Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CORRESPONDENCE - PURCHASE ORDER - 9191409
8/12/19 202.01 Sawcut Concrete/Asphalt (0" < 4") Lineal Foot $ 3.50 $ - 202.02 Sawcut Concrete/Asphalt (4" < 6") Lineal Foot $ 3.65 $ - 202.03 Sawcut Concrete/Asphalt (6" < 8") Lineal Foot $ 4.00 146.00 $ 584.00 202.04 Sawcut Concrete/Asphalt (8" ≤ 10") Lineal Foot $ 5.75 150.00 $ 862.50 202.05 Sawcut - Additional 1" Depth Lineal Foot $ 1.25 $ - 202.06 Remove Concrete Sidewalk Square Foot $ 3.75 518.00 $ 1,942.50 202.07 Remove Concrete Curb & Gutter Lineal Foot $ 6.50 70.00 $ 455.00 202.08 Remove Monolithic Curb, Gutter & Sidewalk Square Foot $ 3.85 $ - 202.09 Remove Concrete Driveway/Apron/Crosspan Square Foot $ 3.75 $ - 202.10 Remove Concrete Pavement - 10" Square Foot $ 4.00 $ - 202.11 Remove Concrete Pavement - Additional 1" Depth Square Foot $ 1.05 $ - 202.12 Remove Asphalt - 6" Square Foot $ 3.00 600.00 $ 1,800.00 202.13 Remove Asphalt - Additional 1" Depth Square Foot $ 1.05 1,200.00 $ 1,260.00 202.14 Remove Inlet Each $ 525.00 $ - 202.15 Remove and Haul Driveway Fillet Each $ 50.00 $ - 202.16 Remove Flagstone Square Foot $ 3.75 $ - 203.01 Excavation - General Less Than 50 CY Cubic Yard $ 42.00 10.00 $ 420.00 203.02 Excavation - General Over 50 CY Cubic Yard $ 32.00 $ - 203.03 Excavation - Walls Only Cubic Yard $ 22.00 $ - 203.04 Excavation - New Inlet Each $ 375.00 $ - 203.05 Borrow - Less than 100 Ton Ton $ 22.00 $ - 203.06 Borrow - Over 100 Ton Ton $ 21.00 $ - 207.01 Imported Topsoil Cubic Yard $ 45.00 $ - 208.01 Stormwater Protection - Rock Filled Wattle Lineal Foot $ 10.00 $ - 2019 Revised Unit Price ADDENDUM 2 BID SCHEDULE 1 - BASE BID (Non-Federal) Item No. Description Unit Units Total COST ESTIMATE FOR LAPORTE & LOOMIS CROSSING IMPROVEMENTS PROJECT ESTMATE 2019 Revised Unit Price Item No. Description Unit Units Total 208.02 Stormwater Protection - Recycled Rubber Filled Wattle Lineal Foot $ 17.00 $ - 208.03 Stormwater Protection - Straw Bales Each $ 21.00 $ - 208.04 SWMP Maintenance Log - 14 Day Inspection Each $ 95.00 $ - 210.01 Reset Flagstone Square Foot $ 5.00 $ - 210.02 Reset Brick Pavers Square Foot $ 8.00 $ - 210.03 Adjust Manhole Each $ 105.00 $ - 210.04 Adjust Valve Box Each $ 105.00 $ - 304.01 Aggregate Base Course/Recycled Concrete Base ≤ 5 Tons Ton $ 39.00 $ - 304.02 Aggregate Base Course/Recycled Concrete Base > 5 Tons Ton $ 38.00 15.00 $ 570.00 304.03 Recycled Asphalt Base Ton $ 26.00 $ - 403.01 Asphalt Surface Preservation Lineal Foot $ 5.00 $ - 403.02 Temporary Asphalt Patching Ton $ 195.00 $ - 601.01 Exposed Sand Finish - Additional Charge Square Foot $ 4.00 $ - 602.01 Reinforcing Steel Pound $ 3.75 $ - 602.02 Reinforcing Steel - Epoxy Coated Pound $ 4.75 $ - 604.01 Install New Area Inlet Each $ 1,350.00 $ - 604.02 Area Inlet – Additional Foot Depth Lineal Foot $ 100.00 $ - 604.03 Reconstruct Area Inlet Deck – Remove & Replace Each $ 775.00 $ - 604.04 Reconstruct Area Inlet Deck - Additional Foot Opening – Remove & Replace Lineal Foot $ 100.00 $ - 604.05 Reconstruct Catch Basin Deck - Remove & Replace Each $ 775.00 $ - 604.06 Reconstruct Catch Basin Deck - Additional Foot Opening – Remove & Replace Lineal Foot $ 100.00 $ - 604.07 Install New Curb Inlet – 4’ Opening Each $ 1,975.00 $ - 604.08 Curb Inlet – Additional Foot Depth Lineal Foot $ 100.00 $ - 604.09 Reconstruct Curb Inlet Deck – Remove and Replace Each $ 775.00 $ - 604.10 Reconstruct Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot $ 100.00 $ - 604.11 Install New Type R Inlet - 5' Opening Each $ 3,400.00 $ - 604.12 Type R Inlet – Additional Foot Depth Lineal Foot $ 100.00 $ - 2019 Revised Unit Price Item No. Description Unit Units Total 604.13 Reconstruct Type R Inlet Deck – Remove and Replace Each $ 1,250.00 $ - 604.14 Reconstruct Type R Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot $ 125.00 $ - 604.15 Install New Modified Type 13 Curb Inlet (includes new Frame, Grate & Adjustable Curb Bonnet) Each $ 2,250.00 $ - 604.16 Modified Type 13 Curb Inlet – Additional Foot Depth Lineal Foot $ 100.00 $ - 604.17 Reconstruct Modified Type 13 Curb Inlet Deck – Remove & Replace Each $ 775.00 $ - 604.18 Reconstruct Modified Type 13 Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot $ 100.00 $ - 604.19 Modified Type 13 Curb Inlet – Materials only - (Frame, Grate, & adjustable bonnet (East Jordan Iron Works 7030 or Equivalent Material) Each $ 800.00 $ - 604.20 Concrete Sidewalk Culvert – 4’ opening Each $ 975.00 $ - 604.21 Metal Sidewalk Culvert - 2' Opening, Remove & Replace Each $ 775.00 $ - 604.22 Metal Sidewalk Culvert - 2' Opening, Materials Only Each $ 1,550.00 $ - 604.23 Additional Square Foot 5/8" Plate Square Foot $ 150.00 $ - 608.01 Driveover Curb, Gutter & 6" Sidewalk Lineal Foot $ 42.00 $ - 608.02 Driveover Curb and Gutter - No Sidewalk Lineal Foot $ 25.00 $ - 608.03 Vertical Curb, Gutter and 6" Sidewalk Lineal Foot $ 42.00 $ - 608.04 Vertical Curb and Gutter - No Sidewalk Lineal Foot $ 26.00 78.00 $ 2,028.00 608.05 Out Fall Curb & Gutter Lineal Foot $ 25.00 $ - 608.06 Hollywood Curb, Gutter and 6" Sidewalk Lineal Foot $ 38.00 $ - 608.07 Hollywood Curb and Gutter - No Sidewalk Lineal Foot $ 21.00 $ - 608.08 Highback Curb and Gutter - No Sidewalk Lineal Foot $ 37.00 $ - 608.09 Barrier Curb - 6" x 18" Lineal Foot $ 25.00 196.00 $ 4,900.00 608.10 Barrier Curb - Key Way Style Lineal Foot $ - $ - 608.11 Barrier Curb - Epoxy Lineal Foot $ - $ - 608.12 Mountable Curb - 12" x 18" Lineal Foot $ 25.00 $ - 608.13 Mountable Curb - Keyway Style Lineal Foot $ - $ - 608.14 Mountable Curb – Epoxy Lineal Foot $ - $ - 608.15 Pedestrian Access Ramp Square Foot $ 8.25 179.00 $ 1,476.75 608.16 Pedestrian Access Ramp, Highback Curb Square Foot $ 8.50 $ - 2019 Revised Unit Price Item No. Description Unit Units Total 608.17 Truncated Dome Panel Square Foot $ 41.00 128.00 $ 5,248.00 608.18 Apron - 8" Square Foot $ 8.50 $ - 608.19 Crosspan - 8" Square Foot $ 8.50 $ - 608.20 Valley Pan - 6" Square Foot $ 7.50 $ - 608.21 Flatwork - 4" Square Foot $ 4.85 $ - 608.22 Flatwork - 6" Square Foot $ 5.85 480.00 $ 2,808.00 608.23 Replace Flatwork - 1" Additional Depth Square Foot $ 1.10 $ - 608.24 Concrete Pavement 8" (Joints Sealed) Square Foot $ 8.65 1,485.00 $ 12,845.25 608.25 Alley Approach - 8" Square Foot $ 8.50 $ - 608.26 Enhanced Crosswalk - 10" Tile Red Square Foot $ 13.50 $ - 608.27 Enhanced Crosswalk - 10" San Diego Buff Square Foot $ 13.00 $ - 608.28 Enhanced Crosswalk - 10" Brick Red, Stamped Square Foot $ 13.50 $ - 608.29 Colored Trail with Fibermesh - 5" Yosemite Brown Square Foot $ 8.00 $ - 608.30 Mow Strip - 4" x 12" Lineal Foot $ 9.50 $ - 608.31 Splashblock - 4" Exposed Aggregate Square Foot 2019 Revised Unit Price Item No. Description Unit Units Total 608.42 Concrete Staining/Sealing Square Foot $ 4.50 $ - 608.43 Expansion and Caulking Lineal Foot $ 4.00 100.00 $ 400.00 608.44 Joint Sealant (Pavement) Lineal Foot $ 5.00 $ - 608.45 Irrigation Sleeve Lineal Foot $ 5.00 20.00 $ 100.00 608.46 Dump Fee Ton $ 58.00 $ - 608.47 6" Concrete Median Barrier Curb, Placed (Detail FC703-Section B) (8" Bar paid under 608.48) Lineal Foot $ 21.00 $ - 608.48 6" Concrete Median Barrier Curb, Drilled (Detail FC703-Section C) Each $ 8.50 $ - 608.49 Add Domes to Existing Ramp - Remove and Replace Square Foot $ 37.00 $ - 608.5 Add Domes to Existing Ramp - Dryset Placement Square Foot $ 30.00 $ - 630.01 "NO PARKING" Sign With Stand Per Each Per Day $ 2.00 $ - 630.02 Vertical Panel Without Light Per Each Per Day $ 1.25 $ - 630.03 Channelizing Barrels Per Each Per Day $ 1.50 40.00 $ 60.00 630.04 Type I/II Barricade Without Light Per Each Per Day $ 1.00 $ - 630.05 Type III Barricade Without Light Per Each Per Day $ 5.00 $ - 630.06 Size A Sign With Stand Per Each Per Day $ 2.00 $ - 630.07 Size B Sign With Stand Per Each Per Day $ 2.00 $ - 630.08 Size A Specialty Sign - Cost of Manufacturing Each $ 95.00 $ - 630.09 Size B Specialty Sign - Cost of Manufacturing Each $ 100.00 $ - 630.10 Cone With Reflective Strip Per Each Per Day $ 0.85 85.00 $ 72.25 630.11 Safety Fence 2019 Revised Unit Price Item No. Description Unit Units Total FA1 Laborer Hour $ 33.00 $ - FA2 Foreman Hour $ 50.00 2.00 $ 100.00 FA3 Finisher Hour $ 45.00 $ - FA4 Form Setter Hour $ 45.00 $ - FA5 Skid Steer Hour $ 85.00 $ - FA6 Mini Trackhoe Hour $ 95.00 $ - FA7 Dump Truck Hour $ 75.00 8.00 $ 600.00 FA8 Backhoe Hour $ 95.00 $ - SUB TOTAL COST $ 41,821.20 25% CONTINGENCY FOR Traffic Control Devices, Flagging Hours, Dump Fees, Temp Patching, Base Material, Backfill, Top Soil. Actual costs will be invoiced at contractual unit prices. $ 10,455.30 SUB TOTAL COST $ 52,276.50 Per Roll Per Day $ 5.00 $ - 630.12 Light Per Each Per Day $ 1.00 $ - 630.13 Advance Warning Flashing or Sequencing Arrow Panel Per Each Per Day $ 45.00 $ - 630.14 Variable Message Board Per Each Per Day $ 90.00 $ - 630.15 Traffic Control Supervisor Per Day $ 425.00 $ - 630.16 Traffic Control Supervisor Hour $ 45.00 30.00 $ 1,350.00 630.17 Flagging Hour $ 26.00 $ - ADDITIONAL SERVICES $ - $ - $ 7.45 $ - 608.32 Splashblock - 4" San Diego Buff Square Foot $ 7.85 $ - 608.33 Median Cover - 4" San Diego Buff Square Foot $ 7.85 247.00 $ 1,938.95 608.34 Fibermesh - Added to Any Item - Additional Charge Pounds / Cubic Yard $ 11.00 $ - 608.35 24 Hour High Early Concrete - Added to Any Item - Additional Charge Cubic Yard $ 65.00 $ - 608.36 Stamp Pattern - Added to Any Item, Additional Charge Square Foot $ 3.00 $ - 608.37 6" Concrete Bollard Each $ 465.00 $ - 608.38 8" Concrete Bollard Each $ 550.00 $ - 608.39 Flowable Fill Cubic Yard $ 145.00 $ - 608.40 Non-reinforced Concrete Wall - 8" Square Face Foot $ 18.00 $ - 608.41 Non-reinforced Concrete Footer - 8" Square Foot $ 18.00 $ -