Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8073 ENGINEERING SERVICES FOR WATER, WASTEWATER & STORMWATER FACILITIES CAPITAL IMPROVEMENTS PROJECTS (2)Utilities Work Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND ICON ENGINEERING, INC. WORK ORDER NUMBER: DLE-2019-01 PROJECT TITLE: 2019 Old Town BC Analysis - Phase 2 ORIGINAL BID/RFP NUMBER & NAME: 8497 Stormwater Consulting Services MASTER AGREEMENT EFFECTIVE DATE: June 26, 2017 ARCHITECT/ENGINEER: Icon Engineering, Inc. OWNER’S REPRESENTATIVE: Dan Evans WORK ORDER COMMENCEMENT DATE: 1/14/2019 WORK ORDER COMPLETION DATE: 10/31/2019 MAXIMUM FEE: (time and reimbursable direct costs): $76,020 PROJECT DESCRIPTION/SCOPE OF SERVICES: Icon Engineering will provide engineering services to finalize the B-C analysis for the Old Town Basin. See attached scope and fee for more detail Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of five (5) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Icon Engineering, Inc. By: Date: Name: Title: Page 1 of 10 DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9 Craig Jacobson Principal January 15, 2019 Utilities Work Order Form Official Purchasing Form Last updated 10/2017 OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Contract Documents are hereby accepted and incorporated herein by this reference. ACCEPTANCE: Date: Dan Evans, Project Manager REVIEWED: Date: Marisa Donegon, Buyer APPROVED AS TO FORM: Date: Name,City Attorney's Title (if greater than $1,000,000) ACCEPTANCE: Date: Ken Sampley , Stromwater Engineering Director ACCEPTANCE: Date: Theresa Connor, Deputy Director - WEFS OPS ACCEPTANCE: Date: Kevin Gertig, Utilities Executive Director (if greater than $1,000,000) ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) ACCEPTANCE: Date: Darin Atteberry, City Manager (if greater than $1,000,000) ATTEST: Date: City Clerk (if greater than $1,000,000) Page 2 of 10 DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9 January 15, 2019 January 15, 2019 January 16, 2019 January 17, 2019 January 17, 2019 Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT A WORK ORDER SCOPE OF SERVICES Page 3 of 10 DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9 ICONENGINEERING, INC. 7000 S. Yosemite Street, Suite 120, Centennial, CO 80112 303.221.0802 | www.iconeng.com Planning | Design | Management January 9, 2019 Mr. Dan Evans, PE, CFM Stormwater Master Planning Manager City of Fort Collins Utilities RE: Proposal for Engineering Services: Old Town BCA Analysis – Phase 2 Dear Dan, ICON Engineering, Inc. is pleased to provide this proposal for engineering services related to development of the Benefit versus Cost Analysis (BCA) for the Old Town Basin Selected Plan. As discussed during our meeting last week, this work will be closely coordinated with both the Utility staff and Anderson Consulting Engineers (ACE), who are currently working to refine the Old Town Selected plan in reference to our updated hydrologic anlaysis. In general, the assumed distribution of work for this project is as follows:  City Utility Staff – will assist ICON in data collection for the following: identification of current building outlines in the updated estimated inundation areas (EIA); current building cost assessments; identification of any new flood proofed buildings to consider; validation on first floor elevations (FFEs); and to provide input regarding depth-damage-curves to use. We anticipate that this information will be provided through working meetings and GIS shape files.  ACE – will provide all cost information as it relates to the current and updated Selected Plan. As the BCA is refined, ACE and ICON will collaborate on adjustments to be made to increase stormwater collection effectiveness.  ICON – will be responsible for updating FLO-2D models for other frequencies needed in the analysis; assembling building damage information into a spreadsheet database; completing baseline damage assessments and valuation; providing adjustments to the damage assessment based on refinement; and preparation of residual flooding assessments for independent projects as part of the Selected Plan. ICON’s work will be collaborative and presented in graphic / analytical format during workshops and project meetings. At the conclusion of the project, ICON will assemble the project findings in a summary report, with a technical appendix and digital data. Goals for the technical work would be that the project is defensible and repeatable using a similar methodology. Timeline objectives include:  For the January 17th - Water Board Meeting, a list of number of buildings inundated for the major (100-year) storm will be identified.  For the March 26th – City Council Meeting, The BCA with the updated selected plan will be presented. Other work will be concluded beyond these major objectives. Our scope is as follows: Page 4 of 10 DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9 ICONENGINEERING, INC. Page 2 of 3 I:\Proposal\misc2018\18-PRO-094_Fort Collins Old Town BCA\Old Town BCA Proposal - ICON - Phase 2.docx SCOPE OF SERVICES – Phase 2 1.0 Meetings & Coordination 1. Meetings: Up to eight (8) coordination meetings are proposed with this project. Approximately five (5) of the eight (8) meetings are assumed to take place prior to the March 26th City Council meeting. Four (4) of the meetings are assumed to be internet- based conferences. 2. Additional Project Coordination: Additional coordination for the project will be made via phone calls and emails. 2.0 Baseline Damage Assessment: The data collected as part of Phase 1 will be compiled into a spreadsheet data base to complete the damage assessment. The following information will be related:  EIA – In addition to the 100-year EIA, estimates will be made for both the 2- and 10-year EIA limits.  For each flood frequency, GIS will be utilized to determine if the EIA intersects the building layer.  If so, depth of flooding will be estimated from the assigned FFE.  Damage to the structure and content will be estimated from the assigned building types and associated damage curves  Total damages for each flooding event will be summarized and then annualized to develop the present worth of flooding within the Old Town Basin. 3.0 Evaluation of Selected Plan Residual Flooding: Following the baseline assessments, ICON will incorporate the Selected Plan developed by ACE into the EIA 100-year FLO-2D model. In general, it will be assumed that surface flooding intersecting a new pipeline corridor will be collected by that system and removed from above ground flooding. ICON will work with ACE through an iterative process to define the Selected Plan and extended laterals to reduce flooding and collect the 100-year discharges. This will involve multiple iterations of modifying the EIA 100- year FLO-2D model Upon development of a successful plan, ACE will provide ICON a summary of the updated Selected Plan costs for comparison to the annualized damages in Task 3.0, above. 4.0 Evaluation of Selected Plan Individual Segments: Following Task 4.0, ICON will review individual segments of the selected plan for an independent BCA evaluation. Similar to the overall systems analysis, it will be assumed that surface flooding intersecting an individual pipeline corridor will be collected by that system and removed from above ground flooding. ICON will not evaluate the individual proposed pipe capacities from the Selected Plan, but will work with ACE to confirm if the results appear valid based on the inflow proportions compared to the selected plan design assumptions. Each variation will include modifying the EIA 100-year FLO-2D model to reflect the individual project segments. It is assumed that this may include variations of the following project components:  Magnolia Street Outfall  Oak Street Outfall  Myrtle Street Outfall  Cherry Street Outfall  Laporte Lateral Extension Page 5 of 10 DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9 ICONENGINEERING, INC. Page 3 of 3 I:\Proposal\misc2018\18-PRO-094_Fort Collins Old Town BCA\Old Town BCA Proposal - ICON - Phase 2.docx Craig Jacobson, PE Project Manager/Principal  Whedbee Lateral Extension  Old Town Plaza / Willow Outfall For each project segment, ICON will compute residual damages for the 2-(if applicable), 10-, and 100-year flood events. These damages will be annualized to determine the damage reduction for each project. ACE will provide ICON a summary of the updated project costs for comparison to the annualized damage reduction. 5.0 Project Reporting – Project assumptions, methodology, and computations will be documented in a project summary report, computational spreadsheets, and technical appendix. Pertinent GIS data will also be databased for future use and reference. ICON will address comments on the final report; however, in order to minimize significant adjustments to the modeling and calculations, which can be very time consuming, ICON will plan on producing interim deliverables to the City for review prior to advancing the project. ASSUMPTIONS & EXCUSIONS Pertinent assumptions and exclusions are discussed within the proposal sections above. SCHEDULE Consultant will complete this project in approximately five (5) to six (6) months from notice to proceed. Work will progress alongside that completed by the City staff and ACE. Key milestones are noted below:  For the January 17th - Water Board Meeting, a list of number of buildings inundated for the major (100-year) storm will be identified.  For the March 26th – City Council Meeting, The BCA with the updated selected plan will be presented. FEE Consultant will complete the Scope of Services for a total fee of $76,020. A breakdown of our hours and fees is attached. Thank you again for the opportunity to assist the City of Fort Collins with this project. Please contact me with any questions about this proposal. Sincerely, ICON Engineering, Inc. Page 6 of 10 DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9 Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT B WORK ORDER COST & SCHEDULE DETAIL Page 7 of 10 DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9 PROJECT NAME: Old Town BCA Evaluations - Phase 2 CLIENT: City of Fort Collins PREPARED BY: CDJ Principal Prof Prof Engineer Design GIS Admins Misc. CHECKED BY: BL / JD Engineer Engineer II Engineer I IV Prof Specialist Assistant Direct DATE: January 9, 2019 $173 $150 $138 $130 $103 $93 $66 Costs Description Hours Hours Hours Hours Hours Hours Hours TOTALS Old Town BCA Evaluations 1. Meetings & Correspondence a Project Meetings (4) 16.0 10.0 6.0 $400 $5,496 b Conference Call Meetings (4) 8.0 8.0 8.0 $3,688 c General Correspondence 4.0 4.0 $1,244 2. Baseline Damage Assessments a Existing FLO-2D for 2- & 10-Year Events 2.0 12.0 40.0 $50 $5,772 b Identification of Flooded Structures 1.0 4.0 4.0 $10 $1,107 c Identification of Flooding Depths on Building 1.0 4.0 12.0 $10 $1,851 d Determine Damage Depth for 2-, 10-, 100-year Frequencies 2.0 4.0 12.0 $10 $2,024 e Computation of Damages and Annualized Values 2.0 12.0 $10 $2,012 3. Evaluation of Selected Plan Residual Flooding a Insertion of Selected Plan into 100-year 2D Model 2.0 24.0 16.0 $50 $5,484 b Iterations and revisions to the Selected plan based on modeling results 2.0 32.0 24.0 $50 $7,428 4. Evaluation of Selected Plan Individual Segments a Iterations to the 2D model for the 2- (if applicable), 10-, and 100-year events - 7 iterations 8.0 42.0 28.0 $50 $10,338 b Identification of Flooded Structures (7 Iterations) 2.0 8.0 14.0 $10 $2,762 c Identification of Flooding Depths on Building (7 Iterations) 2.0 8.0 40.0 $10 $5,180 d Determine Damage Depth for 2-, 10-, 100-year Frequencies (7 Iterations) 2.0 8.0 40.0 $10 $5,180 e Computation of Damages and Annualized Values (7 Iterations) 2.0 8.0 $10 $1,460 5. Project Reporting a Summary Report 6.0 24.0 8.0 8.0 4.0 $25 $6,775 b Technical Appendix 6.0 6.0 $25 $1,753 c GIS Files 2.0 16.0 $1,764 d Review & Revisions 4.0 16.0 4.0 8.0 4.0 $50 $4,702 Total Hours 66.0 162.0 106.0 0.0 0.0 262.0 8.0 TOTAL Total Cost $11,418 $24,300 $14,628 $0 $0 $24,366 $528 $780 $76,020 ICON ENGINEERING, INC. PROJECT ESTIMATING SHEET I:\Proposal\misc2018\18-PRO-094_Fort Collins Old Town BCA\BCA Costs FC - Phase 2.xlsx Page 8 of 10 DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9 ID Task Name Start Finish 1 1. Meetings & Corespondence Mon 1/14/19Fri 5/31/19 2 2. Baseline Damage Assessments Tue 1/15/19 Thu 1/31/19 3 3. Evaluation of Selected Plan Residual Flooding Fri 2/1/19 Fri 2/15/19 4 4. Evaluation of Selected Plan Individual Segments Mon 2/18/19Fri 3/22/19 5 5. Project Reporting Mon 3/25/19Thu 5/30/19 11/18 12/2 12/16 12/30 1/13 1/27 2/10 2/24 3/10 3/24 4/7 4/21 5/5 5/19 6/2 Dec '18 Jan '19 Feb '19 Mar '19 Apr '19 May '19 Jun '19 Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Progress Manual Progress Page 1 Project: Old Town BCA Date: Dec 2018 Page 9 of 10 DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9 Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT C CERTIFICATE OF INSURANCE CONTRACTOR shall submit Certificate of Insurance in compliance with the Contract Documents. Page 10 of 10 DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9 ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? INSR ADDL SUBR LTR INSD WVD PRODUCER CONTACT NAME: PHONE FAX (A/C, No, Ext): (A/C, No): E-MAIL ADDRESS: INSURER A : INSURED INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : POLICY NUMBER POLICY EFF POLICY EXP TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) LIMITS AUTOMOBILE LIABILITY UMBRELLA LIAB EXCESS LIAB WORKERS COMPENSATION AND EMPLOYERS' LIABILITY DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) AUTHORIZED REPRESENTATIVE EACH OCCURRENCE $ CLAIMS-MADE OCCUR DAMAGE TO RENTED PREMISES (Ea occurrence) $ MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ POLICY PRO- LOC JECT PRODUCTS - COMP/OP AGG OTHER: $ COMBINED SINGLE LIMIT (Ea accident) $ ANY AUTO BODILY INJURY (Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY (Per accident) $ HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY (Per accident) $ $ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH- STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $ If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT INSURER(S) AFFORDING COVERAGE NAIC # COMMERCIAL GENERAL LIABILITY Y / N N / A (Mandatory in NH) SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. INSURER(S) AFFORDING COVERAGE INSURER F : INSURER E : INSURER D : INSURER C : INSURER B : INSURER A : NAIC # NAME: CONTACT (A/C, No): FAX E-MAIL ADDRESS: PRODUCER (A/C, No, Ext): PHONE INSURED COVERAGES CERTIFICATE NUMBER:REVISION NUMBER: IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. OTHER: (Per accident) (Ea accident) $ $ N / A SUBR WVD ADDL INSD THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $ $ $ PROPERTY DAMAGE $ BODILY INJURY (Per accident) BODILY INJURY (Per person) COMBINED SINGLE LIMIT AUTOS ONLY AUTOS ONLY AUTOS NON-OWNED OWNED SCHEDULED ANY AUTO AUTOMOBILE LIABILITY Y / N WORKERS COMPENSATION AND EMPLOYERS' LIABILITY OFFICER/MEMBER EXCLUDED? (Mandatory in NH) DESCRIPTION OF OPERATIONS below If yes, describe under ANY PROPRIETOR/PARTNER/EXECUTIVE $ $ $ E.L. DISEASE - POLICY LIMIT E.L. DISEASE - EA EMPLOYEE E.L. EACH ACCIDENT ER OTH- STATUTE PER (MM/DD/YYYY) LIMITS POLICY EXP (MM/DD/YYYY) POLICY EFF LTR TYPE OF INSURANCE POLICY NUMBER INSR DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) EXCESS LIAB UMBRELLA LIAB EACH OCCURRENCE $ AGGREGATE $ $ OCCUR CLAIMS-MADE DED RETENTION $ PRODUCTS - COMP/OP AGG $ GENERAL AGGREGATE $ PERSONAL & ADV INJURY $ MED EXP (Any one person) $ EACH OCCURRENCE $ DAMAGE TO RENTED PREMISES (Ea occurrence) $ COMMERCIAL GENERAL LIABILITY CLAIMS-MADE OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO- JECT LOC CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) CANCELLATION AUTHORIZED REPRESENTATIVE ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. CERTIFICATE HOLDER The ACORD name and logo are registered marks of ACORD HIRED AUTOS ONLY 1/25/2018 Hall & Company 19660 10th Ave NE Poulsbo WA 98370 Jim Ledbetter 360-626-2019 360-598-3703 jledbetter@hallandcompany.com RLI INSURANCE COMPANY 13056 732 Icon Engineering Inc 7000 S Yosemite Street, Suite 120 Centennial CO 80112 513878424 A Professional Liab: Claims Made RDP0031478 1/30/2018 1/30/2019 $2,000,000 Per Claim $2,000,000 Aggregate Additional Insured Status is not available on Professional Liability Policy. Project: 8497 for Stormwater Consulting Engineering Services. City of Fort Collins 700 Wood Street Fort Collins CO 80521 DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9 INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: CERTIFICATE HOLDER CANCELLATION ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) $ $ $ $ $ The ACORD name and logo are registered marks of ACORD 12/21/2018 (720) 212-2050 (303) 799-0156 22357 ICON Engineering Inc Douglas Williams 7000 S Yosemite St #120 Centennial, CO 80112 41190 A 2,000,000 X 34SBAPD8771 1/30/2019 1/30/2020 300,000 10,000 2,000,000 4,000,000 4,000,000 A 2,000,000 X 34SBAPD8771 1/30/2019 1/30/2020 A 2,000,000 34SBAPD8771 1/30/2019 1/30/2020 2,000,000 10,000 B 4077567 2/1/2018 2/1/2019 1,000,000 1,000,000 1,000,000 RE: 8497 Stormwater Consulting Engineering Services As required by written contract or written agreement, The City of Fort Collins, its officers, Agents and employees are included as Additional Insured for ongoing operations under General Liability and Automobile Liability. City of Fort Collins 700 Wood Street Fort Collins, CO 80521 ICONENG-01 WENDYR CCIG 5660 Greenwood Plaza Blvd. Suite 500 Greenwood Village, CO 80111 Beth Ficken BethF@thinkccig.com The Hartford Insurance Group Pinnacol Assurance X X X X X X X X DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9