WORK ORDER
PURSUANT TO A MASTER AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
ICON ENGINEERING, INC.
WORK ORDER NUMBER: UBLA-2019-04
PROJECT TITLE: UWest Vine Basin Floodplain Update - Phase
2
ORIGINAL BID/RFP NUMBER & NAME: U8073, Engineering Services for Water, WW
and Stormwater Facilities Capital
Improvements
MASTER AGREEMENT EFFECTIVE DATE: UMay 15, 2015
ARCHITECT/ENGINEER: UIcon Engineering, Inc.
OWNER’S REPRESENTATIVE: UBeck Anderson
WORK ORDER COMMENCEMENT DATE: UJuly 1, 2019
WORK ORDER COMPLETION DATE: UDecember 31, 2019
MAXIMUM FEE: (time and reimbursable direct costs): U$73,560.00
PROJECT DESCRIPTION/SCOPE OF SERVICES: UProject will update floodplain mapping for
the West Vine Basin to reflect new hydrology. Scope of services for Phase 2 of the project include:
Floodway determination, floodplain mapping, report production, web map development,
comparison of mapped floodplain with regional hydrologic soil types, and 2-deminsional hydraulic
analysis (rain-on-grid) to confirm flow paths and flooding extents identified in the 1-deminsional
floodplain model. See attached supporting documentation.
Service Provider agrees to perform the services identified above and on the attached forms in
accordance with the terms and conditions contained herein and in the Master Agreement between
the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement
and this Work Order (including the attached forms) the Master Agreement shall control.
The attached forms consisting of UfiveU (5) pages are hereby accepted and incorporated herein, by
this reference, and Notice to Proceed is hereby given after all parties have signed this document.
SERVICE PROVIDER: Icon Engineering, Inc.
By: Date:
Name: Title:
Page 1 of 10
DocuSign Envelope ID: 0EB7E27F-91F9-4391-94A6-BA1BBEA21ACB
Craig Jacobson
July 2, 2019
Principal
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
OWNER’S ACCEPTANCE & EXECUTION:
This Work Order and the attached Contract Documents are hereby accepted and incorporated
herein by this reference.
ACCEPTANCE: Date:
Beck Anderson, Civil Engineer III
REVIEWED: Date:
Pat Johnson, Senior Buyer
APPROVED AS TO FORM: Date:
Name,City Attorney's Title
(if greater than $1,000,000)
ACCEPTANCE: Date:
Ken Sampley, Director, Civil Engineering
ACCEPTANCE: Date:
Theresa Connor, Deputy Director, Water Engineering & Field Services
ACCEPTANCE: Date:
Kevin Gertig, Utilities Executive Director
(if greater than $1,000,000)
ACCEPTANCE: Date:
Gerry Paul, Purchasing Director
(if greater than $60,000)
ACCEPTANCE: Date:
Darin Atteberry, City Manager
(if greater than $1,000,000)
ATTEST: Date:
City Clerk
(if greater than $1,000,000)
Page 2 of 10
DocuSign Envelope ID: 0EB7E27F-91F9-4391-94A6-BA1BBEA21ACB
July 2, 2019
July 2, 2019
July 2, 2019
July 2, 2019
July 3, 2019
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT A
WORK ORDER SCOPE OF SERVICES & COST DETAILS
Page 3 of 10
DocuSign Envelope ID: 0EB7E27F-91F9-4391-94A6-BA1BBEA21ACB
ICONENGINEERING, 7000 S. Yosemite Street, Suite 120, Centennial, INC. CO 80112
303.221.0802 | www.iconeng.com
Planning | Design | Management
Exhibit A
Scope of Work
West Vine Basin Floodplain Update – Phase 2
City of Fort Collins
June 7, 2019
ICON Engineering, Inc. is pleased to provide this proposal for engineering services to complete
the floodplain update for the West Vine Basin (Phase 2). Goals for this project are to update the
floodplain mapping to reflect the changes in hydrology identified for the West Vine Basin in
2015. This work will also incorporate recent improvements made to the West Vine Central Flow
Path, north of Vine Drive, in addition to current LiDAR topography. This scope is for the Phase
2 portion of the project, specifically: floodway determination, floodplain mapping, report
production, and web map development. In addition, as requested by the City, as a project
option, ICON will perform additional work related to validation of the floodplain results. First, a
map will be prepared comparing the identified floodplain locations with regional hydrologic soil
types. Second, a 2D analysis will be prepared for the basin reflecting a combination of rain-on-
grid methods and direct hydrograph input to confirm flow paths and flooding extents currently
identified.
Our scope of work is outlined below. A fee spreadsheet has been provided for your review.
Base Services – Phase 2:
Task 1: Correspondence:
Up to three (3) project meetings and up to three (3) periodic conference calls have been
assumed for project correspondence. All other correspondence items will be made via phone
calls and emails.
Task 2: Floodway Analysis, Floodplain Delineation and Flood Profiles:
Floodplains will be delineated for the 100-year flood event only. Floodplain and floodway
delineations will be presented along with profile baselines, hydraulic cross-sections, base flood
elevations (BFEs), and base map references on project workmaps. Flood profiles will be
generated for the flood frequencies identified above.
Page 4 of 10
DocuSign Envelope ID: 0EB7E27F-91F9-4391-94A6-BA1BBEA21ACB
ICONENGINEERING, INC. Page 2 of 3
I:\Proposal\~2019\19-PRO-041_Fort Collins West Vine\ICON Scope of Service West Vine Hydraulics2.docx
Task 3: Submittals and Reports:
ICON will assemble a hydraulics report for the West Vine Basin Master Plan. This appendix will
summarize the hydraulics background, data, methodology, and results from the study. Tables
will be prepared documenting flood elevations and floodway data information. Technical backup
information will be assembled in project appendices.
Task 4: Review and Revisions:
Time has been included to address comments from the City. It should be noted that a technical
review was not completed by the City for the initial floodplain modeling. The entirety of the
model will be reviewed by the City upon completion of the floodplain delineation and floodway
identification. Review comments will address the aggregate of the floodplain modeling,
floodplain delineation, and floodway modeling.
Task 5: Project Webmap
ICON will prepare a project webmap using a MapBox Open Source Platform to display the
results of both the hydrology development and the hydraulic analysis. The web map will be
available to assist in the review of the initial submittal and subsequently updated for the final
project results.
Optional Services: Hydraulic Modeling Verification:
Optional services for the project include preparing a map comparing the identified floodplain
locations with regionally published soil types. The purpose of this map is to serve as a
validation tool, identify if the mapped floodplain is coincident with soil types known to be located
within drainageway regions. Second, for a more detailed analysis, a 2D analysis will be
prepared for the basin. This 2D model will be prepared using HEC-RAS 2D and will reflect rain-
on-grid hydraulics to identify areas of potential flood risk. Similar to the hydrology, separate
models will be prepared upstream, between, and downstream of each canal system.
Downstream of each canal, spill flow hydrographs will also be added to the model to depict the
spill flows from each canal location in the basin hydrology model. The results of the 2D models
will be compared with the results of the existing 1D model to identify if the general flood limits
are consistent. Should significant inconsistencies be discovered, additional hydraulic modeling
may be required. This work will be done as a change to this original scope once the differences
can be reviewed.
Page 5 of 10
DocuSign Envelope ID: 0EB7E27F-91F9-4391-94A6-BA1BBEA21ACB
ICONENGINEERING, INC. Page 3 of 3
I:\Proposal\~2019\19-PRO-041_Fort Collins West Vine\ICON Scope of Service West Vine Hydraulics2.docx
Project Fees and Schedule:
Project fees for this project are estimated at $60,500 for the base services and $13,060 for the
optional services. $73,560 for all services proposed.
We estimate that the base scope for this phase of the project can be completed in
approximately 5-months’ time. Meeting this schedule will require an efficient review from the
City. Additional time (approximately 1 month) will be needed should the City wish to pursue the
optional services. Again, this schedule would assume that significant changes to the baseline
hydraulic analysis would not be needed. Please note that a decision to pursue the optional
services would need to be made prior to ICON beginning work on the initial project tasks.
Thank you again for the opportunity to assist the City with this project. Please let us know if you
have any questions or comments regarding this proposal.
Sincerely,
ICON Engineering, Inc.
Craig D. Jacobson, PE, CFM
Principal
Page 6 of 10
DocuSign Envelope ID: 0EB7E27F-91F9-4391-94A6-BA1BBEA21ACB
ICON ENGINEERING, INC.
PROJECT ESTIMATING SHEET
PROJECT NAME: West Vine Basin Floodplain Analysis
CLIENT: CITY OF FORT COLLINS - Beck Anderson
PREPARED BY: CDJ Principal Professional Professional Engineer GIS Admin GIS Survey Misc.
CHECKED BY: JYM Engineer III Engineer I II Specialist Programmer Crew Direct
DATE: 5/22/19 $176 $163 $140 $110 $94 $67 $105 $165 Costs
Description Hours Hours Hours Hours Hours Hours Hours Hours TOTALS
1 Correspondence
a. Project Meetings (3) 6 6 $200 $2,234
b. Conference Calls & Correspondence 44 $1,356
2 Floodway Analysis, Floodplain Delineation and Flood Profiles
a. Floodway Analyses
- Central Flow Path 3.0 15 6 $3,633
- Eastern Flow Path 2.0 10 4 $2,422
- Southeastern Flow Path 0.5 7 2 $1,449
- Southern Flow Path 3.0 15 6 $3,633
- Northern Flow Path 0.5 8 4 $1,832
- Northeastern Flow Path 0.5 7 2 $1,449
b. Project Workmaps 4 18 48 $15 $8,165
c. Flood Profiles 3 14 54 $15 $8,765
3 Submittals and Report Items
a. Baseline Hydraulics Report 8 32 16 12 4 $50 $9,830
b. Floodplain and Floodway Data Tables
c. Technical Appendix
4 Review and Revisions 4 16 12 8 4 $50 $5,702
5 Webmap
a. Initial Review Map 24 48 $50 $7,922
b. Final Update 8 10 $48 $2,108
TOTAL BASE SERVICES - PHASE 2 39 152 32 106 126 8 0 0 428 $60,500
$6,776 $24,776 $4,480 $11,660 $11,844 $536 $0 $0 $428 $60,500
O.1 Optional Services
a. Soil Comparison Map 2 6 $200 $1,090
b. 2D Model Preparation & Results 8 16 40 24 $98 $11,970
TOTAL OPTIONAL SERVICES - PHASE 2 8 18 40 0 30 0 0 0 298 $13,060
$1,408 $2,934 $5,600 $0 $2,820 $0 $0 $0 $298 $13,060
TOTAL ALL SERVICES - PHASE 2 47 2968 5680 0 2874 0 0 0 726 $73,560
$8,184 $27,710 $10,080 $11,660 $14,664 $536 $0 $0 $726 $73,560
Page 7 of 10
DocuSign Envelope ID: 0EB7E27F-91F9-4391-94A6-BA1BBEA21ACB
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT B
WORK ORDER SCHEDULE DETAILS
Page 8 of 10
DocuSign Envelope ID: 0EB7E27F-91F9-4391-94A6-BA1BBEA21ACB
ID Task
Mode
Task Name Duration Start Finish
1 West Vine Hydraulics - Phase 1
2
3 Correspondence 90 days Mon 6/3/19 Fri 10/4/19
4
5 Floodway Analyses 65 days Mon 6/3/19 Fri 8/30/19
6 - Central Flow Path 10 days Mon 6/3/19 Fri 6/14/19
7 - Eastern Flow Path 10 days Mon 6/17/19Fri 6/28/19
8 - Southeastern Flow Path 5 days Mon 7/1/19 Fri 7/5/19
9 - Southern Flow Path 10 days Mon 7/8/19 Fri 7/19/19
10 - Northern Flow Path 5 days Mon 7/22/19Fri 7/26/19
11 - Northeastern Flow Path 5 days Mon 7/29/19Fri 8/2/19
12 - Project Workmaps 10 days Mon 8/5/19 Fri 8/16/19
13 - Flood Profiles 10 days Mon 8/19/19Fri 8/30/19
14
15 Submittals and Report Items 10 days Mon 9/2/19 Fri 9/13/19
16 - Appendix C - Baseline Hydraulics Report 10 days Mon 9/2/19 Fri 9/13/19
17 - Floodplain and Floodway Data Tables 10 days Mon 9/2/19 Fri 9/13/19
18 - Technical Appendix 5 days Mon 9/9/19 Fri 9/13/19
19
20 City Review 10 days Mon 9/16/19Fri 9/27/19
21
22 Review and Revisions 15 days Mon 9/30/19Fri 10/18/19
23
24 Webmaps 40 days Mon 8/26/19Fri 10/18/19
25 - Initial 15 days Mon 8/26/19Fri 9/13/19
26 - Final 5 days Mon 10/14/19Fri 10/18/19
27
28 Optional Services (time addition) 25 days Mon 10/21/19Fri 11/22/19
22 27 1 6 11 16 21 26 1 6 11 16 21 26 31 5 10 15 20 25 30 4 9 14 19 24 29 4 9 14 19 24 29 3 8 13 18 23
June 2019 July 2019 August 2019 September 2019 October 2019 November 2019
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
West Vine Hydraulics - Phase 1
Page 1
Project: schedule.mpp
Date: Wed 5/22/19
Page 9 of 10
DocuSign Envelope ID: 0EB7E27F-91F9-4391-94A6-BA1BBEA21ACB
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT C
CERTIFICATE OF INSURANCE
CONTRACTOR shall submit Certificate of Insurance in compliance with the Contract Documents.
Page 10 of 10
DocuSign Envelope ID: 0EB7E27F-91F9-4391-94A6-BA1BBEA21ACB
ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED?
INSR ADDL SUBR
LTR INSD WVD
PRODUCER CONTACT
NAME:
PHONE FAX
(A/C, No, Ext): (A/C, No):
E-MAIL
ADDRESS:
INSURER A :
INSURED INSURER B :
INSURER C :
INSURER D :
INSURER E :
INSURER F :
POLICY NUMBER POLICY EFF POLICY EXP
TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) LIMITS
AUTOMOBILE LIABILITY
UMBRELLA LIAB
EXCESS LIAB
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $
CLAIMS-MADE OCCUR DAMAGE TO RENTED
PREMISES (Ea occurrence) $
MED EXP (Any one person) $
PERSONAL & ADV INJURY $
GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $
POLICY PRO- LOC
JECT PRODUCTS - COMP/OP AGG
OTHER: $
COMBINED SINGLE LIMIT
(Ea accident) $
ANY AUTO BODILY INJURY (Per person) $
OWNED SCHEDULED
AUTOS ONLY AUTOS BODILY INJURY (Per accident) $
HIRED NON-OWNED PROPERTY DAMAGE
AUTOS ONLY AUTOS ONLY (Per accident) $
$
OCCUR EACH OCCURRENCE
CLAIMS-MADE AGGREGATE $
DED RETENTION $
PER OTH-
STATUTE ER
E.L. EACH ACCIDENT
E.L. DISEASE - EA EMPLOYEE $
If yes, describe under
DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT
INSURER(S) AFFORDING COVERAGE NAIC #
COMMERCIAL GENERAL LIABILITY
Y / N
N / A
(Mandatory in NH)
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
INSURER(S) AFFORDING COVERAGE
INSURER F :
INSURER E :
INSURER D :
INSURER C :
INSURER B :
INSURER A :
NAIC #
NAME:
CONTACT
(A/C, No):
FAX
E-MAIL
ADDRESS:
PRODUCER
(A/C, No, Ext):
PHONE
INSURED
COVERAGES CERTIFICATE NUMBER:REVISION NUMBER:
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
$
$
$
PROPERTY DAMAGE $
BODILY INJURY (Per accident)
BODILY INJURY (Per person)
COMBINED SINGLE LIMIT
AUTOS ONLY
AUTOS ONLY AUTOS
NON-OWNED
OWNED SCHEDULED
ANY AUTO
AUTOMOBILE LIABILITY
Y / N
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under
ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER
OTH-
STATUTE
PER
(MM/DD/YYYY) LIMITS
POLICY EXP
(MM/DD/YYYY)
POLICY EFF
LTR TYPE OF INSURANCE POLICY NUMBER
INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
EXCESS LIAB
UMBRELLA LIAB EACH OCCURRENCE $
AGGREGATE $
$
OCCUR
CLAIMS-MADE
DED RETENTION $
PRODUCTS - COMP/OP AGG $
GENERAL AGGREGATE $
PERSONAL & ADV INJURY $
MED EXP (Any one person) $
EACH OCCURRENCE $
DAMAGE TO RENTED
PREMISES (Ea occurrence) $
COMMERCIAL GENERAL LIABILITY
CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY
PRO-
JECT LOC
CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
CANCELLATION
AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.
CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED
AUTOS ONLY
1/19/2019
Hall & Company
19660 10th Ave NE
Poulsbo WA 98370
Jim Ledbetter
360-626-2019 360-598-3703
jledbetter@hallandcompany.com
RLI INSURANCE COMPANY 13056
732
Icon Engineering Inc
7000 S Yosemite Street, Suite 120
Centennial CO 80112
300773389
A Professional Liab: Claims Made RDP0035085 1/30/2019 1/30/2020 Per Claim
Aggregate
$2,000,000
$2,000,000
Additional Insured Status is not available on Professional Liability Policy.
Project: 8497 for Stormwater Consulting Engineering Services.
City of Fort Collins
700 Wood Street
Fort Collins CO 80521
DocuSign Envelope ID: 0EB7E27F-91F9-4391-94A6-BA1BBEA21ACB
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
CERTIFICATE HOLDER CANCELLATION
ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved.
CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
4/17/2019
(720) 212-2050 (303) 799-0156
22357
ICON Engineering Inc
Douglas Williams
7000 S Yosemite St #120
Centennial, CO 80112
41190
A 2,000,000
X 34SBAPD8771 1/30/2019 1/30/2020 300,000
10,000
2,000,000
4,000,000
4,000,000
A 2,000,000
X 34SBAPD8771 1/30/2019 1/30/2020
A 2,000,000
34SBAPD8771 1/30/2019 1/30/2020 2,000,000
10,000
B
4077567 2/1/2019 2/1/2020 1,000,000
N 1,000,000
1,000,000
RE: 8497 Stormwater Consulting Engineering Services
As required by written contract, The City, its officers, agents and employees shall be named as additional insureds on the General Liability and Automobile
Liability insurance policies for any claims arising out of worked performed under this Agreement.
City of Fort Collins
700 Wood Street
Fort Collins, CO 80521
ICONENG-01 HANNAHA
CCIG
5660 Greenwood Plaza Blvd.
Suite 500
Greenwood Village, CO 80111
Beth Ficken
BethF@thinkccig.com
The Hartford Insurance Group
Pinnacol Assurance
X
X
X
X
X X
X
X
X
DocuSign Envelope ID: 0EB7E27F-91F9-4391-94A6-BA1BBEA21ACB