Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8475 CIVIL ENGINEERING PROFESSIONAL ON-CALL (11)Official Purchasing Form Last updated 10/2017 Work Order Form WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND INTERWEST CONSULTING GROUP WORK ORDER NUMBER: PROJECT TITLE: Horsetooth and Ziegler Conceptual Modifications ORIGINAL BID/RFP NUMBER & NAME: RFP 8475: Civil Engineering Professional On Call MASTER AGREEMENT EFFECTIVE DATE: June 1, 2017 WORK ORDER COMMENCEMENT DATE: 12-1-2018 WORK ORDER COMPLETION DATE: 4-1-2019 MAXIMUM FEE: (time and reimbursable direct costs): $15,500 PROJECT DESCRIPTION/SCOPE OF SERVICES: See Attached Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of one (1) page are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Date: 12-1-18 Michael Oberlander, Sr. PM ACCEPTANCE: Date: Name, Project Manager REVIEWED: Date: Name, Buyer or Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) 12/13/18 027 – Horsetooth Ziegler December 1, 2018 Mr. Tracy Dyer City of Fort Collins - Engineering Horsetooth and Ziegler Conceptual Modifications Study Project Description and Scope of Services Dear Tracy, Description The Fort Collins Engineering and Traffic departments want to investigate modifications to the existing Horsetooth and Ziegler roundabout to determine if there are changes that can be built to increase capacity and enhance the safety of the intersection without complete reconstruction. Interwest and the Fox Tuttle Hernandez Transportation Group (FTH) will assist City staff by looking at physical layout changes to the intersection and then preparing RODEL models to assess the traffic flow / delay. Recent traffic counts have been provided to the City. Our team will need any other projections (proposed development traffic impact studies, and traffic growth rates) to increase the traffic to whatever level is desired by the staff for this study. At this time, we would propose an allowance for each firm for meetings, drafting, coordination, approximate construction quantities, and traffic modeling ($4,500 for FTH and $11,000 for Interwest). We will proceed with brainstorming solutions for this intersection in December with the intent to have a short memo discussing options in January/February. Total proposed fee for this work order - $15,500. Please call me at 970-460-8471 if you have any questions or need any additional information. Thanks, Michael Oberlander, PE Senior Project Manager Interwest Consulting Group