Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9191334Sole Source Request Form Official Purchasing Form Last updated 7/2016 EXCEPTION TO COMPETIVE PURCHASING PROCESS “SOLE SOURCE” JUSTIFICATION PROJECT NAME: Necco PURCHASE AMOUNT: $38,830 APPROPRIATED BUDGET AMOUNT: $$8.3M SCOPE OF SERVICES/MATERIALS TO BE PURCHASED: Landscape Maintenance SUPPLIER: Zak George Landscaping EXCEPTION TO THE COMPETITIVE PROCESS RATIONALE PER CITY CODE (check all that apply): A contract for materials, professional services or services may be awarded without competition if the Purchasing Agent determines in writing that one (1) or more of the following conditions exists: ☐ There exists only one (1) responsible source; ☐ Although there exists more than one (1) responsible source, a competitive process cannot reasonably be used or, if used, will result in a substantially higher cost to the City, will otherwise injure the City's financial interests or will substantially impede the City's administrative functions or the delivery of services to the public; ☒ A particular material or service is required to maintain interchangeability or compatibility as a part of an existing integrated system; ☒ A particular material, professional service or service is required in order to standardize or maintain standardization for the purpose of reducing financial investment or simplifying administration; ☐ The material is perishable; ☐ The material qualifies as an object of fine art; ☐ A particular material is required to match materials in use, so as to produce visual harmony; ☐ A particular material is required to enable use by a specific individual; ☐ A particular material is prescribed by a professional advisor; ☐ The material, professional service or service is the subject of a change order. BACKGROUND/JUSTIFICATION (Attach Supporting Documentation): ☒ Attach quote (Required) Provide brief justification narrative supporting the reason(s) for the exception(s) to the competitive process selected above. ZGL performed the original installation of all irrigation, seed, plant material, and trees. They are familiar with the site, controllers, line placement, and plant materials so it is logical and cost effective to use their services for maintnenance. DocuSign Envelope ID: 03DFE7A1-517B24A7-6500-5E33-4894-4D47-B248-87B5-980AF3B52771 05C6D4944625 Sole Source Request Form Official Purchasing Form Last updated 7/2016 COST/PRICE ANALYSIS (Attach Supporting Documentation): Normally competition supports establishment of price reasonableness. When adequate price competition does not exist, the reasonableness of the offered price is determined with a Price or Cost Analysis. Complete Price OR Cost Analysis. ☒ Price Analysis – Comparison of quoted price with known indicators of reasonableness without analyzing cost elements (Check all that apply) ☒ Consistent with Independent Cost Estimate (ICE); ☐ Compare to prices obtained through market research for same or similar items; ☐ For services, hourly rates consistent with rates offered in the market for similar level professionals; ☐ Unique or innovative process/service/product; ☐ Consistent with published price lists; ☐ Reviewed analysis of pricing information provided by supplier; ☒ Quoted price consistent with previous prices paid (historical); ☐ Other: ☐ Cost Analysis – Element-by-element analysis of estimated cost based on supplier’s cost or pricing data. Please attach Cost Analysis. SUBMITTED BY: PRINTED: DEPARTMENT: DATE: APPROVED BY: PRINTED: DEPARTMENT MANAGER/SUPERVISOR (Required) PRINTED: REQUESTING DEPARTMENT HEAD (over $60,000) PRINTED: BUYER PRINTED: PURCHASING DIRECTOR RESOLUTION BY CITY COUNCIL (over $200,000) Resolution # Date Passed: ☐ Resolution document attached DocuSign Envelope ID: 03DFE7A1-5E33-4D47-87B5-05C6D4944625 City of Fort Collins Utilities July 22, 2019 Linsey Chalfant July 22, 2019 July 22, 2019 DocuSign Envelope ID: 517B24A7-6500-4894-B248-980AF3B52771 July 23, 2019 Service Labor Hours Crew Members Amount Charged Equiment Type Amount Charged Materials Amount Charged Re‐Seed Native Grass Areas 18.00 1 Operations Manager $ 1,170.00 Drill Seeder $ 1,170.00 Native Seed Mix $ 350.00 10.00 1 Operations Manager $ 650.00 Hydro‐Mulcher $ 650.00 Remove Silt Fence 48.00 3 person crew $ 2,160.00 Dump Fee for Silt Fence $ 380.00 Clean Out Drainage Way 44.00 3 person crew $ 1,980.00 Dump Fee for Trash $ 135.00 Reroute Irrigation Lines 14.00 3 person crew $ 630.00 Irrigation Parts $ 316.00 3.00 1 Irrigation Tech $ 159.00 Plant Replacements 40.00 3 person crew $ 1,800.00 (4) Deciduous Trees, (4) Evergreen Trees, Plant (7) Ornamental Trees, (4) Deciduous Shrubs, Compost $ 7,190.00 4.00 Supervisor $ 220.00 Tree Fertilization 18.00 1 Spray Tech $ 810.00 Applicator $ 270.00 Fertilizer $ 120.00 Winter Watering 30.00 2 person crew $ 1,350.00 Water Truck $ 470.00 Re‐Install Signs 7.75 2 person crew $ 350.00 2019 Site Maintenance Irrigation Start Up 9.00 2 Irrigation Techs $ 515.00 Irrigation Check (Four Visits) 20.00 2 Irrigation Techs $ 1,060.00 Irrigation Blowout 9.00 2 Irrigation Techs $ 515.00 Air Compressor $145 Turf Care 18.00 2 Person Crew $ 810.00 60" Mower $ 450.00 9.00 1 Person Crew $ 405.00 String Trimmer $ 85.00 Native Weed Control (2x) 80.00 1 Spray Tech $ 3,600.00 4 Wheel Sprayer $ 2,000.00 Weed Control $ 550.00 Native Fertilizer 30.00 1 Spray Tech $ 1,350.00 4 Wheel Sprayer $ 750.00 Fertilizer $ 345.00 Trash Detail (8x) 64.00 3 Person Crew $ 2,880.00 Dump Fee for Trash $440 Quality Control (8x) 8.00 1 Supervisor $ 600.00 TOTALS 483.75 $ 23,014.00 $ 5,990.00 Material Total: $ 9,826.00 Project Total: $ 38,830.00 Labor Equipment Materials Necco Maintenance DocuSign Envelope ID: 03DFE7A1-517B24A7-6500-5E33-4894-4D47-B248-87B5-980AF3B52771 05C6D4944625 July August September October November December Weed Control/Fertilizer Site Cleanup, remove fence, replace signs, clean drainage, etc. Re-seed Plant Replacement Watering Irrigation Check Trash Detail DocuSign Envelope ID: 03DFE7A1-517B24A7-6500-5E33-4894-4D47-B248-87B5-980AF3B52771 05C6D4944625