Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9191946Work Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND WORK ORDER NUMBER: PROJECT TITLE: ORIGINAL BID/RFP NUMBER & NAME: MASTER AGREEMENT EFFECTIVE DATE (Contract Signed): WORK ORDER COMMENCEMENT DATE: WORK ORDER COMPLETION DATE: MAXIMUM FEE: (time and reimbursable direct costs): PROJECT DESCRIPTION/SCOPE OF SERVICES: Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of ( ) page(s) are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Date: , ACCEPTANCE: Date: , Project Manager REVIEWED: Date: , Buyer or Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) DocuSign Envelope ID: 362A3B0C-F338-4C2F-AB48-F48055E1801A Spring Canyon Park concrete repairs See attached quote and details for various concrete repairs at Spring Canyon Park. 5/1/2020 10/30/2019 six October 30, 2019 6 $21,005 Jill Wuertz Small and Miscellaneous Concrete Services November 7, 2019 November 1, 2019 Elliot Dale Estimator Fox Construction Systems Reed W Nelson November 12, 2019 Fox Construction Systems, LLC P.O BOX 389 WINDSOR, CO 80550 US estimating@fcsnoco.com Estimate ADDRESS Jill Wuertz Spring Canyon Park Curb & Sidewalk ESTIMATE # DATE EXPIRATION DATE 1033 10/03/2019 10/31/2019 DATE ACTIVITY DESCRIPTION QTY RATE AMOUNT 10/03/2019 DEMOLITION A: Remove and Replace Sidewalk along the north end of the 1st base dugout on the western base ball field (Size of scope is below minimums) 1 2,000.00 2,000.00 10/03/2019 TRUCKING A: Haul Off & Disposal 1 450.00 450.00 10/03/2019 Equipment A: Skid Steer (Concrete will be bucketed in by skid steer) 1 980.00 980.00 10/03/2019 DEMOLITION B: Remove and Replace 4 squares of concrete that have sunken 200 10.00 2,000.00 10/03/2019 TRUCKING B: Haul off & Disposal 1 450.00 450.00 10/03/2019 Equipment B: Skid Steer with Breaker 1 980.00 980.00 10/03/2019 DEMOLITION C: Clear area outlined in attached map, sawcut existing sidewalk, cut and set grade for 2' wide drain pan and catch pan, Labor and Materials to form and pour new concrete. Slope concrete to center (drain pan) then to the north. 175 10.00 1,750.00 10/03/2019 Structural Fill / Base Course C: Import & Placement of Structural Base Course 175 2.50 437.50 10/03/2019 TRUCKING C: Haul off & Disposal 1 450.00 450.00 10/03/2019 Equipment C: Skid Steer 1 980.00 980.00 10/03/2019 Equipment C: Mini Excavator 0.50 870.00 435.00 10/03/2019 DEMOLITION D: Demo Existing Curb and adjacent flatwork to make room for new 2' wide curb & gutter, (Sawcutting, Jackhammer includes skid steer) 350 5.00 1,750.00 10/03/2019 Equipment D: Skid Steer with Breaker 1 980.00 980.00 10/03/2019 Structural Fill / Base Course D: Import & Placement of Structural Base Course 350 2.50 875.00 10/03/2019 Rebar & Reinforcing Steel D: Furnish, Drill and Install #4 dowels 18" OC 175 4.50 787.50 10/03/2019 CONCRETE D: Labor & Material to Form & Pour 20 380.00 7,600.00 DocuSign Envelope ID: 362A3B0C-F338-4C2F-AB48-F48055E1801A DATE ACTIVITY DESCRIPTION QTY RATE AMOUNT Curbing 10/03/2019 TRUCKING D: Haul Off & Disposal 2 450.00 900.00 10/03/2019 Discount DISCOUNT if all options are chosen (Combines equipment, trucking cost and removes minimums charge) 1 -2,800.00 -2,800.00 NOTES: - See attachment for area map - Areas of work will be taped off with caution tape, expected duration if all options are selected. - Fort Collins Parks to remove the fencing for option C, additionally they will provide the rough grading on the north side of the path (remove the tree / shrub and provide access) -Expected Durations -- A: one day -- B: one day -- C: one-two days -- D: two-three days --If all selected: 4-5 days EXCLUSIONS: - Winter Conditions - Overtime / After Hours Work - Traffic Control - Landscaping of any kind (Unmarked irrigation lines may be hit by form stakes) - Irrigation Work - Caulking - Pumping TOTAL $21,005.00 Accepted By Accepted Date DocuSign Envelope ID: 362A3B0C-F338-4C2F-AB48-F48055E1801A DocuSign Envelope ID: 362A3B0C-F338-4C2F-AB48-F48055E1801A DocuSign Envelope ID: 362A3B0C-F338-4C2F-AB48-F48055E1801A DocuSign Envelope ID: 362A3B0C-F338-4C2F-AB48-F48055E1801A DocuSign Envelope ID: 362A3B0C-F338-4C2F-AB48-F48055E1801A