HomeMy WebLinkAboutRESPONSE - RFP - 8898 TRANSFORT NATURAL GAS COMPRESSORDecember 18, 2018
Prepared for:
CITY OF FORT COLLINS
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
Fort Collins, CO 80522
970.221.6775
fcgov.com/purchasing 1301 Academy Ct.
Fort Collins, CO 80524
www.cgrs.com
800.288.2657
Request for Proposals
8898 Transfort
Natural Gas Compressor
May 9, 2019
2
www.cgrs.com
800.288.2857
1301 Academy Ct.
Fort Collins, CO 80528
Request for Proposals 8898
May 9, 2019
City of Fort Collins
Financial Services Purchasing Division
215 N. Mason St. 2nd Floor
Fort Collins, CO 80522
RE: Request for Proposals — 8898 Transfort Natural Gas Compressor
Dear Mr. Clapp:
CGRS is excited to submit this Statement of Qualifications (SOQ) to the City of Fort Collins to provide a proposal to in-
stall and commission a new natural gas compressor at the Transfort fueling facility. We are uniquely qualified, and a
recognized local industry leader in environmental services. We are over 90 of the highest qualified, diversely disciplined,
predominately locally educated and trained, engineers, construction, compressed natural gas (CNG) and remediation
experts.
CGRS is committed to provide the City of Fort Collins with CNG services commensurate with the depth of experience,
staff capabilities, materials, and equipment necessary to respond in a timely fashion to the needs of the City of Fort Col-
lins, specifically in regards to the Request for Proposal, 8898 Transfort Natural Gas Compressor.
We hope in the pages below, exemplifying our experience, expertise, and proven track record of success, that you will
agree we are the right firm for the job; we look forward to partnering, once again, with the City of Fort Collins.
If you have any questions in regards to our statement of qualifications or capabilities, please contact me directly at
720.537.9387.
Sincerely,
CGRS, Inc.
Cory Kahler
Alternative Fuels Manager
May 9, 2019
Mr. Doug Clapp
City of Fort Collins Purchasing
215 N. Mason St., 2nd Floor
Fort Collins, CO 80522
Re: RFP 8898
Transfort Natural Gas Compressor
6570 Portner Road
Fort Collins, CO 80524
Dear Mr. Clapp:
CGRS, Inc. (CGRS) is pleased to provide you with this proposal for the Design/Build CNG fueling system upgrade
at the above-referenced location.
▪ Design, Engineering and Permit for construction
CGRS will provide all site drawings and procure all permits for this project. All necessary permits will be
stamped and provided to the City at completion of the project.
▪ Communication
Weekly progress meetings throughout duration of project with City’s Project Manager
▪ Procure equipment
After receiving design and equipment approval, we will order long lead-time equipment and supplies. This
will include the compressor, electrical gear and valves for inlet.
▪ Construction
Once required permits are obtained and old equipment is removed, CGRS will mobilize to the site to begin
construction. We will provide all labor, materials, equipment, supplies and tools necessary to complete all
work.
▪ Equipment and gas system testing
Following the construction phase, CGRS will perform NDT testing of the low-pressure gas lines prior to
introducing natural gas to the system.
▪ Start-up/commissioning as required by manufacturer
As required by the compressor manufacturer, CGRS will require relevant subcontractors to be on site for
the duration of ANGI Energy start-up. ANGI will provide programming to integrate the priority panel, ANGI
dispenser and GE controller to the new compressor.
▪ City of Fort Collins training
CGRS will provide basic on-site training for (4) hours
Proposed Equipment
Compressor Package
▪ ANGI 200 hp package
▪ Utilizing an Ariel JGQ/2, 4-Stage compressor
▪ 200hp motor controlled with soft start motor starter
▪ Supplies 478 SCFM at utility guarantee of 50psi gas inlet with 4500psi discharge
▪ RX371 site controller
▪ Protective enclosure includes sound attenuation and heat control (-40 to 105 F)
▪ Cold weather package
▪ Off-site monitoring and notification systems
Gas Dryer
▪ Supplied by customer
▪ To be integrated into new equipment
Dispenser
ANGI Series ll fleet supplied by customer
Integrated and programmed with new equipment
Priority Control Panel
▪ 1” design tube construction supplied by customer
▪ Integrated and programmed with new equipment
CNG Storage
▪ To be done by others
Operation
CGRS is proposing a 200hp compressor for this application. We have worked with ANGI to determine the best set-
up for site conditions. Due to the limited site inlet pressure, a 250 hp unit will not increase the output of the
compressor but will add cost – a 250hp option provided. We will work closely with ANGI to reprogram all current
site equipment to function with the new compressor. It is assumed the new compressor will provide primary
compression with the GE as a back-up unit only. We will utilize ANGI ENERGY compression equipment that will
meet or exceed the City of Fort Collins’ requirements for the private/fleet CNG fueling station. This system will be
designed to run on the guaranteed supply gas pressure of 50psi and provide 478 SCFM compression at 50psi inlet
pressure. All proposed equipment will be configured to operate in all weather conditions in Fort Collins, Colorado.
Cold weather provisions will be on all equipment as designed by the equipment manufacturer. This compressor
station will require a 3-phase, 600amp electrical service and a minimum of 50 psi gas inlet. The new compressor
will require an electrical service upgrade to 800amp to allow for all site equipment to work, which is included in our
proposal.
Project Cost
The total estimated cost of the proposed service is $ 479,589.00
OPTION 250 hp compressor $ 7,580.00
Project Assumptions and Variables
▪ CGRS assumes the current electrical transformer will be capable of handling the
800amp service
▪ CGRS assumes the gas service pressure will be increased to 50-60psi during the
construction phase of the project
▪ Asphalt and concrete removal and repair are NOT included.
▪ All associated electrical and communications are included
▪ One-year parts only warranty is included with the proposed equipment
▪ The September 1, 2019 completion is contingent on equipment delivery time. (currently
quoted at 16 weeks)
Sincerely,
CGRS, Inc.
Cory Kahler
Alternative Fuels Manager
3
www.cgrs.com
800.288.2857
Request for Proposal 8898
General Company Information
Primary Contact Information
Name: Cory Kahler
Title: Alternative Fuels Manager
Mailing address: 1301 Academy Court
Fort Collins, CO 80524
Phone number: 970.493.7780
Email address: ckahler@cgrs.com
Description of Company Business and Background:
Size: 95 employees
Location(s): Headquarters in Fort Collins, Colorado.
Field offices including Colorado Springs,
Colorado; Grand Junction, Colorado; and
Sacramento, California.
Capacity
CGRS maintains a staff of professionals with adequate
capacity to immediately and proactively tackle the pro-
ject outlined in this RFP.
Type of Firm
Corporation
Details of Ownership
Private ownership by four local individuals
Year Established
1987
Company Structure
The company is managed by a Board of Directors and
CEO that reside in Fort Collins, Colorado. The CEO
oversees the management of six departments:
Energy Services
Environmental Services
Engineering Services
Construction Services
Compliance Services
California Testing Services
1301 Academy Ct.
Fort Collins, CO 80528
A. Vendor Information
Inspection and Testing
Permitting
Engineering/Design
Construction
Design/Build
Leak Detection
Water Quality Sampling and Assessment
Stormwater Management
Air Emissions Management
SPCC, Mapping and Aerial Services
Reclamation and Material Management
History & Areas of Expertise
CGRS at its core is about Integrity, Innovation, and Ex-
cellent Customer Service. We were founded on these
values 30 years ago, and are committed to staying true
to our roots as we set our sights on the future.
CGRS, Inc. began as an environmental consulting, com-
pliance and construction company providing industry
and regulatory compliance expertise and services to
4
www.cgrs.com
800.288.2857
1301 Academy Ct.
Fort Collins, CO 80528
Request for Proposals 8898
Can Do Attitude: We have a willingness to eval-
uate and tackle any job assigned. We are confident,
bold and reward employees who go above and be-
yond.
Adaptability: We maintain flexibility in our ever-
changing workplace. We are always striving to
make ourselves more innovative yet efficient; al-
ways trying to figure out how to do something bet-
ter.
Communication: We strive for effective and
timely communication between CGRS and clients
and within our departments. We recognize every-
one needs to understand and contribute to how his/
her team connects to the big picture of what we are
trying to accomplish.
Safety: We provide safe and healthful condi-
tions and reduce injuries and illnesses to the lowest
possible level. No task is so important and no ser-
vice so urgent that it cannot be done safely.
CGRS Core Values
CGRS operating principles and Core Values embody
the tasks and projects that we complete on a daily ba-
sis. These values underlie our work, how we interact
with each other, our partners and stakeholders, and
outline strategies we employ to fulfill our mission. Our
greatest asset is our people and our values are the
basic elements of how we go about our work and are
the practices we use every day in everything we do.
Our core values are:
Accountability: We commit to do our best
even when no one is watching.
Customer Service: We measure our suc-
cess by how well we consistently meet and
exceed customer needs. We WOW custom-
ers.
Quality: We seek to do the job right every
time and on time. We continually evaluate and
make improvements.
Profit: We operate a company where the
bottom line is healthy. We reinvest in our or-
ganization and our people.
Self-Management: We hire awesome peo-
ple who do what needs to be done and they
do it well. We promote an environment where
employees are encouraged to participate in
company decisions, pursue new opportunities
and use resources that further their profes-
sional development.
CGRS Health & Safety Program
Safety is a core value at CGRS and we constantly
strive to eliminate incidents, accidents and injuries.
We have an absolute commitment to maintain safety
standards, develop a safety culture and to continually
improve our safety processes. This commitment is
5
Since opening our doors in 1987, we have experi-
enced exponential growth, attracting industry experts
while continuously expanding our service offerings.
Though we have evolved, our goals have remained
the same – to provide customized, practical solutions
to our customers.
CGRS has a proven track-record of success providing
compliance, assessment, construction, and remedia-
tion services addressing the wide array of environ-
mental health and safety regulations that affect the oil
and gas industry, commercial, industrial businesses,
and government entities. Our scope of work is vast –
having focused proficiency in the Rocky Mountain re-
gion, in addition to an extensive variety of environmen-
tal and construction projects in 40 of the 50 states with
both private business and government sectors. Specif-
ically, CGRS has completed numerous projects over
the course of 20 years for the Colorado Department of
Labor & Employment, Division of Oil and Public Safe-
ty, Colorado Department of Public Health & Environment
(CDPHE), and Colorado Oil & Gas Conservation Com-
mission (COGCC). CGRS is also an approved Contrac-
tor for the State of Nebraska, the State of Montana, and
for the State of Wyoming Department of Environmental
Quality.
By cross-pollinating expertise and resources from our
Energy, Environmental, Engineering, Compliance, and
Construction departments, our staff, which includes engi-
neers, geologists, hydrogeologists, field technicians, and
support staff, are uniquely qualified to offer a compre-
hensive range of services tailored to meet the specific
needs of our customers. Collaboration combined with
extensive experience have placed us in a position to
continuously raise the level of proficiency and excellence
for our customers, and ensure problems are identified
upfront, efficiencies are realized, and costs are mini-
mized.
Request for Proposals 8898
www.cgrs.com
800.288.2857
1301 Academy Ct.
Fort Collins, CO 80528
www.cgrs.com
800.288.2857
1301 Academy Ct.
Fort Collins, CO 80528
Our People & Our Commitment
In all that we do, we strive to deliver quality solu-
tions, with integrity and expertise every-time. This is
our mission statement and foundation for our behavior.
Our core values of integrity, innovation, and customer
service are the cornerstones of this foundation. They
represent how we interact with each other, the service
attitude we embody, the experiences we create for our
customers, and the benefits we give back to the environ-
ment and community. We believe so strongly in our core
values, our logo was developed to embody these quali-
ties, representing our commitment to staying true to
them.
6
Request for Proposals 8898
www.cgrs.com
800.288.2857
1301 Academy Ct.
Fort Collins, CO 80528
values, have a can-do attitude, operate openly and hon-
estly, and strive to be the best. Whether in the field or in
the office—the talent, enthusiasm, and commitment of
our team is the driving force behind every completed
project and happy client we serve. Because of this,
CGRS invests in employees through training and devel-
opment, encourages out of the box creativity and col-
laboration, and promotes giving back to the community.
Senior leadership and management are actively in-
volved in projects, offering decades of refined
knowledge, wisdom and support.
For nearly 32 years we’ve been making things better,
safer, more efficient and more sustainable all thanks to
those who make up the CGRS team.
YEAR
OSHA TOTAL
RECORDABLE
INCIDENT RATE
WORKMAN’S
COMPENSATION EMR
2018 1.09 0.73
2017 3.67 0.73
2016 0.00 0.77
CGRS Health & Safety Program
Safety is a core value at CGRS and we constantly strive
to eliminate incidents, accidents and injuries. We have
an absolute commitment to maintain safety standards,
develop a safety culture and to continually improve our
safety processes. This commitment is reflected in our
detailed Health and Safety Program, head by our Health
and Safety Manager Mike Byers.
The specific objectives of our Health and Safety Program
are to monitor the health of CGRS personnel, train CGRS
employees in the use of personal protective equipment,
and to minimize employee and public exposure to haz-
ards at all sites. CGRS promotes worker welfare through
our corporate safety program and the development and
implementation of site-specific health and safety plans.
CGRS also implements Anti-Drug and Alcohol Misuse
Prevention Plans in accordance with 49 CFR parts 199
and 40. CGRS is fully aware and compliant with regula-
tions as presented in Federal 29 CFR 1910.120.
An effective health and safety program is not only based
on OSHA requirements but also on sound industry prac-
tice, which includes management leadership; employee
participation; worksite analysis to identify safety and
health hazards; effective elimination or control of identi-
fied hazards; and safety and health training. To be effec-
tive, a health and safety program must protect and pro-
mote worker health and safety in a manner that is com-
patible with the company culture and objectives. CGRS
currently implements a successful health and safety pro-
gram to eliminate or control hazards, reduce loss from
injuries and illnesses, contribute to productivity and in-
7
www.cgrs.com
800.288.2857
1301 Academy Ct.
Fort Collins, CO 80528
Request for Proposals 8898
C. Firm Capability
CGRS is a respected leader in CNG design-build
throughout the Western U.S. With Cory Kahler at the
helm of our CNG Services team, our expertise is un-
matched. CGRS’s CNG qualifications include:
Experience: CGRS has completed numerous suc-
cessful projects for public and private entities
throughout Colorado - including three for the City of
Fort Collins, providing us with a unique knowledge
of the City’s goals, requirements and operations.
Recognized expert: CGRS is one of a handful of
Colorado Division of Oil and Public Safety CNG
Registered Service Agents with the expertise t o
calibrate CNG dispensers.
Evolution: CGRS has expanded its CNG services
to design-build of Renewable Natural Gas (RNG)
facilities, having designed and now constructing
the City of Longmont’s Wastewater Treatment
Plant’s RNG project.
Value: CGRS offers value engineering, working
with customers to accommodate their budgets and
allowing for future expansion.
1. Organizational Chart/Proposed Project Team
2. Firm Qualifications & Staff Experience
8
www.cgrs.com
800.288.2857
1301 Academy Ct.
Fort Collins, CO 80528
Request for Proposals 8898
3. Relevant Project Examples
City of Fort Collins Streets Facility CNG Fueling Design-Build
Fort Collins, CO
Project Description:
CGRS provided design-build services for ground-up
construction of the Fort Collins Streets CNG facility.
This site was designed to have a maximum output of
2000scfm with two compressors to fill the City’s heavy-
duty fleet. In order to meet the City’s goals and budget,
CGRS worked with City staff to value engineer the pro-
ject and cut construction costs by roughly $120,000 and
completed the project on time. CGRS also added provi-
sions for future expansion to handle the needs of the
City’s growing fleet.
Contact: Tracy Ochsner
Email: tochsner@fcgov.com
Phone number: 970.224.6061
Owner: City of Fort Collins
Original Contract Price: $681,604.71
Final Contract Amount: $692,739.71
Change Orders: $11,135
Subcontractors:
Sterling Crane
CTL Thompson
Benchmark Electrical Solutions
Middlebear Concrete, LLC
9
Request for Proposals 8898
www.cgrs.com
800.288.2857
1301 Academy Ct.
Fort Collins, CO 80528
Project Description:
CGRS installed the Weld County School Dis-
trict RE-1 CNG station, which was designed to
handle up to 400 scfm and the equipment en-
closure is constructed of split-faced CMU to
match the new transportation building, with a
capacity for future compressor and storage.
CGRS served as superintendent for the new
CNG fast-fill system with a rough-in for future
time-fill fueling.
Subcontractors:
CTL Thompson
Carlton Electric
J&B Masonry
Coloscapes Concree
Murphy Company Mechanical
Custom Fence
Duffy Crane
Weld County School District RE-1 CNG Fueling Facility Design-Build
Gilcrest, CO
Contact: James Mora
Email: james.mora@x3cng.com
Phone number: 917.334.9938
Owner: Weld County
Original Contract Amount: $191,132
Final Contract Amount: $230,243
Change Orders: $39,111
10
Request for Proposals 8898
www.cgrs.com
800.288.2857
1301 Academy Ct.
Fort Collins, CO 80528
Project Description:
Project manager Ground-up construction of an 800 scfm
compressor station, including 10 time-fill stations and a
fast-fill dispenser with heavy duty fueling utilizing ANGI
equipment. Included installation of all related CNG equip-
ment as well as civil construction for the site.
CGRS also holds the current Maintenance Contract for
Operation & Maintenance at this site, which includes a
24/7 emergency service clause.
Subconsultants:
Bar S Services, Inc.
Simpson Electric
Terracon
Borderline Fencing
S&S Builders
Redi Services
Kubat Equipment
Contact: Doug Hammack
Email: dhammack@laramiecountry.com
Phone number: 307.633.4693
Owner: Laramie County, Wyoming
Original Contract Amount: $487,150.12
Final Contract Amount: $529,309.78
Change Orders: $42,159.66
Laramie County Public Works CNG Fueling Facility Design-Build
Cheyenne, Wyoming
STANDARD TERMS AND CONDITIONS OF SALE
UNITED STATES & CANADA
ANGI ENERGY SYSTEMS, LLC (“SELLER”) agrees to sell to BUYER equipment and/or services described and listed in the Proposal (hereinafter
“EQUIPMENT,” “GOODS,” and/or “SERVICES”) subject to the following terms and conditions as follows:
1. Acceptance. The following terms and conditions of sale are
applicable to all quotations and purchase orders and are the only terms
and conditions applying to the sale of Seller’s products or services except
those that relate to prices, quantities, delivery schedules, and the
description and specifications of the products. Seller hereby objects to
and rejects any other terms and conditions appearing on, incorporated by
reference in or attached to a purchase order. Buyer’s acceptance of
products or services called for in said purchase order shall constitute its
acceptance of the following terms and conditions.
2. Billing and Payment. Unless otherwise agreed to in writing,
Buyer shall make payments to Seller according to the following progress
payment schedule:
Thirty percent (30%) of the total purchase price as a
down payment to be remitted simultaneously with the written purchase
order.
Thirty percent (30%) of the total purchase price upon
written notice of the commencement of assembly.
Thirty percent (30%) of the total purchase price upon
written notice of readiness to ship.
Ten percent (10%) of the total purchase price “Net-30
Days” from the date of shipment or upon transfer of title to Buyer.
(a) Payment shall be due within 30 days from date of invoice
unless otherwise agreed to in writing by Seller. Payment terms are
subject to approval of Seller’s credit department. Seller reserves the
right to impose finance charges which is the lower one and one-half
percent (1½%) per month or the highest rate allowed by law on any
amount which becomes past due and delinquent. However, if in Seller’s
opinion, Buyer’s financial condition reasonably appears to call for such
action, Seller may require payment in advance.
(b) Prices quoted are exclusive of, and Buyer agrees to pay, any
foreign, federal, state or local excise, sales, use, personal property or any
other taxes or duties, excepting only taxes based on Seller’s income.
Any certificates or other evidence of applicable exemptions to such
taxes or duties must be made available to Seller prior to invoicing or
such taxes or duties will be charged to Buyer, provided, however, that if
Seller does not collect such items from Buyer and is later requested or
required to pay the same to any taxing authority, Buyer will promptly
make such payment to Seller or, if requested by Seller, directly to such
taxing authority.
(c) If any particular invoice is not paid when due, Buyer agrees
to pay all collection costs if this account is referred outside for collection
or, if suit is brought to collect this account, Buyer agrees to pay all costs
and reasonable attorneys’ fees, including all costs and reasonable
attorneys’ fees incurred on any appeal to an appellate court.
3. Place of Delivery, Method of Tender, and Transfer of Title.
(a) Sales within U.S. Delivery terms and pricing for sales within
the United States are CPT (Incoterms 2010) Buyer’s destination (“Place
of Destination”) unless otherwise agreed to in writing by Seller. Seller
shall arrange for transportation of the goods ordered by an appropriate
means of transportation. Freight is Pre-paid from Seller’s Dock (“Point
of Delivery”) and incurred after the goods are delivered to the carrier
from Point of Delivery to the Place of Destination. Risk of loss of or
damage to the goods or any part of the goods shall pass to the Buyer
upon delivery to carrier at the Point of Delivery, and Buyer shall have
the responsibility of filing any damage claims with the carrier. Buyer
shall arrange for applicable insurance covering the goods from Point of
hereunder by Seller and which relates to an invention, improvement,
enhancement or development made by or for Buyer on a date subsequent
to the date of Seller’s offer hereunder.
10. Hazardous Materials. Buyer acknowledges that certain supplies
covered by this contract may be, or become, considered as hazardous
materials under various laws and regulations. Buyer agrees to familiarize
itself (without reliance on Seller except as to the accuracy of special
safety information actually furnished by Seller), with any hazard of such
materials and their applications and the containers in which such
materials are shipped. Buyer agrees to inform and train its employees
and its customers as to such hazards. Buyer agrees to waive any claim
against Seller and hold harmless and indemnify Seller against any claims
by its employees or customers based on allegations relating to any such
hazards except where such claims are based on failure to meet written
specifications or the inaccuracy of specific safety information actually
furnished by Seller.
11. Delay. (a) Delivery dates are approximate and are not guaranteed,
and Seller shall not be liable for damages of any kind resulting from any
delays in fulfillment, shipment or delivery of orders. Furthermore, Seller
shall not be liable for any other loss, damage, cost or expense due to
causes beyond its reasonable control, such as acts of God, acts of Buyer,
acts of civil or military authority, fires, strikes, floods, epidemics, war,
riot, delays in transportation, government restrictions or embargoes, or
difficulties in obtaining necessary labor, materials, manufacturing
facilities or transportation due to such causes.
(b) In the event of a delay in delivery in excess of ninety (90)
consecutive days, Buyer has the right to terminate its order as to the
undelivered portion thereof without Penalty.
12. Goods Not for Resale. Buyer, by placing this order and accepting
these Terms and Conditions, hereby expressly agrees, acknowledges,
represents and warrants to Seller that (a) it is the Seller’s policy to sell
these types of goods only to end users for their own use, (b) the goods
that are the subject of this order are not intended for end user to resell,
(c) the goods that are the subject of this order are in fact being purchased
by Buyer for Buyer’s own use or only for sale to an end user and not for
any other resale to a third party and (d) in the event that Buyer breaches
the foregoing acknowledgment, covenant, representation and/or
warranty by reselling the goods that are the subject of this contract,
Seller shall be permitted to (i) void, eliminate and/or refuse to continue
to extend or make available to Buyer any volume or other types of
discounts, rebates or preferential payment terms to which Buyer is now
or hereafter otherwise might be entitled to or eligible to receive from
Seller or (ii) refuse to accept any further orders from Buyer.
Notwithstanding the foregoing, nothing in these Terms and Conditions is
intended to restrict any OEM from incorporating any goods purchased
from Seller into equipment that is to be resold to the OEM’s end
customer so long as such OEM provides a reasonable certification of
such use to Seller.
13. Cancellation. Unless otherwise agreed in a writing signed by
authorized representatives of Buyer and Seller, Buyer will pay Seller for
all services performed (including but not limited to materials, and labor)
and products provided or specifically ordered for Buyer in reliance on
Buyer’s order, as of the date of the cancellation. Buyer may not cancel
orders for non-standard goods or orders for goods which have left
Seller’s dock.
14. Governing Law; Venue. This Agreement shall be governed by
and construed in accordance with the laws of the State of Wisconsin,
without regard to any choice or conflict of laws principles of such state,
and all disputes shall be adjudicated therein. Buyer and Seller consent to
the sole and exclusive venue and jurisdiction of the courts situated in the
Rev. 3/31/17
SPC10300SLS ANGI Warranty - Rev 1
WARRANTY POLICY
1. Warranty
a. Equipment. The seller, ANGI Energy Systems LLC or its ANGI branded
corporate affiliate, whatever the case may be (“ANGI”), warrants to Buyer
that its equipment conforms to ANGI’s published specifications, is free from
defects in materials and workmanship until the earliest of: (i) 12 months after
substantial completion of commissioning, if applicable; (ii) 12 months from
initial use; or (iii) 18 months from the date the equipment is ready to ship from
ANGI’s facility. ANGI further warrants the equipment enclosures against
rust-through for 2 years from the date it is ready to ship from ANGI’s facility
(equipment may be susceptible to surface rust under normal conditions). The
following are exceptions to this warranty: (i) Used/Refurbished Equipment
– is warranted on a case by case basis as provided by ANGI; (ii) Products
not Manufactured by ANGI – ANGI will pass through transferable
manufacturer’s warranties only.
b. Parts. ANGI warrants its: (i) non-consumable parts such as valves, gauges
and transducers will conform to ANGI’s published specifications and be free
from defects in workmanship and materials for 90 days from date of shipment,
and (ii) consumable parts, such as filter elements, strainers, o-rings, gaskets,
fuses, belts and will conform to ANGI’s published specifications and will be
free from defects in workmanship and materials at the time of delivery. ANGI
warrants reconditioned vendor certified parts for 90 days from the date of
shipment.
c. Consumables. ANGI warrants its consumables, such as oils, lubricants and
desiccant will conform to ANGI’s published specifications and will be free
from defects in workmanship and materials through the expiration or other
date indicated on the packaging or otherwise provided by ANGI.
d. Software. ANGI warrants its software when used under normal operating
and maintenance conditions, will perform substantially in accordance with
ANGI’s published specifications and any accompanying user documentation
for the earlier of 90 days from installation or 120 days from shipment. ANY
THIRD PARTY SOFTWARE PROVIDED WITH THE SOFTWARE AND
DATA AND PRE-RELEASE VERSIONS OF THE SOFTWARE ARE
SUPPLIED “AS IS” WITHOUT CONDITION OR WARRANTY OF ANY
KIND, INCLUDING ANY WARRANTY OF MERCHANTABILITY,
FITNESS FOR A PARTICULAR PURPOSE OR NON-INFRINGEMENT,
EITHER EXPRESS OR IMPLIED. Any software warranty in any software
license agreement between the parties will take precedence over this software
warranty.
e. Services. ANGI warrants all services will be performed in a professional and
workmanlike manner in accordance with applicable industry standards for 30
days after performance.
2. Warranty Services. This warranty only covers costs of replacement
parts/goods. Buyer is responsible for labor costs and all other costs in
connection with the repair or replacement of any non-conforming goods,
including without limitation, costs for diagnosis of defects, shipping, removal
of goods and reinstallation of goods. Buyer must make any warranty claims
in writing within the applicable warranty period and within ten (10) days after
discovery of any non-conformance (30 days after shipment for consumable
parts). Within a reasonable time thereafter, ANGI will make the necessary
repairs after confirmation that the non-conforming goods were stored,
installed, maintained and used in accordance with ANGI’s recommendations,
accompanying documentation, published specifications and standard industry
practice. Warranty services will be performed at the location of the warranted
goods if possible, subject to ANGI’s then prevailing rates and any travel
expenses incurred by ANGI. Otherwise, Buyer will ship the goods at its
expense to ANGI for repair and/or replacement after obtaining a valid Return
Material Authorization number. For the avoidance of doubt, repair or
RECOMMENDED MAINTENANCE INTERVALS FOR
INTERMITTENT DUTY- RECIPROCATING COMPRESSORS
PAGE 1 OF 4 ER-8.2.2
5 Page 2, #9: Changed shutdown pressure to 45 psig (3.1 barg).
4 015308 10-10-08
3 014795 11-19-07
2 014487 8-17-07
1 EC5947 ---
REV DESCRIPTION 0 --- 5-10-94 5 015364 9-13-10
REV EC DATE REV EC DATE
Like all equipment, Ariel compressors do require maintenance. The frequency of
maintenance is dictated by the environment in which the compressor is placed, the loads the
user imposes on the compressor and the cleanliness of the gas.
First and foremost on the preventative maintenance list is the completion and compliance
with the Ariel Corporation Packagers Standard and Compressor Start Up Check List. All items
must be adhered to, both before and after start up.
The following is a guide only and, as stated above, may vary due to operating conditions. The
time intervals start from the start up date of the unit. If your oil supplier's recommended oil
service changes are more frequent than the Ariel recommendations, the supplier’s intervals
should be followed. Regular oil analysis is recommended. If problems develop the oil should
be changed immediately and the cause of the problem determined and corrected.
A log book should be kept with each unit. Every maintenance item can be entered with
exacting detail in order that records will be available for tracking maintenance costs per unit
and for trouble-shooting.
Operator logs should be reviewed by qualified personnel to determine trends in compressor
performance and/or maintenance.
CAUTION! BE SURE THAT THE COMPRESSOR IS COMPLETELY VENTED TO
RELIEVE ALL GAS PRESSURE, AND THE DRIVER WILL NOT EXERT
TORQUE ON THE COMPRESSOR CRANKSHAFT THAT COULD RESULT IN
INJURY, PRIOR TO TAKING COUPLING READINGS, RE-CHECKING
BOLTING TORQUES ON PRESSURE CONTAINING COMPONENTS OR
REMOVING ACCESS COVERS FOR PERFORMING INTERNAL
INSPECTION OR MAINTENANCE ON THE COMPRESSOR. IN THE CASE
OF A DIRECT DRIVE MOTOR, THE BREAKER IS LOCKED OUT. FAILURE
TO FOLLOW THESE STEPS CAN RESULT IN SERIOUS PERSONAL
INJURY OR DEATH.
Daily
After running a new compressor (or after a re-location, re-configuring or major overhaul) for
the first 24 hours, shutdown, vent gas system and perform a hot alignment check at coupling
within 30 minutes, while barring driver shaft to packager’s recommendations. Realign if
necessary to hold coupling hub face and rim hot alignment within 0.005 inch (0.13 mm) TIR,
except for hub O.D. >17 in. (>43 cm) angular hub-face limit is increased to 0° 1’ (0.0167°).
Also check fastener torque on gas nozzle flange, valve cap, cylinder head, compressor rod
packing flange and, if applicable, crosshead guide to frame bolting. Reference Ariel Technical
Manual, Fastener Torque Tightening Values or Toolbox Torque Chart, ER-63. After 150 hours,
repeat this fastener torque check.
RECOMMENDED MAINTENANCE INTERVALS FOR
INTERMITTENT DUTY- RECIPROCATING COMPRESSORS
PAGE 2 OF 4 REV 5 ER-8.2.2
If bearing temperatures increase or a visual inspection of the crankcase indicates bearing
wear, check main, connecting rod and crankshaft-thrust bearing clearances. Replace
affected bearings if clearances are out of tolerances. See the Ariel Technical Manual for
instructions and clearance tolerances.
1. Check frame oil pressure. It should be 50 to 60 psig (3.5 to 4.2 barg) when at
operating temperature. Compressor inlet oil temperature is 190°F
(88°C) maximum.
2. Check frame oil level. It should be visible in the sight glass and approximately
mid-level when running, if not, determine and correct cause. Do not overfill. Check
oil makeup tank for sufficient oil supply.
3. Check lubricator block cycle time. Refer to information plate on top of lubricator
box for correct cycle time. Very dirty or wet gas may require a more frequent cycle
time than normal.
4. Check primary and secondary packing vents for blowing. If blowing, determine
cause and, if necessary, replace packing internal parts.
5. Check and correct any gas leaks.
6. Check and correct any oil leaks.
7. Check operating pressure and temperatures. If not normal, determine cause of
abnormality and correct. It is recommended that a daily log of operating
temperatures and pressure be kept for reference.
8. Check shutdown set points.
9. Low oil pressure shutdown 45 psig (3.1 barg) minimum.
10. High discharge gas temperature shutdowns are to be set within 10% or as close
as practical above the normal operating discharge temperatures, but not to
exceed the “Maximum Discharge Temperature Shutdown Setting” for the service
in which the compressor is operating.
11. High and low pressure shutdowns are to be set as close as practical.
Consideration should be given to the rod load capacity of the machine.
12. Check lubricator box oil level.
13. Check for unusual noises or vibrations.
Every 400 Hours (in addition to Daily Requirements)
After running a new compressor (or after a re-location, re-configuring or major overhaul) for
400 hours, shutdown, vent gas system and check fastener torque on gas nozzle flanges,
valve caps, cylinder heads and compressor rod packing flanges. Reference Ariel Technical
Manual, Fastener Torque Tightening Values or Toolbox Torque Chart, ER-63. Fasteners that
turn at the first month check, should be re-checked after 800 hours. If loosening persists,
consult your packager or Ariel to help determine the cause and recommend the correction.
1. Check and confirm safety shutdown functions.
Every 2000 Hours (plus Daily & 400 Hours)
1. Drain and replace lubricator box oil.
RECOMMENDED MAINTENANCE INTERVALS FOR
INTERMITTENT DUTY- RECIPROCATING COMPRESSORS
PAGE 3 OF 4 REV 5 ER-8.2.2
2. Change oil filter or when oil filter differential pressure exceeds the filter change
value, see filter information plate on the top cover or Ariel Technical Manual, Lube
Section for value.
3. Change oil. A more frequent oil change interval may be required if operating in an
extremely dirty environment or if the oil supplier recommends it or if an oil analysis
dictates it.
4. Clean sintered element in the small oil filter supplied on the force feed lubrication
system or every time main oil filter is changed.
5. Clean strainer when oil is changed.
6. Open frame when oil is changed and visually inspect for foreign material.
Disassembly is not recommended unless a reason for it is found.
7. Check cylinders for the proper lubrication rates. Reference Ariel Technical
Manual, Lube Section for a practical indication using the paper test method.
4000 Hours (plus Daily/400 & 2000 Hours)
1. Check crosshead guide clearance with feelers and if outside the limits listed in the
Ariel Technical Manual, Clearances Table, replace the affected parts.
2. Inspect valves for broken plates and loose center bolts, replace broken parts and
tighten center bolts. Reference Ariel Technical Manual, Fastener Torque
Tightening Values or Toolbox Torque Chart, ER-63.
3. Inspect cylinder bores for damage or wear. If the cylinder bore surface is
blemished or gouged, efficiency can be affected and/or rapid ring wear can result,
or is more than 0.001 inch per inch of cylinder bore diameter (0.001 mm/mm) out
of round or tapered, the cylinder body should be replaced or the bore restored.
Contact Ariel for re-boring and bore restoration guidelines.
4. Inspect piston ring end gap. Replace rings that are outside the maximum limit
listed in the Ariel Technical Manual, Clearance Tables.
5. Re-tighten hold down stud-nuts to proper torque values. Inspect for frame twist or
bending to be sure the main bearing bores are in alignment. Check frame top
cover mounting surface flatness tolerance and/or soft foot (reference Ariel
document ER-82 or Technical Manual Section 2). For soft foot check, more than
0.002 inch (0.05 mm) pull down requires re-shimming.
6. Realign if necessary to hold coupling hub face and rim hot alignment within 0.005
inch (0.13 mm) TIR, except for hub O.D. >17 in. (>43 cm) angular face limit is
increased to 0° 1’ (0.0167°).
7. Inspect piston rods for damage and excessive wear. If gouged or scratched,
replace the rod. If the rod is more than 0.005 inch (0.13 mm) under size, out of
round more than 0.001 inch (0.03 mm), or tapered more than 0.002 inch (0.05
mm) replace the rod.
8. Rebuild cylinder packing cases.
9. Rebuild oil wiper cases.
10. Check and re-calibrate all temperature and pressure gauges.
11. Check and record compressor rod run out.
12. Grease VVCP stem threads at grease fitting, with 2 to 3 pumps of multi-purpose
RECOMMENDED MAINTENANCE INTERVALS FOR
INTERMITTENT DUTY- RECIPROCATING COMPRESSORS
PAGE 4 OF 4 REV 5 ER-8.2.2
grease using a standard hand pump grease gun.
13. Clean crankcase breather filter.
14. Adjust drive chains.
15. Pressure test distribution blocks.
16. Check gas nozzle flange, valve cap, cylinder heads, compressor rod packing,
crosshead pin through bolt, crosshead guide to frame, crosshead guide to
cylinder, cylinder mounting flange to forged steel cylinder, distance piece to
cylinder, distance piece to crosshead guide and tandem cylinder to cylinder
fastener torque.
17. If the compressor is equipped with crankcase over-pressure relief valves, inspect
and exercise valves to the manufacturer’s recommendations.
8,000 Hours (plus Daily/400/2000 & 4000 Hours)
1. Check main, connecting rod, and crankshaft-thrust bearing clearances with a pry
bar and dial indicator. See the Ariel Technical Manual for instructions and
clearance tolerances. Any time bearing clearances are outside the limits, replace
the affected bearings. Disassembly to check clearances is not recommended.
Disassembly should be performed if the pry bar check indicates excessive
clearance.
2. Check auxiliary end chain drive for sprocket teeth undercutting and chain for
excessive stretching.
16,000 Hours (plus Daily/400/2000/4000 & 8000 Hours)
1. Check crosshead pin to crosshead pin bore and connecting rod bushing bore by
removing crosshead pins.
2. Check for excessive wear in the auxiliary end drive chain tightener.
3. Check for excessive ring groove wear in pistons.
32,000 hours (plus Daily/400/2000/4000/8000 & 16,000 Hours)
1. Replace lubricator distribution blocks.
2. Replace crosshead bushings.
Ariel Performance
Company: ANGI Energy Systems Customer: Fort Collins
Quote: Inquiry:
7.7.6.0 Case 1: Project: Fort Collins
Compressor Data: Driver Data:
Elevation,ft: 5004.00 Barmtr,psia: 12.202 Ambient,F: 105.00 Type: Electric
Frame: JGQ/2 Stroke, in: 3.00 Rod Dia, in: 1.125 Mfg:
Max RL Tot, lbf: 20000 Max RL Tens, lbf: 10000 Max RL Comp, lbf: 11000 Model: 60 Hz - 4 Po
Rated RPM: 1800 Rated BHP: 280.0 Rated PS FPM: 900.0 BHP: 200
Calc RPM: 1782.0 BHP: 191 Calc PS FPM: 891.0 Avail: 200
Services Service 1
Gas Model VMG-APRNGL2
Stage Data: 1 (SG) 2 3 4
Target Flow, SCFM 575.000 575.000 575.000 575.000
Flow Calc, SCFM 478.446 478.446 478.450 478.449
BHP per Stage 51.1 35.1 51.9 47.1
Specific Gravity 0.5900 0.5897 0.5897 0.5897
Ratio of Sp Ht (N) 1.2723 1.2728 1.2759 1.2799
Comp Suct (Zs) 0.9883 0.9726 0.9480 0.8651
Comp Disch (Zd) 0.9848 0.9706 0.9597 1.0130
Pres Suct Line, psig 50.00 N/A N/A N/A
Pres Suct Flg, psig 50.00 208.79 421.78 1393.48
Pres Disch Flg, psig 213.79 431.78 1408.94 4545.12
Pres Disch Line, psig N/A N/A N/A 4500.00
Pres Ratio F/F 3.633 2.009 3.275 3.242
Temp Suct, F 60.00 125.00 125.00 125.00
Temp Clr Disch, F 125.00 125.00 125.00 125.00
Cylinder Data: Throw 2 Throw 2 Throw 1 Throw 1
Cyl Model 8-7/8M-CE 4-1/8JG-HE 3-5/8SG-CE 1-3/4SG-FS-
HE
Cyl Bore, in 8.875 4.125 3.625 1.750
Cyl RDP (API), psig 340.9 1022.7 2318.2 5545.5
Cyl MAWP, psig 375.0 1125.0 2550.0 6100.0
Cyl Action CE HE CE HE
Cyl Disp, CFM 188.3 41.3 28.9 7.4
Pres Suct Intl, psig 47.12 187.09 399.46 1384.34
Temp Suct Intl, F 67 129 130 129
Pres Disch Intl, psig 223.23 479.07 1490.96 4638.41
Temp Disch Intl, F 248 254 321 306
HE Suct Gas Vel, FPM 0 10955 0 2660
HE Disch Gas Vel, FPM N/A 10464 N/A 4855
HE Spcrs Used/Max N/A 0/2 N/A N/A
HE Vol Pkt Avail, % N/A No Pkt N/A No Pkt
Vol Pkt Used, % N/A % No Pkt N/A % No Pkt
HE Min Clr, % N/A 15.43 N/A 24.32
HE Total Clr, % N/A 15.43 N/A 24.32
CE Suct Gas Vel, FPM 7174 0 7838 0
CE Disch Gas Vel, FPM 6571 N/A 8010 N/A
CE Spcrs Used/Max 0/4 N/A N/A N/A
CE Min Clr, % 18.74 N/A 22.12 N/A
CE Total Clr, % 18.74 N/A 22.12 N/A
Suct Vol Eff HE/CE, % N/A/59.3 84.2/N/A N/A/59.9 65.4/N/A
Disch Event HE/CE, ms N/A/5.6 7.8/N/A N/A/5.9 5.3/N/A
Suct Pseudo-Q HE/CE N/A/5.0 9.0/N/A N/A/6.2 0.9/N/A
Gas Rod Ld Comp, % 54.2 C 54.2 C 97.9 C 97.9 C
Gas Rod Ld Tens, % 86.6 T 86.6 T 72.4 T 72.4 T
Gas Rod Ld Total, % 73.1 73.1 90.0 90.0
Xhd Pin Deg/%Rvrsl lbf 121/69.7 121/69.7 167/41.0 167/41.0
Flow Calc, SCFM 478.446 478.446 478.450 478.449
Cyl BHP 51.1 35.1 51.9 47.1
Ariel Performance
Company: ANGI Energy Systems Customer: Fort Collins
Quote: Inquiry:
7.7.6.0 Case 2: Project: Fort Collins
Compressor Data: Driver Data:
Elevation,ft: 5004.00 Barmtr,psia: 12.202 Ambient,F: 105.00 Type: Electric
Frame: JGQ/2 Stroke, in: 3.00 Rod Dia, in: 1.125 Mfg:
Max RL Tot, lbf: 20000 Max RL Tens, lbf: 10000 Max RL Comp, lbf: 11000 Model: 60 Hz - 4 Po
Rated RPM: 1800 Rated BHP: 280.0 Rated PS FPM: 900.0 BHP: 200
Calc RPM: 1782.0 BHP: 198 Calc PS FPM: 891.0 Avail: 200
Services Service 1
Gas Model VMG-APRNGL2
Stage Data: 1 (SG) 2 3 4
Target Flow, SCFM 575.000 575.000 575.000 575.000
Flow Calc, SCFM 502.771 502.772 502.774 502.773
BHP per Stage 53.5 36.5 53.9 48.1
Specific Gravity 0.5900 0.5903 0.5903 0.5903
Ratio of Sp Ht (N) 1.2723 1.2731 1.2763 1.2797
Comp Suct (Zs) 0.9877 0.9713 0.9461 0.8626
Comp Disch (Zd) 0.9841 0.9693 0.9586 1.0111
Pres Suct Line, psig 53.00 N/A N/A N/A
Pres Suct Flg, psig 53.00 219.09 438.38 1431.95
Pres Disch Flg, psig 224.09 448.38 1447.59 4545.12
Pres Disch Line, psig N/A N/A N/A 4500.00
Pres Ratio F/F 3.624 1.991 3.240 3.156
Temp Suct, F 60.00 125.00 125.00 125.00
Temp Clr Disch, F 125.00 125.00 125.00 125.00
Cylinder Data: Throw 2 Throw 2 Throw 1 Throw 1
Cyl Model 8-7/8M-CE 4-1/8JG-HE 3-5/8SG-CE 1-3/4SG-FS-
HE
Cyl Bore, in 8.875 4.125 3.625 1.750
Cyl RDP (API), psig 340.9 1022.7 2318.2 5545.5
Cyl MAWP, psig 375.0 1125.0 2550.0 6100.0
Cyl Action CE HE CE HE
Cyl Disp, CFM 188.3 41.3 28.9 7.4
Pres Suct Intl, psig 49.98 196.33 415.14 1422.52
Temp Suct Intl, F 67 129 130 129
Pres Disch Intl, psig 233.98 497.63 1532.18 4639.26
Temp Disch Intl, F 247 253 320 302
HE Suct Gas Vel, FPM 0 10955 0 2660
HE Disch Gas Vel, FPM N/A 10464 N/A 4855
HE Spcrs Used/Max N/A 0/2 N/A N/A
HE Vol Pkt Avail, % N/A No Pkt N/A No Pkt
Vol Pkt Used, % N/A % No Pkt N/A % No Pkt
HE Min Clr, % N/A 15.43 N/A 24.32
HE Total Clr, % N/A 15.43 N/A 24.32
CE Suct Gas Vel, FPM 7174 0 7838 0
CE Disch Gas Vel, FPM 6571 N/A 8010 N/A
CE Spcrs Used/Max 0/4 N/A N/A N/A
CE Min Clr, % 18.74 N/A 22.12 N/A
CE Total Clr, % 18.74 N/A 22.12 N/A
Suct Vol Eff HE/CE, % N/A/59.5 84.5/N/A N/A/60.5 66.7/N/A
Disch Event HE/CE, ms N/A/5.6 7.9/N/A N/A/6.0 5.4/N/A
Suct Pseudo-Q HE/CE N/A/5.0 9.0/N/A N/A/6.2 0.9/N/A
Gas Rod Ld Comp, % 56.2 C 56.2 C 97.8 C 97.8 C
Gas Rod Ld Tens, % 90.5 T 90.5 T 74.0 T 74.0 T
Gas Rod Ld Total, % 76.1 76.1 90.8 90.8
Xhd Pin Deg/%Rvrsl lbf 120/73.2 120/73.2 168/43.5 168/43.5
Flow Calc, SCFM 502.771 502.772 502.774 502.773
Cyl BHP 53.5 36.5 53.9 48.1
Ariel Performance
Company: ANGI Energy Systems Customer: Fort Collins
Quote: Inquiry:
7.7.6.0 Case 3: Project: Fort Collins
Compressor Data: Driver Data:
Elevation,ft: 5004.00 Barmtr,psia: 12.202 Ambient,F: 105.00 Type: Electric
Frame: JGQ/2 Stroke, in: 3.00 Rod Dia, in: 1.125 Mfg:
Max RL Tot, lbf: 20000 Max RL Tens, lbf: 10000 Max RL Comp, lbf: 11000 Model: 60 Hz - 4 Po
Rated RPM: 1800 Rated BHP: 280.0 Rated PS FPM: 900.0 BHP: 200
Calc RPM: 1782.0 BHP: 156 Calc PS FPM: 891.0 Avail: 200
Disch Temp
Services Service 1
Gas Model VMG-APRNGL2
Stage Data: 1 (SG) 2 3 4
Target Flow, SCFM 575.000 575.000 575.000 575.000
Flow Calc, SCFM 358.964 358.961 358.966 358.969
BHP per Stage 39.0 28.3 41.7 41.0
Specific Gravity 0.5900 0.5898 0.5898 0.5898
Ratio of Sp Ht (N) 1.2772 1.2757 1.2777 1.2847
Comp Suct (Zs) 0.9916 0.9800 0.9598 0.8845
Comp Disch (Zd) 0.9893 0.9785 0.9689 1.0266
Pres Suct Line, psig 35.00 N/A N/A N/A
Pres Suct Flg, psig 35.00 157.54 338.67 1204.87
Pres Disch Flg, psig 161.97 347.90 1219.30 4545.12
Pres Disch Line, psig N/A N/A N/A 4500.00
Pres Ratio F/F 3.690 2.122 3.510 3.745
Temp Suct, F 60.00 125.00 125.00 125.00
Temp Clr Disch, F 125.00 125.00 125.00 125.00
Cylinder Data: Throw 2 Throw 2 Throw 1 Throw 1
Cyl Model 8-7/8M-CE 4-1/8JG-HE 3-5/8SG-CE 1-3/4SG-FS-
HE
Cyl Bore, in 8.875 4.125 3.625 1.750
Cyl RDP (API), psig 340.9 1022.7 2318.2 5545.5
Cyl MAWP, psig 375.0 1125.0 2550.0 6100.0
Cyl Action CE HE CE HE
Cyl Disp, CFM 188.3 41.3 28.9 7.4
Pres Suct Intl, psig 32.82 141.00 320.86 1197.13
Temp Suct Intl, F 67 129 131 130
Pres Disch Intl, psig 169.15 385.46 1288.54 4633.90
Temp Disch Intl, F 253 264 334 335
HE Suct Gas Vel, FPM 0 10955 0 2660
HE Disch Gas Vel, FPM N/A 10464 N/A 4855
HE Spcrs Used/Max N/A 0/2 N/A N/A
HE Vol Pkt Avail, % N/A No Pkt N/A No Pkt
Vol Pkt Used, % N/A % No Pkt N/A % No Pkt
HE Min Clr, % N/A 15.43 N/A 24.32
HE Total Clr, % N/A 15.43 N/A 24.32
CE Suct Gas Vel, FPM 7174 0 7838 0
CE Disch Gas Vel, FPM 6571 N/A 8010 N/A
CE Spcrs Used/Max 0/4 N/A N/A N/A
CE Min Clr, % 18.74 N/A 22.12 N/A
CE Total Clr, % 18.74 N/A 22.12 N/A
Suct Vol Eff HE/CE, % N/A/58.9 82.9/N/A N/A/56.3 58.0/N/A
Disch Event HE/CE, ms N/A/5.5 7.5/N/A N/A/5.5 4.7/N/A
Suct Pseudo-Q HE/CE N/A/5.0 8.9/N/A N/A/6.1 0.9/N/A
Gas Rod Ld Comp, % 44.1 C 44.1 C 98.5 C 98.5 C
Gas Rod Ld Tens, % 67.1 T 67.1 T 64.6 T 64.6 T
Gas Rod Ld Total, % 57.8 57.8 86.5 86.5
Xhd Pin Deg/%Rvrsl lbf 145/89.2 145/89.2 109/30.2 109/30.2
Flow Calc, SCFM 358.964 358.961 358.966 358.969
ID Task
Mode
Task Name Duration Start Finish Predecessors Resource Names
1 Bid Due 1 day Thu 5/9/19 Thu 5/9/19
2 Tentative Award 1 day Thu 5/23/19 Thu 5/23/19
3 Contract 13 days Thu 5/23/19 Mon 6/10/19
4 Order Long Lead
Equipment
1 day Mon 6/10/19 Mon 6/10/19
5 Begin permitting process 30 days Mon 6/10/19 Fri 7/19/19
6 Take down Ariel & move
Priority Panel (not part of
this job, but must be done
in order to for this job to
continue)
5 days Mon 8/12/19 Fri 8/16/19
7 Install compressor 5 days Mon 9/9/19 Fri 9/13/19
8 Electrical work 25 days Wed 9/11/19 Tue 10/15/19
9 Equipment start up 4 days Tue 10/8/19 Fri 10/11/19
10 Commissioning 5 days Mon 10/14/19 Fri 10/18/19
W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S
May 12, '19 May 19, '19 May 26, '19 Jun 2, '19 Jun 9
Task
Split
Milestone
Summary
Project Summary
External Tasks
External Milestone
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration‐only
Manual Summary Rollup
Manual Summary
Start‐only
Finish‐only
Deadline
Progress
Page 1
Project: Schedule
Date: Thu 5/9/19
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T
9, '19 Jun 16, '19 Jun 23, '19 Jun 30, '19 Jul 7, '19 Jul 14, '19 Jul 21, '19 Jul 28, '19 Aug 4, '19 Aug 11, '19
Task
Split
Milestone
Summary
Project Summary
External Tasks
External Milestone
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration‐only
Manual Summary Rollup
Manual Summary
Start‐only
Finish‐only
Deadline
Progress
Page 2
Project: Schedule
Date: Thu 5/9/19
T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S
Aug 18, '19 Aug 25, '19 Sep 1, '19 Sep 8, '19 Sep 15, '19 Sep 22, '19 Sep 29, '19 Oct 6, '19 Oct 13, '19 Oct
Task
Split
Milestone
Summary
Project Summary
External Tasks
External Milestone
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration‐only
Manual Summary Rollup
Manual Summary
Start‐only
Finish‐only
Deadline
Progress
Page 3
Project: Schedule
Date: Thu 5/9/19
Cyl BHP 39.0 28.3 41.7 41.0
05/06/2019 09:40:44 Note: BOLD=Out of Limits, ITALIC=Special Appl, BOLD=Review Base: 14.70 psia, 60.0 F Page: 3 of 3
File: C:\Users\cmyers\Fortive\ANGI Sales - Documents\SyncData\Chris\CUSTOMERS\City of Fort
Collins\City of Fort Collins Run.run
CNG/GNC Case:3 - Pkg:1
05/06/2019 09:40:44 Note: BOLD=Out of Limits, ITALIC=Special Appl, BOLD=Review Base: 14.70 psia, 60.0 F Page: 2 of 3
File: C:\Users\cmyers\Fortive\ANGI Sales - Documents\SyncData\Chris\CUSTOMERS\City of Fort
Collins\City of Fort Collins Run.run
CNG/GNC Case:2 - Pkg:1
05/06/2019 09:40:44 Note: BOLD=Out of Limits, ITALIC=Special Appl, BOLD=Review Base: 14.70 psia, 60.0 F Page: 1 of 3
File: C:\Users\cmyers\Fortive\ANGI Sales - Documents\SyncData\Chris\CUSTOMERS\City of Fort
Collins\City of Fort Collins Run.run
CNG/GNC Case:1 - Pkg:1
replacement of any warranted goods or any parts do not extend the initial
warranty period of the warranted goods and any repaired or replacement parts
are not separately warranted. For warranty issues, contact: ANGI Energy
Systems LLC, Customer Service, 305 W Delavan Dr., Janesville, WI 53546;
Toll Free 800 934 5219; Phone 608 563 2800; Fax 608 531 2635; Email
service@angienergy.com.
3. Failure to Repair. If ANGI is unable to repair warranted goods after a
reasonable number of attempts, ANGI will provide, at its option, (i) new or
used replacement goods provided Buyer returns the non-conforming goods;
or (ii) a refund of the purchase price of the unrepaired component,
depreciated in accordance with standard accounting principles.
4. Warranty Exceptions. This Warranty Policy does not cover failure of
warranted goods resulting from: (i) accident, abuse, misuse, neglect,
overloading or any other use not in accordance with ANGI’s
recommendations, accompanying documentation, published
specifications, and standard industry practice; (ii) fire, flood, lightning or
any other act of God, Buyer or third party; (iii) acid rain, rail dust, salt
spray, caustic cleaners, chemicals or solvents, salt air conditions, and other
environmental factors that may accelerate rust, oxidation or corrosion of
metal components; (iv) Buyer’s failure to provide power, air, supplies,
storage conditions, or an operating environment that conforms to ANGI’s
accompanying documentation and published specifications; (v) failure to
follow the maintenance procedures in ANGI’s accompanying
documentation or published specifications or failure to maintain and
provide ANGI with maintenance records verifying Buyer followed proper
maintenance procedures; (vi) installation, repair, service or modification to
the goods by anyone other than ANGI or its authorized representatives;
(vii) the goods or any part thereof being used or coming into contact with
any equipment, parts, supplies or consumables not manufactured,
distributed, or approved by ANGI; (viii) any products attached to the goods
not manufactured, distributed or approved by ANGI; (ix) Buyer’s
noncompliance with applicable codes and safety rules, such as NFPA-52
Vehicular Gaseous Fuel Systems Code (and all other standards and codes
referenced therein), NFPA-70 – Article 500 National Electrical Code,
ASME Boiler and Pressure Vessel Code Section VIII, ANSI/ASME B31.3
Process Piping and ANSI/IAS NGV 4.1 CSA 12.5 NGV Dispensing
Systems; and (x) installation or use at a site that is not compliant with all
applicable laws, regulations, codes, and standard safety requirements. This
Warranty Policy covers only goods owned, leased or otherwise held only
by the initial end user at all times and excludes any goods that are or have
been in the possession of a third party. Unless prohibited by law, this
Warranty Policy only covers goods located in the same country from which
the goods were initially purchased from ANGI. ANGI in its sole but
reasonable discretion will determine whether these exceptions apply.
5. Warranty Disclaimer. THESE WARRANTIES ARE GIVEN SOLELY
TO BUYER (PARTY PURCHASING WARRANTED GOODS OR
SERVICES DIRECTLY FROM ANGI). TO THE EXTENT
PERMITTED BY LAW, THESE WARANTIES ARE IN LIEU OF ALL
OTHER WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING
BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF
MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE
AND NON-INFRINGEMENT. NO EMPLOYEE OR AGENT OF ANGI
IS AUTHORIZED TO GIVE ANY ADDITIONAL WARRANTIES,
OTHER THAN AN OFFICER OF ANGI WHEN DOING SO IN
WRITING. IF LOCAL LAWS REQUIRE ADDITIONAL
WARRANTIES TO BE PROVIDED TO BUYER, SUCH
WARRANTIES ARE INCORPORATED INTO THIS WARRANTY
POLICY ONLY TO THE EXTENT REQUIRED BY LAW. ANY
PARTICULAR TERM IN THIS WARRANTY POLICY THAT IS
PROHIBITED BY LOCAL LAW IS HEREBY NULLIFIED TO THE
EXTENT REQUIRED BY LAW.
6. Liability and Remedies. IN NO EVENT WILL ANGI BE LIABLE FOR
ANY INDIRECT, SPECIAL, INCIDENTAL OR CONSEQUENTIAL
DAMAGES BASED UPON BREACH OF ANY WARRANTY,
BREACH OF CONTRACT, NEGLIGENCE, STRICT TORT, OR ANY
OTHER LEGAL THEORY. ANGI’S MAXIMUM LIABILITY WILL
NOT EXCEED THE PRICE OF THE GOODS OR SERVICES
FURNISHED BY ANGI GIVING RISE TO THE CLAIM. THIS
WARRANTY POLICY CONTAINS BUYER’S EXCLUSIVE
REMEDIES AND ANGI’S SOLE OBLIGATIONS FOR ANY BREACH
OF THIS WARRANTY POLICY. NO OTHER REMEDIES,
OBLIGATIONS, LIABILITIES, RIGHTS, OR CLAIMS, WHETHER
ARISING IN TORT, NEGLIGENCE, STRICT LIABILITY OR
OTHERWISE, ARE AVAILABLE.
State of Wisconsin. Any action for loss or damage with respect to the
goods or services which are the subject of this contract must be
commenced by Buyer within one year from the date of delivery of such
goods or services or such claim shall be forever barred.
15. Compliance with Laws/Anti-Corruption. Buyer shall comply
fully with all applicable laws, rules and regulations, including without
limitation those of the United States and any and all other jurisdictions
globally (“Laws”) that apply to Buyer’s business activities in connection
with its purchase of goods from Seller. Specifically, Buyer shall comply
with all Laws relating to anti-corruption, bribery, extortion, kickbacks,
or similar matters that are applicable to Buyer’s business activities in
connection with this Agreement, including without limitation the U.S.
Foreign Corrupt Practices Act and the UK Bribery Act. Buyer will take
no action that will cause Buyer or Seller or any of their affiliates to
violate any such laws.
16. Entire Agreement. Unless otherwise agreed in a writing signed
by Seller and Buyer, these Terms and Conditions constitute the entire
agreement between the parties, there being no other promises, terms,
conditions, or obligations, referring to the subject matter not contained
herein. If any term or provision of this contract shall to any extent be
invalid or unenforceable, the remainder of the contract shall not be
affected thereby, and each term and provision of this contract shall
continue to be valid and enforced to the fullest extent permitted by law.
Any modifications hereto shall be in writing and signed by both parties.
150831_ANGI Energy Systems Tcs Of Sales-ANGI Products
Page 2 of 2
Delivery to their Place of Destination. Legal title to the goods shall pass
to Buyer at the Point of Delivery.
(b) Sales outside of U.S. Delivery terms and pricing for export
sales are FCA (Incoterms 2010) Seller’s Dock, ANGI Factory Janesville,
WI (“Point of Delivery”) unless otherwise agreed to in writing by Seller.
Seller shall arrange for transportation of the goods ordered by an
appropriate means of transportation and pay all inland freight charges
from Point of Delivery to the first USA port of export unless otherwise
agreed to in writing by Seller. Buyer shall arrange for applicable
insurance covering the goods during transit to their destination. Where
Buyer requires special delivery requirements, any special expense is to
be borne by the Buyer, including special handling, packaging and
additional freight charges. When “export packing” is required, any extra
charges such as export duties, licenses, fees and the like shall be borne
by Buyer. Risk of loss of or damage to the goods or any part of the
goods shall pass to the Buyer upon delivery to carrier at the Point of
Delivery, and Buyer shall have the responsibility of filing any damage
claims with the carrier. This order is subject to Seller’s ability to obtain
export licenses and other necessary papers within a reasonable period.
Buyer will furnish all Consular and Customs declarations and will
accept and bear all responsibility for penalties resulting from errors or
omissions thereon. Buyer shall not re-export the goods or items which
incorporate the goods if such re-export would violate applicable export
laws. Legal title to the goods shall pass to Buyer at the Point of
Delivery, except for sales to Canada or Central or South America
(excluding Mexico), in which case legal title to the goods shall pass to
Buyer when the goods cross an international border (including without
limitation entering international waters), or at such later point as may be
agreed to in writing by Seller.
4. Installation. Unless otherwise specified in writing on a quotation
provided by an authorized representative of Seller, Buyer assumes
responsibility for installation. Seller agrees to make installation and on-
site technical support services available at Seller’s then-prevailing rates,
unless otherwise specified in an initial purchase order or contract
proposal.
5. Maintenance. Buyer assumes responsibility for maintenance on
the goods sold to Buyer. Seller agrees, however, to make maintenance
services available at its then-prevailing rates.
6. Warranties. Seller warrants its equipment parts and supplies in
accordance with its standard warranty policies. A written copy of these
policies accompanies these terms and conditions or is available upon
request. THESE WARRANTIES ARE EXCLUSIVE AND ARE IN
LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED,
INCLUDING BUT NOT LIMITED TO THE IMPLIED
WARRANTIES OF MERCHANT ABILITY, FITNESS FOR A
PARTICULAR PURPOSE AND NON- INFRINGEMENT. NO
EMPLOYEE OR AGENT OF SELLER, OTHER THAN AN OFFICER
OF SELL, IS AUTHORIZED TO MAKE ANY WARRANTY IN
ADDITION TO THE FORGOING.
7. Limitation of Buyers Remedies. IN NO CASE SHALL SELLER
BE LIABLE FOR ANY SPECIAL, INDIRECT, INCIDENTAL,
CONSEQUENTIAL OR PUNITIVE DAMAGE BASED UPON
BREACH OF WARRANTY, BREACH OF CONTRACT,
NEGLEGENCE, STRICT TORT, OR ANY OTHER LEGAL,
EQUITABLE, OR STATUTORY CLAIM, CAUSE OF ACTION, OR
LEGAL THEORY. IN ANY EVENT, SELLER SHALL BE SOLELY
LIABLE FOR ACTUAL DAMAGES CAUSED BY SELLER’S
BREACH AND SELLER’S MAXIMUM LIABILITY HEREUNDER,
REGARDLESS OF THE LEGAL THEORY, SHALL NOT EXCEED
THE CONTRACT PRICE OF THE GOODS FURNISHED BY
SELLER.
8. Sellers Remedies. Without waiving any other rights or remedies
available to it under applicable law or otherwise, Seller may, at its
option, defer shipment or deliveries hereunder or under or pursuant to
any other contract with Buyer, until all past-due accounts of Buyer to
Seller have been satisfied in full. Any rights or remedies of Seller
granted in these Terms and Conditions shall be in addition to and not in
lieu of any other rights or remedies Seller may have at law or in equity.
9. Proprietary Rights. Seller shall retain all rights to designs,
drawings, patterns, plans, specifications, technology, technical data and
information, technical processes and business methods, whether
patentable or not, arising out of or evolving as a result of Seller
rendering engineering services to and designing systems and goods for
Buyer’s use. Buyer agrees not to enforce against Seller or customers of
Seller any patent rights, the scope of which includes a system, process or
business method utilizing goods or engineering services delivered
150831_ANGI Energy Systems Tcs Of Sales-ANGI Products
Page 1 of 2
crease employee morale.
CGRS has not received any OSHA citations on any
jobsite in the last three years. CGRS’s OSHA record-
able accident rate for 2019 year-to-date is 0.96, and
the current workman’s compensation Experience
Modification Rate (EMR) rate year-to-date is 0.00.
Both rates for the last three years are:
Our people are our greatest asset, and we believe our
team is what sets us apart from others. CGRS takes
pride in hiring talented individuals who convey our core
Our Logo
reflected in our detailed Health and Safety Program,
head by our Health and Safety Manager Mike Byers.
The specific objectives of our Health and Safety Pro-
gram are to monitor the health of CGRS personnel,
train CGRS employees in the use of personal protec-
tive equipment, and to minimize employee and public
exposure to hazards at all sites. CGRS promotes worker
welfare through our corporate safety program and the
development and implementation of site-specific health
and safety plans. CGRS also implements Anti-Drug and
Alcohol Misuse Prevention Plans in accordance with 49
CFR parts 199 and 40. CGRS is fully aware and compli-
ant with regulations as presented in Federal 29 CFR
1910.120.
owners and operators in the upstream and downstream
petroleum industry.
Over time, we have diversified to meet our ever-evolving
customer needs by becoming experts in the markets of
Natural Resources/Environmental, Liquid and CNG
Fueling, Oil & Gas, and Water and Waste Water. Our
service offerings are multifaceted and include:
Compliance