WORK ORDER
PURSUANT TO A MASTER AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
ICON ENGINEERING, INC.
WORK ORDER NUMBER: DLE-2019-01
PROJECT TITLE: 2019 Old Town BC Analysis - Phase 2
ORIGINAL BID/RFP NUMBER & NAME: 8497 Stormwater Consulting Services
MASTER AGREEMENT EFFECTIVE DATE: June 26, 2017
ARCHITECT/ENGINEER: Icon Engineering, Inc.
OWNER’S REPRESENTATIVE: Dan Evans
WORK ORDER COMMENCEMENT DATE: 1/14/2019
WORK ORDER COMPLETION DATE: 10/31/2019
MAXIMUM FEE: (time and reimbursable direct costs): $76,020
PROJECT DESCRIPTION/SCOPE OF SERVICES: Icon Engineering will provide engineering
services to finalize the B-C analysis for the Old Town Basin. See attached scope and fee for
more detail
Service Provider agrees to perform the services identified above and on the attached forms in
accordance with the terms and conditions contained herein and in the Master Agreement between
the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement
and this Work Order (including the attached forms) the Master Agreement shall control.
The attached forms consisting of five (5) pages are hereby accepted and incorporated herein, by
this reference, and Notice to Proceed is hereby given after all parties have signed this document.
SERVICE PROVIDER: Icon Engineering, Inc.
By: Date:
Name: Title:
Page 1 of 10
DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9
Craig Jacobson Principal
January 15, 2019
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
OWNER’S ACCEPTANCE & EXECUTION:
This Work Order and the attached Contract Documents are hereby accepted and incorporated
herein by this reference.
ACCEPTANCE: Date:
Dan Evans, Project Manager
REVIEWED: Date:
Marisa Donegon, Buyer
APPROVED AS TO FORM: Date:
Name,City Attorney's Title
(if greater than $1,000,000)
ACCEPTANCE: Date:
Ken Sampley , Stromwater Engineering Director
ACCEPTANCE: Date:
Theresa Connor, Deputy Director - WEFS OPS
ACCEPTANCE: Date:
Kevin Gertig, Utilities Executive Director
(if greater than $1,000,000)
ACCEPTANCE: Date:
Gerry Paul, Purchasing Director
(if greater than $60,000)
ACCEPTANCE: Date:
Darin Atteberry, City Manager
(if greater than $1,000,000)
ATTEST: Date:
City Clerk
(if greater than $1,000,000)
Page 2 of 10
DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9
January 15, 2019
January 15, 2019
January 16, 2019
January 17, 2019
January 17, 2019
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT A
WORK ORDER SCOPE OF SERVICES
Page 3 of 10
DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9
ICONENGINEERING, INC.
7000 S. Yosemite Street, Suite 120, Centennial, CO 80112
303.221.0802 | www.iconeng.com
Planning | Design | Management
January 9, 2019
Mr. Dan Evans, PE, CFM
Stormwater Master Planning Manager
City of Fort Collins Utilities
RE: Proposal for Engineering Services: Old Town BCA Analysis – Phase 2
Dear Dan,
ICON Engineering, Inc. is pleased to provide this proposal for engineering services related to
development of the Benefit versus Cost Analysis (BCA) for the Old Town Basin Selected Plan. As
discussed during our meeting last week, this work will be closely coordinated with both the Utility staff
and Anderson Consulting Engineers (ACE), who are currently working to refine the Old Town Selected
plan in reference to our updated hydrologic anlaysis. In general, the assumed distribution of work for this
project is as follows:
City Utility Staff – will assist ICON in data collection for the following: identification of current
building outlines in the updated estimated inundation areas (EIA); current building cost
assessments; identification of any new flood proofed buildings to consider; validation on first floor
elevations (FFEs); and to provide input regarding depth-damage-curves to use. We anticipate
that this information will be provided through working meetings and GIS shape files.
ACE – will provide all cost information as it relates to the current and updated Selected Plan. As
the BCA is refined, ACE and ICON will collaborate on adjustments to be made to increase
stormwater collection effectiveness.
ICON – will be responsible for updating FLO-2D models for other frequencies needed in the
analysis; assembling building damage information into a spreadsheet database; completing
baseline damage assessments and valuation; providing adjustments to the damage assessment
based on refinement; and preparation of residual flooding assessments for independent projects
as part of the Selected Plan.
ICON’s work will be collaborative and presented in graphic / analytical format during workshops and
project meetings. At the conclusion of the project, ICON will assemble the project findings in a summary
report, with a technical appendix and digital data. Goals for the technical work would be that the project
is defensible and repeatable using a similar methodology.
Timeline objectives include:
For the January 17th - Water Board Meeting, a list of number of buildings inundated for the major
(100-year) storm will be identified.
For the March 26th – City Council Meeting, The BCA with the updated selected plan will be
presented.
Other work will be concluded beyond these major objectives. Our scope is as follows:
Page 4 of 10
DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9
ICONENGINEERING, INC. Page 2 of 3
I:\Proposal\misc2018\18-PRO-094_Fort Collins Old Town BCA\Old Town BCA Proposal - ICON - Phase 2.docx
SCOPE OF SERVICES – Phase 2
1.0 Meetings & Coordination
1. Meetings: Up to eight (8) coordination meetings are proposed with this project.
Approximately five (5) of the eight (8) meetings are assumed to take place prior to the
March 26th City Council meeting. Four (4) of the meetings are assumed to be internet-
based conferences.
2. Additional Project Coordination: Additional coordination for the project will be made via
phone calls and emails.
2.0 Baseline Damage Assessment: The data collected as part of Phase 1 will be compiled into a
spreadsheet data base to complete the damage assessment. The following information will be
related:
EIA – In addition to the 100-year EIA, estimates will be made for both the 2- and 10-year
EIA limits.
For each flood frequency, GIS will be utilized to determine if the EIA intersects the building
layer.
If so, depth of flooding will be estimated from the assigned FFE.
Damage to the structure and content will be estimated from the assigned building types
and associated damage curves
Total damages for each flooding event will be summarized and then annualized to develop
the present worth of flooding within the Old Town Basin.
3.0 Evaluation of Selected Plan Residual Flooding: Following the baseline assessments, ICON
will incorporate the Selected Plan developed by ACE into the EIA 100-year FLO-2D model. In
general, it will be assumed that surface flooding intersecting a new pipeline corridor will be
collected by that system and removed from above ground flooding. ICON will work with ACE
through an iterative process to define the Selected Plan and extended laterals to reduce flooding
and collect the 100-year discharges. This will involve multiple iterations of modifying the EIA 100-
year FLO-2D model Upon development of a successful plan, ACE will provide ICON a summary
of the updated Selected Plan costs for comparison to the annualized damages in Task 3.0, above.
4.0 Evaluation of Selected Plan Individual Segments: Following Task 4.0, ICON will review
individual segments of the selected plan for an independent BCA evaluation. Similar to the overall
systems analysis, it will be assumed that surface flooding intersecting an individual pipeline
corridor will be collected by that system and removed from above ground flooding. ICON will not
evaluate the individual proposed pipe capacities from the Selected Plan, but will work with ACE
to confirm if the results appear valid based on the inflow proportions compared to the selected
plan design assumptions. Each variation will include modifying the EIA 100-year FLO-2D model
to reflect the individual project segments. It is assumed that this may include variations of the
following project components:
Magnolia Street Outfall
Oak Street Outfall
Myrtle Street Outfall
Cherry Street Outfall
Laporte Lateral Extension
Page 5 of 10
DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9
ICONENGINEERING, INC. Page 3 of 3
I:\Proposal\misc2018\18-PRO-094_Fort Collins Old Town BCA\Old Town BCA Proposal - ICON - Phase 2.docx
Craig Jacobson, PE
Project Manager/Principal
Whedbee Lateral Extension
Old Town Plaza / Willow Outfall
For each project segment, ICON will compute residual damages for the 2-(if applicable), 10-, and
100-year flood events. These damages will be annualized to determine the damage reduction for
each project. ACE will provide ICON a summary of the updated project costs for comparison to
the annualized damage reduction.
5.0 Project Reporting – Project assumptions, methodology, and computations will be documented
in a project summary report, computational spreadsheets, and technical appendix. Pertinent GIS
data will also be databased for future use and reference. ICON will address comments on the
final report; however, in order to minimize significant adjustments to the modeling and
calculations, which can be very time consuming, ICON will plan on producing interim deliverables
to the City for review prior to advancing the project.
ASSUMPTIONS & EXCUSIONS
Pertinent assumptions and exclusions are discussed within the proposal sections above.
SCHEDULE
Consultant will complete this project in approximately five (5) to six (6) months from notice to proceed.
Work will progress alongside that completed by the City staff and ACE. Key milestones are noted below:
For the January 17th - Water Board Meeting, a list of number of buildings inundated for
the major (100-year) storm will be identified.
For the March 26th – City Council Meeting, The BCA with the updated selected plan will
be presented.
FEE
Consultant will complete the Scope of Services for a total fee of $76,020. A breakdown of our hours and
fees is attached.
Thank you again for the opportunity to assist the City of Fort Collins with this project. Please contact me
with any questions about this proposal.
Sincerely,
ICON Engineering, Inc.
Page 6 of 10
DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT B
WORK ORDER COST & SCHEDULE DETAIL
Page 7 of 10
DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9
PROJECT NAME: Old Town BCA Evaluations - Phase 2
CLIENT: City of Fort Collins
PREPARED BY: CDJ Principal Prof Prof Engineer Design GIS Admins Misc.
CHECKED BY: BL / JD Engineer Engineer II Engineer I IV Prof Specialist Assistant Direct
DATE: January 9, 2019 $173 $150 $138 $130 $103 $93 $66 Costs
Description Hours Hours Hours Hours Hours Hours Hours TOTALS
Old Town BCA Evaluations
1. Meetings & Correspondence
a Project Meetings (4) 16.0 10.0 6.0 $400 $5,496
b Conference Call Meetings (4) 8.0 8.0 8.0 $3,688
c General Correspondence 4.0 4.0 $1,244
2. Baseline Damage Assessments
a Existing FLO-2D for 2- & 10-Year Events 2.0 12.0 40.0 $50 $5,772
b Identification of Flooded Structures 1.0 4.0 4.0 $10 $1,107
c Identification of Flooding Depths on Building 1.0 4.0 12.0 $10 $1,851
d Determine Damage Depth for 2-, 10-, 100-year Frequencies 2.0 4.0 12.0 $10 $2,024
e Computation of Damages and Annualized Values 2.0 12.0 $10 $2,012
3. Evaluation of Selected Plan Residual Flooding
a Insertion of Selected Plan into 100-year 2D Model 2.0 24.0 16.0 $50 $5,484
b Iterations and revisions to the Selected plan based on modeling results 2.0 32.0 24.0 $50 $7,428
4. Evaluation of Selected Plan Individual Segments
a Iterations to the 2D model for the 2- (if applicable), 10-, and 100-year events - 7 iterations 8.0 42.0 28.0 $50 $10,338
b Identification of Flooded Structures (7 Iterations) 2.0 8.0 14.0 $10 $2,762
c Identification of Flooding Depths on Building (7 Iterations) 2.0 8.0 40.0 $10 $5,180
d Determine Damage Depth for 2-, 10-, 100-year Frequencies (7 Iterations) 2.0 8.0 40.0 $10 $5,180
e Computation of Damages and Annualized Values (7 Iterations) 2.0 8.0 $10 $1,460
5. Project Reporting
a Summary Report 6.0 24.0 8.0 8.0 4.0 $25 $6,775
b Technical Appendix 6.0 6.0 $25 $1,753
c GIS Files 2.0 16.0 $1,764
d Review & Revisions 4.0 16.0 4.0 8.0 4.0 $50 $4,702
Total Hours 66.0 162.0 106.0 0.0 0.0 262.0 8.0 TOTAL
Total Cost $11,418 $24,300 $14,628 $0 $0 $24,366 $528 $780 $76,020
ICON ENGINEERING, INC.
PROJECT ESTIMATING SHEET
I:\Proposal\misc2018\18-PRO-094_Fort Collins Old Town BCA\BCA Costs FC - Phase 2.xlsx
Page 8 of 10
DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9
ID Task Name Start Finish
1 1. Meetings & Corespondence Mon 1/14/19Fri 5/31/19
2 2. Baseline Damage Assessments Tue 1/15/19 Thu 1/31/19
3 3. Evaluation of Selected Plan Residual Flooding Fri 2/1/19 Fri 2/15/19
4 4. Evaluation of Selected Plan Individual Segments Mon 2/18/19Fri 3/22/19
5 5. Project Reporting Mon 3/25/19Thu 5/30/19
11/18 12/2 12/16 12/30 1/13 1/27 2/10 2/24 3/10 3/24 4/7 4/21 5/5 5/19 6/2
Dec '18 Jan '19 Feb '19 Mar '19 Apr '19 May '19 Jun '19
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Page 1
Project: Old Town BCA
Date: Dec 2018
Page 9 of 10
DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT C
CERTIFICATE OF INSURANCE
CONTRACTOR shall submit Certificate of Insurance in compliance with the Contract Documents.
Page 10 of 10
DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9
ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED?
INSR ADDL SUBR
LTR INSD WVD
PRODUCER CONTACT
NAME:
PHONE FAX
(A/C, No, Ext): (A/C, No):
E-MAIL
ADDRESS:
INSURER A :
INSURED INSURER B :
INSURER C :
INSURER D :
INSURER E :
INSURER F :
POLICY NUMBER POLICY EFF POLICY EXP
TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) LIMITS
AUTOMOBILE LIABILITY
UMBRELLA LIAB
EXCESS LIAB
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $
CLAIMS-MADE OCCUR DAMAGE TO RENTED
PREMISES (Ea occurrence) $
MED EXP (Any one person) $
PERSONAL & ADV INJURY $
GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $
POLICY PRO- LOC
JECT PRODUCTS - COMP/OP AGG
OTHER: $
COMBINED SINGLE LIMIT
(Ea accident) $
ANY AUTO BODILY INJURY (Per person) $
OWNED SCHEDULED
AUTOS ONLY AUTOS BODILY INJURY (Per accident) $
HIRED NON-OWNED PROPERTY DAMAGE
AUTOS ONLY AUTOS ONLY (Per accident) $
$
OCCUR EACH OCCURRENCE
CLAIMS-MADE AGGREGATE $
DED RETENTION $
PER OTH-
STATUTE ER
E.L. EACH ACCIDENT
E.L. DISEASE - EA EMPLOYEE $
If yes, describe under
DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT
INSURER(S) AFFORDING COVERAGE NAIC #
COMMERCIAL GENERAL LIABILITY
Y / N
N / A
(Mandatory in NH)
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
INSURER(S) AFFORDING COVERAGE
INSURER F :
INSURER E :
INSURER D :
INSURER C :
INSURER B :
INSURER A :
NAIC #
NAME:
CONTACT
(A/C, No):
FAX
E-MAIL
ADDRESS:
PRODUCER
(A/C, No, Ext):
PHONE
INSURED
COVERAGES CERTIFICATE NUMBER:REVISION NUMBER:
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
$
$
$
PROPERTY DAMAGE $
BODILY INJURY (Per accident)
BODILY INJURY (Per person)
COMBINED SINGLE LIMIT
AUTOS ONLY
AUTOS ONLY AUTOS
NON-OWNED
OWNED SCHEDULED
ANY AUTO
AUTOMOBILE LIABILITY
Y / N
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under
ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER
OTH-
STATUTE
PER
(MM/DD/YYYY) LIMITS
POLICY EXP
(MM/DD/YYYY)
POLICY EFF
LTR TYPE OF INSURANCE POLICY NUMBER
INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
EXCESS LIAB
UMBRELLA LIAB EACH OCCURRENCE $
AGGREGATE $
$
OCCUR
CLAIMS-MADE
DED RETENTION $
PRODUCTS - COMP/OP AGG $
GENERAL AGGREGATE $
PERSONAL & ADV INJURY $
MED EXP (Any one person) $
EACH OCCURRENCE $
DAMAGE TO RENTED
PREMISES (Ea occurrence) $
COMMERCIAL GENERAL LIABILITY
CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY
PRO-
JECT LOC
CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
CANCELLATION
AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.
CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED
AUTOS ONLY
1/25/2018
Hall & Company
19660 10th Ave NE
Poulsbo WA 98370
Jim Ledbetter
360-626-2019 360-598-3703
jledbetter@hallandcompany.com
RLI INSURANCE COMPANY 13056
732
Icon Engineering Inc
7000 S Yosemite Street, Suite 120
Centennial CO 80112
513878424
A Professional Liab: Claims Made RDP0031478 1/30/2018 1/30/2019 $2,000,000 Per Claim
$2,000,000 Aggregate
Additional Insured Status is not available on Professional Liability Policy.
Project: 8497 for Stormwater Consulting Engineering Services.
City of Fort Collins
700 Wood Street
Fort Collins CO 80521
DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
CERTIFICATE HOLDER CANCELLATION
ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved.
CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
12/21/2018
(720) 212-2050 (303) 799-0156
22357
ICON Engineering Inc
Douglas Williams
7000 S Yosemite St #120
Centennial, CO 80112
41190
A 2,000,000
X 34SBAPD8771 1/30/2019 1/30/2020 300,000
10,000
2,000,000
4,000,000
4,000,000
A 2,000,000
X 34SBAPD8771 1/30/2019 1/30/2020
A 2,000,000
34SBAPD8771 1/30/2019 1/30/2020 2,000,000
10,000
B
4077567 2/1/2018 2/1/2019 1,000,000
1,000,000
1,000,000
RE: 8497 Stormwater Consulting Engineering Services
As required by written contract or written agreement, The City of Fort Collins, its officers, Agents and employees are included as Additional Insured for
ongoing operations under General Liability and Automobile Liability.
City of Fort Collins
700 Wood Street
Fort Collins, CO 80521
ICONENG-01 WENDYR
CCIG
5660 Greenwood Plaza Blvd.
Suite 500
Greenwood Village, CO 80111
Beth Ficken
BethF@thinkccig.com
The Hartford Insurance Group
Pinnacol Assurance
X
X
X
X X
X
X
X
DocuSign Envelope ID: 8847DC7C-8155-42D3-824C-2B81CB5E50B9