Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8286 ENGINEERING SERVICES FOR WATER, WW AND STORMWATER FACILITIES CAPITAL IMPROVEMENTSChange Order Form (for Work Orders) Official Purchasing Form Last updated 10/2017 CHANGE ORDER NO. 2 PROJECT TITLE: DWRF Digester 612 Lid Replacement Construction SERVICE PROVIDER: Hydro Construction, Inc. WORK ORDER NUMBER:H-WRF-2019-01 PO NUMBER: 9190183 DESCRIPTION: 1. Reason for Change: Cost and time 2. Description of Change: The original lead and oakum joints, which penetrate through the concrete wall of Digester 612 into the Digester Building basement, are weeping and present a potential hazard once the Digester is pressurized and filled with sludge. In order to initiate the water pressure test and fully start up Digester 612 once construction is completed; these pipe penetrations will need to be demolished and new pipe penetrations installed. Extend substantial completion deadline from October 31, 2019 to November 30, 2019 and in budget by $57,287.00. 3. Change in Work Order Price: $57,287.00 4. Change in Work Order Time: 30 days ORIGINAL WORK ORDER PRICE $ 974,806.00 TOTAL APPROVED CHANGE ORDER $ 65,417.00 TOTAL PENDING CHANGE ORDER $0.00 TOTAL THIS CHANGE ORDER $ 57,287.00 TOTAL % OF THIS CHANGE ORDER 5.9% TOTAL C.O.% OF ORIGINAL WORK ORDER 12.6% ADJUSTED WORK ORDER COST $ 1,097,510.00 SERVICE PROVIDER: Date: John Podeyn, Project Manager ACCEPTANCE: Date: Christina Schroeder, Civil Engineer III REVIEWED: Date: Pat Johnson, Senior Buyer DocuSign Envelope ID: 30F1446B-1541-4A19-A39F-36747462A5CF September 5, 2019 September 6, 2019 September 6, 2019 Change Order Form (for Work Orders) Official Purchasing Form Last updated 10/2017 ACCEPTANCE: Date: Matt Fater, Director, Civil Engineering ACCEPTANCE: Date: Jason Graham, Director, Water Reclamations & Biosolids ACCEPTANCE: Date: Carol Webb, Deputy Director, Water Resources & Treatment Operations ACCEPTANCE: Date: Theresa Connor, Deputy Director, Water Engineering & Field Services ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) DocuSign Envelope ID: 30F1446B-1541-4A19-A39F-36747462A5CF September 10, 2019 September 6, 2019 September 10, 2019 September 10, 2019 September 11, 2019 DWRF Digester 612 Lid Replacement Construction Work Order Change Order 02 Lead and Oakum Joints Cost Estimate DocuSign Envelope ID: 30F1446B-1541-4A19-A39F-36747462A5CF HYDRO CONSTRUCTION CO., INC. DWRF - Digester 612 Page 1 Work Change Directive 002- Digester 612 Penetration Repair 7/16/2019 6:26 PM DocuSign Envelope ID: 30F1446B-1541-4A19-A39F-36747462A5CF HYDRO CONSTRUCTION CO., INC. DWRF - Digester 612 Page 2 Work Change Directive 002- Digester 612 Penetration Repair 7/16/2019 6:26 PM Group Phase Description Takeoff Quantity Labor Cost/Unit Labor Price Labor Amount Material Price Material Amount Sub Amount Equip Price Equip Amount Other Price Other Amount Total Cost/Unit Total Amount 1000.0 00 GENERAL CONDITIONS 1100.10 0 Project Management Project Manager 80.00 hr 47.00 /hr 47.00 /hr 3,760 - - - /hr - - 47.00 /hr 3,760 Project Manager - Vehicle 2.00 wk /wk - - - 400.00 /wk 800 75.00 /wk 150 475.00 /wk 950 Project Manager - Computer/Software 2.00 wk /wk - - - 125.00 /wk 250 - - 125.00 /wk 250 Project Engineer 80.00 hr 32.50 /hr 32.50 /hr 2,600 - - - /hr /0 32.50 /hr 2,600 Project Engineer - Vehicle 2.00 wk /wk - - - 285.00 /wk 570 55.00 /wk 110 340.00 /wk 680 Project Engineer - Computer/Software 2.00 wk /wk - - - 125.00 /wk 250 - - 125.00 /wk 250 1102.10 0 Site Supervision Assit. Superintendent 80.00 hr 32.00 /hr 32.00 /hr 2,560 - - - /hr - - 32.00 /hr 2,560 Assit. Superintendent - Vehicle 2.00 wk /wk - - - 400.00 /wk 800 100.00 /wk 200 500.00 /wk 1,000 Assit. Superintendent - Computer/Software 2.00 wk /wk - - - 125.00 /wk 250 - - 125.00 /wk 250 1250.10 0 Offices Field Office 1.00 mo - - - - - - 0.00 /mo 0 1,300.00 /mo 1,300 1,300.00 /mo 1,300 1255.10 0 Supplies & Equip Office Supply & Equip -GC 1.00 mo - - - /mo - - - 150.00 /mo 150 150.00 /mo 150 Copy Machine 1.00 mo - - - /mo - 350.00 /mo 350 - - 350.00 /mo 350 1260.10 0 Utilities Telephone Charges 1.00 mo - - - /mo - - - 250.00 /mo 250 250.00 /mo 250 Temporary Toilets 1.00 mo - - - /mo - - - 350.00 /mo 350 350.00 /mo 350 1270.10 0 OSHA & Safety Safety Equipment 1.00 ls - - - - - - 500.00 /ls 500 - - 500.00 /ls 500 1622.10 0 Fuels Fuels - Gas 4.00 wk - - - /wk - - - 150.00 /wk 600 150.00 /wk 600 1900.0 00 OWNED EQUIPMENT 1900.00 5 Misc. Equipment Roust-a-bout 4.00 wk - - - - - - 264.00 /wk 1,056 - - 264.00 /wk 1,056 1900.01 HYDRO CONSTRUCTION CO., INC. DWRF - Digester 612 Page 3 Work Change Directive 002- Digester 612 Penetration Repair 7/16/2019 6:26 PM Group Phase Description Takeoff Quantity Labor Cost/Unit Labor Price Labor Amount Material Price Material Amount Sub Amount Equip Price Equip Amount Other Price Other Amount Total Cost/Unit Total Amount 1900.14 0 Pick-up Trucks Jobsite Truck 4.00 wk - - - - - - 400.00 /wk 1,600 - - 400.00 /wk 1,600 2000.0 00 SITEWORK 2221.10 5 Core Drill Concrete Core Drill 10" to 24" depth 3.00 ea 80.00 /ea 40.00 /mh 240 - - 3,500 /ea - - 1,246.67 /ea 3,740 2222.00 7 Demo Valves Demo Pipe Valves 6" 3.00 ea 150.00 /ea 75.00 /ch 450 - - - - - 15.00 /ea 45 165.00 /ea 495 2222.01 5 Demo Pipe DI Demo DI Pipe 6" 6.00 ea 375.00 /ea 75.00 /ch 2,250 - - - - - 75.00 /ea 450 450.00 /ea 2,700 3000.0 00 CONCRETE 3100.10 8 Forms- Encasement Form & Place rebar - Penetration Plug 3.00 ea 750.00 /ea 75.00 /ch 2,250 75.00 /ea 236 - - - 50.00 /ea 150 878.75 /ea 2,636 3310.19 5 Place- Encasement Conc Place Concrete - Penetration Plug 3.00 ea 500.00 /ea 75.00 /ch 1,500 400.00 /ea 1,200 - - - 50.00 /ea 150 950.00 /ea 2,850 15000. 000 MECHANICAL 15110.0 40 Valves - Plug 150# New Plug Valves - 6" - Purchase 3.00 ea /mh 735.00 /ea 2,205 - - - - - 735.00 /ea 2,205 New Plug Valves - 6" - Install 3.00 ea 150.00 /ea 75.00 /ch 450 /ea - - - - - 150.00 /ea 450 15203.0 02 DI Flange Pipe by piece DI Flange Pipe 6" x 6' - Purchase 3.00 ea /ch 1,200.00 /ea 3,600 - - - - - 1,200.00 /ea 3,600 DI Flange Pipe 6" x 6' - Install 3.00 ea 300.75 /ea 75.00 /ch 902 /ea - - - - - 300.75 /ea 902 DocuSign Envelope ID: 30F1446B-1541-4A19-A39F-36747462A5CF HYDRO CONSTRUCTION CO., INC. DWRF - Digester 612 Page 4 Work Change Directive 002- Digester 612 Penetration Repair 7/16/2019 6:26 PM Estimate Totals Description Amount Totals Rate Percent of Total Labor 16,962 29.61% Material 7,241 12.64% Subcontract 3,500 6.11% Equipment 11,526 20.12% Other 3,905 6.82% 43,134 43,134 75.29 75.29% Sales Tax 1,142 7.400 % 1.99% Perform & Payment Bond - 2 yr. 888 1.55% Labor Burden 6,446 38.000 % 11.25% 8,476 51,610 14.80 90.09% Profit & Overhead 5,677 11.000 % 9.91% 5,677 57,287 9.91 100.00% Total 57,287 DocuSign Envelope ID: 30F1446B-1541-4A19-A39F-36747462A5CF DDEEZZUURRII KK CC//OO MMuunniicc iippaall VV aallvvee,, LLLLCC 1177330011 WW.. CCooll ffaaxx SSuu iittee 1100 55 •• GG oollddeenn,, CCoolloorr aaddoo 88 00440011 303-231-9175 Fax 303-231-0964 www.municipaltreatment.com QUOTATION DATE: 7-1-19 TO: Hydro Construction-DWRF-Sludge Valves RE: Will martin Will We can offer the following quote for the Sludge Service valves, per your request: • 3 – 6” w/ Nut/Lever (Sludge). $735 Please contact us if you have any questions or to place an order. Thank you! Chuck Thenell Phone 303.231.9175 Cell 720.351.0412 DocuSign Envelope ID: 30F1446B-1541-4A19-A39F-36747462A5CF DWRF Digester 612 Lid Replacement Construction Work Order Change Order 2 Lead and Oakum Joints Work Change Directive DocuSign Envelope ID: 30F1446B-1541-4A19-A39F-36747462A5CF WCD 002_DWRF DIGESTER_LID_612_LEAD AND OAKUM JOINTS_DRAFT FOR PRICING PAGE 1 OF 2 WORK CHANGE DIRECTIVE TO CONTRACTOR: Hydro Construction, Inc. (Hydro) WCD NO: 002 PI NO: PROJECT: DWRF Digester Lid 612 PROJECT NO: H-WRF-2019-01-564 OWNER: City of Fort Collins – Utilities Department ENGINEER: Carollo Engineers The following additions, deletions, or revisions to the Work have been ordered and authorized: Description of Work: (Title of WCD): Lead and Oakum Joints This Work Change Directive (WCD) directs the Contractor to demolish the lead and oakum joints into Digester 612. This work includes: • Demolish the seven penetrations with lead and oakum joints in the digester basement. • Include work to core out four of the openings. Include time for Carollo to review structural design of this work in estimate. • Install permanent plug per the attached detail on the three abandoned supernatant pipe penetrations. • Include replacement of pipe and install link seal and grout from the interior of the digester. • Include replacement of plug valves on the four openings to be replaced. Per the site walk with Jerry Yakel (COFC), Hydro shall price demolition of the existing lead and oakum joints, replacement of piping and valves for the three locations not included in the base contract, and plug the three abandoned supernatant lines. Hydro shall coordinate replacement with COFC plant staff. The work shall include supplying equipment, labor, and materials to perform the work according to the DWRF Dewatering and Strain Press Project and City of Fort Collins specifications and approved submittals. Reason for Change(s): The existing penetrations going in to Digester 612 are weeping. The City would like to remove the lead and oakum joints and mitigate the risk by replacing the joints and installing link seal around the cored openings. Attachments (List Supporting Documents): SM-DOD-05; Lead and Oakum Joint Photo, Plug Detail – S-904 It is understood that this Work Change Directive may change the Contract Price and/or Time, and is evidence that the parties expect a Change Order request for approval to subsequently follow this Work Change Directive. Ordered By: Owner Date Change in Contract Value: $______ Change in Contract Time: ___ Days DocuSign Envelope ID: 30F1446B-1541-4A19-A39F-36747462A5CF PAGE 2 OF 2 Recommended By: June 23, 2019 Resident Engineer Date Copy: Owner, Engineer, Field File - Procore DocuSign Envelope ID: 30F1446B-1541-4A19-A39F-36747462A5CF Plug existing supernatant penetrations Demo and install new pipe and valves with link seal and grout on the interior of the lid DocuSign Envelope ID: 30F1446B-1541-4A19-A39F-36747462A5CF ABANDONED SUPERNATANT PENETRATIONS VALVE REPLACEMENT INCLUDED IN PROJECT DocuSign Envelope ID: 30F1446B-1541-4A19-A39F-36747462A5CF install cap on both sides of penetration DocuSign Envelope ID: 30F1446B-1541-4A19-A39F-36747462A5CF Certificate Of Completion Envelope Id: 30F1446B15414A19A39F36747462A5CF Status: Completed Subject: Please DocuSign: Hydro Construction - CO2 DWRF Digester 612 Lid Construction.docx, Digester 612... Source Envelope: Document Pages: 14 Signatures: 8 Envelope Originator: Certificate Pages: 6 Initials: 1 Angel Anderson AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 215 N Mason Street Fort Collins, CO 80522 aanderson@fcgov.com IP Address: 198.59.47.100 Record Tracking Status: Original 9/3/2019 10:22:12 AM Holder: Angel Anderson aanderson@fcgov.com Location: DocuSign Signer Events Signature Timestamp Angel Anderson aanderson@fcgov.com Administration Assistant City of Fort Collins - Utilities Water Engineering Field Operations Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 198.59.47.100 Sent: 9/3/2019 10:29:58 AM Viewed: 9/5/2019 2:24:26 PM Signed: 9/5/2019 2:24:36 PM Electronic Record and Signature Disclosure: Accepted: 9/20/2016 6:38:03 AM ID: 1bc750c3-76ab-4f1e-a6c7-7bf92bfa35d8 Pat Johnson pjohnson@fcgov.com CPPB, Senior Buyer City of Fort Collins Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 198.59.47.100 Sent: 9/5/2019 2:24:38 PM Viewed: 9/5/2019 3:08:08 PM Signed: 9/5/2019 3:09:19 PM Electronic Record and Signature Disclosure: Accepted: 3/6/2017 12:11:29 PM ID: 04e21175-6705-4189-8da6-00a1010bd0d2 Christina Schroeder cschroeder@fcgov.com Civil Engineer III City of Fort Collins Utilities Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 198.59.47.100 Sent: 9/5/2019 3:09:21 PM Viewed: 9/6/2019 7:16:17 AM Signed: 9/6/2019 7:16:32 AM Signer Events Signature Timestamp Jason Graham jgraham@fcgov.com City of Fort Collins – Water Resources & Treatment Operations Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 50.205.29.3 Signed using mobile Sent: 9/6/2019 7:16:34 AM Resent: 9/10/2019 9:45:28 AM Viewed: 9/10/2019 11:11:35 AM Signed: 9/10/2019 11:12:05 AM Electronic Record and Signature Disclosure: Accepted: 9/29/2017 1:53:24 PM ID: c675e72b-fe99-4aac-8c1f-ff53e061cdbb Matt Fater MFATER@fcgov.com Special Projects Manager City of Fort Collins Utilities Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 73.153.72.111 Sent: 9/6/2019 7:16:34 AM Viewed: 9/6/2019 8:51:08 AM Signed: 9/6/2019 5:23:48 PM Electronic Record and Signature Disclosure: Accepted: 12/6/2016 4:18:20 PM ID: 1a8e8b4d-d117-4be0-975e-cb548f822347 Carol Webb cwebb@fcgov.com Water Resource/Treatment Operations Manager City of Fort Collins Utilities Security Level: Email, Account Authentication (None) Signature Adoption: Uploaded Signature Image Using IP Address: 198.59.47.100 Sent: 9/10/2019 11:12:07 AM Viewed: 9/10/2019 4:32:11 PM Signed: 9/10/2019 4:32:21 PM Electronic Record and Signature Disclosure: Accepted: 8/30/2017 3:00:50 PM ID: 64e1e037-73d2-4b27-a924-9f00549c1bdc Theresa Connor tconnor@fcgov.com Water Engineering & Field Services Operations Manager City of Fort Collins Utilities Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 198.59.47.100 Sent: 9/10/2019 11:12:08 AM Viewed: 9/10/2019 11:13:10 AM Signed: 9/10/2019 11:13:35 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Gerry S. Paul Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 9/10/2019 4:32:23 PM Certified Delivered Security Checked 9/11/2019 7:10:38 AM Signing Complete Security Checked 9/11/2019 7:13:19 AM Completed Security Checked 9/11/2019 7:13:19 AM Payment Events Status Timestamps Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, City of Fort Collins - Utilities Water Engineering Field Operations (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through your DocuSign, Inc. (DocuSign) Express user account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign Express user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. Electronic Record and Signature Disclosure created on: 8/25/2016 10:28:47 AM Parties agreed to: Angel Anderson, Pat Johnson, John Podeyn, Jason Graham, Matt Fater, Carol Webb, Gerry S. Paul How to contact City of Fort Collins - Utilities Water Engineering Field Operations: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: aanderson@fcgov.com To advise City of Fort Collins - Utilities Water Engineering Field Operations of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at aanderson@fcgov.com and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper copies from City of Fort Collins - Utilities Water Engineering Field Operations To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to aanderson@fcgov.com and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with City of Fort Collins - Utilities Water Engineering Field Operations To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to aanderson@fcgov.com and in the body of such request you must state your e-mail, full name, IS Postal Address, telephone number, and account number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems: Windows2000? or WindowsXP? Browsers (for SENDERS): Internet Explorer 6.0? or above Browsers (for SIGNERS): Internet Explorer 6.0?, Mozilla FireFox 1.0, NetScape 7.2 (or above) Email: Access to a valid email account Screen Resolution: 800 x 600 minimum Enabled Security Settings: •Allow per session cookies •Users accessing the internet behind a Proxy Server must enable HTTP 1.1 settings via proxy connection ** These minimum requirements are subject to change. If these requirements change, we will provide you with an email message at the email address we have on file for you at that time providing you with the revised hardware and software requirements, at which time you will have the right to withdraw your consent. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the 'I agree' button below. By checking the 'I Agree' box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify City of Fort Collins - Utilities Water Engineering Field Operations as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by City of Fort Collins - Utilities Water Engineering Field Operations during the course of my relationship with you. gspaul@fcgov.com Purchasing Director City of Fort Collins Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 198.59.47.100 Sent: 9/10/2019 4:32:23 PM Viewed: 9/11/2019 7:10:38 AM Signed: 9/11/2019 7:13:19 AM Electronic Record and Signature Disclosure: Accepted: 3/7/2017 7:02:26 AM ID: 1dfa1693-39e5-474b-b394-82f385c8c8d4 In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Electronic Record and Signature Disclosure: Not Offered via DocuSign John Podeyn jpodeyn@hydroconstruction.com Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 50.226.191.130 Sent: 9/5/2019 3:09:21 PM Viewed: 9/6/2019 5:49:21 AM Signed: 9/6/2019 5:49:30 AM Electronic Record and Signature Disclosure: Accepted: 9/6/2019 5:49:21 AM ID: b7ae3cfb-8609-4b88-b679-7ae388d58be3 5 Scaffolding Scaffolding 4.00 wk - - - - - - 90.00 /wk 360 - - 90.00 /wk 360 1900.10 0 Skidsteers Skidsteer 4.00 wk - - - - - - 810.00 /wk 3,240 - - 810.00 /wk 3,240 1900.12 0 Cranes Crane Rental 10.00 hrs /hr - - - 150.00 /hrs 1,500 0.00 /hrs 0 150.00 /hrs 1,500 1900.14 0 Pick-up Trucks DocuSign Envelope ID: 30F1446B-1541-4A19-A39F-36747462A5CF