Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CORRESPONDENCE - BID - 8844 MISCELLANEOUS CONCRETE (2)
Work Order Number: Suniga #5 Purchase Order Number: Project Title: O'Reilly Auto Parts new drive approach Original Bid/RFP Project Number & Name: 8844 Miscellaneous Concrete Annual Project Description: Excavate and install new 8" right in / right out access point per approved plan sheet. Department(s): Engineering Inspectors: Tracy Dyer Location: 1006 N. College Avenue Item No. Description Unit Unit Price Est Qty Estimated Total Act Qty Actual Total Cost 202.01 Sawcut Concrete/Asphalt (0" < 4") LF $ 3.50 $ - $ - 202.02 Sawcut Concrete/Asphalt (4" < 6") LF $ 3.65 $ - $ - 202.03 Sawcut Concrete/Asphalt (6" < 8") LF $ 4.00 26 $ 104.00 $ - 202.04 Sawcut Concrete/Asphalt (8" <= 10") LF $ 5.75 $ - $ - 202.05 Sawcut - Additional 1" Depth LF $ 1.25 $ - $ - 202.06 Remove Concrete Sidewalk SF $ 3.75 $ - $ - 202.07 Remove Concrete Curb & Gutter LF $ 6.50 26 $ 169.00 60 $ 390.00 202.08 Remove Monolithic Curb, Gutter & Sidewalk SF $ 3.85 $ - $ - 202.09 Remove Concrete Driveway/Apron/Crosspan SF $ 3.75 $ - $ - 202.10 Remove Concrete Pavement - 10" SF $ 4.00 $ - $ - 202.11 Remove Concrete Pavement - Additional 1" Depth SF $ 1.05 $ - $ - 202.12 Remove Asphalt - 6" SF $ 3.00 $ - $ - 202.13 Remove Asphalt - Additional 1" Depth SF $ 1.05 $ - $ - 202.14 Remove Inlet Each $ 525.00 $ - $ - 202.15 Remove and Haul Driveway Fillet Each $ 50.00 $ - $ - 202.16 Remove Flagstone SF $ 3.75 $ - $ - 203.01 Excavation - General Less Than 50 CY CY $ 42.00 8 $ 336.00 11 $ 466.62 203.02 Excavation - General Over 50 CY CY $ 32.00 $ - $ - 203.03 Excavation - Walls Only CY $ 22.00 $ - $ - 203.04 Excavation - New Inlet Each $ 375.00 $ - $ - 203.05 Borrow - Less than 100 Ton Ton $ 22.00 $ - $ - 203.06 Borrow - Over 100 Ton Ton $ 21.00 $ - $ - 207.01 Imported Topsoil CY $ 45.00 $ - 2 $ 67.50 208.01 Stormwater Protection - Rock Filled Wattle LF $ 10.00 $ - $ - 208.02 Stormwater Protection - Recycled Rubber Filled Wattle LF $ 17.00 28 $ 476.00 $ - 208.03 Stormwater Protection - Straw Bales Each $ 21.00 $ - $ - 208.04 SWMP Maintenance Log - 14 Day Inspection Each $ 95.00 $ - $ - 210.01 Reset Flagstone SF $ 5.00 $ - $ - 210.02 Reset Brick Pavers SF $ 8.00 $ - $ - 210.03 Adjust Manhole Each $ 105.00 $ - $ - 210.04 Adjust Valve Box Each $ 105.00 $ - $ - 304.01 Aggregate Base Course/Recycled Concrete Base ≤ 5 Tons Ton $ 39.00 $ - 4 $ 168.09 304.02 Aggregate Base Course/Recycled Concrete Base > 5 Tons Ton $ 38.00 6 $ 228.00 $ - 304.03 Recycled Asphalt Base Ton $ 26.00 $ - $ - 403.01 Asphalt Surface Preservation LF $ 5.00 26 $ 130.00 60 $ 300.00 403.02 Temporary Asphalt Patching Ton $ 195.00 $ - $ - 601.01 Exposed Sand Finish - Additional Charge SF $ 4.00 $ - $ - 602.01 Reinforcing Steel Pound $ 3.75 42 $ 157.50 18 $ 67.65 602.02 Reinforcing Steel - Epoxy Coated Pound $ 4.75 $ - $ - 604.01 Install New Area Inlet (Detail D-9a) Each $ 1,350.00 $ - $ - 604.02 Area Inlet – Additional Foot Depth (Detail D-9a) LF $ 100.00 $ - $ - 604.03 Reconstruct Area Inlet Deck – Remove & Replace (Detail D-9a) Each $ 775.00 $ - $ - 604.04 Reconstruct Area Inlet Deck - Additional Foot Opening – Remove & Replace (Detail D-9a) LF $ 100.00 $ - $ - 604.05 Reconstruct Catch Basin Deck - Remove & Replace Each $ 775.00 $ - $ - 604.06 Reconstruct Catch Basin Deck - Additional Foot Opening – Remove & Replace LF $ 100.00 $ - $ - 604.07 Install New Curb Inlet – 4’ Opening (Detail D-7a,7b or D-8a,8b) Each $ 1,975.00 $ - $ - 604.10 Reconstruct Curb Inlet Deck – Additional Foot Opening – Remove and Replace (Detail D- 7a,7b or D-8a,8b) LF $ 100.00 $ - $ - 604.11 Install New Type R Inlet - 5' Opening (Detail M-604-12) Each $ 3,400.00 $ - $ - 604.12 Type R Inlet – 5' Opening - Additional Foot Depth (Detail M-604-12) LF $ 100.00 $ - $ - 604.13 Reconstruct Type R Inlet Deck – Remove and Replace (Detail M-604-12) Each $ 1,250.00 $ - $ - 604.14 Reconstruct Type R Inlet Deck – Additional Foot Opening – Remove and Replace (Detail M- LF $ 125.00 $ - $ - 604.15 Install New Modified Type 13 Curb Inlet (includes new Frame, Grate & Adjustable Curb Bonnet) (Detail 13-A) Each $ 2,250.00 $ - $ - 604.16 Modified Type 13 Curb Inlet – Additional Foot Depth (Detail 13-A) LF $ 100.00 $ - $ - 604.17 Reconstruct Modified Type 13 Curb Inlet Deck – Remove & Replace (Detail 13-A) Each $ 775.00 $ - $ - 604.18 Reconstruct Modified Type 13 Curb Inlet Deck – Additional Foot Opening – Remove and Replace (Detail 13-A) LF $ 100.00 $ - $ - 604.19 Modified Type 13 Curb Inlet – Materials only - (Frame, Grate, & adjustable bonnet (East Jordan Each $ 800.00 $ - $ - 604.20 Concrete Sidewalk Culvert – 4’ opening - Remove and Replace Each $ 975.00 $ - $ - 604.21 Metal Sidewalk Culvert - 2' Opening, Remove & Replace Each $ 775.00 $ - $ - 604.22 Metal Sidewalk Culvert - 2' Opening, Materials Only Each $ 1,550.00 $ - $ - 604.23 Additional Square Foot 5/8" Plate SF $ 150.00 $ - $ - 608.01 Driveover Curb, Gutter & 6" Sidewalk LF $ 42.00 $ - $ - 608.02 Driveover Curb and Gutter - No Sidewalk LF $ 25.00 $ - 31 $ 775.00 608.03 Vertical Curb, Gutter and 6" Sidewalk LF $ 42.00 $ - $ - 608.04 Vertical Curb and Gutter - No Sidewalk LF $ 26.00 $ - 22 $ 572.00 608.05 Out Fall Curb & Gutter LF $ 25.00 $ - $ - 608.06 Hollywood Curb, Gutter and 6" Sidewalk LF $ 38.00 $ - $ - 608.07 Hollywood Curb and Gutter - No Sidewalk LF $ 21.00 $ - $ - 608.08 Highback Curb and Gutter - No Sidewalk LF $ 37.00 $ - $ - 608.09 Barrier Curb - 6" x 18" LF $ 25.00 30 $ 750.00 $ - 608.12 Mountable Curb - 12" x 18" LF $ 25.00 $ - $ - 608.15 Pedestrian Access Ramp SF $ 8.25 $ - $ - 608.16 Pedestrian Access Ramp, Highback Curb SF $ 8.50 $ - $ - 608.17 Truncated Dome Panel SF $ 41.00 $ - $ - 608.18 Apron - 8" SF $ 8.50 $ - $ - 608.19 Crosspan - 8" SF $ 8.50 $ - $ - 608.20 Valley Pan - 6" SF $ 7.50 $ - $ - 608.21 Flatwork - 4" SF $ 4.85 $ - $ - 608.22 Flatwork - 6" SF $ 5.85 312 $ 1,825.20 $ - 608.23 Replace Flatwork - 1" Additional Depth SF $ 1.10 624 $ 686.40 240 $ 264.00 608.24 Concrete Pavement 8" (Joints Sealed) SF $ 8.65 $ - $ - 608.25 Alley Approach - 8" SF $ 8.50 $ - 420 $ 3,570.00 608.26 Enhanced Crosswalk - 10" Tile Red SF $ 13.50 $ - $ - 608.27 Enhanced Crosswalk - 10" San Diego Buff SF $ 13.00 $ - $ - 608.28 Enhanced Crosswalk - 10" Brick Red, Stamped SF $ 13.50 $ - $ - 608.29 Colored Trail with Fibermesh - 5" Yosemite Brown SF $ 8.00 $ - $ - 608.30 Mow Strip - 4" x 12" LF $ 9.50 $ - $ - 608.31 Splashblock - 4" Exposed Aggregate SF $ 7.45 $ - $ - 608.32 Splashblock - 4" San Diego Buff SF $ 7.85 $ - $ - 608.33 Median Cover - 4" San Diego Buff SF $ 7.85 $ - $ - 608.34 Fibermesh - Added to Any Item - Additional Charge Pounds / CY $ 11.00 $ - $ - 608.35 24 Hour High Early Concrete - Added to Any Item - Additional Charge CY $ 65.00 $ - $ - 608.45 Irrigation Sleeve LF $ 5.00 30 $ 150.00 80 $ 400.00 608.46 Dump Fee Ton $ 58.00 $ - $ - 608.47 6" Concrete Median Barrier Curb, Placed (Detail FC703-Section B) (8" Bar paid under 608.48) LF $ 21.00 $ - $ - 608.48 6" Concrete Median Barrier Curb, Drilled (Detail FC703-Section C) Each $ 8.50 $ - $ - 608.49 Add Domes to Existing Ramp - Remove and Replace SF $ 37.00 $ - $ - 608.50 Add Domes to Existing Ramp - Dryset Placement SF $ 30.00 $ - $ - 630.01 "NO PARKING" Sign With Stand Per Each Per Day $ 2.00 $ - $ - 630.02 Vertical Panel Without Light Per Each Per Day $ 1.25 $ - 131 $ 163.75 630.03 Channelizing Drum without Light Per Each Per Day $ 1.50 100 $ 150.00 $ - 630.04 Type I/II Barricade Without Light Per Each Per Day $ 1.00 $ - $ - 630.05 Type III Barricade Without Light Per Each Per Day $ 5.00 $ - $ - 630.06 Size A Sign With Stand Per Each Per Day $ 2.00 20 $ 40.00 61 $ 122.00 630.07 Size B Sign With Stand Per Each Per Day $ 2.00 25 $ 50.00 $ - 630.08 Size A Specialty Sign - Cost of Manufacturing Each $ 95.00 $ - $ - 630.09 Size B Specialty Sign - Cost of Manufacturing Each $ 100.00 $ - $ - 630.10 Cone With Reflective Strip Per Each Per Day $ 0.85 50 $ 42.50 125 $ 106.25 630.11 Safety Fence Per Roll Per Day $ 5.00 $ - $ - 630.12 Light Per Each Per Day $ 1.00 $ - $ - 630.13 Advance Warning Flashing or Sequencing Arrow Panel Per Each Per Day $ 45.00 5 $ 225.00 $ - 630.14 Variable Message Board Per Each Per Day $ 90.00 $ - $ - 630.15 Traffic Control Supervisor Per Day $ 425.00 $ - $ - 630.16 Traffic Control Supervisor Hour $ 45.00 32 $ 1,440.00 30 $ 1,350.00 630.17 Flagging Hour $ 26.00 16 $ 416.00 20 $ 507.00 Unit Unit Price Est Qty Estimated Total Act Qty Actual Total Cost 15% Contingency $ 1,124.40 Total Traffic Control $ 2,363.50 $ 2,249.00 Total Asphalt $ - $ - Total Concrete $ 5,012.10 $ 7,160.86 Est Tot. Cost $ 8,500.00 Act Total Cost $ 9,409.86 608.36 Stamp Pattern - Added to Any Item, Additional Charge SF $ 3.00 $ - $ - 608.37 6" Concrete Bollard Each $ 465.00 $ - $ - 608.38 8" Concrete Bollard Each $ 550.00 $ - $ - 608.39 Flowable Fill CY $ 145.00 $ - $ - 608.40 Non-reinforced Concrete Wall - 8" SF $ 18.00 $ - $ - 608.41 Non-reinforced Concrete Footer - 8" SF $ 18.00 $ - $ - 608.42 Concrete Staining/Sealing SF $ 4.50 $ - $ - 608.43 Expansion and Caulking LF $ 4.00 $ - 30 $ 120.00 608.44 Joint Sealant (Pavement) LF $ 5.00 $ - $ - 604.08 Curb Inlet – 4' Opening - Additional Foot Depth (Detail D-7a,7b or D-8a,8b) LF $ 100.00 $ - $ - 604.09 Reconstruct Curb Inlet Deck – Remove and Replace (Detail D-7a,7b or D-8a,8b) Each $ 775.00 $ - $ -