Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8371 ARCHITECTURAL & ENGINEERING SERVICES ON-CALL (16)Work Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND AU WORKSHOP WORK ORDER NUMBER: PR-600315 PROJECT TITLE: Carnegie Building – ADA Elevator Improvements ORIGINAL BID/RFP NUMBER & NAME: 8371 – Architectural & Engineering Services On- Call MASTER AGREEMENT EFFECTIVE DATE: 12/22/2016 WORK ORDER COMMENCEMENT DATE: 10/31/2019 WORK ORDER COMPLETION DATE: 12/31/2020 MAXIMUM FEE: (time and reimbursable direct costs): $35,965 PROJECT DESCRIPTION/SCOPE OF SERVICES: Provide Architectural, Electrical, and structural design services for the installation of a new ADA elevator per the attached proposal dated October 14, 2019 Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of 3 (Three) page(s) are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Date: Jason Kersey, Managing Principal ACCEPTANCE: Date: Mark McLean, Project Manager REVIEWED: Date: Elliot Dale, Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) 04 November 2019 11/7/2019 11/7/19 Page 1 14 October 2019 Mark McLean Facilities Project Manager City of Fort Collins | Operation Services 300 Laporte Ave. Fort Collins, CO 80522 RE: City of Fort Collins | Carnegie Building ADA Elevator Improvements Dear Mark, [au]workshop is pleased to provide you with this fee proposal for ADA Improvements to the existing elevator at the Carnegie Center for Creativity Building located at 200 Mathews Street. PROJECT UNDERSTANDING, SCOPE OF WORK AND DELIVERABLES We understand the scope of the project is to provide design through construction administration services for structural, electrical and architectural design related to the improvements for ADA compliance as outlined below. Elevator upgrade and expansion. The elevator shaft will be expanded to the west and potentially the north to allow for a new larger elevator cab that fully complies with ADA requirements and the associated hoist way. The hoistway may also need to be extended vertically if a new elevator requires the typical 13’ of overrun (current hoistway provides approximately 10’). We will confirm this with the selected elevator manufacture during the design process. FEES and EXPENSES For tasks described above, we propose a time and reimbursable direct cost basis under this agreement using our standard Hourly Rate Chart (per the Professional Service Agreement). Fee Schedule Total fee for work described will be $29,865 without Roof Modifications & $35,965 with Roof Modifications. Please see attached fee schedule (Attachment A) for a complete breakout of fees by consultant and by task. Reimbursable Expenses Reimbursable expenses are not anticipated, but if incurred will be in addition to the fees stated above and will be invoiced at their actual cost. Reimbursable fees will be incurred only with prior approval by City of Fort Collins. City of Fort Collins | Carnegie Building ADA Elevator Improvements Page 2 AGREEMENT By signing below, you agree to the provisions of this proposal. Authorizing services described in this Proposal shall be construed to mean agreement with the Professional Services Agreement executed on 22 December 2016 and renewed on 19 December 2018. Should you have any inquiries, please do not hesitate to contact us at your convenience. Sincerely, [au]workshop, llc. Jason Kersley, AIA LEED AP Managing Principal A G R E E D: By: (signature) ________________________________ Date: ______________________ Printed name: ________________________________ Attachments: Fee Schedule ATTACHMENT A ARCHITECTURAL TASK 1: SCHEMATIC DESIGN Project Kick-Off 2 1 2 4 $110.00 $440.00 Site Visit/As-Builts (Total of Listed Tasks Below) 9 9 $110.00 $990.00 Measure Building 2 Demo Drawings 3 Create Base Plan 4 Proposed Floor Plans 6 6 $110.00 $660.00 Review meeting 2 1 2 4 $110.00 $440.00 SCHEMATIC DESIGN TOTAL 23 $2,530.00 TASK TWO: CONSTRUCTION DOCUMENTATION Plans (Total of Listed Drawings Below) 17 17 $110.00 $1,870.00 Code & Accessibility Review 3 Floor Plan and Schedules 6 RCP 2 Enlarged Plans 6 On-Sheet Specifications 4 4 $110.00 $440.00 Interior Details 10 10 $110.00 $1,100.00 Initial Finish Selection and Review Meeting 2 2 $110.00 $220.00 Finalize Finishes (research/specify) 2 2 $110.00 $220.00 Coordinate w/ Elevator Manufacture 6 6 $110.00 $660.00 Coordinate City Submittal w/ GC 5 5 $110.00 $550.00 Coordinate Consultants (Total of Listed Tasks Below) 12 12 $110.00 $1,320.00 General coordination 5 Coordinate Structural 4 Coordinate Electrical 3 CONSTRUCTION DOCUMENTATION TOTAL 58 $6,380.00 TASK TWO-TWO: CONSTRUCTION DOCUMENTATION W/ Roof Modifications Plans (Total of Listed Drawings Below) 10 10 $110.00 $1,100.00 TASK THREE: BIDDING/CONSTRUCTION ADMINISTRATION Site visits 1 3 2 6 $110.00 $660.00 Weekly Construction Meetings 1 10 2 20 $110.00 $2,200.00 RFI Response 8 8 $110.00 $880.00 Submittals (see detail below) 10.5 10.5 $110.00 $1,155.00 CONSTRUCTION ADMINISTRATION TOTAL 44.5 $4,895.00 ARCHITECTURAL DESIGN SUB-TOTAL 125.5 $13,805.00 STRUCTURAL ENGINEERING $7,000.00 Construction Documents $4,000.00 Construction Administration $3,000.00 STRUCTURAL ENGINEERING - w/ Roof Modifications $12,000.00 Construction Documents $7,000.00 Construction Administration $5,000.00 MECHANICAL/PLUMBING ENGINEERING $0.00 Design Development $0.00 Construction Documents $0.00 Construction Administration/Retainage $0.00 Electronic As-Builts $0.00 ELECTRICAL ENGINEERING $6,600.00 Construction Documents $4,800.00 Construction Administration $1,800.00 COST ESTIMATING $2,460.00 Cost Estimation $2,460.00 TOTAL: 125.5 $29,865.00 TOTAL - w/ Roof Modifications: 135.5 $35,965.00 Total Fee $110.00 AVG. HOURLY RATE Occurance Staff Hours per Task Total Hours $6,100 to be held as contingency only to be used in the event the roof modifications are required. -Mark McLean 10/31/2019