Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8106 UTILITY INFRASTRUCTURE CONSTRUCTION SERVICES FOR WATER, WASTEWATER, AND STORMWATER FACILITIES CAPITAL IMPROVEMENTSUtilities Work Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND BT CONSTRUCTION, INC WORK ORDER NUMBER: UBT-2019-01 PROJECT TITLE: U2900 Blk Moore Lane WWMR ORIGINAL BID/RFP NUMBER & NAME: U8106 – Utility Infrastructure Construction Services for Water, Wastewater, and Stormwater Facilities CIP MASTER AGREEMENT EFFECTIVE DATE: UAugust 17, 2015 ARCHITECT/ENGINEER: UNA OWNER’S REPRESENTATIVE: UAndrew Gingerich WORK ORDER COMMENCEMENT DATE: UApril 4, 2019 WORK ORDER COMPLETION DATE: UApril 26, 2019 MAXIMUM FEE: (time and reimbursable direct costs): U$97,893.97 PROJECT DESCRIPTION/SCOPE OF SERVICES: UInstall 100 LF of 16" Steel Casing under Spring Creek via auger bore methods. Remove and replace 140 LF of 8" Sanitary Sewer Pipe and connect to existing. See attached supporting documentation. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of six (6) pages are hereby accepted and incorporated herein, by U U this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: BT Construction, Inc. By: Date: Name: Title: Page 1 of 11 DocuSign Envelope ID: 320659F2-6649-4AB6-A94C-C2A439B81785 John Beckos April 4, 2019 Project Manager Utilities Work Order Form Official Purchasing Form Last updated 10/2017 OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Contract Documents are hereby accepted and incorporated herein by this reference. ACCEPTANCE: Date: Andrew Gingerich, Director – Water Field Operations REVIEWED: Date: Pat Johnson, Senior Buyer APPROVED AS TO FORM: Date: Name,City Attorney's Title (if greater than $1,000,000) ACCEPTANCE: Date: Theresa Connor, Deputy Director – Water Engineering & Field Services ACCEPTANCE: Date: Kevin Gertig, Utilities Executive Director (if greater than $1,000,000) ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) ACCEPTANCE: Date: Darin Atteberry, City Manager (if greater than $1,000,000) ATTEST: Date: City Clerk (if greater than $1,000,000) Page 2 of 11 DocuSign Envelope ID: 320659F2-6649-4AB6-A94C-C2A439B81785 April 4, 2019 April 4, 2019 April 4, 2019 April 4, 2019 Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT A WORK ORDER COST & SCOPE OF SERVICES Page 3 of 11 DocuSign Envelope ID: 320659F2-6649-4AB6-A94C-C2A439B81785 Page 4 of 11 DocuSign Envelope ID: 320659F2-6649-4AB6-A94C-C2A439B81785 Page 5 of 11 DocuSign Envelope ID: 320659F2-6649-4AB6-A94C-C2A439B81785 Page 6 of 11 DocuSign Envelope ID: 320659F2-6649-4AB6-A94C-C2A439B81785 Page 7 of 11 DocuSign Envelope ID: 320659F2-6649-4AB6-A94C-C2A439B81785 Page 8 of 11 DocuSign Envelope ID: 320659F2-6649-4AB6-A94C-C2A439B81785 Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT B WORK ORDER SCHEDULE OF SERVICES Page 9 of 11 DocuSign Envelope ID: 320659F2-6649-4AB6-A94C-C2A439B81785 3-Apr 4-Apr 5-Apr 8-Apr 9-Apr 10-Apr 11-Apr 12-Apr 15-Apr 16-Apr 17-Apr 18-Apr 19-Apr Mobilization Setup Boring Pipe Install Connect to Existing Site Remediation (if needed) Page 10 of 11 DocuSign Envelope ID: 320659F2-6649-4AB6-A94C-C2A439B81785 Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT C CERTIFICATE OF INSURANCE CONTRACTOR shall submit Certificate of Insurance in compliance with the Contract Documents. Page 11 of 11 DocuSign Envelope ID: 320659F2-6649-4AB6-A94C-C2A439B81785