HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8286 CONSTRUCTION CONTRACTOR FOR PROJECTS AT THE WATER & WASTEWATER TREATMENT FACILITIES (5)Contract Change Order 00950-1 Exhibit B CHANGE ORDER NO. 1 PROJECT TITLE: WTF Site Work - Paving and Grading CONTRACTOR: Hydro Construction PO NUMBER: PO9183076 (BU 5026310074) DESCRIPTION: 1. Reason for change: (why is the change required?) project is complete and ready for close out of work order/PO and BU however, funds remain in PO and BU. 2. Description of Change: (provide details of the changes to the work) Hydro has completed project under budget. The original funds requested on the Finance Capital Project Initiation/Additional Funding Request Form (BU 5026310074) was $140,000, above Hydro’s work order/PO budget of $123,401 to pay for project management, design, and miscellaneous items associated with the project ($16,599). The WTF Site Work – Paving and Grading project was to repair and replace – • Administration Entrance and Parking Area - Remove existing paving, add additional road base and geogrid as necessary and replace paving (~400 sy). • Horsetooth Dissipater Area - Remove existing gravel, place road base, install concrete ribbon curb, concrete paving and place asphalt roadway (~30 tons). • Filter Gallery Access Road - Remove existing paving, add additional road base and geogrid as necessary, clean and grade at culvert outlet and replace paving (~80 sy). • T5/T6 Roof Drains and Slope - Install concrete curbs at roof drain outlets (2 locations), repair, regrade and place fabric and rip rap at culvert outlets then re-seed slope. • Maintenance Shop Parking Area - Remove existing paving, add additional road base as necessary and replace paving (~17 sy). The project was completed with a remaining project balance due to efficient use of time and materials by Hydro Construction, as well as under-utilized funds for PM salary for design and construction. 3. Change in Contract Cost: negative change order for BU funds to be transferred back to the parent, $27,626.38, and close this project. 4. Change in Contract Time: no change __________________________________________________________________________________ ORIGINAL WORK ORDER PRICE $ 123,401.00 TOTAL APPROVED CHANGE ORDERS $00.00 TOTAL PENDING CHANGE ORDERS -$27,626.38 TOTAL THIS CHANGE ORDER -$27,626.38 TOTAL % OF THIS CHANGE ORDER 22% TOTAL C.O.% OF ORIGINAL WORK ORDER 22% ADJUSTED WORK ORDER COST $ 95,774.62 DocuSign Envelope ID: DDBA0944-F8D9-42A7-AA78-0E3101A52321 Contract Change Order 00950-2 CONTRACTOR By: _______________________________________________ DATE: _____________________ Name: ____________________________________________ TITLE: _____________________ ACCEPTANCE: DATE: Sue Paquette, Civil Engineer III REVIEWED: DATE: Pat Johnson, Senior Buyer ACCEPTANCE: DATE: Owen Randall, Chief Engineer APPROVED BY: DATE: Mark Kempton, Director Water Production APPROVED BY: DATE: Purchasing Agent over $60,000 DocuSign Envelope ID: DDBA0944-F8D9-42A7-AA78-0E3101A52321 1/23/2019 Jim Eurich COO 1/23/2019 1/28/2019 1/29/2019 1/29/2019 1/29/2019