CORRESPONDENCE - BID - 8320 ASPHALT OVERLAY PROJECT (5)
Change Order #1 Backup 103.03 Bond Procurement and Mobilization 1 Lump Sum $59,000.00 $ 59,000.00 1 $59,000.00 202.01 Planing and Surface Preparation: Depth < or = 3" (Min Drum Width 70") 147,000 Square Yard $3.40 $ 499,800.00 $ - 147,000 $499,800.00 202.02 Planing and Surface Preparation: Depth > 3" and < or = 5" (Min Drum Width 70") 12,000 Square Yard $4.35 $ 52,200.00 $ - 12,000 $52,200.00 202.04 Taper Planing Adjacent to Gutter - Min Drum Width 70" 112,000 Lineal Foot $2.50 $ 280,000.00 $ - 112,000 $280,000.00 202.06 Skid Steer Style Milling < or = 3" - Drum Width 18-24" 500 Square Yard $6.50 $ 3,250.00 $ - 500 $3,250.00 202.07 Skid Steer Style Milling - Additional Inch Thickness 200 Square Yard/Per Inch $0.65 $ 130.00 $ - 200 $130.00 202.08 Additional Saw Cutting of Asphalt - Min Depth 3" 1,000 Lineal Foot $2.10 $ 2,100.00 $ - 1,000 $2,100.00 203.01 General Excavation - Less Than 100 CY 250 Cubic Yard $26.78 $ 6,695.00 $ - 250 $6,695.00 203.04 Borrow (Complete in Place) - Less Than 100 Ton 50 Ton $41.00 $ 2,050.00 $ - 50 $2,050.00 203.06 Borrow (Shouldering - Complete in Place) 3/4" Minus RAP 500 Lineal Foot $1.62 $ 810.00 $ - 500 $810.00 208.01 Rock Wattle 100 Lineal Foot $3.59 $ 359.00 $ - 100 $359.00 208.02 Crumb Rubber Wattle 250 Lineal Foot $12.65 $ 3,162.50 $ - 250 $3,162.50 208.04 SWMP Maintenance Log - 14 Day Inspection 10 Each $200.00 $ 2,000.00 $ - 10 $2,000.00 210.02 Adjust Valve Box 150 Each $172.00 $ 25,800.00 $ - 150 $25,800.00 210.03 Adjust Valve Box with Ring 10 Each $76.69 $ 766.90 $ - 10 $766.90 210.04 Adjust Valve Box-Tyler 6860 Series, Item R 69, Screw Type Adjustable Riser 10 Each $96.00 $ 960.00 $ - 10 $960.00 210.05 Adjust and Replace Top Section of Valve Box 10 Each $341.00 $ 3,410.00 $ - 10 $3,410.00 210.09 Total Valve Box Replacement, Tyler 6860 Series, 30" Bottom Section 5 Each $520.00 $ 2,600.00 $ - 5 $2,600.00 210.10 Adjust Standard Manhole ≤24" 10 Each $415.00 $ 4,150.00 $ - 10 $4,150.00 210.11 Adjust Special Manhole >24" 10 Each $495.00 $ 4,950.00 $ - 10 $4,950.00 210.12 Adjust Manhole with Ring 10 Each $210.00 $ 2,100.00 $ - 10 $2,100.00 210.13 Adjust Manhole with Locking Ring ≤24" dia, ≤ 3" height 155 Each $219.00 $ 33,945.00 $ - 155 $33,945.00 210.14 Adjust Manhole with Locking Ring ≤24" dia, > 3" height 5 Each $219.00 $ 1,095.00 $ - 5 $1,095.00 210.15 Adjust Manhole with Locking Ring >24" dia, ≤ 3" height 5 Each $235.00 $ 1,175.00 $ - 5 $1,175.00 210.16 Adjust Manhole with Locking Ring >24" dia, > 3" height 5 Each $235.00 $ 1,175.00 $ - 5 $1,175.00 210.17 Arterial Manhole Incentive Achieved 40 $500/Each 0 $ - $ - 40 $0.00 403.02 HMA - Grading SX, (75) 64-22 Binder 500 Ton $74.66 $ 37,330.00 $ - 500 $37,330.00 403.03 HMA - Grading S, (75) 58-28 Binder 500 Ton $72.98 $ 36,490.00 $ - 500 $36,490.00 403.04 HMA - Grading S, (75) 64-22 Binder 16,000 Ton $72.98 $ 1,167,680.00 $ - 16,000 $1,167,680.00 403.05 HMA - Grading S, (75) 64-28 Modified Binder 23,000 Ton $78.60 $ 1,807,800.00 $ - 23,000 $1,807,800.00 403.07 HMA - Grading S 75/100 Hand Patching - Remove & Replace 1,500 Ton $140.57 $ 210,855.00 $ - 1,500 $210,855.00 403.08 HMA Paver Patching - Remove & Replace 1,500 Ton $133.87 $ 200,805.00 $ - 1,500 $200,805.00 403.09 HMA Grading SX, (75) 64-22 Leveling ≤ 50 Tons 100 Tons/Project $76.00 $ 7,600.00 $ - 100 $7,600.00 403.10 HMA Grading SX, (75) 64-22 Leveling: 51 to 100 Tons 100 Tons/Project $76.00 $ 7,600.00 $ - 100 $7,600.00 403.11 HMA Grading SX, (75) 64-22 Leveling: : > 100 Tons 100 Tons/Project $76.00 $ 7,600.00 $ - 100 $7,600.00 Revised Contract Quantities Item No. Item Description Original Total Cost Revised Contract Total Cost Original Contract Quantities Units Original Unit Cost CO1- Change in Quantities CO1- Change in Cost DocuSign Envelope ID: B5D4B703-3FB6-48DC-BC17-558CB1BFC3A9 Revised Contract Quantities Item No. Item Description Original Total Cost Revised Contract Total Cost Original Contract Quantities Units Original Unit Cost CO1- Change in Quantities CO1- Change in Cost 403.12 HMA Grading SX, (75) 64-22 Leveling/Thin Overlay: 150 and Greater 100 Tons/Day $76.00 $ 7,600.00 $ - 100 $7,600.00 403.13 HMA - Speed Humps, Grading S/SX (75) 64-22 150 Square Yard $40.00 $ 6,000.00 $ - 150 $6,000.00 420.01 Geotextile Paving Fabric 100 Square Yard $1.90 $ 190.00 $ - 100 $190.00 420.02 GlassGrid® #8511 - Small Quantity Installation 100 Square Yard $10.23 $ 1,023.00 $ - 100 $1,023.00 627.01 Installation of Thermoplastic 100 Hour $248.00 $ 24,800.00 $ - 100 $24,800.00 627.02 Lead Worker for Striping Layout 150 Hour $49.73 $ 7,459.50 $ - 150 $7,459.50 627.03 Support Workers for Striping Layout 500 Hour $37.61 $ 18,805.00 $ - 500 $18,805.00 627.04 Pavement Marking Paint 860 Gallon $75.00 $ 64,500.00 $ - 860 $64,500.00 627.05 Pavement Mark Removal 4in (Surface Grinding) 500 Square Foot $6.29 $ 3,145.00 $ - 500 $3,145.00 627.06 6 Inch White Line (Thermo) 1,880 Lineal Foot $5.85 $ 10,998.00 $ - 1,880 $10,998.00 627.07 18 Inch White Line (Thermo) 4,750 Lineal Foot $17.64 $ 83,790.00 $ - 4,750 $83,790.00 627.08 24 Inch White Line (Thermo) 105 Lineal Foot $21.54 $ 2,261.70 $ - 105 $2,261.70 627.09 Speed Bump Stencil (Thermo) 36 Each $162.67 $ 5,856.12 $ - 36 $5,856.12 627.10 Bike Symbol (6 ft) W/ Arrow (Thermo) 80 Each $450.00 $ 36,000.00 $ - 80 $36,000.00 627.11 Right/Left Arrow Stencil (Thermo) 130 Each $357.00 $ 46,410.00 -70 $ (24,990.00) 60 $21,420.00 627.12 8 ft "ONLY" Stencil (Thermo) 2 Each $508.00 $ 1,016.00 $ - 2 $1,016.00 627.13 "RR Kit Narrow" Stencil (Thermo) 4 Each $915.00 $ 3,660.00 $ - 4 $3,660.00 627.14 Temporary Yellow Striping Tape Roll 3 Each Roll $111.00 $ 333.00 $ - 3 $333.00 627.15 Temporary White Striping Tape Roll 3 Each Roll $111.00 $ 333.00 $ - 3 $333.00 627.16 Green Bike Box (Thermo) 120 Square Foot $24.45 $ 2,934.00 $ - 120 $2,934.00 627.17 Green Bike Way Finding Dot and Arrow (Thermo) 5 Each $431.00 $ 2,155.00 $ - 5 $2,155.00 627.18 4 Inch White Line (Thermo) 3,600 Square Foot $11.11 $ 39,996.00 $ - 3,600 $39,996.00 627.19 4 Inch Yellow Line (Thermo) 60 Square Foot $11.11 $ 666.60 $ - 60 $666.60 627.20 Disabled Parking Symbol (Thermo) 15 Each $131.00 $ 1,965.00 $ - 15 $1,965.00 627.21 Bike Sharrow (Thermo) 0 Each $313.50 $ - 70 $ 21,945.00 70 $21,945.00 630.01 Construction Zone Traffic Control Percent 5.75% $ 254,912.24 $ - 5.75% $ 254,912.24 630.02 Variable Message Board 100 Per Each / Per Day $187.50 $ 18,750.00 $ - 100 $18,750.00 630.03 Flagging 7,000 Hour $32.35 $ 226,450.00 $ - 7,000 $226,450.00 630.05 Arterial Road Construction Zone Traffic Control 1 Per Each TCP Per Day Per Project $2,826.00 $ 2,826.00 $ - 1 $2,826.00 630.06 Collector Road Construction Zone Traffic Control 4 Per Each TCP Per Day Per Project $2,480.00 $ 9,920.00 $ - 4 $9,920.00 630.07 Residential Road Construction Zone Traffic Control 12 Per Each TCP Per Day Per Project $2,134.00 $ 25,608.00 $ - 12 $25,608.00 630.08 Mobile Construction Zone Traffic Control 9 Per Hour $208.00 $ 1,872.00 $ - 9 $1,872.00 $ 5,075,766.32 $ (3,045.00) $5,072,721.32 $ 5,389,678.56 $ (3,045.00) $ 5,386,633.56 BID ALTERNATE - 1 -0.06% 2019 Total Cost CONTRACT SUB-TOTAL COST CONTRACT TOTAL WITH TRAFFIC CONTROL AND BOND Item No. Item Description 2019 Contract Quantities Revised Contract Quantities Item No. Item Description Original Total Cost Revised Contract Total Cost Original Contract Quantities Units Original Unit Cost CO1- Change in Quantities CO1- Change in Cost 202.03 Planing Surface Preparation: Depth > 5" and < or = 10" (Min Drum Width 70") 1,000 Square Yard $7.96 $ 7,960.00 202.05 Milling Support - Labor, Equipment, Materials 30 Hour $790.00 $ 23,700.00 203.02 General Excavation - Over 100 CY 1,000 Cubic Yard $23.00 $ 23,000.00 203.03 Excavation - Muck 1,000 Cubic Yard $24.00 $ 24,000.00 203.05 Borrow (Complete in Place) - Over 100 Ton 105 Ton $42.00 $ 4,410.00 208.03 Silt Fence 50 Lineal Foot $2.22 $ 111.00 210.01 Reset Mailbox 1 Each $257.00 $ 257.00 210.06 Tyler 6850 Series, Item 58, 14" Valve Box Extension (Part Only) 1 Each $66.95 $ 66.95 210.07 Tyler 6860 Series, 16" Valve Box Top Section Without Lid (Part Only) 15 Each $66.95 $ 1,004.25 210.08 Tyler 6860 Series, 26" Valve Box Top Section Without Lid (Part Only) 6 Each $66.95 $ 401.70 306.01 Reconditioning 1,000 Square Yard $5.62 $ 5,620.00 307.01 Class C Fly Ash Treated Subgrade 1,000 Square Yard $9.65 $ 9,650.00 403.01 HMA - Grading SX, (75) 58-28 Binder 1,000 Ton $75.00 $ 75,000.00 403.06 HMA Grading SG, (75) 64-22 Binder 1,000 Ton $66.95 $ 66,950.00 630.04 Night Work Up-Charge 1 Per Night Worked $5,400.00 $ 5,400.00 BID ALTERNATE - 1 CONTRACT COST $ 247,530.90 DocuSign Envelope ID: B5D4B703-3FB6-48DC-BC17-558CB1BFC3A9 Unit DocuSign Envelope ID: B5D4B703-3FB6-48DC-BC17-558CB1BFC3A9