Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8106 UTILITY INFRASTRUCTURE CONSTRUCTION SERVICES FOR WATER, WASTEWATERChange Order Form (for Work Orders) Official Purchasing Form Last updated 10/2017 CHANGE ORDER NO. 1 PROJECT TITLE: Sherwood Waterline Replacement - Construction SERVICE PROVIDER: Connell Resources, Inc. WORK ORDER NUMBER: Sherwood 2019-3 PO NUMBER: 9191079 DESCRIPTION: 1. Reason for Change: Time Extension 2. Description of Change: Change work order end date to allow the contractor additional time to finalize post-construction televising of the sanitary sewer services within the project area. Time change is from September 1, 2019 to October 15, 2019. 3. Change in Work Order Price: N/A 4. Change in Work Order Time: 45 days (October 15, 2019) ORIGINAL WORK ORDER PRICE $ 0.00 TOTAL APPROVED CHANGE ORDER 0.00 TOTAL PENDING CHANGE ORDER 0.00 TOTAL THIS CHANGE ORDER 0.00 TOTAL % OF THIS CHANGE ORDER 0% TOTAL C.O.% OF ORIGINAL WORK ORDER 0% ADJUSTED WORK ORDER COST $ 0.00 SERVICE PROVIDER: Date: John Warren, Connell Resources, Inc. Vice President ACCEPTANCE: Date: Heather McDowell, Civil Engineer III REVIEWED: Date: Pat Johnston, Senior Buyer ACCEPTANCE: Date: Matt Fater, Director, Civil Engineering DocuSign Envelope ID: 84266BDC-6160-47F3-9711-C189916A6AD8 September 3, 2019 September 3, 2019 September 3, 2019 September 3, 2019 Change Order Form (for Work Orders) Official Purchasing Form Last updated 10/2017 ACCEPTANCE: Date: Andrew Gingerich, Director, Water Field Operations ACCEPTANCE: Date: Theresa Connor, Deputy Director, Water Engineering & Field Services ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) DocuSign Envelope ID: 84266BDC-6160-47F3-9711-C189916A6AD8 September 3, 2019 September 4, 2019