HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9191659September 3, 2019
Lea Ann Haisch
City of Fort Collins
RE: Fossil Creek Park Irrigation Booster Pump
Engineering Services
Lea Ann,
We are pleased to submit this Irrigation Engineering Services Proposal/Agreement for the Fossil
Creek Park Booster Pump project in Fort Collins, Colorado. Our proposal is based on the
information you provided during the on-site meeting on August 30, 2019.
The defined Scope of Work to be performed and our proposed Fees to be charged are
described in Exhibits A and B, respectively, followed by the Terms and Conditions under which
we are available to proceed.
If you wish to contract our services, please return this Agreement, signed by an authorized
representative.
When we receive the executed Agreement from you, we will confer with you about the schedule.
Please note that our fee is subject to review if this agreement is not executed within 90 days.
Please contact us with any questions you may have. We look forward to our work with you.
Respectfully submitted,
Jason Klausner, PE
Project Engineer
Aqua Engineering, Inc. Fossil Creek Booster Pump
Engineering Services
September 3, 2019 - 2 -
EXHIBIT A
SCOPE-OF-WORK:
We propose to provide the following irrigation engineering services:
TASK 1.0: Irrigation Booster Pump Design Documents
• Conduct one site visit with City of Fort Collins representatives to gather necessary
information for the booster pump design.
• Coordinate with City of Fort Collins representatives as necessary.
• Prepare demolition plan of existing irrigation equipment to be removed to make room for
new booster pump.
• Prepare irrigation booster pump construction documents for an engineered, VFD controlled
booster pump. The design will also include a backflow assembly located within a pre-
fabricated aluminum enclosure that also includes new backflow preventer. Booster pump to
be 80 GPM and +/-40 PSI boost. Booster pump to supply the two existing baseball fields
(3.2 acres total).
• Existing hydrometer will be installed downstream of new booster pump.
• Prepare Irrigation Pump System specifications in CSI format.
• Develop Pumping System Installation Details.
• Submit plans, specifications, and installation details for Client review at 90% and 100%
complete.
TASK 1.1: Irrigation Booster Pump Construction Observation
• Review and respond to contractor requests for information (RFIs)
• Review contractor submittals for general conformance with plans and specifications (2
reviews total)
• Conduct one (1) site visit during construction
• Conduct operation test of booster pump – operate 4-5 distal rotor zones to observe
performance of booster pump
• As Built Drawing based on contractor red lines
Field reports will be written and distributed after each site visit. A punch list will be prepared
after the Operational Test.
Aqua Engineering, Inc. Fossil Creek Booster Pump
Engineering Services
September 3, 2019 - 3 -
TASK 2.0: Electrical Engineering Booster Pump Design Documents
• Review site for existing conditions
• Review proposed motor for connections and controls for cabling and conduits.
• Provide one line, load summary, panel schedule, service sizing, and feeder schedules.
• Provide electrical specifications on drawings
• Provide site power plan view for equipment location and recommended conduit routing.
• Provide new load service request.
• Coordinate with utility for service sizing and locations as required.
• Provide construction drawings at 90% and 100% complete
TASK 2.1: Electrical Engineering Construction Observation
• Review submittals (2 total)
• Attend site visit at substantial completion
• Electrical As Built Drawings based on contractor red lines
ASSUMPTIONS
It has been assumed that the following information/services are to be supplied by others before
the irrigation design begins:
• Accurate and finalized computerized base information compatible with .DWG or .DXF
formats containing curb lines, building and other hard surface locations, sidewalk locations,
grading, etc.
• Finalized landscape design.
• Water source location, water pressure, and contacts for coordination issues.
• Power source locations and contacts for coordination issues.
• Applicable City of Fort Collins Irrigation System and Irrigation Pump Station standards.
SERVICES NOT INCLUDED
• Site visits or coordination meetings other than those specified.
• Redesign for changes in design after the drawings have been either partially or completely
prepared because of site changes, concept changes, etc.
• Landscape irrigation design
CHANGES
Because changes in base information and/or landscape design can significantly affect
hydraulics, any such changes will necessitate our charging additional fees, as detailed in the
Agreement. Therefore, the fees quoted presume the availability of completed base information
and completed design before irrigation design begins.
Aqua Engineering, Inc. Fossil Creek Booster Pump
Engineering Services
September 3, 2019 - 4 -
EXHIBIT B
FEES:
We propose the following fees for the scope-of-work defined above:
Task 1.0: Irrigation Booster Pump Renovation Documents ................................... $ 3,000
Task 1.1: Irrigation Booster Pump Construction Observation ............................... $ 1,200
Task 2.0: Electrical Engineering Booster Pump Design Documents .................... $ 2,250
Task 2.1: Electrical Engineering Construction Observation .................................. $ 600
TOTAL (including direct expenses) ............................................................................. $ 7,050
Aqua Engineering, Inc. Fossil Creek Booster Pump
Engineering Services
September 3, 2019 - 5 -
TERMS AND CONDITIONS
Aqua Engineering, Inc.
Aqua Engineering and Client agree as follows:
1. SERVICES: Aqua Engineering will perform the professional services defined in Exhibit A—Scope of Work.
2. COMPENSATION: Client will compensate Aqua Engineering as detailed in Exhibit B—Fees.
3. BILLING: Aqua Engineering’s normal billing period ends at the close of each month, or at the completion of
each work phase. Payment is due and payable within 30 days of invoice date. Past due amounts will accrue
interest in the amount of 2% per month until payment is made, plus any attorneys' fees.
4. CONFORMANCE TO AGREEMENTS WITH HIGHER ENTITY(S): Aqua Engineering will not be subject
to the terms of any agreements related to the project issued by any higher entity(s) unless it has copies of such
agreements to examine. Such copies shall be full and true copies of said agreements, except that fee information
may be excluded. This includes Client’s immediate agreement with its client in addition to any other agreements at
higher levels, i.e. agreement with Owner.
5. PURCHASE ORDERS: Issuance of a purchase order in response to this proposed letter agreement shall
constitute acceptance of these Terms and Conditions whether or not these Terms and Conditions are specifically
referenced on the purchase order.
6. CHANGES: A reasonable amount of coordination is anticipated for the work and is included in the fees quoted.
If the scope-of-work changes through concerns of the Client or base information changes are made which impact
the original scope-of-work, the additional work or coordination will be charged as follows: either on an hourly
basis per Aqua Engineering’s hourly rate schedule in effect at the time of the changes, or through a negotiated
additional fee. If the Client directs Aqua Engineering to coordinate its work with other entity(s), the Client shall
pay Aqua Engineering for any work beyond our original scope of work necessitated by errors or changes made by
the other entity(s).
7. TERMINATION OR SUSPENSION OF WORK: If the scope-of-work delineated is abandoned or suspended
in whole or in part, Aqua Engineering is to be paid for services performed on such work prior to receipt of written
notice to cease work, together with any termination expense resulting from cessation of work.
8. CONSTRUCTION OBSERVATION: Aqua Engineering considers construction observation an important
service, and encourages clients to include construction observation in the scope-of-work. When contracted to
perform construction observation, Aqua Engineering will visit the site as requested by Client to observe
Contractor’s work and to determine, in general, if the work is proceeding in accordance with the contract
documents. Aqua Engineering will not be responsible for and will not have control or charge of construction
means, methods, techniques, sequences or procedures, equipment or product failures, or for safety precautions and
programs in connection with the work. Aqua Engineering will not be responsible for or have control or charge
over the acts or omissions of the Contractor, Subcontractors, or any of their agents or employees, or any other
persons performing any of the work. Whether or not Aqua Engineering is contracted to perform construction
observation services, Aqua Engineering will be indemnified and held harmless in the event that construction does
not conform to the construction documents, or the construction documents are misinterpreted.
9. INDEMNIFICATION: Client agrees, to the fullest extent permitted by law, to indemnify and hold harmless
Aqua Engineering against all damages, liabilities or costs including reasonable attorney's fees and defense costs, to
the extent caused by the Client’s negligent performance of professional services under this agreement and that of
its sub-consultants or anyone for whom the Client is legally liable. Aqua Engineering, Inc. agrees, to the fullest
extent permitted by law, to indemnify and hold harmless, the Client against all damages, liabilities or costs
including reasonable attorney's fees and defense costs, to the extent caused by Aqua Engineering, Inc.’s negligent
performance of professional services under this agreement and anyone for whom Aqua Engineering, Inc. is legally
liable.
Revised 09/03
Aqua Engineering, Inc. Fossil Creek Booster Pump
Engineering Services
September 3, 2019 - 6 -
10. LIMITATION OF LIABILITY: To the fullest extent permitted by law, Aqua Engineering’s total liability to
Client, Owner and any third parties for any and all injuries, claims, losses, expenses, damages or claims expenses
arising out of this agreement from any cause or causes, shall not exceed the contract amount. Such causes include
but are not limited to Aqua Engineering’s negligent acts, errors, and omissions.
11. CONSEQUENTIAL DAMAGES: Aqua Engineering and the Client waive consequential damages for claims,
disputes or other matters in question arising out of or relating to this Agreement. This mutual waiver is applicable,
without limitation, to all consequential damages due to either party’s termination of the Agreement.
12. OWNERSHIP OF DOCUMENTS: Client acknowledges that any construction documents prepared for this
specific project will not be reused for other projects. Client agrees to hold harmless and indemnify Aqua
Engineering against all damages, claims, and losses including defense costs, arising out of reuse of any part of the
construction documents without the written authorization of Aqua Engineering.
13. ELECTRONIC DATA FILES: Any electronic data files furnished by Aqua Engineering to the Client or any
other entity involved with the project are provided only as an “instrument of service” for the convenience of said
user and only for its sole use. Client recognizes that the files may not be adequate or appropriate for user’s needs.
In the case of any defects in the files or any discrepancies between the files and the hardcopy of the files bearing
the seal of Aqua Engineering’s professional registrant, the sealed hardcopy shall govern. Aqua Engineering
assumes no responsibility for the accuracy or completeness of the files. Aqua Engineering is to be indemnified
and held harmless from any and all claims, damages, losses, costs, and expenses, including attorneys’ fees and
court costs arising out of or resulting from Client’s use, reuse, or use by others, regardless of whether such claims,
damages, losses, costs and expenses are caused in whole or in part by Aqua Engineering.
14. OPINION OF PROBABLE COSTS: Since Aqua Engineering has no control over the cost of water, energy,
labor, materials, or equipment, or over Contractor’s method of determining prices, or over competitive bidding or
market conditions, the opinions of probable cost that may be provided for herein are made on the basis of
experience. These opinions represent the judgment of a design professional familiar with the construction
industry. However, Aqua Engineering cannot, and does not, guarantee that proposals, bids, construction cost,
water cost or pumping cost will not vary from opinions of probable cost prepared as a part of the work.
15. DISPUTES: Any claim or dispute arising out of this Agreement shall be subject to mediation prior to arbitration
or legal proceedings by either party. Disputes not solved by mediation may be subject to arbitration, where both
parties agree to the arbitration. In the event that a dispute is not resolved by mediation or arbitration and results in
litigation, it is agreed that the prevailing party shall be entitled to recover all reasonable costs incurred in the
defense of the claim, including staff time, court costs, attorneys’ fees, and other claim related expense.
Revised 09/03
AGREED TO AND ACCEPTED:
Signed: ________________________________ Signed:
Name: ________________________________ Name: Robert W. Beccard, P.E.
Company: _____________________________ Company: Aqua Engineering, Inc.
Title: _________________________________ Title: President
Date: _________________________________ Date: September 3, 2019