Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8371 ARCHITECTURAL & ENGINEERING SERVICES ON-CALL (8)WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND AU WORKSHOP WORK ORDER NUMBER: PR-600275 PROJECT TITLE: Streets and Traffic Ops Generators ORIGINAL BID/RFP NUMBER & NAME: N/A MASTER AGREEMENT EFFECTIVE DATE: 12/20/2018 WORK ORDER COMMENCEMENT DATE: 05/07/2019 WORK ORDER COMPLETION DATE: 12/31/19 MAXIMUM FEE: (time and reimbursable direct costs): $27 ,000 PROJECT DESCRIPTION/SCOPE OF SERVICES: Project Description: New emergency back­ up generators for the Streets Operations main building, Streets De-icing Command Center and Traffic Operations buildings. Scope of Services: Design services related to the installation of generators at the City of Fort Collins Streets Operations main building, Streets De-icing Command Center and Traffic Operations buildings including electrical engineering, structural engineering, landscaping ad justments and site work. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of seven (Z) pa ge(s) are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. ACCEPTANCE: REVIEWED: ACCEPTANCE: Elliot Dale, Senior Buyer Gerry Paul, Purchasing Director (if greater than $60,000) Work Order Fonn Date: 07 May 2019 Date: o�f O'o /,t.J!) '� Date:------- Date: ______ _ Official Purchasing Form Last updated 10/2017 5/10/19 City of Fort Collins | Streets and Traffic Generators Page 1 01 May 2019 Blake Visser Senior Project Manager City of Fort Collins | Operation Services 300 Laporte Ave. Fort Collins, CO 80522 RE: City of Fort Collins | Streets and Traffic Generators Dear Blake, [au]workshop is pleased to provide you with this proposal for design services related to the installation of generators at the City of Fort Collins Traffic Operations, Streets Facility, and the De-Icing Facility. PROJECT UNDERSTANDING, SCOPE OF WORK AND DELIVERABLES We understand the scope of the project is to provide electrical engineering related to new back-up generators for the Streets and Traffic Facilities and per the attached fee proposal from RJ McNutt & Associates (see below). As discussed with you, [au]workshop will provide services on an hourly basis with the intention of working as quickly and efficiently as possible. We will not exceed the dollar amounts noted in the “Fees and Expenses” paragraph below without prior approval from you. FEES and EXPENSES For tasks described above, we propose a time and reimbursable direct cost basis under this agreement using our standard Hourly Rate Chart (per the Professional Service Agreement). Fee Schedule Design and Construction Phases Total [au]workshop: Traffic Operations $1,500 Streets De-Icing $460 Streets Facility $690 RJ McNutt: Traffic Operations Construction Documents $5,500 Construction Administration $1,200 Total Electrical Engineering Fee: $6,700 Streets De-Icing Construction Documents $4,500 Construction Administration $1,200 Total Electrical Engineering Fee: $5,700 City of Fort Collins | Streets and Traffic Generators Page 2 Streets Facility Construction Documents $4,500 Construction Administration $1,200 Total Electrical Engineering Fee: $5,700 JVA Structural: Traffic Operations Transformer Support Concrete Pad Construction Documents $1,200 Construction Administration $600 Total Structural Engineering Fee: $1,800 Streets De-Icing Transformer Support Concrete Pad Construction Documents $1,200 Construction Administration $600 Total Structural Engineering Fee: $1,800 Streets Facility Transformer Support Concrete Pad Construction Documents $1,200 Construction Administration $600 Total Structural Engineering Fee: $1,800 Integrated Mechanical: Streets Facility Total Mechanical Engineering Fee: $850 Total Fees: Traffic Operations $10,000 Streets De-Icing $7,960 Streets Facility $9,040 Reimbursable Expenses Reimbursable expenses are not anticipated, but if incurred will be in addition to the fees stated above and will be invoiced at their actual cost. Reimbursable fees will be incurred only with prior approval by City of Fort Collins. AGREEMENT By signing below, you agree to the provisions of this proposal. Authorizing services described in this Proposal shall be construed to mean agreement with the Professional Services Agreement executed on 22 December 2016. Should you have any inquiries, please do not hesitate to contact us at your convenience. Sincerely, [au]workshop, llc. Jason Kersley, AIA LEED AP Managing Principal City of Fort Collins | Streets and Traffic Generators Page 3 A G R E E D: By: (signature) ________________________________ Date: ______________________ Printed name: ________________________________ Attachments: None 4645 W. 18th Street, Suite 200 Greeley, CO 80634 970-330-3266 waylon@rjmcnutt.com LETTER OF PROPOSAL April 11, 2019 Mr. Jason Kersley AU Workshop 405 Linden St. Fort Collins, CO 80524 RE: CoFC – Traffic/Streets Generator Additions Dear Mr. Kersley, R.J. McNutt & Associates, LLC is pleased to present our proposal for electrical engineering services. SCOPE OF WORK: Engineer is to perform following services: 1. Site visit of existing conditions (Quantity – 1). 2. Electrical Construction drawings. a. Electrical One-Line Diagram. b. Power plans showing new equipment layout (Traffic Operations Building only). c. Optional Stand-By generator. d. Seal and sign Documents for submission to the local Building Department. e. AutoCAD drafting version 2016 or newer. 3. Attend coordination meetings via telephone/video conference. 4. Electrical Specifications Division 16. 5. Construction Phase. a. Review electrical shop drawings. b. Electrical clarifications, addendums and changes. c. Answer electrical field questions. d. Field observations of electrical work in progress (Quantity – 3). e. Review Operating and Maintenance Manuals as prepared by the electrical contractor. f. As-Built Documents in AutoCAD and PDF format. WORK NOT INCLUDED: 1. Construction Documents in AutoCAD/Revit during bidding, negotiation, and construction phase. Documents not available to Contractor and/or supplier or use in preparing shop drawings or field drawings. 2. Design site visit. 3. Schematic Design Phase. 4. Design Development Phase. 5. Electrical Specifications Division 26. Re: CoFC – Traffic/Streets Generator Additions Page 2 Letter of Proposal April 10, 2019 6. Low Voltage Specifications Division 27, 28. 7. Detailed cost estimates, hire electrical contractor for costing. 8. Attend coordination meetings. 9. Additional construction observations of electrical work in progress as requested by Client. 10. Full time construction observations of electrical work in progress. 11. Electrical service upgrades. 12. Sound system. 13. Security system. 14. Fire Alarm. 15. Telephone equipment, terminations both-ends, jacks and cable. 16. Data equipment, terminations, both-ends, jacks and cable. 17. CATV/CCTV system. 18. Utility coordination. 19. Nurse call. 20. Arc Flash Analysis. 21. 30-day ammeter tests. 22. Security equipment and cable. 23. Electrical snow-melt. 24. Electric heat. 25. Manual drafting. 26. Refrigerated air conditioning. 27. Emergency generator. 28. Harmonic Study or Analysis. 29. Coordination Study. 30. “COPS” Design or analysis. 31. LEED Documentation. 32. Building lightning protection or risk assessment. 33. Electrical pay request. 34. Bid Form, Performance Bond and other mandatory contractual arrangements. 35. Pre-Bid contractor walk through. 36. Advertising for bids. 37. Training of Owner's staff. 38. Electrical Commissioning. 39. Overhead or primary distribution design. 40. Any task not specifically included. PROJECT DESCRIPTION: 1. Project: CoFC – Traffic/Streets Generator Addition 2. Location: Fort Collins, CO 3. Description: a. Traffic Operations Building: Provide power plans showing locations of new equipment. Provide Electrical One-line diagram and all associated calculations to add optional stand- by generator to provide back-up power to the entire service. b. Streets De-Icing Building: Provide Electrical One-Line diagram and all associated calculations to add optional stand-by generator to provide back-up power to the entire service. c. Streets Facility Building: Provide Electrical One-Line diagram and all associated calculations to add optional stand-by generator to provide back-up power to the entire service. Re: CoFC – Traffic/Streets Generator Additions Page 3 Letter of Proposal April 10, 2019 CLIENT COOPERATION: Client agrees to cooperate with Engineer and to furnish the following to Engineer to facilitate performance: 1. Architectural Drawings. 2. AutoCAD/Revit version 2016 or newer: 1/8" scale floor plans and scaled site plans. Progress Architectural PDF included with progress updates. 3. Owner's requests. 4. Progress and final Architectural documents. CHARGES AND PAYMENT: Client agrees to pay Engineer in accordance with the following rates and charges: 1. "SCOPE OF WORK" described previously: Service based on hourly rates, hourly rates as listed below, maximum not to exceed the following: a. Traffic Operatives:  Construction Documents ...................................................... $5,500.00  Construction Administration ................................................ $1,200.00 Total ..................................................................................... $6,700.00 b. Streets De-Icing:  Construction Documents ...................................................... $4,500.00  Construction Administration ................................................ $1,200.00 Total ..................................................................................... $5,700.00 c. Streets Facility:  Construction Documents ...................................................... $4,500.00  Construction Administration ................................................ $1,200.00 Total ..................................................................................... $5,700.00 2. "WORK NOT INCLUDED" (described previously). Additional work will be performed on an hourly basis at the following rates. This work will not be undertaken until we have your written authorization to proceed. These rates will be in effect through December 31, 2019. For work after that time, increase these rates by 5%. 3. Hourly Rates:  Principal ............................................................................................. $125.00  Engineer ............................................................................................. $100.00  Designer ............................................................................................... $85.00  AutoCAD ............................................................................................. $65.00  Clerical ................................................................................................. $50.00 4. Reimbursable expenses as follows where prior approved in writing: a. Incidental expenses toward the execution of this work. b. Overnight mailings. TERMS AND CONDITIONS: Refer to 8371 Architectural and Engineering Services On-Call Agreement for detailed proposal service requirements and limitations. Re: CoFC – Traffic/Streets Generator Additions Page 4 Letter of Proposal April 10, 2019 Respectfully submitted, Waylon M. Cash, PE Vice President R. J. McNutt & Associates, LLC Approved and accepted this ________day of _____________, 2019 By _________________________________ Client Please sign and return one copy.