HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9190758Work Order Form
Official Purchasing Form
Last updated 10/2017
WORK ORDER FORM
PURSUANT TO A MASTER AGREEMENT BETWEEN
THE CITY OF FORT COLLINS ENGINEERING DEPARTMENT
AND
CITY OF FORT COLLINS TRAFFIC OPERATIONS
WORK ORDER NUMBER: 400901750-TRAFFIC-19-01
PROJECT TITLE: Sharp Point/Nancy Gray Signing/Striping
ORIGINAL BID/RFP NUMBER & NAME: N/A
MASTER AGREEMENT EFFECTIVE DATE: N/A
WORK ORDER COMMENCEMENT DATE: April 22, 2019
WORK ORDER COMPLETION DATE: December 31, 2019
MAXIMUM FEE: (time and reimbursable direct costs): $5,045.21
PROJECT DESCRIPTION/SCOPE OF SERVICES: Signing and striping for the Sharp Point /
Nancy Gray Construction Project.
Service Provider agrees to perform the services identified above and on the attached forms in
accordance with the terms and conditions contained herein and in the Master Agreement between
the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement
and this Work Order (including the attached forms) the Master Agreement shall control.
The attached forms consisting of two (2) page(s) are hereby accepted and incorporated herein,
by this reference, and Notice to Proceed is hereby given after all parties have signed this
document.
SERVICE PROVIDER: Date:
Rich Brewbaker, Senior Supervisor, Transportation Ops
ACCEPTANCE: Date:
Caleb Feaver, Project Manager
REVIEWED: Date:
Elliot Dale, Senior Buyer
ACCEPTANCE: Date:
Gerry Paul, Purchasing Director
(if greater than $60,000)
DocuSign Envelope ID: C7E64DB8-B1BE-4897-A645-B1FE803EB0CE
4/22/2019
4/22/2019
4/22/2019
Traffic Operations Itemized Estimate
188012 SHARP POINT EXT. MID POINT TO NANCY GREY
ENGINEERING Caleb Feaver 175501
S&P PROJECT (WFO)
4/19/2019
Customer Name Contact Name Customer Number
Work Order ID Work Order Location
Work Order Description
Estimate Date
Projected Start Date Billable Project
Y
Projected Finish Date
Status
IP
12/05/2017 12/05/2017
Work Order Instructions
Description Hours Regular Overtime Extended Cost
OPERATOR I, TRANSPORTATION OPS 9.00 330.14 0.00 330.14
OPERATOR II, TRANSPORTATION OP 9.00 398.66 0.00 398.66
SR SUPERVISOR, TRANSPORTN OPS 3.00 187.43 0.00 187.43
SR TECH, TRANSPORTATION OPS 3.00 147.15 0.00 147.15
UTILITY WORKER- STRTS/TRAFFIC 3.00 101.67 0.00 101.67
Total Estimated Labor 1,165.05
Labor
Description Quantity Cost Per Unit Extended Cost
24" WHITE ROLL 125 MIL (THERMO) 80.00 7.72 617.76
36" Stop signs (9 SQFT) 1.00 48.32 48.32
6' X 2' BIKE STRAIGHT ARROW 125 MIL (THERMO) 5.00 45.88 229.39
6' X 3'4" BIKE SYMBOL 125 MIL (THERMO) 5.00 116.99 584.94
Keep Right Sym. HI 24" x 36" (6 SQFT) 2.00 32.21 64.43
NARROW RR KIT 125MIL (THERMO) 2.00 338.73 677.46
RR 36" ROUND HI (9 SQFT) 2.00 48.32 96.64
SNS 58" X 12" HI .063 (9.68 SQFT) 2.00 55.69 111.38
Telespar 10' x 2" Post 7.00 27.87 195.10
Telespar 3' x 2.25" Stub 7.00 9.46 66.25
WHITE LATEX HIGH BUILD PAINT 30.00 13.51 405.21
YELLOW LATEX HIGH BUILD PAINT 15.00 13.51 202.61
Yellow 9 Ball 18" x 18" HI (2.25 SQFT) 2.00 12.08 24.15
Total Estimated Material 3,323.63
$3,323.63
Materials
Description Hours Cost Per Hour Extended Cost
LARGE STRIPER 3.00 114.40 343.20
TRUCK 2002 CHEVY FLATBED 3.00 23.40 70.20
2012 ISUZU SIGN TRUCK 3.00 37.05 111.15
X-WALK CREW TRAILER 3.00 10.66 31.98
Total Estimated Equipment Cost 556.53
Equipment
Page 1 of 2
DocuSign Envelope ID: C7E64DB8-B1BE-4897-A645-B1FE803EB0CE
Labor
Materials
Equipment
Total
Summary For Work Order 188012
$1,165.05
$3,323.63
$556.53
$5,045.21
Please Note - This is an estimate only - additional expenses may be necessary to complete the work.
Page 2 of 2
DocuSign Envelope ID: C7E64DB8-B1BE-4897-A645-B1FE803EB0CE