HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9191053Korby Landscape LLC
2406 E COUNTY RD 60
WELLINGTON, CO 80549-1614
970-232-1127
info@korbysod.com
Estimate
ADDRESS
CRAIG KISLING
SHIP TO
CRAIG KISLING
Twin Silos Creek Play
ESTIMATE # DATE
20914 02/14/2019
DATE QTY ACTIVITY DESCRIPTION RATE AMOUNT
02/14/2019 Play Landscape Estimate 2019 For Twin
Silos Park
02/14/2019 32 City of Fort Collins
Small Landscape
Labor
Landscape Labor for City of Fort Collins
Small Landscape For Site Demo and
Grubbing
50.00 1,600.00
02/14/2019 4,877 Soil Prep City of
Fort Collins Small
Landscape
Soil Preparation Per SF 0.20 975.40
02/14/2019 20 Compost City of
Fort Collins Small
Landscape
Compost per CY for City of Fort Collins
Small Landscape
32.00 640.00
02/14/2019 58 Concrete Curbing
Installed
Concrete Curbing Installed Per LF 25.00 1,450.00
02/14/2019 545 Crusher Fines
Installed Per Sqft
Crusher Fines Installed Per SF 1.85 1,008.25
02/14/2019 4,877 Bluegrass Sod
Installed
Bluegrass Sod Per Sqft City of Fort Collins
Small Landscape Contract
0.70 3,413.90
02/14/2019 72 City of Fort Collins
Small Landscape
Irrigation Labor
Irrigation Labor to Add Turf Zone 50.00 3,600.00
02/14/2019 1 Irrigation Parts
General
Irrigation Parts ( 1 Valve, Decoder,
Leemco Fittings, Laterals Spray Heads)
3,700.00 3,700.00
02/14/2019 1 Flag Stone
Dimensionally Cut
Dimensionally Cut Flag Stone Placed Per
Ton
1,250.00 1,250.00
02/14/2019 18 City of Fort Collins
Small Landscape
DATE QTY ACTIVITY DESCRIPTION RATE AMOUNT
Materials ( 1.5"
Grey Rock Per Ton)
02/14/2019 50 1 Gallon
Shrub/Grass
1 Gallon Shrub or Grass Installed 27.50 1,375.00
02/14/2019 5 City of Fort Collins
Natural Mulch
Placed
City of Fort Collins Natural Mulch Placed
CY
40.00 200.00
02/14/2019 38 City of Fort Collins
Small Landscape
Labor
Landscape Labor for City of Fort Collins
Small Landscape for installing perforated
pipe and hand digging under concrete
curbing
50.00 1,900.00
TOTAL $22,692.55
Accepted By Accepted Date
Labor
Landscape Labor for City of Fort Collins
Small Landscape for cutting/stablizing
steps for flagstone path
50.00 900.00
02/14/2019 Install Approx 130 ft of Perf Pipe for
Drainage around Deck and Daylight in
Creek
02/14/2019 130 Irrigation Parts
General
Perforated Pipe 130 FT and Parts 3.50 455.00
02/14/2019 4.50 Landscape Pea Gravel Per Ton 50.00 225.00