Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8228 NIX FARM OFFICE & SHOP ADDITIONS (2)2.28.19 City of Fort Collins Nix Farm – Modular Remodel Scope of Work Proposal February 18, 2019 AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND ARCHITECTURE WEST LLC. Project Title: Nix Farm Modular office remodel, tenant finish, construction administration Commencement Date: November, 2018 Architect - Architecture West LLC; Assist with Project Team Coordination for tenant finish, handicap lift and interior structural modifications for the remodeled Nix Farm modular offices. Construction Administration, tenant finish construction documents for an existing modular residence to Office. Interior finish selections by others. Mechanical and plumbing design-build by others, sub-contractor. Site planning approvals were provided under a separate agreement, no site lighting, landscaping, civil design is included in this work. SCOPE of WORK Construction Documents and Construction Administration; (Hourly rates; Principal/Architect $105., Assoc. Architect $90., CADD Tech. $65., Admin. $50.) Tenant Finish CD’s - (invoiced prior) CA - (24-36 h. est.) - $ 3,780. (Shop drawing reviews, meetings/site visits, coord. design/construction team) Sub-total__________________________________ $ 3,780. Additional Provided Consultants Structural Engineering; CTL Thompson ________ $ 800. Electrical Engineering; Electricon _____________ -0- TOTAL_____________________________________________ $ 4,580. EXCLUSIONS - Soils, Survey or Civil Engineering, traffic engineering, landscape design, public meetings, energy analysis/modeling, commissioning, PV analysis, health department or State (modular) requirements (by others), Art in Public Places, ADA Accessibility reviews, environmental assessment/report, hazardous materials impact analysis or others, not specifically noted above. REFERENCE DOCUEMENTS Site planning and Construction Core/shell Documents, previously completed. Stephen J. Steinbicker, AIA, NCARB LEED Accredited Professional BD+C