CORRESPONDENCE - BID - 8844 MISCELLANEOUS CONCRETE (44)
11/14/19 202.01 Sawcut Concrete/Asphalt (0" < 4") Lineal Foot 20 $ 3.50 $ 70.00 $ 3.50 $ - 202.02 Sawcut Concrete/Asphalt (4" < 6") Lineal Foot 20 $ 3.65 $ 73.00 $ 3.65 $ - 202.03 Sawcut Concrete/Asphalt (6" < 8") Lineal Foot 20 $ 4.00 $ 80.00 $ 4.00 $ - 202.04 Sawcut Concrete/Asphalt (8" ≤ 10") Lineal Foot 20 $ 5.75 $ 115.00 $ 5.75 $ - 202.05 Sawcut - Additional 1" Depth Lineal Foot 25 $ 1.25 $ 31.25 $ 1.25 $ - 202.06 Remove Concrete Sidewalk Square Foot 2100 $ 3.75 $ 7,875.00 $ 3.75 $ - 202.07 Remove Concrete Curb & Gutter Lineal Foot 850 $ 6.50 $ 5,525.00 $ 6.50 70.00 $ 455.00 202.08 Remove Monolithic Curb, Gutter & Sidewalk Square Foot 1300 $ 3.85 $ 5,005.00 $ 3.85 $ - 202.09 Remove Concrete Driveway/Apron/Crosspan Square Foot 3000 $ 3.75 $ 11,250.00 $ 3.75 $ - 202.10 Remove Concrete Pavement - 10" Square Foot 300 $ 4.00 $ 1,200.00 $ 4.00 $ - 202.11 Remove Concrete Pavement - Additional 1" Depth Square Foot 100 $ 1.05 $ 105.00 $ 1.05 $ - 202.12 Remove Asphalt - 6" Square Foot 200 $ 3.00 $ 600.00 $ 3.00 700.00 $ 2,100.00 202.13 Remove Asphalt - Additional 1" Depth Square Foot 500 $ 1.05 $ 525.00 $ 1.05 2800.00 $ 2,940.00 202.14 Remove Inlet Each 5 $ 525.00 $ 2,625.00 $ 525.00 $ - 202.15 Remove and Haul Driveway Fillet Each 5 $ 50.00 $ 250.00 $ 50.00 $ - 202.16 Remove Flagstone Square Foot 200 $ 3.75 $ 750.00 $ 3.75 $ - 203.01 Excavation - General Less Than 50 CY Cubic Yard 25 $ 42.00 $ 1,050.00 $ 42.00 $ - 203.02 Excavation - General Over 50 CY Cubic Yard 125 $ 32.00 $ 4,000.00 $ 32.00 $ - 203.03 Excavation - Walls Only Cubic Yard 100 $ 22.00 $ 2,200.00 $ 22.00 $ - 203.04 Excavation - New Inlet Each 5 $ 375.00 $ 1,875.00 $ 375.00 $ - 203.05 Borrow - Less than 100 Ton Ton 50 $ 22.00 $ 1,100.00 $ 22.00 $ - 203.06 Borrow - Over 100 Ton Ton 125 $ 21.00 $ 2,625.00 $ 21.00 $ - 207.01 Imported Topsoil Cubic Yard 25 $ 45.00 $ 1,125.00 $ 45.00 $ - 208.01 Stormwater Protection - Rock Filled Wattle Lineal Foot 100 $ 10.00 $ 1,000.00 $ 10.00 $ - 208.02 Stormwater Protection - Recycled Rubber Filled Wattle Lineal Foot 25 $ 17.00 $ 425.00 $ 17.00 $ - 208.03 Stormwater Protection - Straw Bales Each 5 $ 21.00 $ 105.00 $ 21.00 $ - 208.04 SWMP Maintenance Log - 14 Day Inspection Each 5 $ 95.00 $ 475.00 $ 95.00 $ - 210.01 Reset Flagstone Square Foot 100 $ 5.00 $ 500.00 $ 5.00 $ - 210.02 Reset Brick Pavers Square Foot 250 $ 8.00 $ 2,000.00 $ 8.00 $ - 210.03 Adjust Manhole Each 10 $ 105.00 $ 1,050.00 $ 105.00 $ - 604.07 Install New Curb Inlet – 4’ Opening Each 5 $ 1,975.00 $ 9,875.00 $ 1,975.00 $ - 604.08 Curb Inlet – Additional Foot Depth Lineal Foot 10 $ 100.00 $ 1,000.00 $ 100.00 $ - 604.09 Reconstruct Curb Inlet Deck – Remove and Replace Each 10 $ 775.00 $ 7,750.00 $ 775.00 $ - 604.10 Reconstruct Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot 15 $ 100.00 $ 1,500.00 $ 100.00 $ - 604.11 Install New Type R Inlet - 5' Opening Each 10 $ 3,400.00 $ 34,000.00 $ 3,400.00 $ - 604.12 Type R Inlet – Additional Foot Depth Lineal Foot 15 $ 100.00 $ 1,500.00 $ 100.00 $ - 604.13 Reconstruct Type R Inlet Deck – Remove and Replace Each 10 $ 1,250.00 $ 12,500.00 $ 1,250.00 $ - 604.14 Reconstruct Type R Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot 10 $ 125.00 $ 1,250.00 $ 125.00 $ - 604.15 Install New Modified Type 13 Curb Inlet (includes new Frame, Grate & Adjustable Curb Bonnet) Each 5 $ 2,250.00 $ 11,250.00 $ 2,250.00 $ - 604.16 Modified Type 13 Curb Inlet – Additional Foot Depth Lineal Foot 10 $ 100.00 $ 1,000.00 $ 100.00 $ - 604.17 Reconstruct Modified Type 13 Curb Inlet Deck – Remove & Replace Each 6 $ 775.00 $ 4,650.00 $ 775.00 $ - 604.18 Reconstruct Modified Type 13 Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot 10 $ 100.00 $ 1,000.00 $ 100.00 $ - 604.19 Modified Type 13 Curb Inlet – Materials only - (Frame, Grate, & adjustable bonnet (East Jordan Iron Works 7030 or Equivalent Material) Each 5 $ 800.00 $ 4,000.00 $ 800.00 $ - 604.20 Concrete Sidewalk Culvert – 4’ opening Each 5 $ 975.00 $ 4,875.00 $ 975.00 $ - 604.21 Metal Sidewalk Culvert - 2' Opening, Remove & Replace Each 4 $ 775.00 $ 3,100.00 $ 775.00 $ - 604.22 Metal Sidewalk Culvert - 2' Opening, Materials Only Each 5 $ 1,550.00 $ 7,750.00 $ 1,550.00 $ - 604.23 Additional Square Foot 5/8" Plate Square Foot 15 $ 150.00 $ 2,250.00 $ 150.00 $ - 608.01 Driveover Curb, Gutter & 6" Sidewalk Lineal Foot 1,200 $ 42.00 $ 50,400.00 $ 42.00 $ - 608.02 Driveover Curb and Gutter - No Sidewalk Lineal Foot 525 $ 25.00 $ 13,125.00 $ 25.00 $ - 608.03 Vertical Curb, Gutter and 6" Sidewalk Lineal Foot 1000 $ 42.00 $ 42,000.00 $ 42.00 $ - 608.04 Vertical Curb and Gutter - No Sidewalk Lineal Foot 2300 $ 26.00 $ 59,800.00 $ 26.00 70.00 $ 1,820.00 608.05 Out Fall Curb & Gutter Lineal Foot 100 $ 25.00 $ 2,500.00 $ 25.00 $ - 608.06 Hollywood Curb, Gutter and 6" Sidewalk Lineal Foot 500 $ 38.00 $ 19,000.00 $ 38.00 $ - 608.07 Hollywood Curb and Gutter - No Sidewalk Lineal Foot 300 $ 21.00 $ 6,300.00 $ 21.00 $ - 608.08 Highback Curb and Gutter - No Sidewalk Lineal Foot 500 $ 37.00 $ 18,500.00 $ 37.00 $ - 608.09 Barrier Curb - 6" x 18" Lineal Foot 100 $ 25.00 $ 2,500.00 $ 25.00 $ - 608.10 Barrier Curb - Key Way Style Lineal Foot 100 $ - $ - $ - $ - 608.11 Barrier Curb - Epoxy Lineal Foot 150 $ - $ - $ - $ - 608.12 Mountable Curb - 12" x 18" Lineal Foot 125 $ 25.00 $ 3,125.00 $ 25.00 $ - 608.13 Mountable Curb - Keyway Style Lineal Foot 125 $ - $ - $ - $ - 608.14 Mountable Curb – Epoxy Lineal Foot 100 $ - $ - $ - $ - 608.15 Pedestrian Access Ramp Square Foot 750 $ 8.25 $ 6,187.50 $ 8.25 $ - 608.16 Pedestrian Access Ramp, Highback Curb Square Foot 375 $ 8.50 $ 3,187.50 $ 8.50 $ - 608.17 Truncated Dome Panel Square Foot 300 $ 41.00 $ 12,300.00 $ 41.00 $ - 608.18 Apron - 8" Square Foot 1450 $ 8.50 $ 12,325.00 $ 8.50 $ - 608.19 Crosspan - 8" Square Foot 1200 $ 8.50 $ 10,200.00 $ 8.50 $ - 608.20 Valley Pan - 6" Square Foot 608.33 Median Cover - 4" San Diego Buff Square Foot 400 $ 7.85 $ 3,140.00 $ 7.85 $ - 608.34 Fibermesh - Added to Any Item - Additional Charge Pounds / Cubic Yard 75 $ 11.00 $ 825.00 $ 11.00 $ - 608.35 24 Hour High Early Concrete - Added to Any Item - Additional Charge Cubic Yard 25 $ 65.00 $ 1,625.00 $ 65.00 $ - 608.36 Stamp Pattern - Added to Any Item, Additional Charge Square Foot 150 $ 3.00 $ 450.00 $ 3.00 $ - 608.37 6" Concrete Bollard Each 5 $ 465.00 $ 2,325.00 $ 465.00 $ - 608.38 8" Concrete Bollard Each 5 $ 550.00 $ 2,750.00 $ 550.00 $ - 608.39 Flowable Fill Cubic Yard 25 $ 145.00 $ 3,625.00 $ 145.00 $ - 608.40 Non-reinforced Concrete Wall - 8" Square Face Foot 400 $ 18.00 $ 7,200.00 $ 18.00 $ - 608.41 Non-reinforced Concrete Footer - 8" Square Foot 200 $ 18.00 $ 3,600.00 $ 18.00 $ - 608.42 Concrete Staining/Sealing Square Foot 150 $ 4.50 $ 675.00 $ 4.50 $ - 608.43 Expansion and Caulking Lineal Foot 250 $ 4.00 $ 1,000.00 $ 4.00 $ - 608.44 Joint Sealant (Pavement) Lineal Foot 100 $ 5.00 $ 500.00 $ 5.00 $ - 608.45 Irrigation Sleeve Lineal Foot 20 $ 5.00 $ 100.00 $ 5.00 $ - 608.46 Dump Fee Ton 5 $ 58.00 $ 290.00 $ 58.00 $ - 608.47 6" Concrete Median Barrier Curb, Placed (Detail FC703-Section B) (8" Bar paid under 608.48) Lineal Foot 300 $ 21.00 $ 6,300.00 $ 21.00 $ - 608.48 6" Concrete Median Barrier Curb, Drilled (Detail FC703-Section C) Each 300 $ 8.50 $ 2,550.00 $ 8.50 $ - 608.49 Add Domes to Existing Ramp - Remove and Replace Square Foot 500 $ 37.00 $ 18,500.00 $ 37.00 $ - 608.5 Add Domes to Existing Ramp - Dryset Placement Square Foot 40 $ 30.00 $ 1,200.00 $ 30.00 $ - 630.01 "NO PARKING" Sign With Stand Per Each Per Day 375 $ 2.00 $ 750.00 $ 2.00 $ - 630.02 Vertical Panel Without Light Per Each Per Day 400 $ 1.25 $ 500.00 $ 1.25 $ - 630.03 Channelizing Barrels Per Each Per Day 650 $ 1.50 $ 975.00 $ 1.50 $ - 630.04 Type I/II Barricade Without Light Per Each Per Day 800 $ 1.00 $ 800.00 $ 1.00 $ - 630.05 Type III Barricade Without Light Per Each Per Day 25 $ 5.00 $ 125.00 $ 5.00 $ - 630.06 Size A Sign With Stand Per Each Per Day 350 $ 2.00 $ 700.00 $ 2.00 $ - 630.07 Size B Sign With Stand Per Each Per Day 75 $ 2.00 $ 150.00 $ 2.00 $ - 630.08 Size A Specialty Sign - Cost of Manufacturing Each 2 $ 95.00 $ 190.00 $ 95.00 $ - 630.09 Size B Specialty Sign - Cost of Manufacturing Each 2 $ 100.00 $ 200.00 $ 100.00 $ - 630.10 Cone With Reflective Strip Per Each Per Day 3500 $ 0.85 $ 2,975.00 $ 0.85 $ - 630.11 Safety Fence Per Roll Per Day 20 $ 5.00 $ 100.00 $ 5.00 $ - 630.12 Light Per Each Per Day 20 $ 1.00 $ 20.00 $ 1.00 $ - 630.13 Advance Warning Flashing or Sequencing Arrow Panel Per Each Per Day 15 $ 45.00 $ 675.00 $ 45.00 $ - 630.14 Variable Message Board Per Each Per Day 110 $ 90.00 $ 9,900.00 $ 90.00 $ - 630.15 Traffic Control Supervisor Per Day 25 $ 425.00 $ 10,625.00 $ 425.00 $ - 630.16 Traffic Control Supervisor Hour 450 $ 45.00 $ 20,250.00 $ 45.00 $ - 630.17 Flagging Hour 650 $ 26.00 $ 16,900.00 $ 26.00 $ - $ - $ - $ - FA1 Laborer Hour 15 $ 33.00 $ 495.00 $ 33.00 $ - FA2 Foreman Hour 15 $ 50.00 $ 750.00 $ 50.00 $ - FA3 Finisher Hour 15 $ 45.00 $ 675.00 $ 45.00 $ - FA4 Form Setter Hour 15 $ 45.00 $ 675.00 $ 45.00 $ - FA5 Skid Steer Hour 75 $ 85.00 $ 6,375.00 $ 85.00 $ - FA6 Mini Trackhoe Hour 15 $ 95.00 $ 1,425.00 $ 95.00 $ - FA7 Dump Truck Hour 15 $ 75.00 $ 1,125.00 $ 75.00 $ - FA8 Backhoe Hour 15 $ 95.00 $ 1,425.00 $ 95.00 $ - TOTAL COST $ 701,765.50 $ - $ 15,240.00 Traffic Control Devices, Flagging Hours, Dump Fees, Temp Patching, Base Material, Backfill, Top Soil. Actual costs will be invoiced at contractual unit prices. Plus 25% ~ 19,050.00 Transfort $12,965.00 SMP $6,085.00 ADDITIONAL SERVICES 500 $ 7.50 $ 3,750.00 $ 7.50 $ - 608.21 Flatwork - 4" Square Foot 1,850 $ 4.85 $ 8,972.50 $ 4.85 $ - 608.22 Flatwork - 6" Square Foot 3,800 $ 5.85 $ 22,230.00 $ 5.85 $ - 608.23 Replace Flatwork - 1" Additional Depth Square Foot 250 $ 1.10 $ 275.00 $ 1.10 1400.00 $ 1,540.00 608.24 Concrete Pavement 8" (Joints Sealed) Square Foot 1,500 $ 8.65 $ 12,975.00 $ 8.65 700.00 $ 6,055.00 608.25 Alley Approach - 8" Square Foot 1000 $ 8.50 $ 8,500.00 $ 8.50 $ - 608.26 Enhanced Crosswalk - 10" Tile Red Square Foot 450 $ 13.50 $ 6,075.00 $ 13.50 $ - 608.27 Enhanced Crosswalk - 10" San Diego Buff Square Foot 450 $ 13.00 $ 5,850.00 $ 13.00 $ - 608.28 Enhanced Crosswalk - 10" Brick Red, Stamped Square Foot 450 $ 13.50 $ 6,075.00 $ 13.50 $ - 608.29 Colored Trail with Fibermesh - 5" Yosemite Brown Square Foot 400 $ 8.00 $ 3,200.00 $ 8.00 $ - 608.30 Mow Strip - 4" x 12" Lineal Foot 150 $ 9.50 $ 1,425.00 $ 9.50 $ - 608.31 Splashblock - 4" Exposed Aggregate Square Foot 325 $ 7.45 $ 2,421.25 $ 7.45 $ - 608.32 Splashblock - 4" San Diego Buff Square Foot 350 $ 7.85 $ 2,747.50 $ 7.85 $ - 210.04 Adjust Valve Box Each 10 $ 105.00 $ 1,050.00 $ 105.00 $ - 304.01 Aggregate Base Course/Recycled Concrete Base ≤ 5 Tons Ton 75 $ 39.00 $ 2,925.00 $ 39.00 $ - 304.02 Aggregate Base Course/Recycled Concrete Base > 5 Tons Ton 50 $ 38.00 $ 1,900.00 $ 38.00 $ - 304.03 Recycled Asphalt Base Ton 25 $ 26.00 $ 650.00 $ 26.00 $ - 403.01 Asphalt Surface Preservation Lineal Foot 1000 $ 5.00 $ 5,000.00 $ 5.00 $ - 403.02 Temporary Asphalt Patching Ton 100 $ 195.00 $ 19,500.00 $ 195.00 $ - 601.01 Exposed Sand Finish - Additional Charge Square Foot 500 $ 4.00 $ 2,000.00 $ 4.00 $ - 602.01 Reinforcing Steel Pound 250 $ 3.75 $ 937.50 $ 3.75 88.00 $ 330.00 602.02 Reinforcing Steel - Epoxy Coated Pound 250 $ 4.75 $ 1,187.50 $ 4.75 $ - 604.01 Install New Area Inlet Each 5 $ 1,350.00 $ 6,750.00 $ 1,350.00 $ - 604.02 Area Inlet – Additional Foot Depth Lineal Foot 5 $ 100.00 $ 500.00 $ 100.00 $ - 604.03 Reconstruct Area Inlet Deck – Remove & Replace Each 5 $ 775.00 $ 3,875.00 $ 775.00 $ - 604.04 Reconstruct Area Inlet Deck - Additional Foot Opening – Remove & Replace Lineal Foot 5 $ 100.00 $ 500.00 $ 100.00 $ - 604.05 Reconstruct Catch Basin Deck - Remove & Replace Each 10 $ 775.00 $ 7,750.00 $ 775.00 $ - 604.06 Reconstruct Catch Basin Deck - Additional Foot Opening – Remove & Replace Lineal Foot 10 $ 100.00 $ 1,000.00 $ 100.00 $ - Description Unit Contract Quantity Unit Price Total PROJECT ESTMATE UNITS TOTAL W. Elizabeth Bus Pad 2019 Revised Unit Price ADDENDUM 2 BID SCHEDULE 1 - BASE BID (Non-Federal) Item No.