Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9190732 (2)City of Fort Collins
Waukesha® Service Quotation #9127162 Rev1
RE: A1980T / A4174T / A4906T / A1304T UZD LTC Inspect and Maint in CO
Date: 02/22/19
© 2019 SPX Transformer Solutions, Inc. 2
SPX Transformer Solutions Service Quotation
Date: 02/22/19
Bob Hover
City of Fort Collins
P.O. Box 580
215 North Mason St., 2
nd
Floor
Fort Collins, CO 80522
Ph# 970-217-8109
bhover@fcgov.com
Quote Number #9127162 Rev1
RE: A1980T / A4174T / A4906T / A1304T UZD LTC Inspection and Maintenance
CONTACT INFORMATION ………………………………………………………………………
Regional Sales Associate
Tom Pickens
SPX Transformer Solutions
MOB 919-273-4152
Tom.Pickens@spx.com
Channel Partner
Jim Houlihan
Lewis Associates
MOB 303-232-7273
jim@lewisassociatesinc.com
Territory General Manager
Astha Mitra
SPX Transformer Solutions
MOB 503-351-9114
Astha.Mitra@spx.com
Confidentiality Notice:
This document contains contain privileged and confidential information belonging to the sender. The information is intended only of the use of the
individual or entity named above. If you are not the intended recipient or addressee, you are notified that any disclosure, copying, distribution or taking
any action based on the contents of this information is strictly prohibited. If you have received this document in error, please immediately notify the
sender by telephone to arrange for return of the original documents.
© 2019 SPX Transformer Solutions, Inc. 3
Table of Contents
SCOPE OF WORK ..................................................................................................................................................... 4
PERFORMANCE......................................................................................................................................................... 5
CLARIFICATIONS TO SCOPE OF WORK ............................................................................................................. 5
SCHEDULE OF PRICING ......................................................................................................................................... 6
COMMENTS/EXCEPTIONS TO CONTRACT DOCUMENTS ............................................................................. 8
TERMS & CONDITIONS STATEMENT .................................................................................................................. 8
CUSTOMER AUTHORIZATION ........................................................................................................................................ 9
FIELD SERVICE RATE SCHEDULE .............................................................................................................................. 10
STANDARD TERMS AND CONDITIONS OF SALE .................................................................................................... 12
© 2019 SPX Transformer Solutions, Inc. 4
SCOPE OF WORK
Transformer Solutions is pleased to provide crew and equipment to perform the following scope of work:
Location: City of Fort Collins, Drake and Dixon Substations, Fort Collins, CO 80522
Equipment: Four (4) Waukesha Transformers
Xfmr S/N: A1980T A4174T A4906T A1304T
LTC S/N: U9309-12 U0108-04 U0306-13 Unknown
LTC: UZDRT UZDRT UZDRT UZDRT
Gallons (LTC): 100 gal. 100 gal. 100 gal. 100 gal.
No. of Taps: 61,007 30,646 22,747 Unknown
Scope of Work: A1980T / A4174T / A4906T / A1304T UZD LTC Inspection and Maintenance in CO
Mobilize SPXTS LTC specialists and equipment to City of Fort Collins substation sites in Fort Collins, CO. Note: SPX
includes 2 hours of site orientation/training on site. If additional / required training is required beyond the allowed 2 hours
on site, this will be billed on T&M basis as applicable.
City of Fort Collins to provide two (2) service techs for assistance, scaffolding, unrestricted work hours, along with
performing de-energization, isolation, grounding, LOTO, etc. of associated equipment.
SPXTS to provide oil handling, oil disposal (400 gal. from 4 UZDs), man lift, service truck, new UZD LTC oil (8 drums for 4
LTCs), 4 UZD LTC contact lease kits, 4 UZD LTC gasket kits, test equipment, & dry-air/nitrogen, as needed.
NOTE: BELOW SCOPE OF WORK INCLUDES 4 UZD LTCs EACH (per transformer):
SPXTS to perform pre-testing, to include the following:
o Power factor (Doble) transformer windings / bushings
o Megger windings and core insulation.
o TTR
o Oil (DGA/oil quality)
SPXTS to perform the following UZD LTC external inspection
o Check dehydrating breather.
o Check oil level gauge for proper level.
SPXTS to perform inspection of motor drive operator
o Note operations on operations counter.
o Check control cabinet for cleanliness and moisture, operation of heater(s), wiring insulation and connection tightness,
position indicator for proper operation, and operation of lockout, if applicable.
SPXTS to inspect LTC spring drive compartment
o Check for oil leaks at bearings and flanges (gaskets).
o Check for worn or broken parts.
SPXTS to perform the following UZD LTC internal inspection:
o Drain existing UZD LTC oil (est. 100 gal.) into SPXTS supplied oil disposal drums.
o Open door to LTC compartment.
o Check wear and alignment of all fixed contacts (main, reversing, slip bow-ties)
o Check wear and alignment of all moving contacts (main, reversing, slip bow-ties)
o Replace any/all parts found to be worn or damaged and agreed upon by SPXTS/customer. Note: SPXTS will pre-order
& provide 4 UZD LTC lease contact kit(s) on site. The LTC kit contains contacts and components that would
normally need replacing. City of Fort Collins will only be billed for parts/materials used from the UZD LTC lease
kit. City of Fort Collins will be responsible for receiving LTC kit(s) on site and returning LTC kit(s) to SPX
Components in Dallas, TX (freight prepaid by SPXTS and included in pricing schedule pg. 6)
o Operate LTC to verify proper mechanical timing and alignment on all taps.
Check and measure value of transition resistor.
Check barrier boards (phase moldings) and seals between LTC and transformer main tank.
Install new LTC door gasket.
Close and bolt LTC compartment door.
Refill LTC with new oil (est. 100 gal.) supplied by SPX. Note: SPXTS will be responsible for disposal of existing
LTC oil of each UZD.
Check for oil leaks and proper oil level.
SPXTS to perform post-testing, to include the following:
o Power factor (Doble) transformer windings / bushings
o Megger windings and core insulation.
o TTR
o Oil (DGA/oil quality)
City of Fort Collins personnel will be responsible for removal of grounding, isolation, and re-energization of transformer.
SPXTS to demobilize crew/equipment from site and provide final report with test results
© 2019 SPX Transformer Solutions, Inc. 5
PERFORMANCE
Work is quoted based upon SPX Waukesha crews working 7 days a week, 8–12 hours per day, and 24 hours per day, if needed. It is
estimated that the Scope of Work will take est. 8 days on site (2 days per LTC) to complete, depending on weather conditions.
Proposed Start Date: May 2019 (per City of Fort Collings schedule of events)
Availability of service personnel and equipment is subject to prior sale.
CLARIFICATIONS TO SCOPE OF WORK
Unless specifically addressed in scope of work, the following assumptions have been made in preparation of our offer:
Purchaser shall be responsible for switching, lock out and grounding of any equipment necessary to establish safe work area.
Purchaser shall provide suitable, free, clear, unlimited and compacted access route, roads and area around work location for
access of service equipment.
Purchaser shall disconnect and reconnect all external protection, control and relay wiring, as required.
Purchaser shall disconnect and reconnect all external bushing terminations or bus work, as required.
Purchaser shall disassemble and reassemble any deluge systems, as required.
SPX Waukesha will compile all crating and waste material in designated area; however, purchaser shall be responsible for
disposal of solid wastes.
Purchaser shall provide drum and dispose of all waste, flush and scrap oil generated in execution of work.
Purchaser shall provide communication and sanitation facilities.
No provisions have been included for secondary oil containment as may be required for compliance to local site
SPCC programs.
If required, purchaser shall provide a PCB report showing PCB concentration of the unit within 90 days prior to start of
scheduled work.
If PCB concentration is higher than 49 PPM, SPX Waukesha will be unable to complete the work.
If PCB concentration is 1–49 PPM, an additional decontamination charge will be assessed. Proper disposal of the oil
shall be the responsibility of the purchaser.
When oil handling is part of work scope, SPX Waukesha prefers to have a metals-in-oil screen done prior to start of job to
detect any potential silicone contamination. In the event that silicone is discovered during the processing, additional charges
will apply for addition of anti-foaming compounds and a decontamination fee after completion of job.
SPX Waukesha intends to utilize its own personnel and equipment; however, if scheduling conflicts occur, SPX Waukesha
reserves the right to hire subcontractors to assist with the work.
© 2019 SPX Transformer Solutions, Inc. 6
SCHEDULE OF PRICING
The work scope as defined on pg. 4 to be performed on Fixed Price basis for performance by 06/30/19, and is as follows:
NOTE: Price is estimated for 2 SPXTS LTC Specialists for 10 days (2 travel days, 8 days on site) at est. 10 hours per day on site and
is based on Fixed Price basis, however; the above price is not a “not to exceed price”. If added time/days, trips, parts, materials, parts
installation/replacement, etc. are needed on site, this will be calculated & billed on a T&M basis. Invoicing will be calculated and billed
on actual hours/expenses/materials.
GSS#: Time $ 36,480.00
Customer: Expenses $ 6,140.00
Location: Fort Collins, CO Materials $ 9,600.00
Description: Equipment $ 12,836.00
Point of Contact: Total Cost $ 65,056.00
Time
Date Technician ST Hours OT Hours ST Cost @ $125/Hr OT Cost @ $188/Hr Extended Cost
$ - $ - $ - $ -
Subtotal $ -
Time
Date LTC Specialist ST Hours OT Hours ST Cost @ $175/Hr OT Cost @ $265/Hr Extended Cost
LTC Specialist 1
Day 1 Travel 8 $ 1,400.00 $ - $ - $ 1,400.00
Day 2 A1980T On Site 8 2 $ 1,400.00 $ 530.00 $ - $ 1,930.00
Day 3 On Site 8 2 $ 1,400.00 $ 530.00 $ - $ 1,930.00
Day 4 A4174T On Site 8 2 $ 1,400.00 $ 530.00 $ - $ 1,930.00
Day 5 On Site 8 2 $ 1,400.00 $ 530.00 $ - $ 1,930.00
Day 6 A4906T On Site 8 2 $ 1,400.00 $ 530.00 $ - $ 1,930.00
Day 7 On Site 8 2 $ 1,400.00 $ 530.00 $ - $ 1,930.00
Day 8 A6566T On Site 8 2 $ 1,400.00 $ 530.00 $ - $ 1,930.00
Day 9 On Site 8 2 $ 1,400.00 $ 530.00 $ - $ 1,930.00
Day 10 Travel 8 $ 1,400.00 $ - $ - $ 1,400.00
LTC Specialist 2
Day 1 Travel 8 $ 1,400.00 $ - $ - $ 1,400.00
Day 2 A1980T On Site 8 2 $ 1,400.00 $ 530.00 $ - $ 1,930.00
Day 3 On Site 8 2 $ 1,400.00 $ 530.00 $ - $ 1,930.00
Day 4 A4174T On Site 8 2 $ 1,400.00 $ 530.00 $ - $ 1,930.00
Day 5 On Site 8 2 $ 1,400.00 $ 530.00 $ - $ 1,930.00
Day 6 A4906T On Site 8 2 $ 1,400.00 $ 530.00 $ - $ 1,930.00
Day 7 On Site 8 2 $ 1,400.00 $ 530.00 $ - $ 1,930.00
Day 8 A6566T On Site 8 2 $ 1,400.00 $ 530.00 $ - $ 1,930.00
Day 9 On Site 8 2 $ 1,400.00 $ 530.00 $ - $ 1,930.00
Day 10 Travel 8 $ 1,400.00 $ - $ - $ 1,400.00
Subtotal $ 36,480.00
Expenses
Date Technician/Specialist Item Quantity Rate Subtotal Mark Up Extended Cost
Day 1 - Day 10 LTC Specialist 1 Perdiems 10 $ 250.00 $ 2,500.00 NA $ 2,500.00
Mileage 600 $ 0.95 $ 570.00 NA $ 570.00
Day 1 - Day 10 LTC Specialist 2 Perdiems 10 $ 250.00 $ 2,500.00 NA $ 2,500.00
Mileage 600 $ 0.95 $ 570.00 NA $ 570.00
Subtotal $ 6,140.00
Materials & Parts
Item Quantity Rate/Cost Subtotal Mark Up Extended Cost
440 Gal. New Oild (4 LTCs) 8 drums 440 $ 12.50 $ 5,500.00 N/A $ 5,500.00
400 Gal. Oil Disposal 1 $ 2,000.00 $ 2,000.00 N/A $ 2,000.00
UZD Gasket Kits (4 LTCs) 4 $ 525.00 $ 2,100.00 N/A $ 2,100.00
Subtotal $ 9,600.00
Equipment Usage & Rentals
Item Quantity Rate/Cost Subtotal Mark Up Extended Cost
UZD LTC Lease Contact Kit - Fee 4 $ 580.00 $ 2,320.00 N/A $ 2,320.00
Roundtrip Freight for UZD LTC Contact Lease Kit (TX - CO) 4 $ 300.00 $ 1,200.00 18% $ 1,416.00
Man Lift w/delivery and pickup 1 $ 5,000.00 $ 5,000.00 18% $ 5,900.00
Sevice Truck w/Oil Handling & Test Equipment 8 $ 150.00 $ 1,200.00 N/A $ 1,200.00
© 2019 SPX Transformer Solutions, Inc. 7
SEE BELOW FOR UZD LTC LEASE KIT PRICING (to be calculated and charged on a per/part basis on T&M)
Payment terms and conditions are NET 30 and are subject to credit approval.
Unless specifically noted, prices do not include:
o Any site specific or customer required access and/or safety training
o Any special and/or site-specific safety, PPE or environmental requirements
o Use of union labor
o Local Sales or Use tax
Requested changes to work scope or delays outside the control of SPX Waukesha shall be billed in accordance with
SPX Transformer Solutions’ Technical Service Price List (attached).
DESCRIPTION:
EQUIPMENT TYPE:
HVS PART NUMBER
Item# Each Part Number Description
1 3 1030-027K-OEM-V1 MAIN CONTACT ARMS W/ ROLLERS $1,415.00 $4,245.00
2 1 1030-017K-V1 REVERSING SWITHC UP-GRADE KIT $2,471.00 $2,471.00
3 1 1030-042K-V1 BRAKE ASSEMBLY KIT W/ ROLLERS $246.81 $246.81
4 3 1030-025K-V1 BOW TIE CONTACT TUBE KIT $232.00 $696.00
5 54 1030-052P STATIONARY CONTACT ASSEMBLY $63.18 $3,411.72
6 108 8010-099-509 STEEL SCREW CAP M5X.8 16MM LG $1.17 $126.31
7 108 8010-198-06 LOCK WASHER S.S. M5 $0.09 $9.72
8 1 1030-1730K-V2 CONTACT ARM SUB-ASSEMBLY $920.00 $920.00
10 1 1030-375 GLUE $52.46 $52.46
11 1 1030-472 GREASE $1.60 $1.60
12 1 1030-460 LOCKTITE $4.20 $4.20
13 2 8010-200-103 COTTER PINS S.S. M2 $0.30 $0.60
14 2 1030-470 NYLON COLLAR (BRAKE ROLLER) $11.00 $22.00
15 1 1030-475 DOOR GASKET (OLD DESIGN) $275.00 $275.00
16 1 1030-461 O-RING (NEW DESIGN) $40.00 $40.00
Total Lease Price $12,522.42
KIT PRICE (PURCHASE ONLY) $10,012.00
BILL OF MATERIALS / PRICE LIST
UZD CONTACT LEASE KIT
WAUKESHA UZD
1030-021K
CustomerExtended Price/each Customer Price
Feb-19
© 2019 SPX Transformer Solutions, Inc. 8
COMMENTS/EXCEPTIONS TO CONTRACT DOCUMENTS
None
TERMS & CONDITIONS STATEMENT
Work shall be performed in accordance with SPXTS – City of Fort Collins Services Agreement 7645 executed in 2014.
Bid is valid for a period of 60 days.
All P.O.s / Contracts / Agreements to be addressed to the following:
SPX Transformer Solutions, Inc.
400 S. Prairie Ave.
Waukesha, WI 53186
SPX Transformer Solutions, Inc. thanks you for the opportunity to provide a quotation for this work. We look forward to your
consideration of this offering and welcome any questions you may have regarding this quotation for your service requirements.
Best Regards,
Tom Pickens
Regional Sales Associate – West Region
SPX Transformer Solutions, Inc.
Ph# 919-273-4152
Fx# 208-361-2024
E-mail: Tom.Pickens@spx.com
© 2019 SPX Transformer Solutions, Inc. 9
CUSTOMER AUTHORIZATION
Customer hereby requests that SPX Waukesha perform the above-referenced Services in accordance with the provisions of this
quotation, #9127162 Rev1, including all commercial terms and clarifications and forms the basis of contract with SPX Transformer
Solutions, Inc.
Customer’s Authorization / Purchase Order Number for Accounting Purposes: _________________
Billing Address:
________________________________ By: _____________________________
________________________________ Name: _____________________________
________________________________ Title: _____________________________
________________________________ Date: _____________________________
© 2019 SPX Transformer Solutions, Inc. 10
SERVICE TECHNICIAN & SPECIALIST
RATE SCHEDULE
Waukesha
®
Service maintains a nationwide staff of trained and experienced field service specialists and technicians who are available to
provide advisory assistance, installation, inspection, commissioning, testing, troubleshooting, start-up, technical studies and maintenance
and repair services of electrical apparatus.
Technical professionals are classified in two categories, dependent on the degree of expertise and complexity of the service required:
Service Specialist
The Service Specialist has specific experiences and/or educational training along with factory training and experience in design, assembly,
installation or testing. This expert is required for special diagnosis, repairs, inspection, failure analysis and complex technical evaluations.
Typical scopes of work for these services involve LTCs, engineering services, project management, forensics analysis, condition
assessments, electrical testing, etc.
Service Technician
The Service Technician has specialized factory training and experience. This Technician can act as a consultant for customer’s personnel
with respect to correct installation, testing, maintenance or service requirements consistent with Waukesha
®
Service guidelines.
WAUKESHA
®
SERVICE SPECIALIST AND SERVICE TECHNICIAN RATES
CLASSIFICATION
HOURLY
RATE DAILY PER DIEM
HOURLY
OVERTIME RATE HOURLY SUNDAY & HOLIDAY RATE
Service Specialist $175 $250 $265 $350
Service Technician $125 $250 $188 $250
1. Hourly rate applies to all time worked or traveled during a workday.
2. Overtime rate applies to all hours worked in excess of eight hours on weekdays and all time worked or traveled on Saturdays.
NOTE: Our standard workday is 10–12 hours based on site conditions.
3. Sunday and Holiday rate applies to all hours worked or traveled on Sundays and/or holidays.
Charges for travel and living expenses will be billed at cost plus an 18% handling charge.
Per Diem
Unless requested otherwise from the purchaser, a daily per diem rate will be billed for each day required for project execution along with
travel days to/from the project. Per Diem rates exclude the cost of airfare to/from the job site.
Traveling Time
Billing for traveling time will be done at the applicable rate based on actual time traveled.
Traveling time and expenses for each technical professional will include leaving and returning to the employee’s headquarters.
Minimum Billing
Minimum billing for one day’s service will be charged for each day or fraction thereof that a technical professional spends on the
customer’s premises.
Standby Time
When technical professionals are on the customer’s premises but are unable to perform the services requested because of circumstances
beyond the control of Waukesha
®
Service personnel, the purchaser will be charged at the applicable rate.
© 2019 SPX Transformer Solutions, Inc. 11
WAUKESHA
®
SERVICE TECHNICIAN & SPECIALIST RATE SCHEDULE (CONTINUED)
OTHER CHARGES
The following charges will be in addition to the service rates stated previously:
A. Expendable Small Tools
When a particular job requires the furnishing of small expendable tools not normally carried by the technical professional, a charge
for such tools will be billed at the cost of acquisition.
B. Material Furnished by Waukesha
®
Service
All Waukesha
®
Service material used on the job will be billed at current prices.
C. Material Purchased from Subcontractors or Other Vendors
When the job requires the purchase of materials or services from subcontractors or other vendors, such items will be billed at cost plus
an 18% handling charge.
D. Special Tools and Equipment Furnished by Waukesha
®
Service
Rental charge shall be made for all specialized tools, equipment and instruments. Refer to Waukesha
®
Service Equipment Rental
Rate Schedule.
E. Company Vehicle Mileage Rate
Cost of mileage for standard company vehicles to travel to and from the standard job site will be billed at a rate of $0.95 per mile.
Any vehicle requiring a CDL endorsement to drive shall be billed at a rate of $2.50 per mile for travel to and from the job site.
PRODUCT WARRANTY WORK
Product warranty work on Waukesha
®
Service-supplied equipment will be performed F.O.B. factory or at the customer’s site, at Waukesha
®
Service’s option. Work at the customer’s site will be accomplished during a normal eight hour straight time day. If the purchaser requests that
product warranty work be performed during any other time period, purchaser will be invoiced for the premium time portion of the work, i.e. the
difference between the applicable rate and the overtime rate for the services performed.
TERMS OF PAYMENT
Net 30 days from date of invoice.
TERMS AND CONDITIONS
See SPX Transformer Solutions, Inc. – Service & Components Division Terms and Conditions of Sale.
Test Equipment Freight 1 $ 2,000.00 $ 2,000.00 N/A $ 2,000.00
Subtotal $ 12,836.00
Sunday / Holiday
Cost @ $250/Hr
Sunday / Holiday
Cost @ $350/Hr
Sunday / Holiday
Hours
Sunday / Holiday
Hours
9127162 Rev1
City of Fort Collins
A1980T / A4174T / A4906T / A1304T UZD LTC Inspections and Maintenance
Bob Hover ph# 970-217-8109