WORK ORDER
PURSUANT TO A MASTER AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
CONNELL RESOURCES, INC
WORK ORDER NUMBER: UCR-2019-01
PROJECT TITLE: U1700 Blk Riverside Ave WMR
ORIGINAL BID/RFP NUMBER & NAME: U8106, Utility Infrastructure Construction
Services for Water, Wastewater and
Stormwater Facilities Capital Improvements
MASTER AGREEMENT EFFECTIVE DATE: UAugust 17, 2015
ARCHITECT/ENGINEER: UMichael Baker International
OWNER’S REPRESENTATIVE: UAndrew Gingerich
WORK ORDER COMMENCEMENT DATE: UApril 16, 2019
WORK ORDER COMPLETION DATE: UApril 26, 2019
MAXIMUM FEE: (time and reimbursable direct costs): $U76,953.00
PROJECT DESCRIPTION/SCOPE OF SERVICES: UBore 362 L.F. of 8" PVC Terrabrute waterline
underneath Spring Creek east of Riverside Bridge and complete tie-in to City system, pressure
test and backfill. See attached supporting documentation.
Service Provider agrees to perform the services identified above and on the attached forms in
accordance with the terms and conditions contained herein and in the Master Agreement between
the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement
and this Work Order (including the attached forms) the Master Agreement shall control.
The attached forms consisting of UfourU (4) pages are hereby accepted and incorporated herein, by
this reference, and Notice to Proceed is hereby given after all parties have signed this document.
SERVICE PROVIDER: Connell Resources, Inc.
By: Date:
Name: Title:
Page 1 of 14
DocuSign Envelope ID: 3A77408B-B0DB-4E03-84EE-28D0ADB3A77B
John Martin Warren Vice President
April 22, 2019
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
OWNER’S ACCEPTANCE & EXECUTION:
This Work Order and the attached Contract Documents are hereby accepted and incorporated
herein by this reference.
ACCEPTANCE: Date:
Andrew Gingerich, Director – Water Field Operations
REVIEWED: Date:
Pat Johnson, Senior Buyer
APPROVED AS TO FORM: Date:
Name,City Attorney's Title
(if greater than $1,000,000)
ACCEPTANCE: Date:
Theresa Connor, Deputy Director – Water Engineering & Field Services
ACCEPTANCE: Date:
Kevin Gertig, Utilities Executive Director
(if greater than $1,000,000)
ACCEPTANCE: Date:
Gerry Paul, Purchasing Director
(if greater than $60,000)
ACCEPTANCE: Date:
Darin Atteberry, City Manager
(if greater than $1,000,000)
ATTEST: Date:
City Clerk
(if greater than $1,000,000)
Page 2 of 14
DocuSign Envelope ID: 3A77408B-B0DB-4E03-84EE-28D0ADB3A77B
April 19, 2019
April 19, 2019
April 22, 2019
April 22, 2019
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT A
WORK ORDER SCOPE OF SERVICES
Page 3 of 14
DocuSign Envelope ID: 3A77408B-B0DB-4E03-84EE-28D0ADB3A77B
Connell Resources, Inc.
7785 Highland Meadows Pkwy, #100
Fort Collins, CO 80528
Phone: (970) 223-3151
Fax: (970) 223-3191
Estimator: Dan Giesler QUOTATION Date: 4/15/2019
Submitted To: City Of Fort Collins - Utilities Bid Title Epic 8" Main Repair
Address: 700 Wood St. Bid Number: 2191019
Fort Collins, CO 80522 Project Location: Riverside @ Spring Creek
Contact: Andrew Gingerich Project City, State: Fort Collins, CO
Phone: (970) 221-6700 Fax: (970) 221-6619 Engineer/Architect:
Item # Item Description Estimated Quantity Unit Unit Price Total Price
03.182 8" Tie To Existing 2.00 LF $2,567.00 $5,134.00
03.192 8" Gate Valve W/ Box (to Be Used For Testing) 1.00 EACH $1,852.00 $1,852.00
03.198 8" MJ Bends 3.00 EACH $323.00 $969.00
03.204 8" Plug W/ Temp Blow Off For Testing - Supply, Install, 1.00 EACH $3,417.00 $3,417.00
Remove
03.550 Waterline Bore - 8" Terra Brute DR18 PVC Waterline (STA 360.00 LF $130.25 $46,890.00
10+50 To 14+12)(Shale/Cobble)
03.550 Waterline Bore - Shale / Rock - Allowance 360.00 LF $30.05 $10,818.00
03.550 Connell Crew TM Crew - Allowance 1.00 DY $4,450.00 $4,450.00
10.001 Mobilization 1.00 EACH $1,525.00 $1,525.00
10.017 Site Management 0.40 WK $4,745.00 $1,898.00
Total Bid Price: $76,953.00
ACCEPTED:
The above prices, specifications and conditions are satisfactory
and hereby accepted.
Buyer:
Signature:
Date of Acceptance:
CONFIRMED:
Connell Resources, Inc.
Authorized Signature:
Estimator: Dan Giesler
970-223-3151 dgiesler@connellresources.com
4/15/2019 9:45:45 AM Page 1 of 1
Page 4 of 14
DocuSign Envelope ID: 3A77408B-B0DB-4E03-84EE-28D0ADB3A77B
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT B
WORK ORDER COST DETAIL
Page 5 of 14
DocuSign Envelope ID: 3A77408B-B0DB-4E03-84EE-28D0ADB3A77B
Bid Closing Summary
Project Name: Epic 8" Main Repair Customer: City Of Fort Collins - Utilities
Job Number: 2191019 Bid Number: 2191019 Billing Address: 700 Wood St.
Bid As: Fort Collins, CO 80522
Estimator: Dan Giesler Phone: (970) 221-6700
Project Address: Riverside @ Spring Creek, Fort Collins, CO Contact: Andrew Gingerich
Completion Date:
Bid Cost Summary
Calculated Adds/Cuts Target Current
Direct Cost
Indirect Cost
Bond
Total Cost
$66,590.88
$0.00
$0.00
$66,590.88
$0.00
$0.00
$0.00
$0.00
$66,590.88 $66,590.88
$0.00 $0.00
$0.00 $0.00
$66,590.88 $66,590.88
Calculated Adds/Cuts Target Current
Overhead
Profit
Total Markup
$4,661.36
$5,700.18
$10,361.54
$0.00
$0.00
$0.00
$4,661.36
$5,700.18
$10,361.54
$4,661.36
$5,700.76
$10,362.12
Markup and Price Summary
Total Price $76,952.42 $0.00 $76,952.42 $76,953.00
Target Bid Price
Bid Closing Summary
Current Bid Price $76,953.00 $76,952.42 Difference: $0.58 Bid Closing Status: Open Status Changed:
Pay Items
Description Quantity UM Unit Cost Total Cost Unit Price Total Price MU%
Lock Type: Price
03.182 - 8" Tie To Existing 2.00 LF $2,221.33 $4,442.66 $2,567.00 $5,134.00 15.56%
03.192 - 8" Gate Valve W/ Box (to Be Used For Testing) 1.00 EACH $1,603.27 $1,603.27 $1,852.00 $1,852.00 15.51%
03.198 - 8" MJ Bends 3.00 EACH $279.36 $838.09 $323.00 $969.00 15.62%
03.204 - 8" Plug W/ Temp Blow Off For Testing - Supply, Install, 1.00 EACH
Remove
$2,956.77 $2,956.77 $3,417.00 $3,417.00 15.57%
03.550 - Waterline Bore - 8" Terra Brute DR18 PVC Waterline 360.00 LF
(STA 10+50 To 14+12)(Shale/Cobble)
$112.71 $40,576.85 $130.25 $46,890.00 15.56%
03.550 - Waterline Bore - Shale / Rock - Allowance 360.00 LF $26.00 $9,360.00 $30.05 $10,818.00 15.58%
4/15/2019 9:43:57 AM Page 1
Description Quantity UM Unit Cost Total Cost Unit Price Total Price MU%
Lock Type: Price (continued)
03.550 - Connell Crew TM Crew - Allowance 1.00 DY $3,850.66 $3,850.66 $4,450.00 $4,450.00 15.56%
10.001 - Mobilization 1.00 EACH $1,319.86 $1,319.86 $1,525.00 $1,525.00 15.54%
10.017 - Site Management 0.40 WK $4,106.81 $1,642.72 $4,745.00 $1,898.00 15.54%
Totals for Lock Type Price: $66,590.88 $76,953.00 15.56%
Pay Items Total: $66,590.88 $76,953.00 15.56%
4/15/2019 9:43:57 AM Epic 8" Main Repair Page 2
Page 7 of 14
DocuSign Envelope ID: 3A77408B-B0DB-4E03-84EE-28D0ADB3A77B
Cost Component Summary Report
Project Name: Epic 8" Main Repair Customer: City Of Fort Collins - Utilities
Job Number: 2191019 Bid Number: 2191019 Billing Address: 700 Wood St.
Bid As: Fort Collins, CO 80522
Estimator: Dan Giesler Phone: (970) 221-6700
Project Address: Riverside @ Spring Creek, Fort Collins, CO Contact: Andrew Gingerich
Completion Date:
Crew Name Total Quantity UM Average Unit Cost Total Cost
Crew
GC-Mobilization 1.25 DY $1,055.89 $1,319.86
GC-Project Manager 1.00 DY $553.58 $553.58
GC-Site Manager 2.00 DY $534.57 $1,069.14
Waterline Fittings 1.60 DY $4,068.91 $6,510.25
Waterline Fittings > 16" 1.00 DY $4,003.66 $4,003.66
Waterline Pressure Testing 0.50 DY $1,387.85 $690.09
Waterline Trench Exc & Lay W/400 1.99 DY $3,850.66 $7,680.04
Total: $21,826.63
Labor Type Total Quantity UM Average Unit Cost Total Cost
Labor
DR - Lowboy 11.25 HR $37.12 $417.61
Foreman - Utility 52.97 HR $45.21 $2,394.41
LA - Laborer 50.42 HR $28.78 $1,451.07
LA - Pipelayer 91.89 HR $30.07 $2,763.23
OP - Excavator, Large 6.00 HR $41.36 $248.14
OP - Excavator, Small 39.94 HR $41.36 $1,652.01
OP - Loader, Small 45.94 HR $35.79 $1,644.29
PM - Project Manager / Estimator 8.00 HR $59.20 $473.58
PM - Site Manager 16.00 HR $56.82 $909.14
Total: $11,953.49
Equipment Name Total Quantity UM Average Unit Cost Total Cost
Equipment
Compressor W/ Tools 4.48 HR $17.00 $76.08
Excavator KOM 200 / 210 / 228 / 308 26.95 HR $83.00 $2,236.87
Excavator KOM 390 / 400 / 490 14.40 HR $121.00 $1,742.40
Loader CAT 938 41.35 HR $75.75 $3,132.28
Pickup 67.65 HR $10.00 $676.48
Trench Shoring - Bedding Box 32.35 HR $11.00 $355.85
Trench Shoring - Manhole Box 14.40 HR $10.00 $144.00
Trench Shoring - Trench Box 32.35 HR $10.00 $323.50
Truck - Low Boy Transport 11.25 HR $80.20 $902.25
Truck - Testing Van 4.72 HR $60.00 $283.43
4/15/2019 9:42:28 AM Page 1
Page 8 of 14
DocuSign Envelope ID: 3A77408B-B0DB-4E03-84EE-28D0ADB3A77B
Total: $9,873.14
Miscellaneous Total Quantity UM Average Unit Cost Total Cost
Miscellaneous
Temp Sanitary Facility 0.10 MO $200.00 $20.00
Total: $20.00
Material Type Total Quantity UM Average Unit Cost Total Cost
Material
AG-CRI-Carr-Bedding Rock 3/8" Pea Gravel Screened (squeegee) (Connell 40.00
Resources, Inc)
TON $12.00 $480.00
CO-M-Concrete Class BZ 4000 PSI 1.10 CY $156.22 $171.84
F-B-2" BRASS SCREWED 90 ELL 1.00 EACH $28.82 $28.82
F-B-2" X 24" BRASS NIPPLE 1.00 EACH $92.87 $92.87
W-A-12 GAUGE TRACER WIRE - COPPER CLAD SS BURST / HDD 750.00 LF $1.50 $1,125.00
W-A-3M DBY TRACER WIRE CONNECTORS 3.00 EACH $3.50 $10.50
W-ACC-POLY TUBE, 10" & 12" PIPE, 8-MIL 40.00 LF $1.00 $40.00
W-HY-2" Mainguard Blowoff Hydrant #77 1.00 EACH $450.00 $450.00
W-MJ-8" Bend 45 Degree 3.00 EACH $225.00 $675.00
W-MJ-8" Plug Tapped 2" 1.00 EACH $120.00 $120.00
W-MJ-8" Solid Sleeve 2.00 EACH $251.00 $502.00
W-ML-8" Bell Restraint 1.00 EACH $75.00 $75.00
W-PVC-8" X 20' C900 Class 150 DR 18 Pipe 20.00 LF $6.50 $130.00
W-PVC-8" X 20' C900 Class 150 DR 18 Restrained TerraBrute 380.00 LF $12.25 $4,655.00
W-V-Gate Valve 8" W/Box 1.00 EACH $1,175.00 $1,175.00
Total: $9,731.03
Description Total Quantity UM Average Unit Cost Total Cost
Trucking
Trucking - Hired 40.00 TON $10.56 $422.22
Total: $422.22
Item # Description Total Quantity UM Unit Cost Total Cost
Subcontracted
[03.550] Bore And Jack Contractor - Rock Allowance (Switchback 360.00
Drilling LLC)
LF $26.00 $9,360.00
[03.550] Bore And Jack Contractor (Switchback Drilling LLC) 360.00 LF $69.69 $25,090.00
Total: $34,450.00
4/15/2019 9:42:28 AM Epic 8" Main Repair Page 2
Page 9 of 14
DocuSign Envelope ID: 3A77408B-B0DB-4E03-84EE-28D0ADB3A77B
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT C
WORK ORDER SCHEDULE DETAIL
Page 10 of 14
DocuSign Envelope ID: 3A77408B-B0DB-4E03-84EE-28D0ADB3A77B
Riverside Waterline Replacement Boring Schedule:
17-Apr 18-Apr 19-Apr 20-Apr 21-Apr 22-Apr 23-Apr 24-Apr 25-Apr
Mobilization
Dig Pits
Boring
Tie to Existing (N)
Load, Test, Flush
Tie to Existing (S)
BackFill
Page 11 of 14
DocuSign Envelope ID: 3A77408B-B0DB-4E03-84EE-28D0ADB3A77B
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT D
WORK ORDER PLANS DETAILS
Page 12 of 14
DocuSign Envelope ID: 3A77408B-B0DB-4E03-84EE-28D0ADB3A77B
Page 13 of 14
DocuSign Envelope ID: 3A77408B-B0DB-4E03-84EE-28D0ADB3A77B
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT E
CERTIFICATE OF INSURANCE
CONTRACTOR shall submit Certificate of Insurance in compliance with the Contract Documents.
Page 14 of 14
DocuSign Envelope ID: 3A77408B-B0DB-4E03-84EE-28D0ADB3A77B
Page 6 of 14
DocuSign Envelope ID: 3A77408B-B0DB-4E03-84EE-28D0ADB3A77B