Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9191924Work Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND WORK ORDER NUMBER: PROJECT TITLE: ORIGINAL BID/RFP NUMBER & NAME: MASTER AGREEMENT EFFECTIVE DATE (Contract Signed): WORK ORDER COMMENCEMENT DATE: WORK ORDER COMPLETION DATE: MAXIMUM FEE: (time and reimbursable direct costs): PROJECT DESCRIPTION/SCOPE OF SERVICES: Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of ( ) page(s) are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Date: , ACCEPTANCE: Date: , Project Manager REVIEWED: Date: , Buyer or Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) DocuSign Envelope ID: 0B0B528E-8DD7-4A63-94D9-6634D98FC704 $4,070 Small and Miscellaneous Concrete Jill Wuertz 3 10/30/2019 ADA Playground Ramp. See attached quote and scope documents. October 30, 2019 Westfield ADA ramp 5/1/2020 three November 7, 2019 November 1, 2019 Elliot Dale Reed W Nelson Estimator Fox Construction Systems November 7, 2019 Fox Construction Systems, LLC P.O BOX 389 WINDSOR, CO 80550 US estimating@fcsnoco.com Estimate ADDRESS Jill Wuertz Westfield Park ADA Ramp ESTIMATE # DATE EXPIRATION DATE 1028 10/03/2019 10/31/2019 P.O. NUMBER SALES REP 1027 Reed Nelson DATE ACTIVITY DESCRIPTION QTY RATE AMOUNT 10/03/2019 DEMOLITION Remove & Replace sidewalk adjacent to corner where ADA ramp is to be installed 24 10.00 240.00 10/03/2019 EXTERIOR FLATWORK Excavate, Form & Pour ADA Ramp 100 9.50 950.00 10/03/2019 Structural Fill / Base Course Import & Placement of Structural Base Course 1 400.00 400.00 10/03/2019 Equipment Skid Steer, with breaker attachment 1 980.00 980.00 10/03/2019 CONCRETE MATERIAL Concrete Material 5 140.00 700.00 10/03/2019 Concrete Pumping Concrete Line Pump 1 800.00 800.00 NOTES: - Access is very limited, all demo & materials will be hauled in & out by skid steers - Concrete price will increase $7/CY as of 11/1/2019 due to winter conditions - FCS will provide caution tape around the work area, expected duration is one to two days - All effort will be made to avoid using the access adjacent to the school, if that access is required we will have a spotter walk with the equipment to ensure children and other pedestrians remain clear EXCLUSIONS: - Winter Conditions - Overtime / After Hours Work - Stamped / Colored Concrete - Landscaping or any kind - Traffic / Pedestrian Control beyond what is outlined TOTAL $4,070.00 Accepted By Accepted Date DocuSign Envelope ID: 0B0B528E-8DD7-4A63-94D9-6634D98FC704 DocuSign Envelope ID: 0B0B528E-8DD7-4A63-94D9-6634D98FC704 DocuSign Envelope ID: 0B0B528E-8DD7-4A63-94D9-6634D98FC704