67 9 $825.03 Netafim Dripline S.F. $2.05 $0.00 CATEGORY SUBTOTAL $825.03 SECTION D (W. Laurel St. through W. Myrtle St.) SUBTOTAL $1,015,993.48 25% Master Plan Contingency $253,998.37 SECTION D (W. Laurel St. through W. Myrtle St.) TOTAL $1,269,991.85 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 70 C o s t e s t i M A t e s 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 96 of 125 NOTES SECTION C (E. Myrtle St. through E. Laurel St.) CONSTRUCTION Mobilization ALLOW $5,000.00 1 $5,000.00 Inlets, Catch Basins & Connecting to Storm ALLOW $20,000.00 1 $20,000.00 CATEGORY SUBTOTAL $25,000.00 DEMOLITION Concrete and Asphalt S.F. $2.00 19,830 $39,660.00 CATEGORY SUBTOTAL $39,660.00 SITE WORK Concrete Edge L.F. $10.00 40 $400.00 6” width against all existing building edges Unit Pavers on Concrete Base S.F. $16.00 19,830 $317,280.00 CATEGORY SUBTOTAL $317,680.00 PLANTING Soil Prep - Compost and fertilizer as required S.F. $0.05 600 $30.00 1.5” Ornamental Tree EA. $350.00 $0.00 Annual Plantings for Planter Pots - Large EA. $118.35 $0.00 Annual Plantings for Planter Pots - Small EA. $88.10 $0.00 Rain Gardens S.F. $7.40 600 $4,440.00 shrubs, perennials, mulch CATEGORY SUBTOTAL $4,470.00 SITE LIGHTING AND ELECTRICAL Undergrounding Electrical ALLOW $100,000.00 1 $100,000.00 Electrical Distribution ALLOW $5,000.00 1 $5,000.00 Transformer ALLOW $30,000.00 1 $30,000.00 Light Post EA. $6,000.00 $0.00 Overhead Strand Lighting L.F. $35.30 300 $10,590.00 CATEGORY SUBTOTAL $145,590.00 FURNISHINGS AND ARCHITECTURE Wind Turbine Sculpture EA. $15,000.00 $0.00 Includes Installation Planter Pots - Large EA. $1,554.20 $0.00 Planter Pots - Small EA. $1,201.20 $0.00 Trash Receptacle EA. $1,250.00 8 $10,000.00 6’ Bench EA. $1,500.00 6 $9,000.00 Surface mount Trash and Recycling Compactor Enclosure EA. $15,000.00 1 $15,000.00 CATEGORY SUBTOTAL $34,000.00 IRRIGATION Planter Pots EA. $91.67 $0.00 Netafim Dripline S.F. $2.05 600 $1,230.00 CATEGORY SUBTOTAL $1,230.00 SECTION C (E. Myrtle St. through E. Laurel St.) SUBTOTAL $567,630.00 25% Master Plan Contingency $141,907.50 SECTION C (E. Myrtle St. through E. Laurel St.) TOTAL $709,537.50 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  C o s t e s t i M A t e s 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 95 of 125 COST QTY. EXTENDED COST NOTES SECTION A (Mountain Ave. through Oak St.) CONSTRUCTION Mobilization ALLOW $5,000.00 1 $5,000.00 Inlets, Catch Basins & Connecting to Storm ALLOW $20,000.00 1 $20,000.00 CATEGORY SUBTOTAL $25,000.00 DEMOLITION Concrete and Asphalt S.F. $2.00 17,800 $35,600.00 CATEGORY SUBTOTAL $35,600.00 SITE WORK Concrete Edge L.F. $10.00 160 $1,600.00 6” width against all existing building edges Unit Pavers on Concrete Base S.F. $16.00 17,515 $280,240.00 CATEGORY SUBTOTAL $281,840.00 PLANTING Soil Prep - Compost and fertilizer as required S.F. $0.05 1,260 $63.00 1.5” Ornamental Tree EA. $350.00 2 $700.00 Annual Plantings for Planter Pots - Large EA. $118.35 46 $5,444.10 Annual Plantings for Planter Pots - Small EA. $88.10 $0.00 Rain Gardens S.F. $7.40 1,260 $9,324.00 shrubs, perennials, mulch CATEGORY SUBTOTAL $15,531.10 SITE LIGHTING AND ELECTRICAL Undergrounding Electrical ALLOW $100,000.00 1 $100,000.00 Electrical Distribution ALLOW $5,000.00 1 $5,000.00 Transformer ALLOW $30,000.00 1 $30,000.00 Light Post EA. $6,000.00 13 $78,000.00 Overhead Strand Lighting L.F. $35.30 350 $12,355.00 CATEGORY SUBTOTAL $225,355.00 FURNISHINGS AND ARCHITECTURE Wind Turbine Sculpture EA. $15,000.00 1 $15,000.00 Includes Installation Planter Pots - Large EA. $1,554.20 46 $71,493.20 Planter Pots - Small EA. $1,201.20 $0.00 Trash Receptacle EA. $1,250.00 6 $7,500.00 6’ Bench EA. $1,500.00 8 $12,000.00 Surface mount Trash and Recycling Compactor Enclosure EA. $15,000.00 2 $30,000.00 CATEGORY SUBTOTAL $105,993.20 IRRIGATION Planter Pots EA. $91.67 46 $4,216.82 Netafim Dripline S.F. $2.05 1,260 $2,583.00 CATEGORY SUBTOTAL $6,799.82 SECTION A (Mountain Ave. through Oak St.) SUBTOTAL $711,119.12 25% Master Plan Contingency $177,779.78 SECTION A (Mountain Ave. through Oak St.) TOTAL $888,898.90 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  C o s t e s t i M A t e s 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 94 of 125 l i n D e n s t t H r o u G H C H e s t n u t s t 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 88 of 125 WALNUT LINDEN JEFFERSON MULBERRy MAGNOLIA OLIVE LAUREL MyRTLE REMINGTON CSU k e y P l A n VIEW DIRECTION 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 0 P i n e s t t H r o u G H l i n D e n s t 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 86 of 125 k e y P l A n 0 10 0 0’ VIEW DIRECTION VIEW DIRECTION 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  w e s t o A k t H r o u G H w e s t M o u n t A i n A V e 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 82 of 125 POTENTIAL NEW SIDEWALK CONNECTION TO COLLEGE AVE BIOSWALE LAPORTE MOUNTAIN OAK COLLEGE MASON WALNUT LINDEN JEFFERSON MULBERRy MAGNOLIA OLIVE LAUREL MyRTLE REMINGTON CSU k e y P l A n 0 10 0 0’ BIOSWALE 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  w e s t l A u r e l t H r o u G H w e s t M y r t l e s t 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 78 of 125 MAGNOLIA OLIVE LAUREL MyRTLE CSU k e y P l A n 0 10 0 0’ VIEW DIRECTION REMINGTON 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 0 e A s t M y r t l e s t . t H r o u G H e A s t l A u r e l 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 76 of 125 CSU k e y P l A n 0 10 0 0’ 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 75 of 125 ALLEy ENTRANCE TREATMENT WITh OVERhEAD LIGhTING ThAT MATChES TRIMBLE COURT POTENTIAL RAIN GARDENS & BIO-SWALES FOR STORM WATER ALONG ALLEy CONCRETE PAVERS AS LONG TERM DURABLE SOLUTION ONE WAy 0 10 0 0’ VIEW DIRECTION 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  e A s t o A k A V e . t H r o u G H e A s t o l i V e s t . 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 72 of 125 MULBERRy MAGNOLIA OLIVE LAUREL MyRTLE REMINGTON CSU k e y P l A n ONE WAy POTENTIAL REDEVELOPMENT VIEW DIRECTION 0 10 0 0’ 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  e A s t M o u n t A i n A V e . t H r o u G H e A s t o A k s t . 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 70 of 125 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 0 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 66 of 125 ENTRy PLAzA TRUCK DELIVERy PARKING Tr NOTE: These diagrams are purely conceptual are not intended to provide specific planning guidance for adjacent areas to Fort Collins alleys. oLIVe sT. mason sT. CoLLeGe aVe. mounTaIn aVe. 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 64 of 125 PARKING Tr NOTE: These diagrams are purely conceptual are not intended to provide specific planning guidance for adjacent areas to Fort Collins alleys. LaureL CoLLeGe aVe. mYrTLe sT. mason sT. 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 7 w e s t M y r t l e s t . t H r o u G H w e s t l A u r e l 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 63 of 125 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 62 of 125 Tr CoLLeGe aVe. oLIVe sT. remInGTon sT. mounTaIn aVe. 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  e A s t M o u n t A i n A V e . t H r o u G H e A s t o l i V e s t . 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 61 of 125 entering a perforated pipe and conveyed into the underground storm water utility. Plantings in bio-swales contribute to alley aesthetics and can be partially irrigated by storm runoff. Soil-moisture sensors should be 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  A l l e y r e C o M M e n D A t i o n s 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 58 of 125 • Need for extensive parking E 2.3 • Prime location for future redevelopment • Access to Mason Corridor and transit stop @Mulberry • Potential for redevelopment to capitalize on location (Mulberry/Mason/College) • Immediate streetscape enhancements along Mason to complement Mason Corridor 2.0 • Functions as obstacle to continuous alley network to Downtown F 3.3 • Prime location for future redevelopment • Access to Mason Corridor and transit stop @Mulberry • Potential for redevelopment to capitalize on location (Mulberry/Mason/College) • Immediate streetscape enhancements along Mason to complement Mason Corridor 2.8 • Functions as obstacle to continuous alley network to Downtown • Lack of retail presence - primarily commercial G 3.0 • Strong connection to Oak St. • Wide corridor and extensive open areas creates flexibility • Existing tree groves provide shade and create park-like setting • Strong connections w/Mason Corridor • Potential for redevelopment at Mason and Oak St, commercial property • Immediate streetscape enhancements along Olive to Mason Corridor • Courtyard and patio spaces at north end of alley • Activate alley entry at Oak St. Plaza • Sustainable storm water strategies 4.0 • Frequent vehicular use and circulation • Ace Hardware parking currently critical for overall retail success • Narrow corridor at Olive and Oak St. • Need for frequent delivery truck access H 3.7 • DDA owned surface parking lot • Strong connection to Oak St. Plaza, Mason Corridor and Mountain Ave. • Existing model for courtyards/patios at Rio Grande Restaurant • Extensive retail frontage • Create parking garage w/ surface level retail • Courtyards/patios and plazas to complement business uses • Showcase alley for sustainable strategies (central downtown location) • Remove bank teller structure to create urban courtyard/plaza • On-alley retail access throughout • Sustainable storm water strategies to address drainage issues • Activate alley entries at Mountain Ave., Oak St. Plaza and Mason St. 3.5 • Need for extensive parking • Topography creates drainage issues 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  A l l e y s C o r e C A r D o P P o r t u n i t i e s A n D C H A l l e n G e s 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 50 of 125 Problematic vehicular access 2.4 AREA C CRITERIA RANKING Contributing to retail/commercial business 3 Potential for redevelopment/infill 2.96 Connection to east/west attractions 2.49 Unique character 2.91 Shared street potential 4.61 Need for alternative waste disposal 3 Problematic vehicular access 1.96 AREA D Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.5 3.9 3.8 3.8 4.8 Need for alternative waste disposal Problematic vehicular access 3.7 4.2 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.4 1.7 2.5 4.7 2.8 Need for alternative waste disposal Problematic vehicular access 2.4 3.3 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 4.6 2.9 2.5 3.0 3.0 Need for alternative waste disposal Problematic vehicular access 2.0 3.0 AVG. ANKING 4.75 3.77 3.78 3.86 3.48 4.21 3.65 ANKING 2.78 4.73 2.49 1.65 3.4 3.32 2.4 ANKING 3 2.96 2.49 2.91 4.61 3 1.96 ANKING 4.66 4.26 4.98 3.4 4.18 3.13 2.86 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.5 3.9 3.8 3.8 4.8 Need for alternative waste disposal Problematic vehicular access 3.7 4.2 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.4 1.7 2.5 4.7 2.8 Need for alternative waste disposal Problematic vehicular access 2.4 3.3 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 4.6 2.9 2.5 3.0 3.0 Need for alternative waste disposal Problematic vehicular access 2.0 3.0 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 4.2 3.4 5.0 4.3 4.7 Need for alternative waste disposal Problematic vehicular access 2.9 3.1 AVG. Need for alternative waste disposal 3.13 Problematic vehicular access 2.86 AREA E CRITERIA RANKING Contributing to retail/commercial business 1.13 Potential for redevelopment/infill 2.38 Connection to east/west attractions 2 Unique character 4.61 Shared street potential 1.38 Need for alternative waste disposal 2.25 Problematic vehicular access 1.64 AREA F CRITERIA RANKING Contributing to retail/commercial business 2 Potential for redevelopment/infill 4.63 Connection to east/west attractions 2.86 Unique character 4.18 Shared street potential 2.63 Need for alternative waste disposal 2.86 Problematic vehicular access 2.74 AREA G CRITERIA RANKING Contributing to retail/commercial business 3.78 Potential for redevelopment/infill 4.21 Connection to east/west attractions 2.46 Unique character 1.38 Shared street potential 2.86 Need for alternative waste disposal 3.73 Problematic vehicular access 4.22 AREA H CRITERIA RANKING Contributing to retail/commercial business 4.4 Potential for redevelopment/infill 4.39 Connection to east/west attractions 3.51 Unique character 2.63 Shared street potential 3.74 Need for alternative waste disposal 3.65 Problematic vehicular access 3.34 AREA I CRITERIA RANKING Contributing to retail/commercial business 3.48 Potential for redevelopment/infill 2.83 Connection to east/west attractions 3.23 Unique character 2.86 Shared street potential 3.1 Need for alternative waste disposal 4.23 Problematic vehicular access 2.78 AREA J CRITERIA RANKING Contributing to retail/commercial business 4.56 Potential for redevelopment/infill 4.13 Connection to east/west attractions 3.31 Unique character 3.74 Shared street potential 4.1 Need for alternative waste disposal 3.51 Problematic vehicular access 3.18 AREA K CRITERIA RANKING Contributing to retail/commercial business 2.99 Potential for redevelopment/infill 3.43 Connection to east/west attractions 2.7 Unique character 3.1 Shared street potential 3.52 Need for alternative waste disposal 3.51 Problematic vehicular access 3.44 Need for alternative waste disposal Problematic vehicular access 2.9 3.1 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 1.4 4.6 2.0 2.4 1.1 Need for alternative waste disposal Problematic vehicular access 1.6 2.3 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 2.6 4.2 2.9 4.6 2.0 Need for alternative waste disposal Problematic vehicular access 2.7 2.9 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 2.9 1.4 2.5 4.2 3.8 Need for alternative waste disposal Problematic vehicular access 4.2 3.7 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.7 2.6 3.5 4.4 4.4 Need for alternative waste disposal Problematic vehicular access 3.3 3.7 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.1 2.9 3.2 2.8 3.5 Need for alternative waste disposal Problematic vehicular access 2.8 4.2 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 4.1 3.7 3.3 4.1 4.6 Need for alternative waste disposal Problematic vehicular access 3.2 3.5 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.5 3.1 2.7 3.4 3.0 Need for alternative waste disposal Problematic vehicular access 3.4 3.5 AVG. 2.3 2.0 Need for alternative waste disposal 2.25 Problematic vehicular access 1.64 AREA F CRITERIA RANKING Contributing to retail/commercial business 2 Potential for redevelopment/infill 4.63 Connection to east/west attractions 2.86 Unique character 4.18 Shared street potential 2.63 Need for alternative waste disposal 2.86 Problematic vehicular access 2.74 AREA G CRITERIA RANKING Contributing to retail/commercial business 3.78 Potential for redevelopment/infill 4.21 Connection to east/west attractions 2.46 Unique character 1.38 Shared street potential 2.86 Need for alternative waste disposal 3.73 Problematic vehicular access 4.22 AREA H CRITERIA RANKING Contributing to retail/commercial business 4.4 Potential for redevelopment/infill 4.39 Connection to east/west attractions 3.51 Unique character 2.63 Shared street potential 3.74 Need for alternative waste disposal 3.65 Problematic vehicular access 3.34 AREA I CRITERIA RANKING Contributing to retail/commercial business 3.48 Potential for redevelopment/infill 2.83 Connection to east/west attractions 3.23 Unique character 2.86 Shared street potential 3.1 Need for alternative waste disposal 4.23 Problematic vehicular access 2.78 AREA J CRITERIA RANKING Contributing to retail/commercial business 4.56 Potential for redevelopment/infill 4.13 Connection to east/west attractions 3.31 Unique character 3.74 Shared street potential 4.1 Need for alternative waste disposal 3.51 Problematic vehicular access 3.18 AREA K CRITERIA RANKING Contributing to retail/commercial business 2.99 Potential for redevelopment/infill 3.43 Connection to east/west attractions 2.7 Unique character 3.1 Shared street potential 3.52 Need for alternative waste disposal 3.51 Problematic vehicular access 3.44 Problematic vehicular access 1.6 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 2.6 4.2 2.9 4.6 2.0 Need for alternative waste disposal Problematic vehicular access 2.7 2.9 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 2.9 1.4 2.5 4.2 3.8 Need for alternative waste disposal Problematic vehicular access 4.2 3.7 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.7 2.6 3.5 4.4 4.4 Need for alternative waste disposal Problematic vehicular access 3.3 3.7 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.1 2.9 3.2 2.8 3.5 Need for alternative waste disposal Problematic vehicular access 2.8 4.2 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 4.1 3.7 3.3 4.1 4.6 Need for alternative waste disposal Problematic vehicular access 3.2 3.5 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.5 3.1 2.7 3.4 3.0 Need for alternative waste disposal Problematic vehicular access 3.4 3.5 AVG. Need for alternative waste disposal 2.86 Problematic vehicular access 2.74 AREA G CRITERIA RANKING Contributing to retail/commercial business 3.78 Potential for redevelopment/infill 4.21 Connection to east/west attractions 2.46 Unique character 1.38 Shared street potential 2.86 Need for alternative waste disposal 3.73 Problematic vehicular access 4.22 AREA H CRITERIA RANKING Contributing to retail/commercial business 4.4 Potential for redevelopment/infill 4.39 Connection to east/west attractions 3.51 Unique character 2.63 Shared street potential 3.74 Need for alternative waste disposal 3.65 Problematic vehicular access 3.34 AREA I CRITERIA RANKING Contributing to retail/commercial business 3.48 Potential for redevelopment/infill 2.83 Connection to east/west attractions 3.23 Unique character 2.86 Shared street potential 3.1 Need for alternative waste disposal 4.23 Problematic vehicular access 2.78 AREA J CRITERIA RANKING Contributing to retail/commercial business 4.56 Potential for redevelopment/infill 4.13 Connection to east/west attractions 3.31 Unique character 3.74 Shared street potential 4.1 Need for alternative waste disposal 3.51 Problematic vehicular access 3.18 AREA K CRITERIA RANKING Contributing to retail/commercial business 2.99 Potential for redevelopment/infill 3.43 Connection to east/west attractions 2.7 Unique character 3.1 Shared street potential 3.52 Need for alternative waste disposal 3.51 Problematic vehicular access 3.44 Need for alternative waste disposal Problematic vehicular access 2.7 2.9 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 2.9 1.4 2.5 4.2 3.8 Need for alternative waste disposal Problematic vehicular access 4.2 3.7 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.7 2.6 3.5 4.4 4.4 Need for alternative waste disposal Problematic vehicular access 3.3 3.7 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.1 2.9 3.2 2.8 3.5 Need for alternative waste disposal Problematic vehicular access 2.8 4.2 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 4.1 3.7 3.3 4.1 4.6 Need for alternative waste disposal Problematic vehicular access 3.2 3.5 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.5 3.1 2.7 3.4 3.0 Need for alternative waste disposal Problematic vehicular access 3.4 3.5 Connection to east/west attractions 2.86 Unique character 4.18 Shared street potential 2.63 Need for alternative waste disposal 2.86 Problematic vehicular access 2.74 AREA G CRITERIA RANKING Contributing to retail/commercial business 3.78 Potential for redevelopment/infill 4.21 Connection to east/west attractions 2.46 Unique character 1.38 Shared street potential 2.86 Need for alternative waste disposal 3.73 Problematic vehicular access 4.22 AREA H CRITERIA RANKING Contributing to retail/commercial business 4.4 Potential for redevelopment/infill 4.39 Connection to east/west attractions 3.51 Unique character 2.63 Shared street potential 3.74 Need for alternative waste disposal 3.65 Problematic vehicular access 3.34 AREA I CRITERIA RANKING Contributing to retail/commercial business 3.48 Potential for redevelopment/infill 2.83 Connection to east/west attractions 3.23 Unique character 2.86 Shared street potential 3.1 Need for alternative waste disposal 4.23 Problematic vehicular access 2.78 AREA J CRITERIA RANKING Contributing to retail/commercial business 4.56 Potential for redevelopment/infill 4.13 Connection to east/west attractions 3.31 Unique character 3.74 Shared street potential 4.1 Need for alternative waste disposal 3.51 Problematic vehicular access 3.18 AREA K CRITERIA RANKING Contributing to retail/commercial business 2.99 Potential for redevelopment/infill 3.43 Connection to east/west attractions 2.7 Unique character 3.1 Shared street potential 3.52 Need for alternative waste disposal 3.51 Problematic vehicular access 3.44 Unique character Shared street potential 2.6 4.2 Need for alternative waste disposal Problematic vehicular access 2.7 2.9 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 2.9 1.4 2.5 4.2 3.8 Need for alternative waste disposal Problematic vehicular access 4.2 3.7 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.7 2.6 3.5 4.4 4.4 Need for alternative waste disposal Problematic vehicular access 3.3 3.7 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.1 2.9 3.2 2.8 3.5 Need for alternative waste disposal Problematic vehicular access 2.8 4.2 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 4.1 3.7 3.3 4.1 4.6 Need for alternative waste disposal Problematic vehicular access 3.2 3.5 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.5 3.1 2.7 3.4 3.0 Need for alternative waste disposal Problematic vehicular access 3.4 3.5 AVG. CRITERIA RANKING Contributing to retail/commercial business 2 Potential for redevelopment/infill 4.63 Connection to east/west attractions 2.86 Unique character 4.18 Shared street potential 2.63 Need for alternative waste disposal 2.86 Problematic vehicular access 2.74 AREA G CRITERIA RANKING Contributing to retail/commercial business 3.78 Potential for redevelopment/infill 4.21 Connection to east/west attractions 2.46 Unique character 1.38 Shared street potential 2.86 Need for alternative waste disposal 3.73 Problematic vehicular access 4.22 AREA H CRITERIA RANKING Contributing to retail/commercial business 4.4 Potential for redevelopment/infill 4.39 Connection to east/west attractions 3.51 Unique character 2.63 Shared street potential 3.74 Need for alternative waste disposal 3.65 Problematic vehicular access 3.34 AREA I CRITERIA RANKING Contributing to retail/commercial business 3.48 Potential for redevelopment/infill 2.83 Connection to east/west attractions 3.23 Unique character 2.86 Shared street potential 3.1 Need for alternative waste disposal 4.23 Problematic vehicular access 2.78 AREA J CRITERIA RANKING Contributing to retail/commercial business 4.56 Potential for redevelopment/infill 4.13 Connection to east/west attractions 3.31 Unique character 3.74 Shared street potential 4.1 Need for alternative waste disposal 3.51 Problematic vehicular access 3.18 AREA K CRITERIA RANKING Contributing to retail/commercial business 2.99 Potential for redevelopment/infill 3.43 Connection to east/west attractions 2.7 Unique character 3.1 Shared street potential 3.52 Need for alternative waste disposal 3.51 Problematic vehicular access 3.44 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 2.6 4.2 2.9 4.6 2.0 Need for alternative waste disposal Problematic vehicular access 2.7 2.9 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 2.9 1.4 2.5 4.2 3.8 Need for alternative waste disposal Problematic vehicular access 4.2 3.7 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.7 2.6 3.5 4.4 4.4 Need for alternative waste disposal Problematic vehicular access 3.3 3.7 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.1 2.9 3.2 2.8 3.5 Need for alternative waste disposal Problematic vehicular access 2.8 4.2 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 4.1 3.7 3.3 4.1 4.6 Need for alternative waste disposal Problematic vehicular access 3.2 3.5 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.5 3.1 2.7 3.4 3.0 Need for alternative waste disposal Problematic vehicular access 3.4 3.5 AVG. CRITERIA RANKING Contributing to retail/commercial business 2 Potential for redevelopment/infill 4.63 Connection to east/west attractions 2.86 Unique character 4.18 Shared street potential 2.63 Need for alternative waste disposal 2.86 Problematic vehicular access 2.74 AREA G CRITERIA RANKING Contributing to retail/commercial business 3.78 Potential for redevelopment/infill 4.21 Connection to east/west attractions 2.46 Unique character 1.38 Shared street potential 2.86 Need for alternative waste disposal 3.73 Problematic vehicular access 4.22 AREA H CRITERIA RANKING Contributing to retail/commercial business 4.4 Potential for redevelopment/infill 4.39 Connection to east/west attractions 3.51 Unique character 2.63 Shared street potential 3.74 Need for alternative waste disposal 3.65 Problematic vehicular access 3.34 AREA I CRITERIA RANKING Contributing to retail/commercial business 3.48 Potential for redevelopment/infill 2.83 Connection to east/west attractions 3.23 Unique character 2.86 Shared street potential 3.1 Need for alternative waste disposal 4.23 Problematic vehicular access 2.78 AREA J CRITERIA RANKING Contributing to retail/commercial business 4.56 Potential for redevelopment/infill 4.13 Connection to east/west attractions 3.31 Unique character 3.74 Shared street potential 4.1 Need for alternative waste disposal 3.51 Problematic vehicular access 3.18 AREA K CRITERIA RANKING Contributing to retail/commercial business 2.99 Potential for redevelopment/infill 3.43 Connection to east/west attractions 2.7 Unique character 3.1 Shared street potential 3.52 Need for alternative waste disposal 3.51 Problematic vehicular access 3.44 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 2.6 4.2 2.9 4.6 2.0 Need for alternative waste disposal Problematic vehicular access 2.7 2.9 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 2.9 1.4 2.5 4.2 3.8 Need for alternative waste disposal Problematic vehicular access 4.2 3.7 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.7 2.6 3.5 4.4 4.4 Need for alternative waste disposal Problematic vehicular access 3.3 3.7 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.1 2.9 3.2 2.8 3.5 Need for alternative waste disposal Problematic vehicular access 2.8 4.2 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 4.1 3.7 3.3 4.1 4.6 Need for alternative waste disposal Problematic vehicular access 3.2 3.5 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.5 3.1 2.7 3.4 3.0 Need for alternative waste disposal Problematic vehicular access 3.4 3.5 AVG. AREA F CRITERIA RANKING Contributing to retail/commercial business 2 Potential for redevelopment/infill 4.63 Connection to east/west attractions 2.86 Unique character 4.18 Shared street potential 2.63 Need for alternative waste disposal 2.86 Problematic vehicular access 2.74 AREA G CRITERIA RANKING Contributing to retail/commercial business 3.78 Potential for redevelopment/infill 4.21 Connection to east/west attractions 2.46 Unique character 1.38 Shared street potential 2.86 Need for alternative waste disposal 3.73 Problematic vehicular access 4.22 AREA H CRITERIA RANKING Contributing to retail/commercial business 4.4 Potential for redevelopment/infill 4.39 Connection to east/west attractions 3.51 Unique character 2.63 Shared street potential 3.74 Need for alternative waste disposal 3.65 Problematic vehicular access 3.34 AREA I CRITERIA RANKING Contributing to retail/commercial business 3.48 Potential for redevelopment/infill 2.83 Connection to east/west attractions 3.23 Unique character 2.86 Shared street potential 3.1 Need for alternative waste disposal 4.23 Problematic vehicular access 2.78 AREA J CRITERIA RANKING Contributing to retail/commercial business 4.56 Potential for redevelopment/infill 4.13 Connection to east/west attractions 3.31 Unique character 3.74 Shared street potential 4.1 Need for alternative waste disposal 3.51 Problematic vehicular access 3.18 AREA K CRITERIA RANKING Contributing to retail/commercial business 2.99 Potential for redevelopment/infill 3.43 Connection to east/west attractions 2.7 Unique character 3.1 Shared street potential 3.52 Need for alternative waste disposal 3.51 Problematic vehicular access 3.44 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 2.6 4.2 2.9 4.6 2.0 Need for alternative waste disposal Problematic vehicular access 2.7 2.9 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 2.9 1.4 2.5 4.2 3.8 Need for alternative waste disposal Problematic vehicular access 4.2 3.7 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.7 2.6 3.5 4.4 4.4 Need for alternative waste disposal Problematic vehicular access 3.3 3.7 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.1 2.9 3.2 2.8 3.5 Need for alternative waste disposal Problematic vehicular access 2.8 4.2 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 4.1 3.7 3.3 4.1 4.6 Need for alternative waste disposal Problematic vehicular access 3.2 3.5 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.5 3.1 2.7 3.4 3.0 Need for alternative waste disposal Problematic vehicular access 3.4 3.5 AVG. 5.7 3 1.96 NKING 4.66 4.26 4.98 3.4 4.18 3.13 2.86 NKING 1.13 2.38 2 4.61 1.38 2.25 1.64 NKING 2 4.63 2.86 4.18 2.63 2.86 2.74 NKING 3.78 4.21 2.46 1.38 2.86 3.73 4.22 NKING 4.4 4.39 3.51 2.63 3.74 3.65 3.34 NKING 3.48 2.83 3.23 2.86 3.1 4.23 2.78 NKING 4.56 4.13 3.31 3.74 4.1 3.51 3.18 NKING 2.99 3.43 2.7 3.1 3.52 3.51 3.44 Problematic vehicular access 2.0 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 4.2 3.4 5.0 4.3 4.7 Need for alternative waste disposal Problematic vehicular access 2.9 3.1 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 1.4 4.6 2.0 2.4 1.1 Need for alternative waste disposal Problematic vehicular access 1.6 2.3 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 2.6 4.2 2.9 4.6 2.0 Need for alternative waste disposal Problematic vehicular access 2.7 2.9 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 2.9 1.4 2.5 4.2 3.8 Need for alternative waste disposal Problematic vehicular access 4.2 3.7 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.7 2.6 3.5 4.4 4.4 Need for alternative waste disposal Problematic vehicular access 3.3 3.7 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.1 2.9 3.2 2.8 3.5 Need for alternative waste disposal Problematic vehicular access 2.8 4.2 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 4.1 3.7 3.3 4.1 4.6 Need for alternative waste disposal Problematic vehicular access 3.2 3.5 Contributing to retail/commercial business Potential for redevelopment/infill Connection to east/west attractions Unique character Shared street potential 3.5 3.1 2.7 3.4 3.0 Need for alternative waste disposal Problematic vehicular access 3.4 3.5 3.0 4.3 3.0 4.0 AVG. AVG. 3.3 2.8 3.7 3.5 3.1 3.5 4.0 3.4 3.1 3.5 4.0 4.0 3.0 2.9 3.2 2.5 0 0 0 10’ l e G e n D ASSETS AND OPPORTUNITIES ChALLENGES DDA BOUNDARy W LaureL s mason sT W mYrTLe sT W muLBerrY sT W maGnoLIa sT W oLIVe sT mapLe sT LaporTe aVe W mounTaIn aVe W oak sT n mason sT JeFFerson sT LInDen sT WaLnuT sT WILLoW sT e mounTaIn aVe e oak sT e oLIVe sT e maGnoLIa sT e muLBerrY sT remInGTon sT maTheWs sT peTerson sT e mYrTLe sT e LaureL s CoLLeGe aVe C D e F G h I J k B a 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n  A l l e y s C o r e C A r D s u M M A r y 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 49 of 125 park WaLnuT sT e mounTaIn aVe s mason sT n mason sT s CoLLeGe aVe Csu reFer To rIVer DIsTrICT sTraTeGIC pLan For FuTure ConneCTIons rIVer DIsTrICT 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 1 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 47 of 125 SECONDARy ALLEy CONNECTION 0 0 0 10’ l e G e n D reFer To rIVer DIsTrICT sTraTeGIC pLan For FuTure ConneCTIons rIVer DIsTrICT 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 0 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 46 of 125 l e G e n D 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 1 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 45 of 125 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 44 of 125 WILLoW sT CherrY sT 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 1 V e H i C l e A C C e s s , P A r k i n G A n D D u M P s t e r C o u n t 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 40 of 125 A fundamental difference between the pedestrian-only Tenney and Trimble Court alley improvements and the designs contained in this plan is the application of the ‘shared street’ concept in which pedestrians and vehicles share the same enhanced space. The shared street is a positive compromise that preserves functionality and access for existing business needs, offers new investment opportunity for both infill and existing buildings, and provides visitors with fun, vibrant, and logical connections between downtown districts and neighborhoods. P r o j e C t G o A l s At the outset of this study goals were established. Each goal also has a set of objectives listed below. The project goals and objectives helped guide the design direction and set the framework for the master plan. The goals and objectives are listed below. G o A l s A n D o B j e C t i V e s 1. Establish a pedestrian network of alleys and walkways efficiently linking CSU, Old Town and the River District. a. Connect with the Mason St. Corridor, which will function as a primary North-South transportation corridor. b. Analyze frequently used walkable routes as a basis for connections. c. Emphasize North-South connections and establish East-West connections to these routes. . Create design concepts for vibrant alleys/walkways which are activated, safe, engaging and help stimulate business activity. a. Emphasize connections with retail corridors including College Avenue, Laurel St., Old Town and the River District. b. Develop examples of on-alley retail/commercial entrances that address a variety of applications. c. Integrate a variety of outdoor spaces within the alleys including outdoor cafe seating, courtyards, plazas and private nooks. d. Emphasize a safe and vibrant ambience using festive lighting, integrated art, architectural treatments, special paving and a variety of types of planting. e. Design alleys with a unique theme/character responding to respective zones and districts within the network. f. Identify opportunities for redevelopment and infill where appropriate. . Develop strategies to integrate operational needs of alleys including service and emergency vehicle access, trash and waste disposal needs, and parking/vehicular access. a. Utilize shared-street models such as Woonerfs (Dutch) and parking courts to allow vehicular access in a controlled and integrated manner. b. Create a trash collection strategy responding to business owners’ needs, while removing receptacles from the pedestrian environment when possible. c. Develop alternative strategies for service vehicle access where possible. d. Identify utility corridors that will significantly effect design decisions. 114 east oak st, fort collins, colorado 80524 p: 970.484.8855 www.russellmillsstudios.com russell+mills studios F o r t C o l l i n s D o w n t o w n A l l e y s M A s t e r P l A n 7 P r o j e C t B A C k G r o u n D 9093 Architectural and Engineering Services for Fort Collins DDA 2020 Alley Renovations Page 33 of 125