Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8286 CONSTRUCTION CONTRACTOR FOR PROJECTS AT THE WATER & WASTEWATER TREATMENT FACILITIES (7)Work Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND HYDRO CONSTRUCTION, INC. WORK ORDER NUMBER: WTFSolidsHauling2019 PROJECT TITLE: WTF Solids Hauling 2019 ORIGINAL BID/RFP NUMBER & NAME: 8286, Construction Contractor for Projects a the Water and Wastewater Treatment Facilities MASTER AGREEMENT EFFECTIVE DATE: June 20, 2016 WORK ORDER COMMENCEMENT DATE: February 19, 2019 WORK ORDER COMPLETION DATE: February 22, 2019 MAXIMUM FEE: (time and reimbursable direct costs): $14,033.73 PROJECT DESCRIPTION/SCOPE OF SERVICES: Provide hauling services of process solids to the Larimer County Landfill. City of Fort Collins will load trucks and cover disposal costs. Hauling will occur over a three day period when staff is available and weather allows. This proposal anticipates approximately 150 loads. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of three (3) page(s) are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Date: Jim Eurich, COO ACCEPTANCE: Date: Gregg Stonecipher, Acting Director of Plant Operations REVIEWED: Date: Pat Johnson, Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) DocuSign Envelope ID: E133783F-FF13-43FB-B604-41882D6FEADB 2/15/2019 2/15/2019 2/15/2019 December 20, 2018 Hydro Construction Company, Inc. - Scope of Services. Fort Collins Water Production Facility - Solids Hauling Provide hauling services of process solids to the Larimer County Landfill. City of Fort Collins will load trucks and cover disposal costs. Hauling will occur over a three day period when staff is available and weather allows. This proposal anticipates approximately 150 loads Project cost $15,000.00 $14,033.73 DocuSign Envelope ID: E133783F-FF13-43FB-B604-41882D6FEADB NO: na PROJECT: FCWTF LOCATION: Fort Collins Water Treatment Plant ITEM: 2019 Solids Hauling LABOR $ Subsist Total Employee Hr. Fringe Hours Sub-Total Burden Labor Project Manager $35.00 $0.00 10 $350.00 38% $483.00 Field Engineer $29.00 $0.00 0 $0.00 38% $0.00 Superintendent $35.00 $0.00 0 $0.00 38% $0.00 Operator $31.00 $0.00 0 $0.00 38% $0.00 Craftsmen $28.00 $0.00 0 $0.00 38% $0.00 Laborer $20.00 $0.00 30 $600.00 38% $828.00 Project Coordinator $24.00 $0.00 0 $0.00 38% $0.00 Total This Item $1,311.00 EQUIPMENT (INTERNAL) $ Wk Weeks Sub-Total Repairs Fuel Pick-up $250.00 0 $0.00 $0.00 $0.00 $0.00 Skid Steer $621.00 0 $0.00 $0.00 $0.00 $0.00 Bobcat $927.00 0 $0.00 $0.00 $0.00 $0.00 Track Hoe $3,020.00 0 $0.00 $0.00 $0.00 $0.00 Backhoe $1,621.00 0 $0.00 $0.00 $0.00 $0.00 Dump Truck $475.00 0 $0.00 $0.00 $0.00 $0.00 Confined Space Equip $250.00 0 $0.00 $0.00 $0.00 $0.00 Grader $3,060.00 0 $0.00 $0.00 $0.00 $0.00 Loader $2,200.00 0 $0.00 $0.00 $0.00 $0.00 Small Tools (saw blades, etc.) $0.00 Total This Item $0.00 CONSUMABLE SUPPLIES Total This Item $0.00 PERMANENT MATERIALS @ $0.00 $0.00 Total This Item $0.00 SUBCONTRACTORS & SERVICES Trucking 4 day @ $3,040.00 $12,160.00 Total This Item $12,160.00 INDIRECTS Labor $1,311.00 Equipment $0.00 Consumable Materials $0.00 Permanent Materials $0.00 Subcontractors & Services $12,160.00 Indirects $0.00 Sub-Total Cost $13,471.00 Profit & Overhead $1,481.81 11.0% Profit & Overhead Total of Above: $14,952.81 $483.00 $483.00 $12,643.00 $1,390.73 $14,033.73 DocuSign Envelope ID: E133783F-FF13-43FB-B604-41882D6FEADB Project FCWTF Solid Hauling Project # na Subject Subcontract cost per day Name J. Eurich Date 12/18/2018 Sheet 1 of 1 Truck Type # trucks $/hr hrs/day total/day Side Dump 4 $ 95.00 8 $ 3,040.00 DocuSign Envelope ID: E133783F-FF13-43FB-B604-41882D6FEADB