Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 8083 MISCELLANEOUS STREET IMPROVEMENTS (4)10/21/19 Connell Resources, Inc. 7785 Highland Meadows Pkwy, #100 Fort Collins, CO 80528 Phone: (970) 223-3151 Fax: (970) 223-3191 Estimator: Dan Giesler QUOTATION Date: 10/11/2019 Submitted To: Ditesco Bid Title Transfort Bus Barn Removals Address: 1315 Oakridge Dr. Suite 120 Bid Number: Fort Collins, CO 80525 Project Location: Portner @ Trilby Contact: Nathaniel Johnson Project City, State: Fort Collins, CO Phone: 970-988-8605 Fax: Engineer/Architect: Ditesco Item # Item Description Estimated Quantity Unit Unit Price Total Price 10.001 Mobilization / Site Management 1.00 LS $1,420.00 $1,420.00 22.202 Remove Concrete Flatwork 6" 8.00 HR $642.00 $5,136.00 22.302 Sawcut Concrete 6" 100.00 LF $5.40 $540.00 29.101 Pothole Existing Utilities 4.00 HR $243.00 $972.00 Total Bid Price: $8,068.00 Notes: • Pricing is based upon conversation & site visit with Nathaniel from Ditesco and no Geotechnical Engineering report or information • The following are excluded from this proposal: Construction layout and engineering; Drainage facility certification; Warrantee period in excess of one year; Street cleaning for work performed by others; Permits: including but not limited to, city building, development construction, construction dewatering, wastewater discharge, storm water discharge (NPDES), air quality, etc.; Fees, including but not limited to, for development, inspection, utility connection, meters, etc.; Dewatering; Maintenance of erosion control devices for others; quality control or acceptance testing; prairie dog removal, relocation, or extermination; landscaping, seeding, or revegetation. • Material prices for pipeline Items are guaranteed for a period of 30 days from the date shown on the top of this quote. After 30 days the material prices may change the unit prices quoted. • Connell will install fire line to the extent agreed upon, Connell will notify the sponsor so that a certified fire protection contractor is available to inspect the installation, pressure test, and blow off of the fire line, Connell will only perform these tests once. • Environmental site assessment / mitigation of hazardous or contaminated materials is excluded. Treatment or testing for contaminated groundwater is specifically excluded. • Add 1% to include performance and payment bond. ACCEPTED: The above prices, specifications and conditions are satisfactory and hereby accepted. Buyer: Signature: Date of Acceptance: CONFIRMED: Connell Resources, Inc. Authorized Signature: Estimator: Dan Giesler 970-223-3151 dgiesler@connellresources.com 10/11/2019 9:47:28 AM Page 1 of 1