HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8073 ENGINEERING SERVICES FOR WATER, WASTEWATER & STORMWATER FACILITIES CAPITAL IMPROVEMENTS PROJECTS (6)Change Order Form (for Work Orders) Official Purchasing Form Last updated 10/2017 CHANGE ORDER NO. 1 PROJECT TITLE: Cathodic Protection AB Water Line Design and Repairs CONTRACTOR: HDR Engineering, Inc WORK ORDER NUMBER: HDR-SCP-CPABDesign-082018 PO NUMBER: 9185133 DESCRIPTION: 1. Reason for Change: Cost increase and time extension 2. Description of Change: Additional time and funds are needed to complete additional design scope items including a radio path ground study and report for the SCADA antenna design as well as CP 101 presentation and preparation for City Utility staff and management, corrosion engineer site inspections and testing, coordination of survey and utility work at the Timberline location, and initiation of submittal review and log preparation 3. Change in Work Order Price: $7,800.00 4. Completion Date (if changed): June 30, 2019 ORIGINAL WORK ORDER PRICE $ 150,485.00 TOTAL APPROVED CHANGE ORDER 00.00 TOTAL PENDING CHANGE ORDER 00.00 TOTAL THIS CHANGE ORDER $ 7,800.00 TOTAL % OF THIS CHANGE ORDER 5.18 % TOTAL C.O.% OF ORIGINAL WORK ORDER 5.18 % ADJUSTED WORK ORDER COST $ 158,285.00 CONTRACTOR: HDR Engineering, Inc. By: Date: Name: Title: ACCEPTANCE: Date: Susan Paquette, Civil Engineer III REVIEWED: Date: Marisa Donegon, Buyer II ACCEPTANCE: Date: Matt Fater, Director, Civil Engineering DocuSign Envelope ID: 2E93D001-D67C-42BE-80D3-0A664F9BF957 May 29, 2019 May 31, 2019 Brad Martin Senior Vice President May 29, 2019 May 31, 2019 Change Order Form (for Work Orders) Official Purchasing Form Last updated 10/2017 ACCEPTANCE: Date: Andrew Gingerich, Director, Water Field Operations ACCEPTANCE: Date: Theresa Connor, Deputy Director, Water Engineering & Field Services ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) DocuSign Envelope ID: 2E93D001-D67C-42BE-80D3-0A664F9BF957 May 31, 2019 May 31, 2019