Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9190849 (2)Contract No.: SCO1-18 Date Prepared: 4/3/2019 Buying Agency: Contractor: Contact Person: Prepared By: Phone: Phone: Fax: Fax: Email: Email: Product Code: Description: Cost Cost $22,229.00 $6,429.00 $23,896.00 $2,563.00 Subtotal B: $ 55,117.00 Cost Cost $1,173.00 $1,528.00 $1,746.00 Subtotal C: $ 4,447.00 8% D. Total Cost before any other applicable Charges, Trade-Ins, Allowances, Discounts, Etc. (A+B+C) 1 59564 = Subtotal D: $ 59,564.00 Cost Cost ($6,815.70) Subtotal E: -6815.7 $ 52,748.30 Subtotal From Additional Sheet(s): Chevron Tires for SPR Description LH323 HPL Dual Lighthead LH323-1 Trilight Lighthead Description Subtotal From Additional Sheet(s): Quantity Ordered: Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit For this transaction the percentage is: Price plus Published Options (A+B). X Subtotal of A + B + C: E. Trade-Ins / Special Discounts / Other Allowances / Freight / Installation / Miscellaneous Charges Description Delivery Date: 15-30 days F. Total Purchase Price (D+E): less return customer discount Description CONTRACT PRICING WORKSHEET For Standard Equipment Purchases Accessories A. Product Item Base Unit Price Per Contractor's H-GAC Contract: This Worksheet is prepared by Contractor and given to End User. If a PO is issued, both documents MUST be faxed to H-GAC @ 713-993-4548. Therefore please type or print legibly. Robin Guthrie 800-327-7791 ext 224 City of Fort Collins, CO Chris Magana Elxsi dba CUES B. Published Options - Itemize below - Attach additional sheet if necessary - Include Option Code in description if applicable (Note: Published Options are options which were submitted and priced in Contractor's bid.) MZ323 Adapter Tube/cable for OZIII camera MZ300 OZIII camera LED Description Description WS350 Steerable Pipe Ranger with wheels WS308 Electric Lift C. Unpublished Options - Itemize below - Attach additional sheet if necessary (Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)