Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 8197 SMALL LANDSCAPE & IRRIGATION ANNUAL (20)WORK ORDER FORM PURSUANT THE TO KORBY A CITY MASTER LANDSCAPE OF AND FORT AGREEMENT COLLINS LLC BETWEEN WORK ORDER NUMBER: PROJECT TITLE: 02-Korby-400903715-2019 Lee Martinez Improvements Irrigation Repair and Landscape Restoration ORIGINAL BID/RFP NUMBER & NAME: ANNUAL 8197 SMALL LANDSCAPE & IRRIGATION MASTER AGREEMENT EFFECTIVE DATE: June 15, 2014 WORK ORDER COMMENCEMENT DATE: June 31 2019 WORK ORDER COMPLETION DATE: June 24, 2019 MAXIMUM FEE: (time and reimbursable direct costs): $14,476 PROJECT meetings DESCRIPTION/and restore irrigation SCOPE and OF landscaping SERVICES: due Improvements to sidewalk construction include conducting as necessary. onsite of Upon services project does completion not include to be reviewed authorization by contractor to deviate and from City the engineering approved staff. location The without scope approval from engineering project manager. Service accordance Provider with agrees the terms to perform and conditions the services contained identified herein above and and in on the the Master attached Agreement forms in between Agreement the and parties. this Work In the Order event (of including a conflict the between attached or ambiguity forms) the in Master the terms Agreement of the Master shall control. The by this attached reference, forms and consisting Notice of to l Proceed (two) page(is s) hereby are hereby given accepted after all parties and incorporated have signed herein, this document. SERVICE PROVIDER: � "it Kyle rby, f?,,. Ow � r ACCEPTANCE:� � Brad Buckman, Project Manager REVIEWED: krtCollins � Otyof Elliot Dale, Senior Buyer Work Order Form Date: _fo_l--.· 3--"-· 1 ....... 9 __ Date: _6_- /_Y_-____ ( 'j_ Date: ------- Official Putthasing Foon LasJ updated 10/2017 6/19/19 Korby Landscape LLC 2406 E COUNTY RD 60 WELLINGTON, CO 80549-1614 970-232-1127 info@korbysod.com Estimate ADDRESS KARI CRAVEN PO BOX 580 FT COLLINS, CO 80522 SHIP TO KARI CRAVEN PO BOX 580 FT COLLINS, CO 80522 ESTIMATE # DATE 20967 06/12/2019 DATE QTY ACTIVITY DESCRIPTION RATE AMOUNT 06/12/2019 Martinez Park Repairs ADA Sidewalk 2019 ( Repair 3 LATERALS DAMAGED ) 06/12/2019 3,500 Bluegrass Sod Installed Bluegrass Sod Per Sqft City of Fort Collins Small Landscape Contract 0.70 2,450.00 06/12/2019 4,700 Soil Prep City of Fort Collins Small Landscape Soil Preparation Per SF 0.20 940.00 06/12/2019 42 Compost City of Fort Collins Small Landscape Compost/Top Soil per CY for City of Fort Collins Small Landscape 32.00 1,344.00 06/12/2019 32 Certified Tech Landscape City of Fort Collins Small Landscape Certified Landscape Tech Per Hour 56.00 1,792.00 06/12/2019 34 City of Fort Collins Small Landscape Irrigation Labor Irrigation Tech per Hour 50.00 1,700.00 06/12/2019 24 City of Fort Collins Small Landscape Labor Landscape Labor for City of Fort Collins Small Landscape 50.00 1,200.00 06/12/2019 1.50 Crew Foreman/Supervisor City of Fort Collins Per Hour Crew Foreman/Supervisor 50.00 75.00 06/12/2019 1 Irrigation Parts General Irrigation Parts Replacement of Heads, Laterals, Swing Joints and Tie ins 4,975.00 4,975.00 TOTAL $14,476.00 Accepted By Accepted Date