HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9192032Date: 11/13/2019
Job #: KJ940-19
Customer ID: CFC
To:
Salesperson Job
Kevin Johnson
513-532-8453
Phone:
970-221-6227
Email:
Job
Deadlines:
n/a
Line Item Description of Work Performed Labor Line Total
1
Steel Materials: 1 1/4X11 GA round tube, 1
1/4 X1 1/4X11 GA sq tube, 12X2X1/4 rect
tube, 1/2" round rod, 1/8X5 strap, L3X3X3/8
angle, 6X4X1/4 rect tube, 3/8X6 strap,
L4X4X3/8 angle, 3/8X2 strap, 1/4X2 strap,
misc. steel
$ - 4,511.71
2
Measurement, Shop drawings,
Coordination, Material Acquisition
$ 854.68 854.68
3 Cut Parts $ 556.47 629.64
4 Tack and fabricate assembly $ 2,428.03 2,458.06
5 Final weld and grind joints smooth $ 913.88 1,355.33
6 Test Fit: n/a $ - -
7
Finish: Ramp and railing sections to have
galvanized finish.
$ 300.00 4,704.33
8
Installation: Installation includes ramp
sections thru-bolted to existing concrete
wall suppports with 3/4" thru-bolts, as per
plans. Top of ramp to tie into existing
conrete wall. Bottom of ramp bolted to
new concrete pad with 5/8" threaded
anchors. Two ramp sections bolted
together per RFI.
$ 2,475.00 2,793.54
9
McNichols parts (bar grating part#:
6601310132, woven wire mesh part #:
36942500) 1/8" diamond plate transition
piece
$ - 4,475.88
10 Telehandler rental $ - 445.00
11 Bending round rod for grab rail brackets $ 75.00 75.00
12 Woven wire mesh processing $ 74.93 74.93
Subtotal $ 22,378.08
Sales tax -
Contract Fee $ 22,378.08
Services Agreement
300 Laporte Ramp
and Railing
(woven wire mesh
C.H. Yarber Construction Steel Fabrication, Supply & Erection
112 Southwest Drive * Cheyenne WY * 82007 * (307) 632-2710
Date: October 14th, 2019
To: Blake Visser / City of Fort Collins
Re: CoFC Op Service Ramp / Fort Collins, CO
Attn: Blake,
In response to the above referenced project, C.H. Yarber Construction is pleased to furnish our proposal
price based on drawings supplied in email on 09/25/19 drawing name CONSTRUCTION DOCUMENTS
Steel - Supply, Fabrication & Erection (Pipe Guardrail) $51,479.00
Detailing & Shop Drawings
Steel per Drawings: A101, AD101, S101
Ramp Steel: HSS Tube, Flat Bar, Plate, Angle, Pipe, Anchor Bolts & Steel to Steel Connection Bolts
Galvanizing, Certified Welders & Operators, (1) Mobilization, Necessary Equipment, Travel
Delivery & Material Tax
Steel - Supply, Fabrication & Erection (Mesh Guardrail) $44,990.00
Detailing & Shop Drawings
Steel per Drawings: A101, AD101, S101
Ramp Steel: HSS Tube, Flat Bar, Plate, Angle, Pipe, Mesh, Anchor Bolts & Steel to Steel Connection
Bolts. Galvanizing, Certified Welders & Operators, (1) Mobilization, Necessary Equipment, Travel
Delivery & Material Tax
Value Engineering available upon request
Excludes: Permits, Fees, Testing, Prevailing Wage, Dust Control, Demolition, Final Painting, Concrete
Work, Rebar, Cold Formed Structural Steel or Metal Studs/Joist, Light Gauge Metals (Less than 11ga), All
Fencing, installation of items not identified, and any items not listed above.
Contingency Items:
1. Vertical or lateral shift on concrete foundations, piers or pilings may result in a Change Order for additional
field welding of structural steel columns, structural steel beams & any misc. metals.
2. Incorrect installation of anchor bolts may cause a delay in the installation of structural steel columns, structural
steel beams and misc. metals may result in a Change Order for additional mobilizations.
3. Foundations, piers or pilings not installed per Construction Documents may result in a Change Order for
redesign and fabrication of structural steel columns, structural steel beams and any misc. metals.
4. All delays in construction / Demolition will result in a Change Order for equipment mobilization and travel.
5. All delays caused by other contractors will result in a Change Order for equipment and travel.
6. Weather delays due to natural disasters not covered.
Continued on next page…….
C.H. Yarber Construction Steel Fabrication, Supply & Erection
112 Southwest Drive * Cheyenne WY * 82007 * (307) 632-2710
C.H. YARBER STANDARD TERMS AND CONDITIONS APPLY. C.H. YARBER CONSTRUCTION
WILL INVOICE PROJECT MONTHLY. QUOTATION VALID FOR 30 DAYS AND IS SUBJECT TO
AVAILABILITY, MILL INCREASES AND SURCHARGES. INDEPENDENT INSPECTORS /
INSPECTION CHARGES WILL BE IN ADDITION TO BID AMOUNT IF REQUIRED. C.H. YARBER
IS NOT AN AISC CERTIFIED FABRICATION SHOP. NOTE: STEEL PRICES GOOD FOR 7 DAYS.
Thank you for considering C.H. Yarber Construction for this project, and we look forward to being of
service to you. If you have any further questions please call us at (307) 632-2710.
Respectfully Submitted,
Preconstruction Services
CC: Kurt Sultzman, CFO
Proposal: 33758356
Date: 10/24/2019
City of Fort Collins
Attn: Blake Visser
To:
Op Services Ramp
300 Laparte Ave.
Fort Collins, CO 80522
Project:
Salesperson
Isaac Hollenbeck Phone: 970.482.2224 Ext: 105 Fax: 970.482.1030
Scope of Work
(1) Ramp structure to have HSS12x2x1/4 stringers per RFI 01, galvanized bar grates and connections per plan. Ramp to
have guardrail with handrail on one side, and handrail on the other side. 16' linear ft. of additional guardrail will be
installed at landing. Guardrail to have 1-1/4" sch. 40 pipe top rail and posts with 1-1/4" sch. 10 pipe horizontal rails.
Handrail to have 1-1/4" sch. 40 pipe rail and posts and flat bar plate at bottom edge. All guardrail and handrail posts to
weld to top of stringers.
Alternate shows pricing for welded wire type guardrail, Prime finish, Powder coat finish, and Galvanize finish.
Welded wire guardrail to have 1-1/4" sch. 40 pipe top rail and posts with 4x4x1/4 welded wire infill.
Drawings submitted prior to fabrication. Install included.
Exclusions
Engineering excluded unless specified.
Reference Extended Price
01 Ramp Framing 16,137.52
02 Ramp Railing 11,833.52
Proposal Total: $ 27,971.04
Acceptance of General Terms and Conditions on Final Page
Accepted by:
Title:
Date:
Page 1 of 4
Distinctive Welding, Inc. Quote
700 West Willox Lane
Fort Collins, CO 80524
www.distinctiveweldinginc.com
Proposal: 33758356
Date: 10/24/2019
Alternate: 01
City of Fort Collins
Attn: Blake Visser
To:
Op Services Ramp
300 Laparte Ave.
Fort Collins, CO 80522
Project:
Salesperson
Isaac Hollenbeck Phone: 970.482.2224 Ext: 105 Fax: 970.482.1030
Description
Welded Wire Guardrail
Reference Extended Price
03 Ramp Railing Welded Wire 10,402.96
Initial to Accept:
Alternate Total: $ 10,402.97
Page 2 of 4
Distinctive Welding, Inc. Quote
700 West Willox Lane
Fort Collins, CO 80524
www.distinctiveweldinginc.com
Proposal: 33758356
Date: 10/24/2019
Alternate: 02
City of Fort Collins
Attn: Blake Visser
To:
Op Services Ramp
300 Laparte Ave.
Fort Collins, CO 80522
Project:
Salesperson
Isaac Hollenbeck Phone: 970.482.2224 Ext: 105 Fax: 970.482.1030
Description
Price for each finish type.
Reference Extended Price
04 Galvanize Finish 6,444.28
05 Powder Coat Finish 2,995.70
06 Prime Finish 1,109.92
Initial to Accept:
Alternate Total: $ 10,549.90
Page 3 of 4
Distinctive Welding, Inc. Quote
700 West Willox Lane
Fort Collins, CO 80524
www.distinctiveweldinginc.com
General Terms and Conditions
1) Time for acceptance of agreement: This agreement and general terms must be signed and returned to the contractor within 30
days of the date or contract will be deemed null and void. Acceptance by contractor of this agreement depends upon approval of
customer by the credit department. The Agreement consists of both the contract and these general terms and conditions.
2) Payment: Deposit may be required prior to any work being completed or material ordered. All progress payments shall be due
within 30 days from invoice date. Final payment shall be upon substantial completion and submittal of the final invoice. Any amount
not paid when due shall bear interest from the due date until paid in full at 18%, or the maximum amount allowed by law.
3) Warranties and limitation on liability: Contractor grants the customer a one year warranty on workmanship. In the event of a claim
of defective workmanship, the notice of the warranty claim must be submitted in writing and must describe the claim in sufficient detail
to determine the nature of the problem(s), and must be signed by the customer.
4) Change orders: Any extra work which is requested of required due to the condition of the building or building code changes shall be
performed only after a written change order, “Addendum”, is signed by the customer upon a contractors change order form, and
delivered to contractor accompanied by full payment for the change order if applicable. A change order may increase or decrease the
price, provided for more or less time to complete work, for more or less materials or labor and other clauses.
5) Work funded by insurance payments: In the event the work is to be funded from insurance proceeds, the insurance company and
the contractor shall agree upon the total price. Customer authorizes the contractor to negotiate directly with the insurance company.
Customer authorizes the insurance company to pay contractor directly for all work performed/provided for herein. If the insurer refuses
to fund necessary work, contractor may terminate the agreement. Homeowner is responsible for paying claim deductible to contractor.
6) Customers covenant noninterference: Customer shall not attempt to direct workers on the site, exclude them from the site, demand
work from them, remove the permit from the site, or interfere in any way with the contractors work.
7) Customers required insurance: Customer shall carry homeowners insurance in the full replacement value of all improvements on
the property and public liability insurance.
8) Contractors required insurance: Contractor shall carry insurance required by law or a contractor.
9) Excess Materials: In order to insure there are enough materials to do the work(s), contractor may order more materials than may be
necessary to complete said work(s). Any access materials will not result in a change of the agreed upon contract price. All materials
remaining after completion of the work shall belong to Distinctive Welding, Inc.
10) Default: In the event that either party defaults in performing any covenant hereof, the non-defaulting party shall deliver to the
defaulting party a dated “notice of default,” specifying the default and requesting the correction thereof. In the event it is not corrected
within ten(10) days after receipt of said notice, the non-defaulting party shall have all remedies at law and in equity for said default. In
addition to any other remedy for default provided for herein or at Colorado law. Contractor shall have the right, but not the obligation
to suspend or terminate its work(s), to retain all deposits then held and to peacefully repossess all materials previously delivered or
installed, for which payment has not been made in full, to remove its equipment from the job site and terminate this agreement.
11) Notices: Any notice shall be sufficient of delivered to the address of the party given in the agreement, by hand or U.S. mail.
12) Assignment: Neither this agreement nor any warranty granted herein is assignable.
13) Act of God and delays: In the event the completion of work is prevented or delayed due to damage or destruction of the building,
fire, accident, vandalism, earth movement, hurricane, tornado, windstorm, theft, labor strikes, warfare, material shortage, delay of any
governmental agency in issuing any required permit or certificate, or in performing inspections, litigation, or any act of God, then the
completion of work shall be delayed until a later date and contractor and customer shall sign a change order reflecting the same. If
customer declines to sign the change order then this agreement may be terminated by contractor where upon all sums then due to
contractor for work(s) completed shall be immediately due and payable to contractor.
14) Time is of the essence for this agreement: Upon the receiving of the first check the work specified in this contract will be put in to
production as fast as possible.
15) Effective date of this agreement: this agreement becomes effective when signed and applicable terms such as insurance
company approval and/or deposit are met.
16) Governing law, venue, waiver of the jury trial and attorney fees: This agreement is to be governed by the law of Colorado. Venue
for any action other than a lien foreclosure may at contractor’s option lie in its home county. The parties intentionally waive the right of
a jury trial, in any litigation arising under this agreement; the prevailing party shall recover its attorney fees and costs.
17) Entire agreement: No prior representation: Amendment: This is the entire agreement upon the contractor and customer. There is
no representation past or present, by contractor or any person acting for contractor, which does not appear herein. This agreement
may not be amended except by a written change order or amendment executed and paid for as provided herein.
18) Severability: Any remaining provisions hereof shall remain in full force and effect.
Acceptance of the contract constitutes agreement to these general terms and conditions
Page 4 of 4
Distinctive Welding, Inc. Quote
700 West Willox Lane
Fort Collins, CO 80524
www.distinctiveweldinginc.com
railing) REV3
Blake Visser
bvisser@fcgov.com
Customer
Contact
Job includes fabrication, galvanized finish, and installation
of new ramp/railling section at 300 Laporte Ave. Material
used includes 12x2x1/4" rectangular tube stringers, bar
grating material for ramp, 1-1/4"x11 gauge square tube
railing frame, 4" o.c. woven wire mesh, and various
rectangular tube, angle iron, and strap for connections to
concrete walls. Ramp/railing to have hot dipped
galvanized finish. Installation includes bolting sections to
existing concrete walls and anchoring to concrete pad at
top of ramp. This quote does not include any demo of
existing ramp/railing. Revision 3 includes addition of
6x12x3/8" plate to splice two sections of ramp together (per
drawings from JVA), addition of welded strap at opening of
bottom of rectangular tube stringer, and addition of
mechanically fastened connections at guard rail splices.
Exclusions: engineering of shop drawings. Demo work.
Concrete work. Note: shop drawings will be designed to
mechanically fasten all parts of assembly during
installation, however some welding/grinding may be
necessary during final install, in this case cold galvanizing
touch up spray will be used as a final protection coating.
$ 30.03
$ 441.45
$ -
$ -
Hueber Industries Inc.
Design & Metal Fabrication
Fort Collins City Clerk
300 Laporte Ave.
Job Description
kevin@hueberi
ndustries.com
Fort Collins, CO 80521
The Contract Fee is subject to change if the cost of materials to complete
the Work or Job materially rises.
$ -
$ -
Materials
4001 John Deere Dr. Unit 1 Fort Collins, CO 80524 970-825-5758 sales@hueberindustries.com
$ 73.17
$ 4,404.33
$ 318.54
$ 4,475.88
$ 445.00
Thank you for your business!
Quotations valid for 30 days from date of quotation
$ 4,511.71
Please sign and return this to signify approval of the SERVICES AGREEMENT and the attached "TERMS AND
CONDITIONS". X______________________________________
NOTE: 25% Deposit required on all work over $2,000