Loading...
HomeMy WebLinkAboutRFP - 9068 CM/GC SERVICES FOR THE LINDEN STREET RENOVATION PROJECTRFP 9068 CM/GC Services for Linden St Renovations Page 1 of 130 REQUEST FOR PROPOSAL 9068 CM/GC SERVICES FOR THE LINDEN STREET RENOVATION PROJECT The City of Fort Collins (City) is seeking proposals from qualified Contractors for Construction Manager/General Contractor (CM/GC) services related to the design and construction of the renovation of the 200 block of Linden Street in Historic Downtown Fort Collins. As part of the City’s commitment to Sustainable Purchasing, proposals submission via email is preferred. Proposals shall be submitted in a single Microsoft Word or PDF file under 20MB and e-mailed to: purchasing@fcgov.com. If electing to submit a hard copy proposal we require one (1) hard copy and one (1) electronic copy on a jump drive to be received at the City of Fort Collins' Purchasing Division, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524. Proposals must be received before 3:00 PM (our clock) on January 17, 2020 and referenced as Proposal No. 9068. If delivered, they are to be sent to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado 80524. If mailed, send to the attention of the Purchasing Division at address is P.O. Box 580, Fort Collins, 80522-0580. Please note, additional time is required for RFPs mailed to the PO Box to be received at the Purchasing Office. Prohibition of Unlawful Discrimination: The City of Fort Collins, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d- 4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The City strictly prohibits unlawful discrimination based on an individual’s gender (regardless of gender identity or gender expression), race, color, religion, creed, national origin, ancestry, age 40 years or older, marital status, disability, sexual orientation, genetic information, or other characteristics protected by law. For the purpose of this policy “sexual orientation” means a person’s actual or perceived orientation toward heterosexuality, homosexuality, and bisexuality. The City also strictly prohibits unlawful harassment in the workplace, including sexual harassment. Further, the City strictly prohibits unlawful retaliation against a person who engages in protected activity. Protected activity includes an employee complaining that he or she has been discriminated against in violation of the above policy or participating in an employment discrimination proceeding. The City requires its vendors to comply with the City’s policy for equal employment opportunity and to prohibit unlawful discrimination, harassment and retaliation. This requirement applies to all third-party vendors and their subcontractors at every tier. A pre-proposal meeting will be held at 2:00 PM MST, on January 6, 2020, in Training Room 2E, at 215 N Mason St., Fort Collins. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing RFP 9068 CM/GC Services for Linden St Renovations Page 2 of 130 All questions should be submitted, in writing via email, to Elliot Dale, Senior Buyer, Elliot Dale, Senior Buyer, at edale@fcgov.comedale@fcgov.com, with a copy to Nicole Hahn, Project Manager, at nhahn@fcgov.com, no later than 5:00 PM MST (our clock) on January 8, 2020. Please format your e-mail to include: RFP 9068 CM/GC Services for Linden Street Renovation in the subject line. Questions received after this deadline may not be answered. Responses to all questions submitted before the deadline will be addressed in an addendum and posted on the Rocky Mountain E-Purchasing System webpage. Rocky Mountain E-Purchasing System hosted by Bidnet A copy of the RFP may be obtained at http://www.bidnetdirect.com/colorado/city-of-fort-collins. Public Viewing Copy: The City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any proposals submitted hereunder are subject to public disclosure by the City pursuant to CORA and City ordinances. Vendors may submit one (1) additional complete proposal clearly marked “FOR PUBLIC VIEWING.” In this version of the proposal, the Vendor may redact text and/or data that it deems confidential or proprietary pursuant to CORA. Such statement does not necessarily exempt such documentation from public disclosure if required by CORA, by order of a court of appropriate jurisdiction, or other applicable law. Generally, under CORA trade secrets, confidential commercial and financial data information is not required to be disclosed by the City. Proposals may not be marked “Confidential” or ‘Proprietary’ in their entirety. All provisions of any contract resulting from this request for proposal will be public information. New Vendors: The City requires new Vendors receiving awards from the City to fill out and submit an IRS form W-9 and to register for Direct Deposit (Electronic) payment. If needed, the W-9 form and the Vendor Direct Deposit Authorization Form can be found on the City’s Purchasing website at www.fcgov.com/purchasing under Vendor Reference Documents. Please do not submit with your proposal. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. Collusive or Sham Proposals: Any proposal deemed to be collusive or a sham proposal will be rejected and reported to authorities as such. Your authorized signature of this proposal assures that such proposal is genuine and is not a collusive or sham proposal. The City of Fort Collins reserves the right to reject any and all proposals and to waive any irregularities or informalities. Utilization of Award by Other Agencies: The City of Fort Collins reserves the right to allow other state and local governmental agencies, political subdivisions, and/or school districts to utilize the resulting award under all terms and conditions specified and upon agreement by all parties. Usage by any other entity shall not have a negative impact on the City of Fort Collins in the current term or in any future terms. RFP 9068 CM/GC Services for Linden St Renovations Page 3 of 130 The selected Vendor shall be expected to sign the City’s standard Agreement prior to commencing Services (see sample attached to this Proposal). Sincerely, Gerry Paul Purchasing Director Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 4 of 130 I. PROJECT SCOPE OF WORK AND REQUIREMENTS A. General Information The City is planning to renovate the section of Linden Street between Walnut and Jefferson Streets. The City envisions a more vibrant, pedestrian oriented urban street in the heart of Old Town Fort Collins. The project’s goals can be simplified as transforming Linden Street from a street you go through to a street you go to. The project has identified specific goals that are imperative to carry from the design phase into the construction phase. The ideal CM/GC team member would integrate these project goals into their approach for construction: 1. Bridge the Gap a) Provide cohesive materials and palette that bind Old Town and the River District b) Allow unimpeded movement between the two spaces 2. Flexible Space a) Provide for year-round use b) Easily convert the space for events 3. Economic Vitality a) Provide a safe environment at all times, at all events b) Minimize construction disruption c) Finish the project with no business loss or claims d) Draw customers and enhance healthy economic environment 4. Partnerships a) Provide for sustained stakeholder engagement b) Ensure Downtown Development Authority/Downtown Business Association support throughout project 5. World Class Experience a) Design and build an easily maintained space b) Develop an award-winning project 6. Honoring the Past, Planning for the Future a) Integrate historical context into design and art b) Complement historical elements through thoughtful urban design The planned improvements will provide for larger patio enhancements, a dedicated urban amenity zone, a more defined pedestrian space, on-street parallel parking, and two shared use travel lanes. The planned improvements do not include a vertical curb and gutter; providing the ability to transform Linden Street into a roadway that can safely accommodate public gatherings by closing it to vehicular and bicycle traffic. This project is a partnership between numerous stakeholders, including the Downtown Development Authority, the Downtown Business Association, adjacent property and business owners, and others. The project will draw inspiration from the historic context of Linden Street. An emphasis on high quality project finishes is standard in Old Town Fort Collins. Planned improvements include: • Pre-cast Concrete paver roadway and sidewalks • Irrigated landscaping (seasonal and permanent) • Pedestrian scale lighting • Tivoli lighting • Urban amenities including bike parking, unique seating, game and bistro tables, shade structures, planter pots, etc. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 5 of 130 The design for the Linden Street Improvements are approximately 30% complete and are available in Attachment 1. For the purposes of this RFP, the City is seeking innovative phasing approaches to accelerate the project delivery while minimizing impacts to the local business community. The City is looking for a phasing plan that balances the project schedule requirements with stakeholder concerns (i.e. access, construction coordination, messaging, impacts, etc.). Construction constraints include: • Maintaining continuous ADA accessible access to all business storefronts during operating hours for the project duration • Minimizing all business disruption including utility outages • Protecting historic building facades and foundations • Protecting and maintaining existing street trees during construction. Maintaining all business operations including trash service, deliveries, point of sale facilities and customer access. • The project will be required to be phased in pieces so as not to close more than a quarter/quadrant of Linden between Walnut and Jefferson. • Bohemian Nights at New West Fest is scheduled for August 14, 15 and 16, 2020. The project should be at a state of completion such that the Walnut and Linden intersection is open and accessible for festival use. Work on Linden Street should either be complete or reopened to festival pedestrian traffic. Additional project constraints and requirements will be developed in partnership with the selected CM/GC and impacted stakeholders. The CM/GC is encouraged to discuss innovative approaches and options to phasing in order to accelerate the project schedule. Any cost savings or efficiencies gained with phasing or construction techniques should also be considered. Local funds will be used for the construction of the improvements. The anticipated “total” project budget is approximately $3,800,000 for design, right-of-way and construction for the entire Linden Renovation Project. This value includes approximately $60,000 for five years of maintenance. The prioritized Project Goals for the project are: 1. Achieve a partial project opening in late July 2020. 2. Minimize inconvenience to the traveling public and maintain ADA accessible business access during construction – vehicular and pedestrian. 3. Provide real time project coordination and logistics planning with the business community and adjacent stakeholders. 4. Develop positive working relationships with local businesses with a focus on clear, consistent and accurate communication regarding design and construction impacts. 5. Provide high-quality project finishes consistent with the quality of historic Downtown Fort Collins including urban design elements and landscaping. The CM/GC is asked to address their approach to accomplishing these goals in their proposal. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 6 of 130 Project stakeholders include the Downtown Development Authority, Downtown Business Association, Bohemian Foundation, adjacent active construction projects, local businesses and residents on and near Linden, and the traveling public. This RFP shall cover construction management and general contractor services for all of the work identified above and in all attachments. B. Project Status The City entered into an agreement with Ditesco Project and Construction Services to provide the final engineering design for the Linden Street Renovations and to provide consultant support services for the CM/GC process. The project design team has progressed the urban design, civil, grading, and drainage plans to an aggregate 30% design level and provided the plans with the RFP as Attachment 1. It is not anticipated that the design will change significantly from these plans to the final design. Some phasing constraints and initial thoughts have been provided in Section A. General Information, but the City is requesting the CM/GC to expand upon these phasing concepts and propose new thoughts and ideas in their proposal. Final phasing and scheduling will be discussed and agreed upon by all parties throughout the preconstruction phase of the CM/GC contract. The following general timelines for design and phasing milestones are as follows: • 60% Plans Design Submittal February, 2020 • Early work and procurement package March 2020 • CM/GC 90% Estimate Late March, 2020 • Final Design Plan Submittal April,2020 • Final Phasing Plan Submittal On or before April 1, 2020 • Construction Notice to Proceed (NTP) On or before May 1, 2020 • Partial Project Opening Late July 2020 • Project Final Completion September 2020 The City is aware that subcontractor procurement will be a key date and milestone for any major subcontractors. The exact timeline for final procurement will be determined with the selected CM/GC. The CM/GC is encouraged to identify any key subcontractors that they anticipate using in their proposal and discuss their qualifications. This shall include, at a minimum, electrical and hardscape subcontractors. C. CM/GC Scope of Work CM/GC is a contracting method that involves the general contractor in the design process. The selected CM/GC will be required to enter into a Services Agreement – Work Order type for Preconstruction Support Services and Construction Work Order Agreement for construction. The City anticipates award of separate Work Orders for each phase of the project including; 1) Preconstruction Support Services; 2) Early work package and 3) Construction Services. The intent is to form a strong partnership with the City of Fort Collins (the Owner), the entire design Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 7 of 130 team, and the selected CM/GC team. to effectively collaborate through the design process to minimize risk, improve the construction schedule, promote innovation, and provide cost-efficient construction. 1) Preconstruction Support Services The CM/GC team relies on the expertise of the CM/GC to deliver a better product in less time and at a cost competitive with traditional design-bid-build construction processes. a) Provide a designated representative to participate in the design effort, which will begin upon contract award. This may include: attending key design team meetings, regular communication and coordination with the design team throughout design, preparation of cost estimates at key times in the design process, and providing input / insight on the project design and collaboration between disciplines to reduce cost and avoid discrepancies between plan sets that could impact construction costs and/or schedule. b) The CM/GC is required to provide the following expertise during the Preconstruction Support Services Phase of the project: • The skills, knowledge and experience necessary to coordinate the project work with stakeholders. • The skills and knowledge to estimate the quantities of materials, labor, and equipment needed to construct the project. • The ability to communicate with, coordinate and schedule subcontractors and obtain accurate and detailed pricing and schedules to be incorporated into the overall project. • The skills and knowledge to determine the tasks (work breakdown structure) needed to complete the project and estimate the costs, duration, and sequence of these tasks. • An understanding of the availability, cost, and capacities of materials, labor, and equipment. • The skills and knowledge to identify potential risks (including cost risks) and methods to mitigate them during the design process. • The skills and knowledge to determine constructability of various designs and to develop construction phasing and maintenance of traffic schemes for various designs. • The skill, knowledge and commitment to provide protection of existing trees throughout construction. • The skills, knowledge and experience necessary to coordinate the project work with anticipated utilities conflicts and relocations. This includes relocation of stormwater inlets and pipelines, existing lighting, and existing irrigation systems with proposed new infrastructure improvements. • The ability to coordinate with adjacent development project c) Partnering: The City expects a strong partnering relationship with the selected CM/GC. A formal Partnering Session will be held with the selected CM/GC and primary subcontractors, City of Fort Collins team members, contract Architects and Engineers soon after the selection process is completed. A successful CM/GC project delivery requires an environment where trust and teamwork prevent disputes, fosters a cooperative bond to everyone’s benefit, and facilitates the completion of a successful Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 8 of 130 project. Adversarial relationships between the CM/GC and Owner will not be acceptable on the project and could lead to the termination of the contract. d) Initial Risk Assessment Workshop: Participate in an initial project introduction and Risk Assessment workshop. The workshop will be conducted in Fort Collins and will include the following tasks: • Project site walk thru • Introduction to the project and the project stakeholders • Project status, goals, objectives, funding, etc. • Presentation of project elements • Review phasing options for construction • Development of alternative phasing concepts • Assessment of primary project risks in terms of cost, quality and schedule e) Design Reviews and Construction Phasing (collaborative design development): Participate in formal design review and construction phasing development. For each review the CM/GC may be asked to perform any or all of the following tasks: • Provide constructability reviews, design refinement, and optimization of project budget through design refinements to ensure project budget and design standards are maintained • Work with the designer to prepare draft construction phasing and maintenance of traffic/access schemes to ensure completion of the project in the most expeditious manner possible • Ensuring existing operations of local businesses • Develop construction schedules • Provide construction cost estimates • Provide a procurement and implementation strategy to leverage project funding, and ensure quality products • Perform a risk assessment in terms of cost, quality and schedule • Provide ongoing risk assessment to reduce risk, cost and schedule • Engage and coordinate with stakeholders, property owners, and design team The CM/GC may be asked to perform any of the above tasks throughout the design phase, and not necessarily during formal design reviews. It is anticipated the CM/GC will be fully engaged throughout the design process and be willing to provide input when requested. The CM/GC shall be compensated for all of their time spent providing design assistance as identified above, in accordance with the Preconstruction Support Services Work Order. For the purposes of the preconstruction cost proposal, the CM/GC shall assume the following: • Meeting attendance at ten (10) design meetings. • Attendance at special meetings focused on particular elements of the work – anticipate two, two-hour meetings. • Design package review workshops shall occur at the 60% and 90% phases. This shall include review of design, constructability, value engineering opportunities, and project phasing. The CM/GC shall assume two, four-hour work sessions for these meetings. CM/GC participation in these sessions is expected. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 9 of 130 • The CM/GC is expected to provide cost estimating and Guaranteed Maximum Price (GMP) development services at the 60% and 90% levels of contract document completion. A final GMP for each work package is expected at the 90% completion level. The CM/GC is expected to provide cost estimates to accurate market conditions at the 60% and 90% stages. The CM/GC may be required to engage and coordinate with stakeholders and property owners prior to construction. f) Coordination with project critical trades: The City is aware that several components of the work may be performed by subcontractors to the CM/GC depending on the selection of the CM/GC, particularly any detailed urban design work. Should this or other significant portions of the work be completed by a subcontractor, it is expected that those subcontractors be available throughout the Preconstruction Support Services Phase of the project and adhere to the City’s “open book” negotiation policy as required. The City shall be involved with the procurement of any subcontractors performing significant and critical work that weren’t identified as part of the project team with the original proposal. The City shall determine, at its sole discretion, any items that may be considered significant and critical work. It is expected that the CM/GC involve the City in the subcontractor procurement process and work together with the City to procure acceptable contractors in terms of scope, schedule, budget and quality. Examples of trades the City would consider to be significant and critical may include, but not be limited to: • Electrical • Concrete/Hardscapes • Masonry • Traffic control • Landscaping and irrigation • Lighting/electrical and urban design elements The selected CM/GC will be awarded a Services Agreement – Work Order type for Preconstruction Support Services, prepared and administered by the City. The cost of the Work Order will be based upon the CM/GC’s initial Preconstruction Services fee proposal, a final negotiated scope, total hours and unit rate for each key employee for “Preconstruction Support Services”. Any primary subcontractors identified as part of the project team shall be included in the cost of the Work Order established for “Preconstruction Support Services”. The City will compensate the CM/GC for preconstruction services on a time and material basis, based upon the fee proposal. 2) CM/GC Process and Fees The City intends to negotiate a Guaranteed Maximum Price (GMP) contract that shall cover the entire scope of construction services with the selected CM/GC and may require the City’s “Open Book Negotiation Process”. A final schedule of values will be negotiated with the selected CM/GC based on the accepted GMP. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 10 of 130 The CM/GC shall include overhead, profit and markup rates to develop the cost of work. Overhead, profit and markup rates for development of the cost of work will be set forth in the Master Services Agreement. The Engineers Joint Contract Document Committee (EJCDC) contract documents will be used on this project. The Owner will have specific modifications to the contract documents. The contract type will be GMP fixed fee, with open book pricing and cost control. The CM/GC may use pre-qualified bidders for subcontracted work. Specialty subcontractors may be selected through pre-qualification; bidding; or qualification-based selection at the discretion of the Owner and CM/GC at the time of procurement. a) Construction Contract Price Negotiations Price Negotiation Process: The following procedures will be used for Construction Contract Price Negotiations. i. Selection of the CM/GC through RFP process and issuance of a Services Agreement – Work Order type for Preconstruction Support Services and paid as described above. ii. The CM/GC will develop progressive cost estimates based upon both CM/GC and subcontractor estimates. The CM/GC should have capacity to provide cost estimates for work in-house using cost data and known project specifics. iii. Upon completion of the contract drawings and specifications, the CM/GC will complete an open bidding process to solicit bids from subcontractors. This process will be open- book with Owner verification and participation of the process. Final value-selection of subcontractors will be completed by the project team. iv. The total cost of the work will be developed based upon CM/GC markups, as established in the Master Services Agreement. v. The City will produce an independent construction cost estimate for the work. At the discretion of the City, the City may engage a third-party cost estimator to assist with the development of the independent construction cost estimate. vi. Upon reviewing the CM/GC’s price, the City will determine its acceptability by comparing it to its independent construction cost estimate, by reviewing the competitive quotes, or employing other factors as determined to be in the best interest for the project. vii. If the City determines the price is acceptable, the City and CM/GC will work to segregate the GMP into schedule of values for pay application purposes. viii. The City will prepare a Work Order for construction services. If a previous Work Order for construction services had been entered into, this work may be added to that contract by change order. ix. If the price is not acceptable, the City and the CM/GC will conduct a price negotiation meeting to discuss the variances between the price and independent construction cost estimates, or other factors that led to its unacceptability. x. The project will be delivered with “open book” cost model price negotiations at all times through this process, where the CM/GC will be required to reveal and defend its detailed pricing breakdowns including labor, materials, equipment, subcontractor and supplier quotes, mobilization, overhead, mark-up, and profit. See below for the City’s “Open Book” Negotiations Process for negotiation requirements. Actual construction costs will Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 11 of 130 be tracked through construction, and if cost savings are realized, the savings will be passed to the City in full. xi. At any time, if the City determines that an agreement cannot be successfully negotiated, the City reserves the right to end Construction Contract Cost Negotiations and procure the construction of the project by other means. If the City offers the project up for public bids the CM/GC will not be eligible to bid on the project. b) “Open Book” Negotiations Process: Negotiations may require any or all of the following information. The CM/GC shall provide cost or pricing data, broken down by individual work item, for the CM/GC and each major subcontractor. The Owner will participate and verify CM/GC and subcontractor competitive bidding process and shall review all material and subcontractor quotes, anticipated labor and equipment usage, and anticipated production rates during the GMP development and negotiation process. As a part of the Open Book Negotiations Process, the CM/GC shall be prepared to complete the following: Submit a written proposal for the work identifying the major elements of the work, the quantity/scope of the element, and its contribution to the proposed price. Provide further breakdowns if requested by the City. Material: Furnish quotes and/or material invoices showing the cost of material to be incorporated in the work. Labor: Show basic hourly rates, fringe benefits, applicable payroll costs (workers compensation, insurance, etc.) paid subsistence, and travel costs for each labor classification employed in the work Equipment: Provide a complete descriptive listing of equipment to be used in the work including make, model and year of manufacture. Support rented or leased equipment costs with invoices Other direct costs: Furnish documentation of invoices to support any other direct costs to be incurred that are not included above (e.g., bonds, mobilization, permits, etc.) Production Rates: Provide actual anticipated hours of performance, on a daily basis, for each labor classification and for each piece of equipment. Subcontract Costs: Provide supporting data as required above. Fee: The CM/GC Overhead, Profit, and Markup shall be included in the proposed CM/GC Fee, as identified in the CM/GC’s proposal and the Master Services Agreement. The CM/GC’s fee shall consist of the CM/GC’s Overhead, Profit, and Markup, as identified herein. Overhead: Identify overhead rates and list the types of costs that are included in overhead. Profit: Include a reasonable profit reflecting the efficiency and economy of the CM/GC and subcontractors in performing the work, the contract risk type, the work difficulty, and management effectiveness. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 12 of 130 Markup: List any markup cost for subcontractors or other items. Provide backup information as requested for a breakdown and justification of markup expenses. 3) Construction Requirements The City expects the CM/GC to provide full construction services related to the completion of the Project. The CM/GC will be required to sign a Work Order for construction services. A template of the City’s Work Order for construction Services is included in Section VI. Sample Agreements. For the most part, construction services will be contracted and performed in accordance with the City’s standard processes for traditional design-bid-build projects. These services are to include, but not be limited to the following: • Provide construction services according to the Agreement and contract documents including self-performance with a goal of at least 20% of the physical work (including overhead, profit and materials). Self-performance is expected to be defined as self-performed work, materials procured, fee and overhead related to the project scope. • Provide qualified full-time site supervision and management of trade subcontractors to meet or exceed the defined project schedule. It is expected that the personnel filling this role will integrate with business owners and the public during construction, providing coordination with business deliveries, customer access, etc. • Provide open procurement of subcontractors and material suppliers that are not assigned by the City. Include the City in the procurement process. A minimum of 3 quotes may be required for the procurement process. If less than 3 subcontractor or material supplier quotes are obtained for a given item of work or material requirement, justification must be provided to, and agreed upon by, the City. The City may choose to limit the amount of quotes at their discretion. The City and CM/GC will complete a value-based selection of all major subcontractors and suppliers. • Provide stormwater management and BMP maintenance for the site complying with City regulations. • The Stormwater Criteria forms are available at: https://www.fcgov.com/utilities/business/builders-and- developers/development-forms-guidelines-regulations/stormwater-criteria • Provide construction delivery scheduling, meeting attendance and reporting according to contract document requirements. This includes progress reporting and subcontractor work participation. • Provide site security and protection during construction. Provide all site safety management and compliance with OSHA standards and criteria. Implement a site safety program that is reported on regularly. • Provide for a quality control program that meets or exceeds minimum job/contract document and industry standards. Work plans, method of procedure and other work control means shall be implemented to control work. Material testing and inspection will be provided through a third party working directly for the City. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 13 of 130 • At any time, if the City determines that personnel on the construction team is not fit to continue, the City reserves the right to request CM/GC personnel change as needed. • Meet all licensing and permitting requirements as set forth by the City of Fort Collins and the State of Colorado for both CM/GC and subcontracted work. • The CM/GC shall provide plans, applications and submittals necessary to obtain construction dewatering, building and stormwater management permits. All building permit fees will be paid for by the Owner. All other permit fees will be paid for by the CM/GC. • The CM/GC will be responsible to provide work that complies with the Larimer County Urban Area Street Standards (LCUASS), City of Fort Collins Development Construction Standards for Water, Wastewater and Stormwater dated December 2011, and project construction contract. • All final construction work must comply with the latest adopted Americans with Disabilities Act (ADA). https://www.ada.gov/ • Any damage caused to the existing buildings, parking lot, site, & landscaping through access to the construction area will be at the CM/GC’s expense to repair the damaged area to existing conditions before the damage occurred. • Provide services to manage participation in project close out process and needs during the project warranty period. • Provide staging and offsite construction parking for the duration of the work. • Required to adhere to the City of Fort Collins Dust Prevention and Control Manual. The manual is available at https://www.fcgov.com/airquality/pdf/dust-prevention-and-control- manual.pdf Early Procurement of Long Lead Time Materials and Other Services: The CM/GC may be asked to procure long lead materials that may be in short supply or require longer than desired lead times from purchase to delivery. The City may also procure through the CM/GC such services as pavement cores, potholes, or other investigations to facilitate the design. The City may choose to exercise this option if the early procurement saves significant construction time, money, avoids potential delays once the project begins, or for other reasons at the City’s sole determination. The procedures as previously described will be used to negotiate early materials procurements. The City may ask to procure these items at any reasonable time throughout the design and construction phase of the project. Early Action Construction Contracts: Similar to early materials procurements, early action construction projects may be initiated before the design as a whole is completed for the project. The Construction Contract Price Negotiation process will be followed for the negotiation of early action construction contracts. 4) Services Agreement and Construction Contract The CM/GC will be required to enter into a Services Agreement – Work Order type (found in Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 14 of 130 Section VI. Sample Agreements) and sign a Work Order for the Preconstruction Support Services. Following successful completion of the Preconstruction Support Services, the CM/GC will enter into a Work Order for construction services. All cost factors used to establish each GMP will be fixed in the Services Agreement and will be based upon those factors as established in the Project Budget and Cost Control submittal. A template of the City’s Work Order for construction services is included in this RFP. The project will be based upon the Contract Documents, General Requirements, Technical Specifications, and EJCDC General Conditions, as described herein. Any exceptions to the agreements must be stated with your submission of qualifications for this project. The City makes no guarantees it will change the agreements but may consider the exceptions. The Owner reserves the right to competitively bid any portion of the Work contemplated under the MSA in the event a final GMP cannot be negotiated and qualified through third-party estimating. Each Construction Work Order will include a 2-year warranty for all work. Each Construction Work Order will also contain liquidated damages connected to the final negotiated construction schedule for each Work Order. 5) RFP Procurement Schedule and Additional Requirements RFP Procurement Schedule EVENT DATE Issued for Advertisement Week of December 16, 2019 Pre-Proposal Meeting January 6, 2020 Final Questions January 8, 2020 Proposals Due January 17, 2020 Interview Notifications January 22, 2020 Interviews January 30, 2020 Selection Notification January 31 – February 3, 2020 It is anticipated that once the CM/GC is notified of their selection, they will be available to engage with the City on design related reviews, construction input, construction pricing and other tasks immediately. Interviews In addition to submitting a written proposal, the top-rated CM/GCs may be interviewed by the RFP assessment team and asked to participate in an oral presentation to provide an overview of the company, approach to the project and to address questions. The evaluation criteria for the oral interviews will be the same as the criteria for the written evaluations and is included in Section III. Laws and Regulations The CM/GC agrees to comply fully with all applicable local, State of Colorado and Federal laws and regulations and municipal ordinances. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 15 of 130 Fees, Licenses, Permits The successful CM/GC shall be responsible for obtaining any necessary licenses, fees or permits without additional expense to the City. All equipment shall be properly licensed and insured, carry the appropriate permits and be placarded as required by law. Standard of Conduct The successful CM/GC shall be responsible for maintaining satisfactory standards of employees' and subcontractor’s competency, conduct, courtesy, appearance, honesty, and integrity, and shall be responsible for taking such disciplinary action with respect to any individual, as may be necessary. The personal conduct of the CM/GC and its staff has a direct impact on the quality of performance. Unacceptable personal conduct/behavior, as defined herein, may result in immediate or early termination of the Agreement. The City may request, at their sole discretion, the CM/GC to immediately remove from this assignment any employee and/or subcontractor found unfit to perform duties due to one or more of the following reasons: (1) Neglect of duty. (2) Disorderly conduct, use of abusive or offensive language, quarreling, intimidation by words or actions or fighting. (3) Theft, vandalism, immoral conduct or any other criminal action. (4) Selling, consuming, possessing, or being under the influence of intoxicants, including alcohol, or substances while on assignment for the City. All City-owned or operated facilities and their grounds are non-smoking sites. All City parks, trails and natural areas are also non-smoking. Invoicing and Payment Invoices should be emailed monthly to invoices@fcgov.com with a copy to the Project Manager. The cost of the work completed shall be paid to the CM/GC each month following the submittal of a correct invoice by the CM/GC indicating the project name, Purchase Order number, task description, hours worked, personnel/work type category, hourly rate for each employee/work type category, date of the work performed specific to the task, percentage of that work that has been completed by task, 3rd party supporting documentation with the same detail and a brief progress report. Payments will be made using the prices listed on the agreed-to Price Schedule. In the event a service is requested which is not listed on the Price Schedule, the CM/GC and the City will negotiate an appropriate unit price for the service prior to the CM/GC initiating such work. The City is exempt from all state taxation including state sales and use taxes. The City pays invoices on Net 30 terms. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 16 of 130 II. SUBMITTAL REQUIREMENTS Proposal Format CM/GC firms that have the requisite experience and qualifications are encouraged to submit proposals. It is highly recommended to limit proposals to approximately twenty-five (25) double sided or fifty (50) single sided 8 ½ x 11” pages (excluding cover pages, table of contents, dividers and Vendor Statement form – Section V.). Font shall be a minimum of 10 Arial and margins are limited to no less than .5” for sides and top/bottom. Please, no embedded documents. The City of Fort Collins shall not reimburse any firm for costs incurred in the preparation and presentation of their proposal. General Company Information Name of firm, contact person for this proposal, title, phone number, email address, street and mailing addresses, and previous names of firm in last 10 years; date firm was established. Describe how the firm is organized. Provide general contracting licenses held by firm. Include a summary of contract defaults, liquidated damages, debarments, lawsuits, or failures to complete any awarded work from the past 10 years. Profile Projects Provide a brief project description and history of projects, similar in scope to this project, completed in the last 5 years. Limit profile projects lists to 5 projects max. Identify any Key Personnel that were involved with the profile projects and will be assigned to this project as well. Include the following information: 1. Project description that includes the project name and scope, firms that comprised the design team (if project is a design-build or CM/GC delivery), and site location. Be sure to note scope items that are similar to the scope of this project such as high traffic areas, concrete and asphalt pavement reconstruction, utilities coordination and relocation, significant landscaping and urban design elements, lighting, etc. 2. Project history that includes the original schedule agreed upon at the time of signing the contract, the actual duration of construction, and any special characteristics of the project that affected delivery. 3. Type of project delivery model used. 4. Original contract cost. 5. Cost at completion and number of change orders. 6. Contractor, subcontractor or owner-initiated claims and their resolution. 7. Original contract time and actual completion time. 8. Owner name and contact information. Provide a brief discussion of any unusual factors that affected the project delivery (e.g. owner initiated delays, additions to the work, etc.). Provide an owner reference for cited projects. Project Profiles should be limited to no more than one page in length for each profile. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 17 of 130 Project Approach Describe the approach to the overall project scope, schedule and impacts, process and coordination. Discuss how the Project Approach will address the prioritized Project Goals identified in Section I A. Include narrative describing how you would build the work; outline project challenges you see and how they may be overcome. Address your firm’s capability, resources and key project staff as it relates to the scope of the project identified in this RFP. Discuss any potential and known subcontracted work along with potential subcontractors. Discuss your firm’s experience in working on high profile City projects. If major portions of the work are to be subcontracted, significant subcontractors should be identified in your proposal and are highly encouraged to attend any requested interviews. Discuss how your project approach will prioritize and sequence work in a way that accelerates the project schedule while balancing impacts to the public and local businesses. Include in your proposal any potential traffic phasing options, early construction options or innovative construction methods that will benefit the project schedule and reduce overall impacts. Discuss your firm’s phasing strategy to maximize project efficiency. The City is particularly interested in maximizing efficiencies and reducing impacts to local businesses, particularly as it relates to pedestrian access and parking impacts. Discuss your approach to completing the work on schedule and how the team will handle communication and coordination with the various stakeholders (ie other active construction projects and local business community). Any methods to accelerate work and reduce business impact is encouraged. Discuss your approach to completing the identified work with potential methods to limit the impact to businesses. Describe your approach to the CM/GC process and coordination with the City Departments and the City’s design engineering firm. Discuss any relevant experience in similar projects and what your company’s approach to coordinating several different entities including other contractors, owners and designers. The City is seeking to hire a CM/GC that is committed to working together with the City to expedite all the work while minimizing impacts to the public and local businesses. The CM/GC will be expected to develop strong working relationships with City Engineering Department and the City’s design engineer, Utility companies, and local businesses and stakeholders among others. The CM/GC will be required to meet with local business owners and associations and incorporate feedback into construction phasing and traffic control options. The City shall be involved and facilitate these meetings. The City will require that an industry recognized software is used to develop and manage the project schedule such as Microsoft Project or Oracle Primavera P-6; fully base-lined, critical path shown and float managed. Key Personnel Names and resumes of proposed Key Personnel should be provided. Key Personnel for the project include, but are not limited to, the Project Manager, the Preconstruction Support Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 18 of 130 Services Manager and construction Project Superintendent. Include two references for each assigned person. Detail the availability and commitment of Key Personnel. (Note: Key Personnel should be highly committed to this project for the duration of their phase of the work (i.e. Project Manager for the entire duration of the project, Preconstruction Support Services Manager for the preconstruction phase of the project and construction Project Superintendent for the construction phase of the project). Resumes for Key Personnel should be limited to no more than one page for each person.  The proposed project manager shall have no less than 10 years of experience in urban development projects.  The proposed superintendent shall have no less than 5 years of experience in urban development projects and must have acted as superintendent on a similar project  The proposed Preconstruction Support Services Manager shall be a highly experienced senior manager with the authority to make contractual decisions for the construction contract pricing. Project Budget & Cost Control Pre-Construction Services: The CM/GC shall complete Attachment 2 – Preconstruction Support Services Proposal Form as their fee proposal to complete the preconstruction services portion of the work, as identified in this RFP. Additionally, the CM/GC shall provide a listing of hourly rates and number of anticipated hours to complete the proposed scope of work. Preconstruction Phase Costs Item Description Containing Hourly Rates Fully burdened labor rates for all project managers, estimators, superintendents and staff expected to be involved in the preconstruction phase. Construction Services: Describe in detail how your firm uses the markups, CM/GC General Conditions, and direct cost of work to develop the GMP for the project. The City anticipates working with the CM/GC to develop this cost for all known quantities of the project. For unknown circumstances, the City anticipates negotiating contingencies to complete the work. The final project cost will be established as a GMP and may include a detailed bid schedule. Any markup that the CM/GC intends to charge that is not included in the five markup items listed below needs to be explicitly stated in their submittal. Provide construction crew labor and equipment rates. These rates may be shown as fully burdened or unburdened, but it must be stated so in the proposal. The City would like to know how the CM/GC is applying their markups to each cost with this RFP. This will be critical during the final pricing negotiations. Please complete Attachment 3 – CM/GC Cost Factor Worksheet in order to illustrate how your firm uses markups and fees. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 19 of 130 Construction Phase Costs Item Description Containing Fee Development (The five (5) Markups) 1. Overhead Markup, consisting of: − Home and field office setup and operation costs − Office equipment and materials costs − Equipment costs, owned and/or rented − Project management labor 2. Profit/Fee Markup 3. Subcontractor Markup 4. Materials Markup 5. Bonds and Insurance Markup Describe your approach to being transparent and ‘open book’ when developing the GMP and how it relates to the City’s “Open Book” negotiation process as defined above. The final cost, plus allowances (if any), will encompass a final GMP for the project. Contingencies for this project may be allocated inside or outside the CM/GC’s GMP. In either case, the expenditure of contingencies will be at the discretion of the Owner. • Describe your approach to developing a cost to complete this project • Describe your approach to developing value engineering ideas through preconstruction and construction delivery to enhance the work product while potentially saving cost. Construction Sequencing & Phasing Submit an initial construction phasing plan for the major items of work and general timelines associated with each phase. This shall be an initial phasing plan based off the information provided with this RFP and any additional information from the pre-bid, website, project research, etc. The City acknowledges that this phasing plan will likely be modified and/or adjusted based on future discussions and other information obtained after the CM/GC is selected through the final design process prior to construction (i.e. business and stakeholder meetings/discussions). Phasing plans that provide reasonable assumptions, well thought out construction methods and risk discussions will be scored higher, even though this may not be the final phasing plan.  A commitment has been made to maintain business and delivery access at all times during construction. Describe your approach to sequencing construction while maintaining access to businesses during operating hours and the impact this has on the overall project schedule.  Describe the way in which your firm develops and maintains project schedules for projects of this size and nature.  Describe your process and frequency for updating project schedules and how your firm works to overcome challenges to maintain the original completion date.  Submit an example of a project schedule for a similar size project.  Submit who will be developing the schedule and their level of experience using the proposed software. Risk Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 20 of 130 Submit a risk discussion narrative (or ‘register’) and description of the thought process, assumptions, risks, etc. that are anticipated. Identify any major coordination items and/or potential schedule/price risks based on the information provided. Quality Control and Contractor Performance This project is in Historic Downtown Fort Collins. The visual aesthetic of projects in this area is of the utmost importance to all project stakeholders. Quality of all construction elements inducing the visual aesthetic is a primary project goal. Provide details on your firm’s quality control program. Explain how your team administers a quality control program during construction, how performance measures are documented and how quality issues are addressed. Provide examples of when your firm exceeded quality standards, gained industry recognition or received quality awards. The City values quality work at all levels from physical construction, project communications, traffic control and coordination, and management of an effective schedule. The Downtown context of this project enhances the need for high quality work products. Describe how your quality control procedures dictate overall performance on construction contracts. Describe how your quality control plan relates to your subcontractor’s work and how you ensure quality work from all subcontractors. Safety Record Provide the firm’s OSHA reportable accident rate and current workman’s compensation insurance multiplier for the last 3 years. Provide the OSHA reportable accident rate on projects managed by the proposed superintendent or project manager over the three year period. Provide a list of all projects in the last 5 years that have received an OSHA citation either to the GC or subcontractor on the jobsite and provide a narrative of the citations. Financial Statement Provide the most recent audited financial statement. Also provide a current balance sheet and income statement as of the date of your submittal. Item Description Containing Balance Sheet Current Assets Current Liabilities Other Liabilities Fixed Assets and Equipment A/R Information Income Statement Net and Gross Income and Expenses  Include a current banking reference (contact name, address, email and phone number).  The financial statements shall be provided in a separate sealed envelope (hard copy or electronic) and may be marked “confidential – not for public viewing”. The financial statements will not be counted towards the proposal page length requirements. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 21 of 130 Bonding Company Reference Provide the name, address and phone number of the firm’s bonding agent. Provide a letter from the bonding agent indicating the firm’s bonding capacity is adequate to undertake this work relative to the CM/GC’s current, committed backlog. The letter from the bonding company is not included within the page count. Insurance Company Provide the name, address and phone number of the firm’s insurance agent(s). Provide certificate of insurance outlining coverage and policy limits. Provide statements to answer the following questions. (See also Insurance Requirements in Item VI. Sample Agreements). 1. Does coverage meet minimum project requirements? 2. Does coverage include builder’s risk? 3. Can this coverage be extended for work on this project? 4. Can coverage be increased? 5. Can the City be listed as an additional insured? This is a requirement for the final contract. 6. Are there any current claims that will affect coverage limits available for this project? Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 22 of 130 III. EVALUATION CRITERIA CM/GC Qualification Review and Assessment CM/GC firms will be evaluated on the following qualification criteria. These criteria will be the basis for review of the written proposals, as well as for the oral interviews (if necessary) of the top ranked firms. The rating scale shall be from 1 to 5, with 1 being a poor rating, 3 being an average rating, and a 5 being an outstanding rating. Weighting factors for the criteria are listed adjacent to the qualification. Weighting Factor Qualification Standard 1.0 Assigned Project Team Does the proposed team have the necessary skills and experience to fulfill the requirements of the project, including alternate delivery? Does the key staff have the requisite experience on similar projects? Is the key staff available and committed to do the work? 2.0 Firm Experience Has the CM/GC worked on projects similar in scope to this project? Does the CM/GC have the experience necessary for this project? Does the CM/GC have local experience? Has the CM/GC worked in collaborative settings with owners and designers, providing and incorporating feedback in an iterative process to improve the end result? Does the CM/GC have a strong safety record? Does the CM/GC develop strong working relationships? Is the CM/GC’s experience supported with strong references? 3.0 Project Budget & Cost Control and Initial Construction Phasing Plan Are the cost factors/markup percentages presented in the proposal reflective of industry standards? Do they offer a reasonable way to approach development and the GMP? Has the CM/GC presented detailed and thorough assumptions and risk factors? Has the CM/GC provided a well thought out phasing plan based off the provided information? Does the CM/GC understand the impacts of their phasing plan? 2.0 Quality Control and Construction Performance Do the CM/GCs past projects reflect favorably in respect to schedule, cost and owner satisfaction? Do the CM/GC’s Quality Control procedures provide for a high-quality and successful project? Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 23 of 130 Weighting Factor Qualification Standard 2.0 Project Approach Does the project approach present a well thought out and constructible construction phasing plan? Does the written project approach reflect a good balance between construction efficiency, maintenance of traffic, access to businesses and pedestrian access during construction? Does the method of construction and project approach provide a strong approach to meeting and exceeding the project schedule? Does the project approach include meaningful and firm contractual commitments to exceed the minimum requirements of the contract in ways that are beneficial to the project? Reference evaluation process (top rated firm) Below is the typical reference evaluation process for the City, however, the City reserves the right to check references at any point after submittals are received. After the interviews (if necessary) have been conducted, the evaluation committee will select the top rated firm and the Project Manager may check references for overall performance, timetable, completeness, budget and job knowledge of selected project/references. A satisfactory/unsatisfactory rating shall be given to each reference contacted. If references check out for the top firm, then the City of Fort Collins will work to negotiate a contract for CMGC services with the top firm. If the top firm references do not check out, then the selection committee will look to the second ranked firm and check their references. During this phase of the selection process, the City may also review and analyze the financial statement(s) provided with the proposal to assign a satisfactory/unsatisfactory rating. QUALIFICATION STANDARD Overall Performance Would you hire this Contractor again? Working Relationship Did you have a constructive, positive and collaborative working relationship? Timetable Was the original Scope of Work completed within the specified time? Were interim deadlines met in a timely manner? Completeness Was the Contractor responsive to client needs; did they anticipate problems? Were problems solved quickly and effectively? Budget Was the original Scope of Work completed within the project budget? Job Knowledge Did Contractor personnel exhibit the knowledge and skills necessary for the efficient completion of the scope or work? Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 24 of 130 IV. ATTACHMENTS: Attachment 1: Linden Street Renovation 30% Plans Attachment 2: Preconstruction Support Services Proposal Form Attachment 3: CM/GC Cost Factor Worksheet Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 25 of 130 V. VENDOR STATEMENT Vendor hereby acknowledges receipt of the City of Fort Collins Request for Proposal and acknowledges that it has read and agrees to be fully bound by all of the terms, conditions and other provisions set forth in the RFP. Additionally, Vendor hereby makes the following representations to City: a. All of the statements and representations made in this proposal are true to the best of the Vendor’s knowledge and belief. b. Vendor commits that it is able to meet the terms provided in this proposal. c. This proposal is a firm and binding offer, for a period of 90 days from the date hereof. d. Vendor further agrees that the method of award is acceptable. e. Vendor also agrees to complete the proposed Agreement with the City of Fort Collins within 30 days of notice of award. If contract is not completed and signed within 30 days, City reserves the right to cancel and award to the next highest rated firm. f. Vendor acknowledge receipt of addenda. Legal Firm Name: Physical Address: Remit to Address: Phone: Name of Authorized Agent of Firm: Signature of Authorized Agent: Primary Contact for Project: Title: Email Address: Phone: Cell Phone: NOTE: VENDOR STATEMENT IS TO BE SIGNED & RETURNED WITH YOUR PROPOSAL. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 26 of 130 VI. SAMPLE AGREEMENTS SERVICES AGREEMENT WORK ORDER TYPE THIS AGREEMENT made and entered into the day and year set forth below, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and hereinafter referred to as "Service Provider". WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Services to be Performed. a. This Agreement shall constitute the basic agreement between the parties for services for . The conditions set forth herein shall apply to all services performed by the Service Provider on behalf of the City and particularly described in Work Orders agreed upon in writing by the parties from time to time. Such Work Orders, a sample of which is attached hereto as Exhibit A, consisting of one (1) page and incorporated herein by this reference, shall include a description of the services to be performed, the location and time for performance, the amount of payment, any materials to be supplied by the City and any other special circumstances relating to the performance of services. No Work Order shall exceed $ . A general scope of services is attached hereto as Exhibit C, consisting of ( ) page(s), and incorporated herein by this reference. The only services authorized under this Agreement are those which are performed after receipt of such Work Order, except in emergency circumstances where oral work requests may be issued. Oral requests for emergency actions will be confirmed by issuance of a written Work Order within two (2) working days. Irrespective of references in Exhibit A to certain named third parties, Service Provider shall be solely responsible for performance of all duties hereunder. b. The City may, at any time during the term of a particular Work Order and without invalidating such Work Order, make changes to the scope of the particular services. Such changes shall be agreed upon in writing by the parties by Change Order, a sample of which is attached hereto as Exhibit B, consisting of one (1) page and incorporated herein by this reference. 2. Changes in the Work. The City reserves the right to independently bid any services rather than issuing work to the Service Provider pursuant to this Agreement. Nothing within this Agreement shall obligate the City to have any particular service performed by the Service Provider. 3. Time of Commencement and Completion of Services. The services to be performed pursuant to this Agreement shall be initiated as specified by each written Work Order or oral Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 27 of 130 emergency service request. Oral emergency service requests will be acted upon without waiting for a written Work Order. Time is of the essence. 4. Contract Period. This Agreement shall commence , 20 and shall continue in full force and effect until , 20 , unless sooner terminated as herein provided. In addition, at the option of the City, the Agreement may be extended for additional one year periods not to exceed ( ) additional one year periods. Renewals and pricing changes shall be negotiated by and agreed to by both parties. Written notice of renewal shall be provided to the Service Provider and mailed no later than thirty (30) days prior to contract end. 5. Delay. If either party is prevented in whole or in part from performing its obligations by unforeseeable causes beyond its reasonable control and without is fault or negligence, then the party so prevented shall be excused from whatever performance is prevented by such cause. To the extent that the performance is actually prevented, the Service Provider must provide written notice to the City of such condition within fifteen (15) days from the onset of such condition. 6. Early Termination by City/Notices. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Service Provider. Such notice shall be mailed at least fifteen (15) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties. All notices provided under this Agreement shall be effective when mailed, postage prepaid and sent to the following address: Service Provider: City: Copy to: Attn: City of Fort Collins Attn: PO Box 580 Fort Collins, CO 80522 City of Fort Collins Attn: Purchasing Dept. PO Box 580 Fort Collins, CO 80522 In the event of early termination by the City, the Service Provider shall be paid for services rendered to the termination date, subject only to the satisfactory performance of the Service Provider's obligations under this Agreement. Such payment shall be the Service Provider's sole right and remedy for such termination. 7. Contract Sum. This is an open-end indefinite quantity Agreement with no fixed price. The actual amount of work to be performed will be stated on the individual Work Orders. The City makes no guarantee as to the number of Work Orders that may be issued or the actual amount of services which will in fact be requested. 8. Payments. a. The City agrees to pay and the Service Provider agrees to accept as full payment for all work done and all materials furnished and for all costs and expenses incurred in performance of the work the sums set forth for the hourly labor rate and material costs, with markups, stated within the Bid Schedule Proposal Form, attached hereto as Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 28 of 130 Exhibit , consisting of ( ) page(s), and incorporated herein by this reference. Payment shall be made by the City Net 30 days from the date of the invoice and upon acceptance of the work by the City and upon the Service Provider furnishing satisfactory evidence of payment of all wages, taxes, supplies and materials, and other costs incurred in connection with the performance of such work. 9. City Representative. The City's representative will be shown on the specific Work Order and shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the work requested. All requests concerning this Agreement shall be directed to the City Representative. 10. Independent Contractor. It is agreed that in the performance of any services hereunder, the Service Provider is an independent contractor responsible to the City only as to the results to be obtained in the particular work assignment and to the extent that the work shall be done in accordance with the terms, plans and specifications furnished by the City. 11. Subcontractors. Service Provider may not subcontract any of the Work set forth in the Exhibit A, Statement of Work without the prior written consent of the city, which shall not be unreasonably withheld. If any of the Work is subcontracted hereunder (with the consent of the City), then the following provisions shall apply: (a) the subcontractor must be a reputable, qualified firm with an established record of successful performance in its respective trade performing identical or substantially similar work, (b) the subcontractor will be required to comply with all applicable terms of this Agreement, (c) the subcontract will not create any contractual relationship between any such subcontractor and the City, nor will it obligate the City to pay or see to the payment of any subcontractor, and (d) the work of the subcontractor will be subject to inspection by the City to the same extent as the work of the Service Provider. 12. Personal Services. It is understood that the City enters into the Agreement based on the special abilities of the Service Provider and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Service Provider shall neither assign any responsibilities nor delegate any duties arising under the Agreement without the prior written consent of the city. 13. Acceptance Not Waiver. The City's approval or acceptance of, or payment for any of the services shall not be construed to operate as a waiver of any rights under the Agreement or of any cause of action arising out of the performance of this Agreement. 14. Warranty. a. Service Provider warrants that all work performed hereunder shall be performed with the highest degree of competence and care in accordance with accepted standards for work of a similar nature. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 29 of 130 b. Unless otherwise provided in the Agreement, all materials and equipment incorporated into any work shall be new and, where not specified, of the most suitable grade of their respective kinds for their intended use, and all workmanship shall be acceptable to City. c. Service Provider warrants all equipment, materials, labor and other work, provided under this Agreement, except City-furnished materials, equipment and labor, against defects and nonconformances in design, materials and workmanship/workwomanship for a period beginning with the start of the work and ending twelve (12) months from and after final acceptance under the Agreement, regardless whether the same were furnished or performed by Service Provider or by any of its subcontractors of any tier. Upon receipt of written notice from City of any such defect or nonconformances, the affected item or part thereof shall be redesigned, repaired or replaced by Service Provider in a manner and at a time acceptable to City. 15. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this Agreement, such party may be declared in default thereof. 16. Remedies. In the event a party has been declared in default, such defaulting party shall be allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail himself of any other remedy at law or equity. If the non-defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non-defaulting party for the non-defaulting party's reasonable attorney fees and costs incurred because of the default. 17. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire Agreement between the parties and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representative, successors and assigns of said parties. 18. Indemnity/Insurance. a. The Service Provider agrees to indemnify and save harmless the City, its officers, agents and employees against and from any and all actions, suits, claims, demands or liability of any character whatsoever, brought or asserted for injuries to or death of any person or persons, or damages to property arising out of, result from or occurring in connection with the performance of any service hereunder. b. The Service Provider shall take all necessary precautions in performing the work hereunder to prevent injury to persons and property. c. Without limiting any of the Service Provider's obligations hereunder, the Service Provider shall provide and maintain insurance coverage naming the City as an additional insured under this Agreement of the type and with the limits specified within Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 30 of 130 Exhibit , consisting of one (1) page, attached hereto and incorporated herein by this reference. The Service Provider before commencing services hereunder shall deliver to the City's Purchasing Director, P. O. Box 580, Fort Collins, Colorado 80522 one copy of a certificate evidencing the insurance coverage required from an insurance company acceptable to the city. 19. Entire Agreement. This Agreement, along with all Exhibits and other documents incorporated herein, shall constitute the entire Agreement of the parties. Covenants or representations not contained in this Agreement shall not be binding on the parties. 20. Law/Severability. This Agreement shall be governed in all respect by the laws of the State of Colorado. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction such holding shall not invalidate or render unenforceable any other provision of this Agreement. 21. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101, C.R.S., et. seq., Service Provider represents and agrees that: a. As of the date of this Agreement: 1) Service Provider does not knowingly employ or contract with an illegal alien who will perform work under this Agreement; and 2) Service Provider will participate in either the e-Verify program created in Public Law 208, 104th Congress, as amended, and expanded in Public Law 156, 108th Congress, as amended, administered by the United States Department of Homeland Security (the “e-Verify Program”) or the Department Program (the “Department Program”), an employment verification program established pursuant to Section 8- 17.5-102(5)(c) C.R.S. in order to confirm the employment eligibility of all newly hired employees to perform work under this Agreement. b. Service Provider shall not knowingly employ or contract with an illegal alien to perform work under this Agreement or knowingly enter into a contract with a subcontractor that knowingly employs or contracts with an illegal alien to perform work under this Agreement. c. Service Provider is prohibited from using the e-Verify Program or Department Program procedures to undertake pre-employment screening of job applicants while this Agreement is being performed. d. If Service Provider obtains actual knowledge that a subcontractor performing work under this Agreement knowingly employs or contracts with an illegal alien, Service Provider shall: 1) Notify such subcontractor and the City within three days that Service Provider has actual knowledge that the subcontractor is employing or contracting with an illegal alien; and Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 31 of 130 2) Terminate the subcontract with the subcontractor if within three days of receiving the notice required pursuant to this section the subcontractor does not cease employing or contracting with the illegal alien; except that Service Provider shall not terminate the contract with the subcontractor if during such three days the subcontractor provides information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien. e. Service Provider shall comply with any reasonable request by the Colorado Department of Labor and Employment (the “Department”) made in the course of an investigation that the Department undertakes or is undertaking pursuant to the authority established in Subsection 8-17.5-102 (5), C.R.S. f. If Service Provider violates any provision of this Agreement pertaining to the duties imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this Agreement is so terminated, Service Provider shall be liable for actual and consequential damages to the City arising out of Service Provider’s violation of Subsection 8-17.5-102, C.R.S. g. The City will notify the Office of the Secretary of State if Service Provider violates this provision of this Agreement and the City terminates the Agreement for such breach. 22. Dust Control. The Service Provider shall abide by the City of Fort Collins “Dust Control and Prevention Manual,” which is available for public download at https://www.fcgov.com/airquality/pdf/dust-prevention-and-control-manual.pdf, and is incorporated herein by this reference. The City of Fort Collins has implemented this manual for all projects performed for the City of Fort Collins or located within the City of Fort Collins City limits. 23. Haul Routes. All trucks used for work contracted by the City utilizing asphalt from the asphalt plant located at 1800 North Taft Hill Road may only enter North Taft Hill Road from the North using CR 54 G and only exit the site on North Taft Hill Road to the North to CR 54G. 24. Special Provisions. Special provisions or conditions relating to the services to be performed pursuant to this Agreement are set forth in Exhibit - Confidentiality, consisting of one (1) page, attached hereto and incorporated herein by this reference. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 32 of 130 THE CITY OF FORT COLLINS, COLORADO By: Gerry Paul Purchasing Director DATE: ATTEST: APPROVED AS TO FORM: SERVICE PROVIDER'S NAME By: Printed: Title: CORPORATE PRESIDENT OR VICE PRESIDENT Date: Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 33 of 130 EXHIBIT A WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND SERVICE PROVIDER'S NAME WORK ORDER NUMBER: PROJECT TITLE: ORIGINAL BID/RFP NUMBER & NAME: MASTER AGREEMENT EFFECTIVE DATE: Original Contract Date WORK ORDER COMMENCEMENT DATE: WORK ORDER COMPLETION DATE: MAXIMUM FEE: (time and reimbursable direct costs): PROJECT DESCRIPTION/SCOPE OF SERVICES: Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of ( ) page(s) are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Date: Name, Title ACCEPTANCE: Date: Name, Project Manager REVIEWED: Date: Name, Buyer or Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 34 of 130 EXHIBIT B CHANGE ORDER NO. PROJECT TITLE: SERVICE PROVIDER: Company Name WORK ORDER NUMBER: PO NUMBER: DESCRIPTION: 1. Reason for Change: Why is the change required? 2. Description of Change: Provide details of the changes to the Work 3. Change in Work Order Price: 4. Change in Work Order Time: ORIGINAL WORK ORDER PRICE $ .00 TOTAL APPROVED CHANGE ORDER .00 TOTAL PENDING CHANGE ORDER .00 TOTAL THIS CHANGE ORDER .00 TOTAL % OF THIS CHANGE ORDER % TOTAL C.O.% OF ORIGINAL WORK ORDER % ADJUSTED WORK ORDER COST $ .00 SERVICE PROVIDER: Date: Name, Title ACCEPTANCE: Date: Name, Project Manager REVIEWED: Date: Name, Buyer or Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 35 of 130 EXHIBIT C GENERAL SCOPE OF SERVICES Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 36 of 130 EXHIBIT (BID SCHEDULE/COMPENSATION) Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 37 of 130 EXHIBIT INSURANCE REQUIREMENTS 1. The Service Provider will provide, from insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this bid, the Service Provider shall furnish the City with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies, and containing substantially the following statement: “The insurance evidenced by this Certificate will not reduce coverage or limits and will not be cancelled, except after thirty (30) days written notice has been received by the City of Fort Collins.” In case of the breach of any provision of the Insurance Requirements, the City, at its option, may take out and maintain, at the expense of the Service Provider, such insurance as the City may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Service Provider under this Agreement. The City, its officers, agents and employees shall be named as additional insureds on the Service Provider 's general liability and automobile liability insurance policies for any claims arising out of work performed under this Agreement. 2. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. The Service Provider shall maintain during the life of this Agreement for all of the Service Provider's employees engaged in work performed under this Agreement: 1. Workers' Compensation insurance with statutory limits as required by Colorado law. 2. Employer's Liability insurance with limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee. B. Commercial General & Vehicle Liability. The Service Provider shall maintain during the life of this Agreement such commercial general liability and automobile liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this Agreement. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for each coverage, Commercial General and Vehicle, shall not be less than $1,000,000 combined single limits for bodily injury and property damage. In the event any work is performed by a subcontractor, the Service Provider shall be responsible for any liability directly or indirectly arising out of the work performed under this Agreement by a subcontractor, which liability is not covered by the subcontractor's insurance. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 38 of 130 EXHIBIT CONFIDENTIALITY IN CONNECTION WITH SERVICES provided to the City of Fort Collins (the “City”) pursuant to this Agreement (the “Agreement”), the Service Provider hereby acknowledges that it has been informed that the City has established policies and procedures with regard to the handling of confidential information and other sensitive materials. In consideration of access to certain information, data and material (hereinafter individually and collectively, regardless of nature, referred to as “information”) that are the property of and/or relate to the City or its employees, customers or suppliers, which access is related to the performance of services that the Service Provider has agreed to perform, the Service Provider hereby acknowledges and agrees as follows: That information that has or will come into its possession or knowledge in connection with the performance of services for the City may be confidential and/or proprietary. The Service Provider agrees to treat as confidential (a) all information that is owned by the City, or that relates to the business of the City, or that is used by the City in carrying on business, and (b) all information that is proprietary to a third party (including but not limited to customers and suppliers of the City). The Service Provider shall not disclose any such information to any person not having a legitimate need-to-know for purposes authorized by the City. Further, the Service Provider shall not use such information to obtain any economic or other benefit for itself, or any third party, except as specifically authorized by the City. The foregoing to the contrary notwithstanding, the Service Provider understands that it shall have no obligation under this Agreement with respect to information and material that (a) becomes generally known to the public by publication or some means other than a breach of duty of this Agreement, or (b) is required by law, regulation or court order to be disclosed, provided that the request for such disclosure is proper and the disclosure does not exceed that which is required. In the event of any disclosure under (b) above, the Service Provider shall furnish a copy of this Agreement to anyone to whom it is required to make such disclosure and shall promptly advise the City in writing of each such disclosure. In the event that the Service Provider ceases to perform services for the City, or the City so requests for any reason, the Service Provider shall promptly return to the City any and all information described hereinabove, including all copies, notes and/or summaries (handwritten or mechanically produced) thereof, in its possession or control or as to which it otherwise has access. The Service Provider understands and agrees that the City’s remedies at law for a breach of the Service Provider’s obligations under this Confidentiality Agreement may be inadequate and that the City shall, in the event of any such breach, be entitled to seek equitable relief (including without limitation preliminary and permanent injunctive relief and specific performance) in addition to all other remedies provided hereunder or available at law. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 39 of 130 CONSTRUCTION WORK ORDER FOR [ORIGINAL PROJECT # AND NAME] WORK ORDER NO. TITLED (WORK ORDER TITLE) DATE: CONTRACTOR: Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 40 of 130 TABLE OF CONTENTS AGREEMENT FORMS 00525 Work Order & Notice of Award 00530 Work Order Notice to Proceed 00600 Bonds and Certificates 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate CONDITIONS OF THE CONTRACT 00700 General Conditions Exhibit GC-A GC-A1 - GC-A2 00800 Supplementary Conditions 00900 Addenda, Modifications and Payment 00950 Work Order Change Order Form 00960 Application for Payment Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 41 of 130 SECTION 00500 CONSTRUCTION WORK ORDER AGREEMENT FORMS 00525 Work Order, Notice of Award & Bid Schedule 00530 Work Order Notice to Proceed Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 42 of 130 SECTION 00525 WORK ORDER, NOTICE OF AWARD AND BID SCHEDULE TO: WORK ORDER # & TITLE: PURCHASE ORDER: ORIGINAL BID/RFP # & TITLE: ENGINEER: OWNER’S REPRESENTATIVE: NOTICE OF AWARD DATE: OWNER: City of Fort Collins (hereinafter referred to as OWNER) 1. WORK. You are hereby notified that your bid dated , for the above Work Order has been considered. Pursuant to your AGREEMENT with OWNER dated , you have been awarded a Work Order for this Work Order Description: A. See Section 01100 – Summary of Work. 2. CONTRACT PRICE, BONDS AND CERTIFICATES. The price of your Work Order is ($ ). Pursuant to the AGREEMENT and the Contract Documents, Performance and Payment Bonds and insurance are required. 3. CONTRACT TIMES. Pursuant to the AGREEMENT and the Contract Documents, the date for Substantial Completion of this Work Order is , and after Substantial Completion, the date for Final Completion is . 4. LIQUIDATED DAMAGES. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTACTOR shall pay OWNER the amounts set forth hereafter. 1. Substantial Completion: ($ ) for each calendar day or fraction thereof that expires after until the work is Substantially Complete. 2. Final Acceptance: After Substantial Completion ($ ) for each calendar day or fraction thereof that expires after the 60 calendar day period for Final Payment and Acceptance until the Work is ready for Final Payment and Acceptance. 5. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 43 of 130 5.1 PROGRESS PAYMENTS. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER, once each month during construction as provided below. All progress payments will be on the basis of the progress of the Work measured by the schedule of values established in paragraph 2.6 of the General Conditions and in the case of Unit Price Work based on the number of units completed, and in accordance with the General Requirements concerning Unit Price Work. 5.1.1 Prior to Substantial Completion, Owner will be entitled to withhold as contract retainage five percent (5%) of each progress payment, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. If , in the sole discretion of Owner, on recommendation of Engineer, Owner determines that the character and progress of the Work have been satisfactory to OWNER and ENGINEER, OWNER may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100% of the Work completed. 95% of materials and equipment not incorporated in the Work (but delivered, suitably stored and accompanied by documentation satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions) may be included in the application Section 00520 Page 3 for payment. 5.1.2 Upon Substantial Completion payment will be made in an amount sufficient, if necessary, to increase total payments to CONTRACTOR to 95% of the Contract Price, less such amounts as ENGINEER shall determine or OWNER may withhold in accordance with paragraph 14.7 of the General Conditions or as provided by law. 5.2 FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. 6. CONTRACTOR'S REPRESENTATION. In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: 6.1 CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, site, locality, and with all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. 6.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions and drawings of physical conditions which are identified in the Supplementary Conditions as provided in paragraph 4.2 of the General Conditions. 6.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 44 of 130 supplement those referred to in paragraph 6.2 above) which pertain to the subsurface or physical condition at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work as CONTRACTOR considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of paragraph 4.2 of the General Conditions; and no additional examinations, investigations, explorations, tests, reports, studies or similar information or data are or will be required by CONTRACTOR for such purposes. 6.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provision of paragraph 4.3. of the General Conditions. 6.5 CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents. 6.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. 7. CONTRACT DOCUMENTS. 7.1 The Contract Documents which comprise the entire Agreement between OWNER and CONTRACTOR concerning the Work consist of the General Conditions, Supplementary Conditions, those items included in the definition of “Contract Documents” in Article 1.10 of the General Conditions, and such other items as are referenced in this Article 7, all of which are incorporated herein by this reference. 7.2 Forms for use by CONTRACTOR in performing the Work and related actions in carrying out the terms of this Agreement are deemed Contract Documents and incorporated herein by this reference, and include, but are not limited to, the following: 7.2.1 Certificate of Substantial Completion 7.2.2 Certificate of Final Acceptance 7.2.3 Lien Waiver Releases 7.2.4 Consent of Surety 7.2.5 Application for Exemption Certificate 7.2.6 Application for Payment 7.3 Drawings, consisting of a cover sheet and sheets numbered as follows: Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 45 of 130 The Contract Drawings shall be stamped "Final for Construction" and dated. Any revisions made shall be clearly identified and dated. 7.4 The Contract Documents also include all written amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. 7.5 There are no Contract Documents other than those listed or incorporated by reference in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General Conditions. 8. MISCELLANEOUS 8.1. Terms used in this Agreement which are defined in Article I of the General Conditions shall have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but not without limitations, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge that assignor from any duty or responsibility under the Contract Document. 8.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, Agreement and obligations contained in the Contract Document. 9. EXECUTION. Three (3) copies of this proposed Work Order & Notice of Award, and accompanying amendments or supplements to the Contract Documents (except any applicable Drawings) incorporated herein, are provided. Three (3) sets of any applicable Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is, by . A. You must deliver to OWNER three (3) fully-executed counterparts of this Work Order, including all amendments or supplements to the Contract Documents incorporated herein. Each Work Order must bear your signature as provided. B. You must deliver with the executed Work Order the Contract Security (Bonds) and insurance, as specified in the Agreement, this Work Order, the General Conditions (Article 5.1) and the Supplementary Conditions. Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned and to annul this Work Order & Notice of Award. Within ten (10) days after you comply with those conditions, OWNER will return to you one (1) fully-signed counterpart of this Work Order with any amendments or supplements to the Contract Documents attached. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 46 of 130 CONTRACTOR’S NOTICE OF AWARD REPRESENTATION & EXECUTION: CONTRACTOR agrees to perform the services identified above, in accordance with the terms and conditions contained herein and in the AGREEMENT dated , and the NOTICE OF AWARD dated , between the parties. In the event of a conflict between or ambiguity in the terms of the AGREEMENT or specific Work Orders, the AGREEMENT shall control. CONTRACTOR: By: Date: Name: Title: Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 47 of 130 OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Contract Documents are hereby accepted and incorporated herein by this reference and the attached Notice to Proceed is hereby given. ACCEPTANCE: Date: _____ , Projects Manager OWNER: CITY OF FORT COLLINS ACCEPTANCE: ___________________________________________ Date: __________ Darin Atteberry, City Manager (if greater than $1,000,000) ACCEPTANCE: ___________________________________________ Date: __________ Gerry Paul, Purchasing Director (if greater than $60,000) APPROVED AS TO FORM: __________________________________ Date: __________ ATTEST: ___ ________________________________________ Date: __________ Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 48 of 130 BID SCHEDULE Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 49 of 130 SECTION 00530 WORK ORDER NOTICE TO PROCEED NOTICE TO PROCEED DATE: WORK ORDER TITLE: WORK ORDER NUMBER: ORIGINAL BID/RFP # & TITLE: TO: Attn: This notice is to advise you: That the Work Order and all amendments and supplements to the Contract Documents covering the above described Work have been fully executed by the CONTRACTOR and the OWNER. That the required CONTRACTOR's Performance and Payment Bonds and insurance have been received by the OWNER. That the OWNER has approved the said Work Order and Contract Documents. Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and directed to proceed within ( ) calendar days from receipt of this notice as required by the Work Order and the AGREEMENT. The dates for Substantial Completion and Final Acceptance shall be , and , respectively. Dated this _____________ day of ___________, _____. CITY OF FORT COLLINS (OWNER) By: ___________________________________________ ___________________________________________ Name & Title ACKNOWLEDGMENT OF NOTICE Receipt of the above Work Order Notice to Proceed is hereby acknowledged this _____________ day of ___________, _____. (CONTRACTOR) By: ___________________________________________ ___________________________________________ Name & Title Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 50 of 130 SECTION 00600 BONDS AND CERTIFICATES 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00651 Lien Waiver Release (SUBCONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 51 of 130 SECTION 00610 PERFORMANCE BOND Bond No __ KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the day of , 2 , for (original bid/rfp # & name) a copy of which is hereto attached and made a part hereof, for the performance of The City of Fort Collins Work Order, titled , Work Order Number , dated the day of , , a copy of which is hereto attached and made a part hereof. NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions and agreements of said Work Order and Agreement during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without Notice to the Surety and during the life of the guaranty period, and if the Principal shall satisfy all claims and demands incurred under such Work Order and Agreement, and shall fully indemnify and save harmless the OWNER from all cost and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 52 of 130 IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this _____ day of ___________, _____. IN PRESENCE OF: Principal (Title) (Title) (Corporate Seal) (Address) IN PRESENCE OF: Other Partners _____________________________ By: _____________________________ By: IN PRESENCE OF: Surety _____________________________ By: _____________________________ (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 53 of 130 SECTION 00615 PAYMENT BOND Bond No __ KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the day of , , for (original bid/rfp # & name), a copy of which is hereto attached and made a part hereof, for the performance of The City of Fort Collins Work Order, titled , Work Order Number , dated the day of , , a copy of which is hereto attached and made a part hereof. NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in such Work Order and Agreement and any authorized extension or modification thereof, including all amounts due for materials, lubricants, repairs on machinery, equipment and tools, consumed, rented or used in connection with the construction of such Work, and all insurance premiums on said Work, and for all labor, performed in such Work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 54 of 130 IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this _____ day of ___________, _____. IN PRESENCE OF: Principal (Title) (Title) (Corporate Seal) (Address) IN PRESENCE OF: Other Partners _____________________________ By: _____________________________ By: IN PRESENCE OF: Surety _____________________________ By: _____________________________ (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 55 of 130 SECTION 00630 CERTIFICATE OF INSURANCE CONTRACTOR shall insert his own standard form for Certificate of Insurance in accordance with the following: 2. The Contractor will provide, from insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this bid, the Contractor shall furnish the City with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies, and containing substantially the following statement: “The insurance evidenced by this Certificate will not reduce coverage or limits and will not be cancelled, except after thirty (30) days written notice has been received by the City of Fort Collins.” In case of the breach of any provision of the Insurance Requirements, the City, at its option, may take out and maintain, at the expense of the Contractor, such insurance as the City may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Contractor under this Agreement. The City, its officers, agents and employees shall be named as additional insureds on the Contractor’s general liability and automobile liability insurance policies for any claims arising out of work performed under this Agreement. 2. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. The Contractor shall maintain during the life of this Agreement for all of the Contractor's employees engaged in work performed under this agreement: 1. Workers' Compensation insurance with statutory limits as required by Colorado law. 2. Employer's Liability insurance with limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee. B. Commercial General & Vehicle Liability. The Contractor shall maintain during the life of this Agreement such commercial general liability and automobile liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this Agreement. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for each coverage, Commercial General and Vehicle, shall not be less than $1,000,000 combined single limits for bodily injury and property damage. In the event any work is performed by a subcontractor, the Contractor shall be responsible for any liability directly or indirectly arising out of the work performed under this Agreement by a subcontractor, which liability is not covered by the subcontractor's insurance. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 56 of 130 SECTION 00635 CERTIFICATE OF SUBSTANTIAL COMPLETION TO: CITY OF FORT COLLINS (OWNER) WORK ORDER # & TITLE: DATE OF SUBSTANTIAL COMPLETION: ORIGINAL BID/RFP # & TITLE: PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado INCLUDE: OWNER: City of Fort Collins CONTRACTOR: WORK ORDER DATE: The Work performed under this Work Order, pursuant to the Contract Documents, has been inspected by authorized representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project (or specified part of the project, as indicated above) is hereby declared to be substantially completed on the above date. A tentative list of items to be completed or corrected is appended hereto. This list may not be exhaustive, and the failure to include an item on it does not alter the responsibility of the CONTRACTOR to complete all the Work in accordance with the Contract Documents. _____________________________ By: __________________________ ________ PROJECT MANAGER AUTHORIZED REPRESENTATIVE DATE The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the tentative list within the time indicated. _____________________________ By: __________________________ ________ CONTRACTOR AUTHORIZED REPRESENTATIVE DATE The OWNER accepts the project or specified area of the project as substantially complete and will assume full possession of the project or specified area of the project at 12:01 a.m., on . The responsibility for heat, utilities, security, and insurance under the Contract Documents shall be as set forth under "Remarks" below. CITY OF FORT COLLINS ________ By: __________________________ ________ OWNER AUTHORIZED REPRESENTATIVE DATE REMARKS: _________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 57 of 130 SECTION 00640 CERTIFICATE OF FINAL ACCEPTANCE DATE: ________________, _____ TO: Gentlemen: You are hereby notified that on the day of , , the City of Fort Collins, Colorado, has accepted the Work completed by , for the City of Fort Collins Work Order, titled , Work Order Number under (original bid/rfp # & name). A check is attached hereto in the amount of $ as Final Payment for all Work done, subject to the terms of the Contract Documents, including the Work Order, which is dated , and the AGREEMENT, which is dated . In conformance with the Work Order and Contract Documents for this project, your obligations and guarantees will continue for the specified time from the following date: ___________________, _____. Sincerely, City of Fort Collins OWNER By: ___________________________________________ ___________________________________________ Name & Title ATTEST: _________________________________________ ___________________________________________ Name & Title Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 58 of 130 SECTION 00650 LIEN WAIVER RELEASE (CONTRACTOR) TO: City of Fort Collins, Colorado (OWNER) FROM: (CONTRACTOR) WORK ORDER TITLE: WORK ORDER NUMBER: ORIGINAL BID/RFP # & TITLE: 1. The CONTRACTOR acknowledges having received payment, except retainage from the OWNER for all work, labor, skill and material furnished, delivered and performed by the CONTRACTOR for the OWNER or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which the CONTRACTOR may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design, improvement, alteration, addition or repair of the above described project, against the OWNER or its officers, agents, employees or assigns, against any fund of or in the possession or control of the OWNER, against the project or against all land and the buildings on and appurtenances to the land improved by the project. 3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or performed to or for the construction, design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the CONTRACTOR or its agents, employees, and servants, or by and through the CONTRACTOR by various Subcontractors or materialmen or their agents, employees and servants and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or any funds in the OWNER'S possession or control concerning the project or against the OWNER or its officers, agents, employees or assigns arising out of the project. 4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any, and the Surety on the project against and from any claim hereinafter made by the CONTRACTOR's Subcontractors, materialmen, employees, servants, agents or assigns against the project or against the OWNER or its officers, employees, agents or assigns arising out of the project for all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims. 5. The parties acknowledge that the description of the project set forth above constitutes an adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 59 of 130 may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material bonds for the project. Signed this ______ day of __________, ___. CONTRACTOR: By: ___________________________________________ ___________________________________________ Name & Title ATTEST: _____________________________ Secretary STATE OF COLORADO ) )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this _________ day of __________, _____, by ________________________________________________________________. Witness my hand and official seal. My Commission Expires: ___________________________. _________________________ Notary Public Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 60 of 130 SECTION 00660 CONSENT OF SURETY TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER") CONTRACTOR: WORK ORDER # & TITLE: ORIGINAL BID/RFP # & TITLE: CONTRACT DATE: WORK ORDER DATE: In accordance with the provisions of the Work Order and Contract between the OWNER and the CONTRACTOR as indicated above, for the Work Order titled on bond of , (Surety) _______________________________________ hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to the CONTRACTOR shall not relieve the Surety Company of any of its obligations to the OWNER, as set forth in the said Surety Company's Bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this _________ day of _________ _, _____. ____________________________________________ (Surety Company) By: ________________________________________ (Name) Attorney-in-Fact ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 61 of 130 SECTION 00670 APPLICATION FOR EXEMPTION CERTIFICATE Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 62 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 63 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 64 of 130 SECTION 00700 GENERAL CONDITIONS Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 65 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 66 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 67 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 68 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 69 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 70 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 71 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 72 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 73 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 74 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 75 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 76 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 77 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 78 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 79 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 80 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 81 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 82 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 83 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 84 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 85 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 86 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 87 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 88 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 89 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 90 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 91 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 92 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 93 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 94 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 95 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 96 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 97 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 98 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 99 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 100 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 101 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 102 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 103 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 104 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 105 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 106 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 107 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 108 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 109 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 110 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 111 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 112 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 113 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 114 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 115 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 116 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 117 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 118 of 130 Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 119 of 130 SECTION 00800 SUPPLEMENTARY CONDITIONS Conditions of the Contract These Supplementary Conditions amend or supplement the General Conditions of the Construction Contract (EJCDC General Conditions 1910-8, 1990 edition, with City of Fort Collins Modifications, Rev. 9/94) and other provisions of the Contract Documents as indicated below. SC-1 DEFINITIONS SC-1.38. Add the following language to the conclusion of paragraph 1.38 of the General Conditions: 1.38. Substantial Completion. .... Substantial Completion is further defined as that degree of completion of the operating facilities or systems of the Project defined in the Work Order sufficient to provide the OWNER the full time, uninterrupted, continuous, beneficial operation of the modifications, and all inspections required have been completed and identified conditions corrected. SC-1.43.A. Add the following new paragraph immediately after paragraph 1.43 of the General Conditions: 1.43.A. Work Order--A written document executed by OWNER and CONTRACTOR that provides for the construction of a portion of the Work, pursuant to the Agreement and all as required by the Contract Documents, and that becomes a Contract Document when executed. SC-2 PRELIMINARY MATTERS SC-2.8. Delete paragraph 2.8 of the General Conditions entirely and replace it with the following paragraph: 2.8. Preconstruction Conference. Within ten days after the Contract Times for a Work Order start to run, but before any Work at the site is started, a conference attended by CONTRACTOR, ENGINEER and others as appropriate will be held to establish a working relationship among the parties as to the Work and to discuss the schedules referred to in paragraph 2.6, procedures for handling Shop Drawings and other submittals, processing Applications for Payment, and maintaining required records. SC-2.10. Add the following new paragraph immediately after paragraph 2.9 of the General Conditions: 2.10. Work Order Required for All Work. References to the Agreement in this Article 2 and in the General and Supplementary Conditions and Contract Documents notwithstanding, no Work shall be initiated or performed until CONTRACTOR has received a signed and executed Work Order, incorporating the Notice to Proceed, from OWNER; and no provision of this Article 2 or of the General and Supplementary Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 120 of 130 Conditions and Contract Documents shall permit or require any action of CONTRACTOR in the absence of a signed and executed Work Order. All provisions of this Article 2 and of the General and Supplementary Conditions and Contract Documents referencing the Agreement or other parts of the Contract Documents, or permitting or requiring any action of CONTRACTOR, shall be read as referencing and, as appropriate, requiring a signed and executed Work Order. SC-4 AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS SC-4.2.1.2. Add the following new paragraph immediately following paragraph 4.2.1.2 of the General Conditions: 4.2.1.2.1. No drawing of physical conditions in or relating to existing surface or subsurface structures (except Underground Facilities referred to in paragraph 4.3) which are at or contiguous to the site have been utilized by the Engineer in preparation of the Contract Documents, except the following: SC-5 BONDS AND INSURANCE SC-5.4.7. Include the following parties or entities as additional insureds, as provided in paragraph 5.4.7 of the General Conditions: 5.4.7.1. City of Fort Collins, Colorado, 4316 LaPorte Avenue, Fort Collins, Colorado 80522 5.4.7.2. . SC-5.4.8.1. Add the following new paragraph immediately following paragraph 5.4.8 of the General Conditions: 9.4.8.1. Limits of Liability. The limits of liability for the insurance required by the paragraph numbers of the General Conditions listed below are as follows: For Paragraphs 5.02.A.1 and 5.02.A.2: Coverage A - Statutory Limits; Coverage B - $100,000 / $100,000 / $500,000. For Paragraphs 5.02.A.3 and 5.02.A.5: The Commercial General Liability policy will have limits of $1,000,000 combined single limits (CSL). This policy will include coverage for Explosion, Collapse, and Underground coverage unless waived by the Owner. For Paragraph 5.02.A.6: The Comprehensive Automobile Liability Insurance policy will have limits of $1,000,000 combined single limits (CSL). For Paragraph 5.02.B.3: This policy will include completed operations coverage / product liability coverage with limits of $1,000,000 combined single limits (CSL). This policy shall also include an Umbrella Excess Liability as follows: General liability and automobile liability insurance in an amount not less than $1,000,000 per occurrence in excess of the above stated primary limits. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 121 of 130 SC-6 CONTRACTOR’S RESPONSIBILITIES SC-6.14.3. Add the following new paragraph immediately after paragraph 6.14.2 of the General Conditions: 6.14.3. The following Laws or Regulations are included in the Contract Documents as mandated by statute or for the convenience of the CONTRACTOR. Other Laws and Regulations apply which are not included herein, and are within the CONTRACTOR's duty and responsibility for compliance thereto: 6.14.3.1. Notice to owners of Underground Facilities is required prior to excavations in the vicinity of such facilities. 6.14.3.2. Unless otherwise decided by reason of the amount of the Contract Price involved, or other good reason, before or at the time that the contract is awarded to a corporation outside the State of Colorado, such corporation must carry out the proper procedure to become authorized to do business in the State of Colorado, designate a place of business therein, and appoint an agent for service of process. Such corporation must furnish the OWNER with a certificate from the Secretary of State of Colorado has been issued by its office and there shall also be procured from the Colorado Secretary of State of photostatic or certified copy of the designated of place of business and appointment of agent for service of process, or a letter from the Colorado Secretary of State that such designation of place of business and agent for service of process have been made. 6.14.3.3. The CONTRACTOR must conform to the rules and regulations of the Industrial Commission of Colorado. Particular reference is made to rules and regulations governing excavation Work adopted by the Industrial Commission of Colorado. SC-11 CHANGE OF CONTRACT PRICE SC-11.6.2.7. Add the following new paragraph to paragraph 11.6.2 of the General Conditions: 11.6.2.7. Cost of the Work. Allowances for profit, overhead and mark-up prescribed by Article 4 of the Agreement shall be used in lieu of any CONTRACTOR'S fee, overhead, profit or mark-up allowances as prescribed in paragraphs 11.6.2.1, 11.6.2.2, and 11.6.2.3. SC-12 CHANGE OF CONTRACT TIMES SC-12.3. Add the following language to the end of paragraph 12.3 of the General Conditions: 12.3. .... Lost days due to abnormal weather conditions will be allocated as required. SC-14 PAYMENTS TO CONTRACTOR AND COMPLETION Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 122 of 130 SC-14.1. Add the following language to the end of paragraph 14.1 of the General Conditions: 14.1. Schedule of Values. .... Progress payments on the fixed fee shall be in proportion to the cumulative actual Cost of the Work as a percentage of the Allowable Cost of the Work. An amount not to exceed fifteen (15%) percent of the fixed fee shall be advanced to the Contractor for mobilization in the first progress payment. Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 123 of 130 SECTION 00900 ADDENDA, MODIFICATIONS AND PAYMENT 00950 Change Order 00960 Application for Payment Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 124 of 130 SECTION 00950 CHANGE ORDER FORM CHANGE ORDER NO. CONTRACTOR: WORK ORDER TITLE & NO. : ORIGINAL BID/RFP # & TITLE: DESCRIPTION: 1. Reason for change: 2. Description of Change: 3. Change in Contract Cost: 4. Change in Contract Time: ORIGINAL CONTRACT COSTS $ ________________ TOTAL APPROVED CHANGE ORDER(S) $ ________________ TOTAL PENDING CHANGE ORDER(S) $ ________________ TOTAL THIS CHANGE ORDER $ ________________ TOTAL % OF ORIGINAL CONTRACT, THIS CO: _______________ % TOTAL % OF ORIGINAL CONTRACT, ALL CO’S: _______________ % ADJUSTED CONTRACT COST $ ________________ _________________ (Assuming all change orders approved) ACCEPTED BY: _____________________________________ DATE: ____________ Contractor's Representative ACCEPTED BY: _____________________________________ DATE: ____________ Project Manager REVIEWED BY: _____________________________________ DATE: ____________ Title: APPROVED BY: _____________________________________ DATE: ____________ Title: APPROVED BY: _____________________________________ DATE: ____________ (Purchasing Agent if > $60,000) cc: City Clerk Architect/Engineer Finance Purchasing Project Manager Contractor Official Purchasing Document Last updated 10/2017 RFP 9068 CM/GC Services for Linden St Renovations Page 125 of 130 SECTION 00960 PAYMENT APPLICATION Official Purchasing Document Last updated 10/2017 RFP 8859 CM/GC Services for Linden Street Improvements Page 126 of 130 Section 00960 APPLICATION FOR PAYMENT PAGE 1 OF 4 OWNER: City of Fort Collins PROJECT: APPLICATION NUMBER: APPLICATION DATE: PERIOD BEGINNING: ENGINEER: CONTRACTOR: PERIOD ENDING: PROJECT NUMBER: CHANGE ORDERS Application is made for Payment as shown below in connection with Contract NUMBER DATE AMOUNT The present status of the account for this Contract is as follows: 1 2 Original Contract Amount: 3 Net Change by Change Order: Current contract Amount: $0.00 Total Completed and Stored to Date: Less Previous Applications: Amount Due this Application - Before Retainage: $0.00 Less Retainage: Net Change by Change Order $0.00 AMOUNT DUE THIS APPLICATION: $0.00 CERTIFICATION: The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with the Work have been satisfied as required in Paragraph 14.3. of the General Conditions of the Contract. The above Amount Due This Application is requested by the CONTRACTOR. Date: By: Payment of the above Amount Due This Application is recommended by the ENGINEER. Date: By: Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager. Date: By: Official Purchasing Document Last updated 10/2017 RFP 8859 CM/GC Services for Linden Street Improvements Page 127 of 130 Payment of the above Amount Due This Application is approved by the OWNER. Date: By: CONTRACT AMOUNTS APPLICATION FOR PAYMENT PAGE 2 OF 4 Work Completed Work Completed Work Completed Stored Bid This Month Previous Periods To Date Materials Total Item This Earned Percent Number Description Quantity Units Unit Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date Billed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Official Purchasing Document Last updated 10/2017 RFP 8859 CM/GC Services for Linden Street Improvements Page 128 of 130 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 CHANGE ORDERS APPLICATION FOR PAYMENT PAGE 3 OF 4 Work Completed Work Completed Work Completed Stored Bid This Month Previous Periods To Date Materials Total Item This Earned Percent Number Description Quantity Units Unit Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date Billed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Official Purchasing Document Last updated 10/2017 RFP 8859 CM/GC Services for Linden Street Improvements Page 129 of 130 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS CHANGE ORDERS $0.00 $0.00 $0.00 $0.00 $0.00 PROJECT TOTALS $0.00 $0.00 $0.00 $0.00 $0.00 STORED MATERIALS SUMMARY PAGE 4 OF 4 On Hand Received Installed On Hand Item Invoice Previous This This This Number Number Description Application Period Period Application $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Official Purchasing Document Last updated 10/2017 RFP 8859 CM/GC Services for Linden Street Improvements Page 130 of 130 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS $0.00 $0.00 $0.00 $0.00 LINDEN STREET RENOVATION CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R CIVIL ENGINEER CONTACT INFORMATION LOCATED IN THE WEST HALF OF SECTION 12, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6th P.M. CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO 30% CONSTRUCTION DOCUMENTS CERTIFICATION STATEMENT: Ditesco Jill Burrell, P.E. 2133 S. Timberline Road, Suite 110 Fort Collins, Colorado 80525 (970) 690-1889 BENCHMARKS Coordinate Control VERTICAL DATUM: HORIZONTAL DATUM: DISCLAIMER STATEMENT: City of Fort Collins, Colorado UTILITY PLAN APPROVAL Date Date Date Date Date Date City Engineer Traffic Engineer Parks & Recreation Stormwater Utility Water & Wastewater Utility DECEMBER, 2019 PROJECT LOCATION VICINITY MAP OWNER City of Fort Collins Utilities Kyle Lambrecht 281 North College Avenue Fort Collins, Colorado 80521 (970) 221-6566 SURVEYOR Northern Engineering 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\Linden-Monday, Cover.December dwg 02, 3:2019 35 PM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET C002 2 GENERAL NOTES NTS CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City of Fort Collins, Colorado UTILITY PLAN APPROVAL Date Date Date Date Date Date City Engineer Traffic Engineer Parks & Recreation Stormwater Utility Water & Wastewater Utility B. Street Improvement Notes C. Traffic Signing and Pavement Marking Construction Notes D. Utility Notes GENERAL NOTES (City of Fort Collins) A. Grading and Erosion Control Notes ST ST ST ST 6" SS 6" SS 6" SS W W W W W W W S D 8" SS 8" SS 8" SS S D 8" SS 8" SS 8" SS F F W W 8" W 8" W W W W W W 8" SS 8" SS 8" SS W SS W W W 16" W F F S D S D SS SS SS SS F F W F F 8" W F F F F F F W SS S D D WV WV WV WV WV 8" W ST ST ST ST S D S D S D S D S D D WV WV WV WV WV G C S C S W W C S C.O. G I I I II I I II I II II I I II II I I II I II II I X LID FO D D D D D D D H Y D ST ST ST ST 6" SS 6" SS 6" SS S D 8" SS 8" SS 8" SS S D 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS SS S D S D SS SS SS SS SS S D D WV WV WV WV WV G C S C S W W C S C.O. G I I I II I I II I II II I I II II I I II I II II I 8'' ST 8'' ST 8'' ST 8'' ST LID D D D D D H Y D W V W V W V W V W V W V W V W V W V C S C S C S C S C S C S Electric Vault Electric Vault Electric Vault Electric Vault RD RD Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control H Y D W V W V W V W V W V W V C S C S C S C S C S C S C S C S C S C S C S C S C S Electric Vault Electric Vault G RD Irrigation Control Irrigation Control Irrigation Control Irrigation Control G G GG G C S G W W C S 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS III I II I II III I III II III I I I II II I I II I I II I I II II I I I II I I II II I I II I I I ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST W V W V Electric Vault Irrigation Control Irrigation Control M LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 3 3 3 3 3 LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 H Y D C S C S LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 3 3 C S Irrigation Control G FO LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 3 3 C ST ST ST ST ST ST Traffic Vault T S LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 3 3 W V W V Electric Vault 3 3 3 D C S 3 3 3 W V C S C S 3 W V W V C S C S Irrigation Control 3 3 3 W V C S Irrigation Control Irrigation Control 3 3 3 C302 10 SEATWALL SITE LAYOUT AND GRADING DETAIL PLAN W V C S Electric Vault W 3 ST ST ST ST ST ST ST D 3 3 3 C303 11 SEATWALL SITE LAYOUT AND GRADING DETAIL PLAN 1" = 5' SCALE: 1" = 5' 5' 0 5' 10' 15' (True scale for 22x34 sheet size) SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\Linden-Detailed Tuesday, Seatwall.December dwg 03, 8:2019 25 AM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET 111 C303 SEATWALL AREA 13S 112 C303 SEATWALL AREA 14S LEGEND: NOTES: 2.0% City of Fort Collins, Colorado UTILITY PLAN APPROVAL Date Date Date Date LID D D D D H Y D W V W V W V W V W V W V W V W V W V W V W V W V W V C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S Electric Vault Electric 6" SS 6" SS 6" SS 6" SS 6" SS II I II I I III II II III I I II II I I I I II I I II II I I III I I III I II II II II SS ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST X X X D D 8'' ST 8'' ST D H Y D W V W V W V W V W V Electric Vault Irrigation Control Irrigation Control Irrigation Control Irrigation Control M M Electric Vault LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 3 3 3 3 3 Walnut Street Linden Street D D W V W V W V C S Electric Vault ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST D D H Y D W V Traffic Vault Traffic Vault Traffic Vault Electric W V T S LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 3 3 Jefferson Street Linden Street ST ST ST ST 8" W 8" W F F F F F F F F F ST ST ST ST ST ST ST ST ST ST ST G W W W W W W W W W W W W W W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W E E E E E E E E FO FO FO FO FO FO FO D W V W V C S C S ST ST ST ST 6" SS 6" SS 6" SS S D 8" SS 8" SS 8" SS S D 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS SS S D S D SS SS SS SS SS S D D WV WV WV WV WV G C S C S W W C S C.O. G I I I II I I II I II II I I II II I I II I II II I CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City of Fort Collins, Colorado UTILITY PLAN APPROVAL Date Date Date Date Date Date City Engineer Traffic Engineer Parks & Recreation Stormwater Utility Water & Wastewater Utility C602 18 EROSION CONTROL DETAILS NTS SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\Linden-Erosion Tuesday, Control December Details.dwg 03, 9:2019 21 AM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET 200 C602 CURB INLET PROTECTION IP INLET PROTECTION GUTTER PROTECTION SETUP GS 201 C602 202 C602 IP 300 C701 CURB AND CONCRETE PAN CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City of Fort Collins, Colorado UTILITY PLAN APPROVAL Date Date Date Date Date Date City Engineer Traffic Engineer Parks & Recreation Stormwater Utility Water & Wastewater Utility C701 19 SITE DETAILS NTS SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\Linden-Tuesday, Site Details.December dwg 03, 9:2019 27 AM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET 301 C701 CONCRETE PAVER CROSS SECTION 302 C701 TREE PROTECTION TREE PROTECTION AREA 1.5 X's DISTANCE BETWEEN TRUNK AND DRIP LINE, OR 1 FOOT FOR EVERY DIAMETER INCH OF TRUNK, WHICHEVER IS GREATER ZONE 1 BRANCH PROTECTION -PROTECT LOWER BRANCHES OF TREE CANOPY PROVIDE SNOW FENCE FENCING AT DRIPLINE (MIN.) W W W W W W W W W W W W 8" SS 8" SS F F F W W W 8" W 8" W 8" W W W W W W 8" SS 8" SS 8" SS 8" SS 8" SS W W F F F SS SS SS SS SS SS F F F 8" W 8" W F F F F F F F F F W W S D W V WV WV WV F F F F F T CTV CTV CTV CTV CTV UGE II I II I I I 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 8'' W 8'' W 8'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W W W W W W W W W 6" SS 6" SS W W W 16" W WV 8" W 8" W F F F F F C.O. 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS SS ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\SUE Monday, Linden Photo.May dwg 06, 2019 10:13 AM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET SU03 22 SUBSURFACE UTILITY ENGINEERING PHOTOS NTS CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R 100 PHOTO OF C3D POINT #1 & #2 (POTHOLE 1) SU03 101 PHOTO OF C3D POINT #3, #4 & #5 (POTHOLE 2) SU03 102 PHOTO OF C3D POINT #6 (POTHOLE 3) SU03 SUBSURFACE UTILITY ENGINEERING PLAN QUALITY LEVEL A NOT FOR CONSTRUCTION 103 PHOTO OF C3D POINT #7 & #8 (POTHOLE 3A) SU03 106 PHOTO OF C3D POINT #13 & #14 (POTHOLE 6) SU03 104 PHOTO OF C3D POINT #9 & #10 (POTHOLE 4) SU03 107 PHOTO OF C3D POINT #15 & #16 (POTHOLE 7) SU03 105 PHOTO OF C3D POINT #11 & #12 (POTHOLE 5) SU03 108 SU03 PHOTO OF C3D POINT #17, #18, #19 & #20 (POTHOLE 7A) SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\SUE Monday, Linden Photo.May dwg 06, 2019 10:13 AM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET SU04 23 SUBSURFACE UTILITY ENGINEERING PHOTOS Scale CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R 109 PHOTO OF C3D POINT #21 & #22 (POTHOLE 8) SU04 110 PHOTO OF C3D POINT #23 & #24 (POTHOLE 9) SU04 111 PHOTO OF C3D POINT #25 & #26 (POTHOLE 10A) SU04 SUBSURFACE UTILITY ENGINEERING PLAN QUALITY LEVEL A NOT FOR CONSTRUCTION 112 PHOTO OF C3D POINT #27 & #28 (POTHOLE 11) SU04 115 PHOTO OF C3D POINT #31 (POTHOLE 14) SU04 113 PHOTO OF C3D POINT #29 (POTHOLE 12) SU04 116 PHOTO OF C3D POINT #32 & #33 (POTHOLE 15) SU04 114 PHOTO OF C3D POINT #30 (POTHOLE 13) SU04 117 PHOTO OF C3D POINT #34, #35 & #36 (POTHOLE 16) SU04 SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\SUE Monday, Linden Photo.May dwg 06, 2019 10:13 AM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET SU04 23 SUBSURFACE UTILITY ENGINEERING PHOTOS Scale CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R 118 PHOTO OF C3D POINT #37 (POTHOLE 17) SU05 SUBSURFACE UTILITY ENGINEERING PLAN QUALITY LEVEL A NOT FOR CONSTRUCTION LPC Meeting #2 WALNUT STREET COLLEGE AVENUE MOUNTAIN AVENUE LINDEN STREET PARKING GARAGE GINGER AND BAKER THE UNION OLD TOWN SQUARE JEFFERSON STREET WILLOW STREET OLD FIREHOUSE ALLEY Linden Street Renovations Contextual Site Plan 0 20 40 80’ LPC Meeting #2 Pre-cast concrete pavers, typ. Overhead tivoli lighting Proposed street trees paver grate, typ. Existing street trees to remain, typ. Raised planting area Seatwall w/ stone cap Potential Extended Patio Zone Curb/gutter adjusted to minimize crossing distance across Walnut Street Moveable Umbrellas and Chairs Bike rack 56 total spaces shown Bollard Raised planter Blonde brick wall/ stone cap w/ planter Pedestrian lighting Ring catenary lighting Concrete pavers - Herringbone pattern Moveable/Game Tables and Chairs Pavers across Walnut Street to connect Old Town Square 1 4 3 2 3 4 5 6 7 8 9 9 5/6 1/2 7 8 Colored concrete across Jefferson Street to connect to River District Sidewalk improvements to connect parking garage entrance to Linden St Moveable game tables, typ. Bollard, typ. Moveable cafe tables/ seating w/ umbrellas, typ. Bike rack, typ. Entry gateway walls w/ planter pots Parallel parking stall - 14 from Walnut to alley Parallel parking stall - 14 LPC Meeting #2 Proposed street trees in planting area Existing street trees to remain, typ. Moveable cafe tables/ seating w/ umbrellas, typ. Potential event tent location, typ. Pavers across Walnut Street to connect Old Town Square Reconfigured planting areas at corner to soften look Curb height wall with planter pots to act as gateway onto Linden Street Moveable game tables Parallel parking stall - 28 from Walnut to Jefferson St Reset stone paving at corner Bike rack, typ. Elliptical paver pattern connects to Old Town Square pattern and form Globe catenary lighting across Walnut Street Pre-cast concrete pavers, typ. Overhead tivoli lighting Central focal point - kinetic/ lighting feature A A’ Site Enlargement Plan Potential extended patio zone Potential extended patio zone Linden Street Renovations Sketch - Looking Northeast LPC Meeting #2 Pedestrian Lighting and Kinetic lighting feature w/LED spotlights Tivoli ties into Old Town Square Pedestrian Pavers Existing street trees Amenity Zone w/ Expanded patios moveable tables + chairs and planting Linden Street Renovations CITY OF FORT COLLINS RFP 9068 - CMGC LINDEN STREET RENOVATION PROJECT 1 Attachment 2 - Preconstruction Support Services Proposal Form For Preconstruction Support Services provide a breakdown of the approximate hours, by individual, for staff anticipated to provide the services. CM/GC Support Services: Name Title Rate Estimated Hours Activities Total Amount for Preconstruction Support Services Total Hours Total Amount Subcontractor Support services: Subcontractor Title Rate Estimated Hours Activities Total Amount for Preconstruction Sub Contractor Support Services Total Hours Total Amount CITY OF FORT COLLINS RFP 9068 - CMGC LINDEN STREET RENOVATION PROJECT 1 Attachment 3 - CM/GC Cost Factor Worksheet Complete the below table to demonstrate how your firm uses markups and fees. Please provide a description of your approach to pricing in your Project Budget and Cost Control submittal. CM/GC Support Services: Cost Category Value Overhead Markup % Profit/Fee Markup % Subcontractor Markup % Materials Markup % Bonds and Insurance Markup % from alley to Jefferson St Pedestrian light - pole w/ hanging basket Ring catenary lighting Central focal point - kinetic/lighting feature Radial pavement pattern slows traffic near alley crossing JEFFERSON STREET OLD FIREHOUSE ALLEY WALNUT STREET • Radial pattern tie to Old Town Square • Sinuous walking path • Curved shapes allow natural ped. movement • Umbrella cafe seating/game tables added along streetscape • Additional street trees Linden Street Renovations Overall Site Plan ST ST ST ST ST ST G G G G G W W W W W 8'' W 8'' W 8'' W 8'' W 8'' W E E E X X FO FO FO D D H Y D W V W V W V W V C S C S C S C S C S C S Electric Vault Electric Vault Electric Vault Electric Vault G RD RD RD RD Irrigation Control Irrigation Control Irrigation Control S S S C.O. Traffic Vault Traffic Vault Traffic Vault Traffic Vault Traffic Vault Electric W V T S MH G G G C S T S T S W Traffic Vault G G G FO FO E E LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC EXIST. SSMH EXIST. ST INLET EXIST. ST INLET EXIST. STMH EXIST. ST INLET 3 3 3 3 3 3 25 21 23 28 27 22 24 26 EXIST. SSMH EXIST. STMH EXIST. ST INLET EXIST. SSMH X" STORM 15" STORM 15" STORM X" STORM X" STORM 18" STORM 12" STORM Linden Street Jefferson Street Subsurface Utility Engineering Pothole Table Civil 3D Point No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 Pothole No. 1 1 2 2 2 3 3A 3A 4 4 5 5 6 6 7 7 7A 7A 7A 7A 8 8 9 9 10A 10A 11 11 12 13 14 15 15 16 16 16 17 Detail No. 100 100 101 101 101 102 103 103 104 104 105 105 106 106 107 107 108 108 108 108 109 109 110 110 111 111 112 112 113 114 115 116 116 117 117 117 118 Utility Type Gas Electric Gas Electric TOC Electric BOC Communication Communication TOC Communication BOC Water GAS Electric Communication Communication Communication Communication Gas Communication TOC Communication BOC Gas Unknown Communication Electric Electric Abandoned Clay Gas Water Electric TOP Electric BOP Communication Communication Gas Electric Communication Gas Electric TOP Electric BOP Gas Utility Size 3" 2" 4" 3/4" 3" 6" 4" 4" 6" 1" 1 1/2" 1" 8" 3" 3" 4" 4" 1" 2" 2" 1 1/2" 3" 2" 6" 4" 2" 2" 2" 4" Material Type Steel PVC Steel Encased in Concrete Encased in Concrete Encased in Concrete Encased in Concrete Encased in Concrete Copper Steel PVC PVC PVC PVC Encased in Concrete Steel Encased in Concrete Encased in Concrete PE Steel Steel PVC PVC Clay Steel PVC PVC PVC PVC PVC PE PVC PVC Steel PVC PVC Steel Depth from Surface 38" 35 1/2" 35" 22" 31" 30" 29" 36 1/2" 68 1/2" 37" 22 1/2" 22" 27 1/2" 31" 51" 18 1/2" 51" 67" 40" 50" 48" 27" 31" 31" 44" 74" 29" 36" 32" 32" 28" 33 1/2" 33" 32" 21" 29" 38" Surface Elevation 4980.483 4980.483 4980.386 4980.386 4980.386 4980.554 4980.552 4980.552 4979.998 4979.998 4979.529 4979.529 4979.388 4979.515 4979.029 4979.029 4979.049 4979.049 4979.049 4979.049 4977.826 4977.826 4977.836 4977.836 4978.223 4978.223 4978.045 4978.045 4979.393 4979.442 4979.485 4979.393 4979.393 4980.271 4980.271 4980.271 4979.433 Northing 1457766.911 1457766.911 1457729.532 1457729.532 1457729.532 1457780.098 1457780.704 1457780.704 1457868.421 1457868.421 1457927.266 1457927.266 1457940.156 1457939.904 1458009.547 1458009.547 1458007.559 1458007.559 1458007.559 1458007.559 1458092.707 1458092.707 1458098.478 1458098.478 1458048.677 1458048.677 1457992.594 1457992.594 1457905.509 1457902.391 1457899.098 1457897.096 1457897.096 1457832.320 1457832.320 1457832.320 1457930.420 Easting 3118761.818 3118761.818 3118808.043 3118808.043 3118808.043 3118790.073 3118788.953 3118788.953 3118865.258 3118865.258 3118916.831 3118916.831 3118914.257 3118914.038 3118974.200 3118974.200 3118974.124 3118974.124 3118974.124 3118974.124 3119049.380 3119049.380 3119043.057 3119043.057 3119023.128 3119023.128 3119052.062 3119052.062 3118964.146 3118960.135 3118956.083 3118951.427 3118951.427 3118912.590 3118912.590 3118912.590 3118920.029 Notes Encased in Concrete Encased in Concrete Encased in Concrete Encased in Concrete Encased in Concrete Encased in Concrete Encased in Concrete Encased in Concrete Unknown utility found directly under gas Broken and abandoned clay pipe found 3 conduits stacked vertically 3 conduits stacked vertically 3 conduits stacked vertically 3 conduits stacked vertically SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\SUE Wednesday, Linden Plan.December dwg 04, 6:42 2019 AM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET SCALE: 1" =20' 0 (True scale for 22x34 sheet size) 20' 20' 40' 60' SUBSURFACE UTILITY ENGINEERING PLAN QUALITY LEVEL A NOT FOR CONSTRUCTION LINE MATCH STA SHEET SU01 SU02 21 SUBSURFACE UTILITY ENGINEERING PLAN 1" = 20' LEGEND: SS W G E NOTES: 33 FO F OHT OHE OHE UGE UGE IRR H Y D Electric Vault Irrigation Control E ELEC BRKR C S W G Cable Vault CTV RD C.O. W V D S Traffic Vault T S MH CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE G G G G G ST ST ST ST IRR IRR IRR UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE IRR IRR IRR IRR IRR IRR UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE G G G G G G G G G G G G G G G G G G G E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E T T T T T T T T T T OHT OHT OHT OHT OHT OHT OHT OHT X X X X X X X X X X X X X X X X X X X X X X X X X X X OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W C.O. C.O. C.O. E E E E E E E E D C S C S C S C S W FO T T T T T G G G G G G G G G G GG E LEC ELEC ELEC ELEC ELEC ELEC ELEC VAULT ELEC CC CC CC CC CC MH MH MH MH MH MH MH RD RD RD RD RD RD RD RD RD RD 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' ST 8'' ST 8'' ST 8'' ST 8'' ST 8'' ST 8'' ST G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W W W W W W W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E X X X X X X FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV LID D D D D D H Y D H Y D W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault G RD RD RD Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control G G GG G C S G W W C S S FO Cable Vault C S W W W M M Electric Vault Electric Vault Electric MH H2O E ELEC BRKR LID 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 2'' W 1'' W 1'' W 0.75'' W 0.75'' W 6'' W 6'' W 6'' F 6'' F 6'' SS 6'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS G G G LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 7 37 17 25 13 14 15 28 29 30 31 33 12 35 3 6 1 10 8 4 5 34 36 11 27 32 9 2 16 18 19 20 26 EXIST. SSMH EXIST. STMH EXIST. ST INLET EXIST. STMH EXIST. STMH EXIST. STMH EXIST. STMH EXIST. STMH EXIST. ST INLET EXIST. ST INLET EXIST. SSMH EXIST. SSMH EXIST. SSMH 8" STORM 8" STORM 18" STORM 12" STORM 12" STORM 12" STORM 12" STORM 12" STORM 24" STORM 36" STORM 24" STORM Linden Street Walnut Street Old Firehouse Alley Old Firehouse Alley Walnut Street SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\SUE Wednesday, Linden Plan.December dwg 04, 6:42 2019 AM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET SU01 20 SUBSURFACE UTILITY ENGINEERING PLAN 1" = 20' SCALE: 1" =20' 0 (True scale for 22x34 sheet size) 20' 20' 40' 60' LEGEND: SS W G E NOTES: SUBSURFACE UTILITY ENGINEERING PLAN QUALITY LEVEL A NOT FOR CONSTRUCTION 33 LINE MATCH STA SHEET SU02 FO F OHT OHE OHE UGE UGE IRR CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R H Y D Electric Vault Irrigation Control E ELEC BRKR C S W G Cable Vault CTV RD C.O. W V D S Traffic Vault T S MH ZONE 2 TRUNK PROTECTION -REQUIRED IF WHEELED CONSTRUCTION EQUIPMENT INVOLVED WITHIN 10' OR LESS NO MATERIALS SHALL BE STORED WITHIN THE TREE PROTECTION ZONE 3 ROOT PROTECTION AREA -VARIES PER TREE SIZE EXTENDS FROM DRIPLINE TO DRIPLINE 303 C701 TYPE 13 INLET 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' ST 8'' ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST 8'' ST 8'' ST 8'' ST 8'' ST X LID FO D D D D D D D H Y D H Y D H Y D W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault G G G G H 2O RD RD RD RD RD RD RD RD RD RD W Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control S S S C.O. E E E T Traffic Vault Traffic Vault Traffic Vault Traffic Vault Traffic Vault Electric Electric W V T V.P. V.P. ELEC BRKR T S MH G G G G G G G C S G C S C S T S T S W W C S S FO Cable Vault Traffic Vault C S W W W M M Electric Vault Electric Vault Electric MH H2O E ELEC BRKR LID 6'' SS 6'' SS SS LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 T T T CTV CTV CTV CTV CTV CTV G G G G G ST ST ST ST ST ST ST IRR IRR IRR IRR IRR IRR D 10'' W T T T T T T T X X X X X X X X X X X X X X X X X X X X X 6'' SS 6'' SS 6'' SS 6'' SS W W W 18" ST 18" ST S S C .O. C.C.O. O. C.O. C.O. E E EE E E E E D D C S C S C S C S C S C S C S C S C S W W H2O FO T T T T T G G G G G G G G G G G G G CONTROL IRR CONTROL IRR ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC VAULT ELEC CC CC CC CC CC CC CC CC CC CC CC MH MH MH MH MH MH MH RD RD RD RD RD RD RD RD RD RD RD Jefferson Street Old Firehouse Alley Walnut Street GS IP GS GS IP GS IP IP GS GS IP IP CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City of Fort Collins, Colorado UTILITY PLAN APPROVAL Date Date Date Date Date Date City Engineer Traffic Engineer Parks & Recreation Stormwater Utility Water & Wastewater Utility C601 17 EROSION CONTROL PLAN 1" = 30' SCALE: 1" =30' 30' 0 30' 60' 90' (True scale for 22x34 sheet size) SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\Linden-Erosion Tuesday, Control.December dwg 03, 5:2019 28 PM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET LEGEND: NOTES: IP GS C S C S Traffic Vault Traffic Vault G T S W G G G G G G G G FO FO FO E E E E E LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 3 3 3 3 3 3 Linden Street 16" W 16" W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 8'' W 8'' W 8'' W 8'' W 8'' W 16'' W 16'' W 16'' W W 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS SS SS SS ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST G G G G G G G G G X X FO FO FO D D H Y D W V Control Irrigation Control Traffic Vault Traffic Vault Traffic Vault Electric W V T S G G G FO FO FO FO FO E E E E E LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 3 3 Jefferson Street KEYMAP C501 16 LINDEN STREET AND JEFFERSON STREET STORM DRAIN PLAN AND PROFILE 1" = 10' SCALE: 1" =10' 10' 0 10' 20' 30' (True scale for 22x34 sheet size) SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\Linden-Sunday, Storm December P&P.dwg 01, 2:2019 23 PM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET PROFILE SCALE: 18" STORM DRAIN 18" STORM DRAIN ST ST ST ST ST ST ST ST ST W V C S S Traffic Vault G G T S L OC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 3 3 Linden Street Jefferson Street Linden Street KEYMAP C404 15 LINDEN STREET / JEFFERSON STREET INTERSECTION DETAIL PLAN AND PROFILE 1" = 10' SCALE: 1" =10' 10' 0 10' 20' 30' (True scale for 22x34 sheet size) SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\Linden-Curb Sunday, Returns December P&P.dwg 01, 2:2019 21 PM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET NW CURB RETURN PROFILE JEFFERSON ST / LINDEN ST SE CURB RETURN PROFILE JEFFERSON ST / LINDEN ST RD Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Electric Vault Electric LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 3 3 3 3 3 Linden Street Walnut Street KEYMAP C403 14 LINDEN STREET / WALNUT STREET INTERSECTION DETAIL PLAN AND PROFILE 1" = 10' SCALE: 1" =10' 10' 0 10' 20' 30' (True scale for 22x34 sheet size) SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\Linden-Curb Sunday, Returns December P&P.dwg 01, 2:2019 21 PM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET NW CURB RETURN PROFILE WALNUT ST / LINDEN ST SE CURB RETURN PROFILE WALNUT ST / LINDEN ST H Y D W V W V W V W V W V C S C S C S C S C S C S C S Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault G RD I rrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control S E E E Traffic Vault Traffic Vault Traffic Vault Traffic Vault Traffic Vault Electric Electric W V T V.P. ELEC BRKR T S MH G G G G GG G T S T S W W C S FO LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 3 3 3 3 3 3 3 3 3 3 3 3 3 RD 12+40 12+80 13+20 13+60 14+00 14+40 14+80 15+00 12+40 12+80 13+20 13+60 14+00 14+40 14+80 15+00 12+40 12+80 13+20 13+60 14+00 14+40 14+80 15+00 Jefferson Street Linden Street Union Pacific Railroad 18" HDPE STORM DRAIN (SEE SHEET ####) 18" HDPE STORM DRAIN (SEE SHEET ####) 4976 4980 4984 4976 4980 4984 12+40 12+80 13+20 13+60 14+00 14+40 14+80 15+00 4976 4980 4984 4976 4980 4984 12+40 12+80 13+20 13+60 14+00 14+40 14+80 15+00 4976 4980 4984 4976 4980 4984 12+40 12+80 13+20 13+60 14+00 14+40 14+80 15+00 City of Fort Collins, Colorado UTILITY PLAN APPROVAL Date Date Date Date Date Date City Engineer Traffic Engineer Parks & Recreation Stormwater Utility Water & Wastewater Utility C402 13 LINDEN STREET FLOWLINE & CENTERLINE PLAN AND PROFILE 1" = 20' SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\Linden-Sunday, Street December P&P.dwg 01, 2:2019 14 PM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET SCALE: 1" =20' 0 (True scale for 22x34 sheet size) 20' 20' 40' 60' RIGHT FLOWLINE PROFILE LINDEN STREET MATCH LINE STA 12+60 CENTERLINE PROFILE LINDEN STREET LEFT FLOWLINE PROFILE LINDEN STREET LINE MATCH STA 12+60 KEYMAP LEGEND: NOTES: 2.0% Vault Electric Vault Electric Vault Electric Vault G RD RD RD Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control G G GG G C S G W W C S FO Cable Vault W W M Electric Vault Electric Vault E ELEC BRKR LID LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 T RD 9+00 9+20 9+60 10+00 10+40 10+80 11+20 11+60 12+00 12+40 12+80 13+20 13+60 9+00 9+20 9+60 10+00 10+40 10+80 11+20 11+60 12+00 12+40 12+80 13+20 13+60 9+00 9+20 9+60 10+00 10+40 10+80 11+20 11+60 12+00 12+40 12+80 13+20 13+60 Old Firehouse Alley Walnut Street 4978 4980 4984 4978 4980 4984 9+00 9+20 9+60 10+00 10+40 10+80 11+20 11+60 12+00 12+40 12+80 4978 4980 4984 4978 4980 4984 9+00 9+20 9+60 10+00 10+40 10+80 11+20 11+60 12+00 12+40 12+80 4978 4980 4984 4978 4980 4984 9+00 9+20 9+60 10+00 10+40 10+80 11+20 11+60 12+00 12+40 12+80 City of Fort Collins, Colorado UTILITY PLAN APPROVAL Date Date Date Date Date Date City Engineer Traffic Engineer Parks & Recreation Stormwater Utility Water & Wastewater Utility C401 12 LINDEN STREET FLOWLINE & CENTERLINE PLAN AND PROFILE 1" = 20' SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\Linden-Sunday, Street December P&P.dwg 01, 2:2019 14 PM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET SCALE: 1" =20' 0 (True scale for 22x34 sheet size) 20' 20' 40' 60' MATCH LINE STA 12+60 LINE MATCH STA 12+60 RIGHT FLOWLINE PROFILE LINDEN STREET CENTERLINE PROFILE LINDEN STREET LEFT FLOWLINE PROFILE LINDEN STREET KEYMAP LEGEND: NOTES: 2.0% Date Date City Engineer Traffic Engineer Parks & Recreation Stormwater Utility Water & Wastewater Utility 1" = 5' SCALE: 1" = 5' 5' 0 5' 10' 15' (True scale for 22x34 sheet size) SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\Linden-Detailed Tuesday, Seatwall.December dwg 03, 8:2019 25 AM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET 105 C302 SEATWALL AREA 7N 106 C302 SEATWALL AREA 8S 107 C302 SEATWALL AREA 9S 108 C302 SEATWALL AREA 10S 109 C302 SEATWALL AREA 11S 110 C302 SEATWALL AREA 12S LEGEND: NOTES: 2.0% City of Fort Collins, Colorado UTILITY PLAN APPROVAL Date Date Date Date Date Date City Engineer Traffic Engineer Parks & Recreation Stormwater Utility Water & Wastewater Utility S C S G LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 C301 9 SEATWALL SITE LAYOUT AND GRADING DETAIL PLAN 1" = 5' SCALE: 1" = 5' 5' 0 5' 10' 15' (True scale for 22x34 sheet size) SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\Linden-Detailed Tuesday, Seatwall.December dwg 03, 8:2019 25 AM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET 100 C301 SEATWALL AREA 1N AND 2N 101 C301 SEATWALL AREA 3N 102 C301 SEATWALL AREA 4N 103 C301 SEATWALL AREA 5N 104 C301 SEATWALL AREA 6N LEGEND: NOTES: 2.0% City of Fort Collins, Colorado UTILITY PLAN APPROVAL Date Date Date Date Date Date City Engineer Traffic Engineer Parks & Recreation Stormwater Utility Water & Wastewater Utility ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST X X X X X X T T D D H Y D W V W V W V W V W V C S C S C S C S C S C S C S Electric Vault Electric Vault Electric Vault G Irrigation Control Irrigation Control S Traffic Vault Traffic Vault Traffic Vault Traffic Vault Traffic Vault Electric W V T T S MH G G G G GG T S T S W W C S LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 3 3 3 3 3 3 3 1.1% 1.8% 1.8% 1.7% 1.8% 1.8% 1.1% 2.2% 1.7% 1.5% 1.4% 1.6% 2.2% 1.1% 1.4% 1.7% 1.8% 1.7% 4.3% 1.5% 4.6% 1.5% 4.3% 1.5% 4.3% 1.5% 1.5% 4.3% 1.5% 4.3% 4.3% 1.5% 1.5% 4.3% 4.4% 2.4% 0.9% 0.7% 1.2% 0.8% 1.7% 0.6% 1.2% 2.2% 2.2% Jefferson Street Linden Street 18" HDPE STORM DRAIN (SEE SHEET ####) 18" HDPE STORM DRAIN (SEE SHEET ####) SEATWALL 6N (SEE SHEET C301) SEATWALL 7N (SEE SHEET C302) SEATWALL 13S (SEE SHEET C303) SEATWALL 14S (SEE SHEET C303) City of Fort Collins, Colorado UTILITY PLAN APPROVAL Date Date Date Date Date Date City Engineer Traffic Engineer Parks & Recreation Stormwater Utility Water & Wastewater Utility C204 8 DETAILED GRADING PLAN 1" = 10' SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\Linden-Detailed Tuesday, Grading.December dwg 03, 5:2019 22 PM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET LINE MATCH STA 13+00 SCALE: 1" =10' 10' 0 10' 20' 30' (True scale for 22x34 sheet size) KEYMAP LEGEND: NOTES: 2.0% FO C able Vault LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 RD 0.6% 0.6% 0.6% 0.6% 0.6% 0.6% 1.1% 1.8% 1.6% 2.2% 2.0% 3.1% 2.0% 3.7% 2.1% 2.2% 2.0% 2.0% 0.5% 0.5% 0.7% 0.6% 1.2% 0.7% 1.3% 0.6% 1.1% 1.1% 1.4% 2.3% 2.0% 2.4% 2.6% 2.4% 2.5% 2.4% 2.4% 2.4% 2.4% 3.4% 2.5% 3.4% 2.4% 4.3% 2.4% 4.3% 2.4% 2.4% 4.3% 1.5% 4.3% 1.5% 1.5% 4.6% 4.3% 1.5% 0.8% 2.5% 1.6% 1.9% 2.0% 1.5% 1.3% 0.9% 1.1% 0.9% 0.7% Old Firehouse Alley Linden Street SEATWALL 3N (SEE SHEET C301) SEATWALL 4N (SEE SHEET C301) SEATWALL 5N (SEE SHEET C301) SEATWALL 10S (SEE SHEET C302) SEATWALL 11S (SEE SHEET C302) SEATWALL 12S (SEE SHEET C302) SEATWALL 13S (SEE SHEET C303) City of Fort Collins, Colorado UTILITY PLAN APPROVAL Date Date Date Date Date Date City Engineer Traffic Engineer Parks & Recreation Stormwater Utility Water & Wastewater Utility C203 7 DETAILED GRADING PLAN 1" = 10' SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\Linden-Detailed Tuesday, Grading.December dwg 03, 5:2019 22 PM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET LINE MATCH STA 11+00 LINE MATCH STA 13+00 SCALE: 1" =10' 10' 0 10' 20' 30' (True scale for 22x34 sheet size) KEYMAP LEGEND: NOTES: 2.0% Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control C S G W W M M Electric Vault Electric Vault Electric E ELEC BRKR LID 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 6'' W 6'' W 6'' W 6'' W LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 3 3 3 3 3 3 3 3 3 3 3 3 3 ST 0.8% 0.6% 0.6% 2.0% 1.1% 0.4% 0.8% 0.5% 0.5% 0.5% 1.6% 2.2% 1.5% 2.1% 2.0% 2.4% 2.3% 2.0% 2.4% 2.6% 0.6% 0.9% 0.8% Walnut Street Linden Street SEATWALL 1N (SEE SHEET C301) SEATWALL 2N (SEE SHEET C301) SEATWALL 3N (SEE SHEET C301) SEATWALL 8S (SEE SHEET C302) SEATWALL 9S (SEE SHEET C302) SEATWALL 10S (SEE SHEET C302) City of Fort Collins, Colorado UTILITY PLAN APPROVAL Date Date Date Date Date Date City Engineer Traffic Engineer Parks & Recreation Stormwater Utility Water & Wastewater Utility C202 6 DETAILED GRADING PLAN 1" = 10' SCALE: 1" =10' 10' 0 10' 20' 30' (True scale for 22x34 sheet size) SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\Linden-Detailed Tuesday, Grading.December dwg 03, 5:2019 22 PM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET LINE MATCH STA 11+00 KEYMAP LEGEND: NOTES: 2.0% 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS X LID FO D D D D D D D H Y D H Y D H Y D W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault G G G G H 2O RD RD RD RD RD RD RD RD RD RD W Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control S S S C.O. E E E T Traffic Vault Traffic Vault Traffic Vault Traffic Vault Traffic Vault Electric Electric W V T V.P. V.P. ELEC BRKR T S MH G G G G G G G C S G C S C S T S T S W W C S S FO Cable Vault Traffic Vault C S W W W M M Electric Vault Electric Vault Electric MH H2O E ELEC BRKR LID 6'' SS 6'' SS SS LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 T T T CTV CTV CTV CTV CTV CTV G G G G G ST ST ST ST ST ST ST IRR IRR IRR IRR IRR IRR D 10'' W T T T T T T T X X X X X X X X X X X X X X X X X X X X X 6'' SS 6'' SS 6'' SS 6'' SS W W W 18" ST 18" ST S S C .O. C.C.O. O. C.O. C.O. E E EE E E E E D D C S C S C S C S C S C S C S C S C S W W H2O FO T T T T T G G G G G G G G G G G G G CONTROL IRR CONTROL IRR ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC VAULT ELEC CC CC CC CC CC CC CC CC CC CC CC MH MH MH MH MH MH MH RD RD RD RD RD RD RD RD RD RD RD Jefferson Street Old Firehouse Alley Walnut Street CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City of Fort Collins, Colorado UTILITY PLAN APPROVAL Date Date Date Date Date Date City Engineer Traffic Engineer Parks & Recreation Stormwater Utility Water & Wastewater Utility C201 5 OVERALL GRADING PLAN 1" = 30' SCALE: 1" =30' 30' 0 30' 60' 90' (True scale for 22x34 sheet size) SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\Linden-Overall Tuesday, Grading.December dwg 03, 6:2019 11 AM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET LEGEND: NOTES: H Y D H Y D W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault G G G G H 2O RD RD RD RD RD RD RD RD RD RD W Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control S S S C.O. E E E T Traffic Vault Traffic Vault Traffic Vault Traffic Vault Traffic Vault Electric Electric W V T V.P. V.P. ELEC BRKR T S MH G G G G G G G C S G C S C S T S T S W W C S S FO Cable Vault Traffic Vault C S W W W M M Electric Vault Electric Vault Electric MH H2O E ELEC BRKR LID 6'' SS 6'' SS LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 D 10'' W X X X X X X X X X X X X X X X X X X X X X 6'' SS 6'' SS 6'' SS 6'' SS W W W 18" ST 18" ST S S C.O. C.C.O. O. C.O. C.O. E E EE E E E E D D C S C S C S C S C S C S C S C S C S W W H2O FO T T T T T G G G G G G G G G G G G G CONTROL IRR CONTROL IRR ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC VAULT ELEC CC CC CC CC CC CC CC CC CC CC CC MH MH MH MH MH MH MH RD RD RD RD RD RD RD RD RD RD RD Jefferson Street Old Firehouse Alley Walnut Street Linden Street N41°18'39"E PROJECT CENTERLINE S89°51'53"E SECTION LINE CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City of Fort Collins, Colorado UTILITY PLAN APPROVAL Date Date Date Date Date Date City Engineer Traffic Engineer Parks & Recreation Stormwater Utility Water & Wastewater Utility C102 4 OVERALL SITE PLAN 1" = 30' SCALE: 1" =30' 30' 0 30' 60' 90' (True scale for 22x34 sheet size) SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\Sunday, Linden-Site.December dwg 01, 12:2019 48 PM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET NOTES: LEGEND: F F F G C S C S W W C S C.O. G I I I II I I II I II II I I II II I I II I II II I 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 8'' W 8'' W 8'' W 8'' W 8'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W 16'' W W 16'' W W W W W W W 6'' SS 6'' SS 6'' SS 6'' SS 6'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS SS 8'' ST 8'' ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST 8'' ST 8'' ST 8'' ST 8'' ST G G G G G G G G G G G G G G G G G G G G G G G G G G G G G W W W W W W W W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W E E E E E E E E E E E E E E E E E E E E E E E X X FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO CTV CTV CTV CTV CTV CTV CTV LID FO D D D D D D D H Y D H Y D H Y D W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V W V C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S C S Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault Electric Vault G G G G H 2O RD RD RD RD RD RD RD RD RD RD W Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control Irrigation Control S S S C.O. E E E T Traffic Vault Traffic Vault Traffic Vault Traffic Vault Traffic Vault Electric Electric W V T V.P. V.P. ELEC BRKR T S MH G G G G G G G C S G C S C S T S T S W W C S S FO Cable Vault Traffic Vault C S W W W M M Electric Vault Electric Vault Electric MH H2O E ELEC BRKR LID 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 6'' F 1'' W 0.75'' W 2'' W 1'' W 0.75'' W 0.75'' W 0.75'' W 6'' W 6'' F 6'' SS 6'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS 8'' SS SS 8'' SS G G G FO E LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC T T T CTV CTV CTV CTV CTV CTV UGE UGE UGE UGE UGE UGE UGE UGE UGE G G G G G ST ST ST ST ST ST ST IRR IRR UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE IRR IRR IRR IRR UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE D 10'' W G G G G G G G G G G G G G G G E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E T T T T T T T OHT OHT OHT OHT OHT X X X X X X X X X X X X X X X X X X X X X 6'' SS 6'' SS 6'' SS 6'' SS OHE OHE OHE OHE OHE OHE OHE OHE OHE 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W 8'' W W W W 6'' SS 18" ST 18" ST S S C.O. C.C.O. O. C.O. C.O. E E EE E E E E D D C S C S C S C S C S C S C S C S C S W W H2O FO T T T T T G G G G G G G G G G G G G CONTROL IRR CONTROL IRR ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC VAULT ELEC CC CC CC CC CC CC CC CC CC CC CC MH MH MH MH MH MH MH RD RD RD RD RD RD RD RD RD RD RD Jefferson Street Old Firehouse Alley Walnut Street Old Firehouse Alley 1 1 1 2 3 4 5 8 11 20 21 1000 2945 SURVEY CONTROL POINTS POINT # 1 2 3 4 5 6 7 8 11 20 21 100 1000 2945 DESCRIPTION CP CP CP CP CP CP CP CP CP CP CP BM CP 5 CHK BM 5-00 NORTHING 1457715.9035 1457542.5999 1457907.5684 1457931.0670 1458178.9967 1458433.2992 1457800.4771 1457996.6147 1457715.9002 1458034.7111 1458252.7551 1458698.9862 1458179.0364 1458094.3819 EASTING 3118759.5800 3119009.0177 3118599.0477 3118909.7061 3119169.7741 3118676.6439 3119485.1262 3119265.2414 3118759.5822 3119111.5745 3118997.2027 3118263.0666 3119169.8156 3119042.1815 ELEVATION 4980.73 4977.74 4981.39 4979.40 4976.35 4978.01 4973.56 4975.54 4980.74 4977.22 4978.36 4979.73 4976.38 4977.97 Linden Street 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 5 5 5 5 5 5 5 5 5 1 City of Fort Collins, Colorado UTILITY PLAN APPROVAL Date Date Date Date Date Date City Engineer Traffic Engineer Parks & Recreation Stormwater Utility Water & Wastewater Utility SHEET NO. x PROJECT NO. SHEET INDEX DESIGNED BY: DRAWN BY: APPROVED BY: SCALE: SHEET SUBSET: CITY OF FORT COLLINS LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\Linden-Wednesday, Existing.December dwg 04, 6:41 2019 AM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET C101 3 EXISTING CONDITION AND DEMOLITION PLAN 1" = 30' SCALE: 1" =30' 30' 0 30' 60' 90' (True scale for 22x34 sheet size) FIELD SURVEY BY: NOTES: 1 PROTECTION AND REMOVAL TAG: 2 LEGEND: W V S Irrigation Control Electric Vault H Y D D SS W G E FO F OHT OHE OHE UGE UGE IRR Cable Vault CTV Traffic Vault T S C S W LOC LOC LOC 100 3 4 5 LINDEN STREET RENOVATIONS DATE: NONE December 4, 2019 K. Meyer Drawing Name: D:\Projects\COFC Linden Street\Dwg\Sheets\Linden-Monday, Cover.December dwg 02, 3:2019 35 PM By: Rhonda Bunner R. Bunner J. Burrell NOT FOR CONSTRUCTION 30% REVIEW SET C001 1 COVER SHEET NTS SHEET INDEX INDEX NO. SHEET NO. DESCRIPTION COVER AND GENERAL NOTES 1 C001 COVER SHEET 2 C002 GENERAL NOTES OVERALL SHEETS 3 C101 EXISTING CONDITION AND DEMOLITION PLAN 4 C102 OVERALL SITE PLAN GRADING SHEETS 5 C201 OVERALL GRADING PLAN 6 C202 DETAILED GRADING PLAN 7 C203 DETAILED GRADING PLAN 8 C204 DETAILED GRADING PLAN LINDEN STREET SEATWALLS 9 C301 SEATWALL SITE LAYOUT AND GRADING DETAIL PLAN 10 C302 SEATWALL SITE LAYOUT AND GRADING DETAIL PLAN 11 C303 SEATWALL SITE LAYOUT AND GRADING DETAIL PLAN LINDEN STREET PLAN AND PROFILE SHEETS 12 C401 LINDEN STREET FLOWLINE & CENTERLINE PLAN AND PROFILE 13 C402 LINDEN STREET FLOWLINE & CENTERLINE PLAN AND PROFILE 14 C403 LINDEN STREET / WALNUT STREET INTERSECTION DETAIL PLAN AND PROFILE 15 C404 LINDEN STREET / JEFFERSON STREET INTERSECTION DETAIL PLAN AND PROFILE STORM DRAIN PLAN AND PROFILE SHEETS 16 C501 LINDEN STREET AND JEFFERSON STREET STORM DRAIN PLAN AND PROFILE EROSION CONTROL SHEETS 14 C601 EROSION CONTROL PLAN 18 C602 EROSION CONTROL DETAILS DETAIL SHEETS 19 C701 SITE DETAILS SUBSURFACE UTILITY ENGINEERING SHEETS 20 SU01 SUBSURFACE UTILITY ENGINEERING PLAN 21 SU02 SUBSURFACE UTILITY ENGINEERING PLAN 22 SU03 SUBSURFACE UTILITY ENGINEERING PHOTOS 23 SU04 SUBSURFACE UTILITY ENGINEERING PHOTOS 24 SU05 SUBSURFACE UTILITY ENGINEERING PHOTOS ATTACHMENT 1