HomeMy WebLinkAboutCORRESPONDENCE - BID - 8197 SMALL LANDSCAPE & IRRIGATION ANNUAL (20)WORK ORDER FORM
PURSUANT THE TO KORBY A CITY MASTER LANDSCAPE OF AND FORT AGREEMENT COLLINS LLC BETWEEN
WORK ORDER NUMBER:
PROJECT TITLE:
02-Korby-400903715-2019 Lee Martinez
Improvements Irrigation Repair and Landscape Restoration
ORIGINAL BID/RFP NUMBER & NAME: ANNUAL 8197 SMALL LANDSCAPE & IRRIGATION
MASTER AGREEMENT EFFECTIVE DATE: June 15, 2014
WORK ORDER COMMENCEMENT DATE: June 31 2019
WORK ORDER COMPLETION DATE: June 24, 2019
MAXIMUM FEE: (time and reimbursable direct costs): $14,476
PROJECT meetings DESCRIPTION/and restore irrigation SCOPE and OF landscaping SERVICES: due Improvements to sidewalk construction include conducting as necessary. onsite
of Upon services project does completion not include to be reviewed authorization by contractor to deviate and from City the engineering approved staff. location The without scope
approval from engineering project manager.
Service accordance Provider with agrees the terms to perform and conditions the services contained identified herein above and and in on the the Master attached Agreement forms in
between Agreement the and parties. this Work In the Order event (of including a conflict the between attached or ambiguity forms) the in Master the terms Agreement of the Master shall
control.
The by this attached reference, forms and consisting Notice of to l Proceed (two) page(is s) hereby are hereby given accepted after all parties and incorporated have signed herein, this
document.
SERVICE PROVIDER: �
"it
Kyle rby, f?,,. Ow � r
ACCEPTANCE:� �
Brad Buckman, Project Manager
REVIEWED:
krtCollins � Otyof
Elliot Dale, Senior Buyer
Work Order Form
Date: _fo_l--.· 3--"-· 1 ....... 9 __
Date: _6_- /_Y_-____ ( 'j_
Date: -------
Official Putthasing Foon
LasJ updated 10/2017
6/19/19
Korby Landscape LLC
2406 E COUNTY RD 60
WELLINGTON, CO 80549-1614
970-232-1127
info@korbysod.com
Estimate
ADDRESS
KARI CRAVEN
PO BOX 580
FT COLLINS, CO 80522
SHIP TO
KARI CRAVEN
PO BOX 580
FT COLLINS, CO 80522
ESTIMATE # DATE
20967 06/12/2019
DATE QTY ACTIVITY DESCRIPTION RATE AMOUNT
06/12/2019 Martinez Park Repairs ADA Sidewalk
2019 ( Repair 3 LATERALS DAMAGED )
06/12/2019 3,500 Bluegrass Sod
Installed
Bluegrass Sod Per Sqft City of Fort Collins
Small Landscape Contract
0.70 2,450.00
06/12/2019 4,700 Soil Prep City of
Fort Collins Small
Landscape
Soil Preparation Per SF 0.20 940.00
06/12/2019 42 Compost City of
Fort Collins Small
Landscape
Compost/Top Soil per CY for City of Fort
Collins Small Landscape
32.00 1,344.00
06/12/2019 32 Certified Tech
Landscape City of
Fort Collins Small
Landscape
Certified Landscape Tech Per Hour 56.00 1,792.00
06/12/2019 34 City of Fort Collins
Small Landscape
Irrigation Labor
Irrigation Tech per Hour 50.00 1,700.00
06/12/2019 24 City of Fort Collins
Small Landscape
Labor
Landscape Labor for City of Fort Collins
Small Landscape
50.00 1,200.00
06/12/2019 1.50 Crew
Foreman/Supervisor
City of Fort Collins
Per Hour Crew Foreman/Supervisor 50.00 75.00
06/12/2019 1 Irrigation Parts
General
Irrigation Parts Replacement of Heads,
Laterals, Swing Joints and Tie ins
4,975.00 4,975.00
TOTAL $14,476.00
Accepted By Accepted Date