HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8805 PAVEMENT CONDITION DATA COLLECTION SERVICESRevised Estimate – Total Cost Labor Category Hourly Rate Est. Hours Subtotal Project Manager $160 48 $7,680 Project Engineer $135 72 $9,720 QC/QA Engineer (Blended) $69 90 $6,210 GIS Technician $68 52 $3,536 Equipment Operator $50 428 $21,400 Pavement Technician (Blended) $43 298 $12,814 Equipment Fee Quantity Per Day PathRunner System Fee* 20 $1,500 $30,000 Reimbursable Expenses Quantity Lump Sum Travel, Per Diem, Printing, Etc.** 1 $10,174 $10,174 Contingency Fee Quantity Lump Sum Additional services*** 1 $23,466 $23,466 Total Cost $125,000 *Note: This is a reduced equipment/technology fee for projects with more than 5 days of data collection. **Note: We estimate travel and per diem for data collection team at GSA standard rates. Travel and per diem estimate includes MOB of the system and onsite lodging for the inspection team (Est. 2 persons for 20 days). ***Note: At the City’s request, we have included an additional contingency fee for additional meetings, additional data collection and processing, and extra services that may be requested. Contingency funds will not be used unless directed by the City of Fort Collins’ Project Manager. Use of Contingency will only be used for actual Reimbursable Expenses incurred. Assumptions + Alternative Recommendations: In our estimate, we have assumed collecting 810 lane miles of pavement data, and processing 100% of the data using automated tools to determine IRI, RN, and rutting information. For a network level pavement condition survey, this means evaluating 100% of the surveyed miles with automated distress detection and a manual review of the data for calculating network level PCI values. The PCI values are then calculated at the network level per ASTM D6433 network level guidelines, which are provided only a reference and are customizable to meet an agency’s needs. Meeting Rates 2. Onsite meetings with both Project Manager and QA Engineer: Same rate as above + travel expenses (est. $430 + $750 = $1,180) 1. Meetings with onsite QC/QA Engineer + Project Manager via phone (2 hours): $430/meeting