HomeMy WebLinkAboutCORRESPONDENCE - BID - 8567 CABLING INSTALLATION SERVICES (6)City of Fort Collins Proposal Date: February 13th, 2018
Director of Purchasing 2nd Floor
PO Box 580, 215 N. Mason Street
Fort Collins CO 80522-0580
Attn: Wayne Brown
Reference :
Description of work:
Provide and install a total of eight (8) single cat 6 cables from IDF
Provide and install a total of twenty six (26) dual cat 6 cables from IDF to workstations.
Demo Out existing cables currently installed to old Telecom Room
Provide and install a 7' tall lockable cabinet in the new telecom room.
Install a 12 strand between vault and new Telecom room. Splice in vault and in closet
** See itemized BOM for all material.
$ 9,920.49
$ 8,646.76
$ 18,567.25
STURGEON ELECTRIC COMPANY, INC.
NAME:
TITLE:
SIGNATURE: Roy Bouchard
AUTHORIZED BY
COMPANY:
NAME:
TITLE:
SIGNATURE:
Total Material:
12150 East 112th Avenue. Henderson, CO 80640. (303) 286-8000
P R O P O S A L
PROPOSAL SUBMITTED TO:
Gardens Expansion Proposal Rev 2
Acceptance of Proposal - The above prices, specifications and
conditions are satisfactory and are hereby accepted. You are
authorized to do the work as specified. Payment will be made as
outlined above. PLEASE INDICATE ACCEPTANCE BY SIGNING
AND RETURNING ONE (1) COPY TO MY ATTENTION.
Date of Acceptance:
Total Labor:
Grand Total:
City of Fort Collins agrees to pay Sturgeon’s Billing for such work within 30 days of the date of such billing. If City of Fort
Collins fails to so pay, it shall be liable to Sturgeon for: Late charges of 1 ½% per month on the unpaid balance; any costs and
attorney’s fees incurred by Sturgeon in collecting and amount due.
The proposal may be withdrawn if not accepted within 30 days. Work will be undertaken upon written acceptance of the proposal.
All material is guaranteed to be as specified. All work to be completed
in a workmanlike manner according to standard practices. Any
alteration or deviation from above specifications involving extra costs
will be executed only upon written orders, and will become an extra
charge over and above the estimate. All agreements are contingent
upon accidents or delays beyond our control. Owner agrees to
indemnify and hold the proposer, his employees and agents harmless
in the event of bodily injury or property damage arising from the actual,
alleged or threatened discharge, dispersal, released or escape of any
pollutant as defined in the current ISO policies held by the proposer.
Roy Bouchard
Project Manager
City Of Fort Collins
Sturgeon Electric Proprietary Confidential Material And Labor Unit Pricing
Description Part number Qty. Unit Total Cost
Per Unit Total Material
Cost
Total Labor
Cost
(Mat'l + Labor)
Gigaspeed Cat-6 4-pair cable
UNIPRISE 7504 WHITE CPK CABLE, CAT6, PLENUM 4763314/10 8,000 feet $0.460 $3,680.00 $3,680.00
Demo of existing cables 48 each $0.000 $0.00 $1,200.00 $1,200.00
Install WAP 2 each $0.000 $0.00 $50.00 $50.00
Install 1 cable (based on faceplate quantities) 8 each $0.000 $0.00 $800.00 $800.00
Install 2 cable (based on faceplate quantities) 26 each $0.000 $0.00 $3,250.00 $3,250.00
Total cables 60
Jacks and faceplates
Systimax white Duplex SMB M101SMB-B-262 2 each $2.500 $5.00 $5.00 $10.00
Systimax white Faceplate M14L-262 26 each $1.450 $37.70 $65.00 $102.70
Total faceplates 2
Commscope white Modular Jack Cat-6 UNJ600 UNJ600-262 60 each $5.790 $347.40 $400.20 $747.60
Faceplate/Cable Labels
Faceplate Labels / patch panel labels 120 each $0.140 $16.80 $50.40 $67.20
Cable Labels 120 each $0.150 $18.00 $50.40 $68.40
Patch Cords/Crossconnect
Systimax 3 ft. Category 6 XL patch cord White 60 each $6.590 $395.40 $395.40
Data 4-pair termination hardware and management
Uniprise 48 Port flat Patch Panel - Category 6 UNP610-48P2U 2 each $302.070 $604.14 $13.34 $617.48
Siemens 2RU Horizontal Wire Manager WM-144-5 3 each $37.510 $112.53 $20.01 $132.54
Cabinet
CPI Cabinet 7' Tall M1242-702 1 each $2,546.670 $2,546.67 $200.00 $2,746.67
Cabinet Freight 1 each $250.000 $250.00 $100.00 $350.00
Fiber
12-STRAND, SM, 012E88-33131-29 400 feet $0.28 $112.00 $460.00 $572.00
ADC Fiber Panel FL2-CA80024AN-1C50 1 Each $445.83 $445.83 $1.25 $447.08
Corning Vault Enclosure SCG-8C18-01 1 Each $446.83 $446.83 $200.00 $646.83
Corning Vault Splice Tray SCF-ST-116 1 Each $447.83 $447.83 $12.50 $460.33
Splice fibers
Shrink tube 2 each $1.11 $2.22 $3.34 $5.56
Splice fibers 760034199 24 each $0.00 $0.00 $240.00 $240.00
Splice sleeve SFS-SLEEVE 24 each $0.56 $13.44 $240.00 $253.44
Consumables for fiber optic splice 24 each $0.56 $13.44 $10.08 $23.52
Test and Document Installed singlemode fiber strands OTDR 12 strands $0.00 n/a $120.00 $120.00
cable labels 2 each $2.22 $4.44 $0.84 $5.28
Netpco Pull tape with woven aramid with footage markings
1800LB
WL1800 400 feet $0.20 $80.00 $80.00
Pulling lube 1 each $19.98 $19.98 $19.98
Medium D-rings 8 each $1.23 $9.84 $20.00 $29.84
Terminate, Test and Document copper
Terminate one 4-pair voice or data cable at closet and dress 60 each $0.000 $0.00 $600.00 $600.00
Test one voice or data jack 60 each $0.000 $0.00 $150.00 $150.00
Document one voice or data jack 60 each $0.000 $0.00 $50.40 $50.40
Project Support Material
Horizontal cat-6 from corridor to outlet
Hiliti Ceiling supports grid wire #8 Galvanized and clip 6ft. 2044902 50 each $0.740 $37.0000 $208.50 $245.50
Ceiling supports shot 27cal. yellow Western Fastener 50 each $0.240 $12.0000 $12.00
Ceiling supports J- hook Cat-32 Holds 50 cables (bat wing) CAT324Z34 50 each $3.750 $187.5000 $42.00 $229.50
Ceiling grid support clip - EC3114Z34 EC3114Z34 50 each $1.490 $74.5000 $83.50 $158.00
TOTALS $9,920.49 $8,646.76 $18,567.25
Bond $0.00
Material Price Labor Price
Sturgeon Electric Proprietary Confidential Material And Labor Unit Pricing
Description Part number Qty. Unit Total Cost
Per Unit Total Material
Cost
Total Labor
Cost
(Mat'l + Labor)
Material Price Labor Price
Grand Total $18,567.25
2/13/2019
2/13/2019