HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 918569711/29/18
Estimate:
DATE: 10/12/2018
ESD-3637
NAME / ADDRESS
City of Fort Collins
PO Box 580
Fort Collins, CO 80522
Customer PO No.: PENDING
Estimated Delivery Time: TBD
PLEASE LET ME KNOW IF YOU HAVE ANY QUESTIONS.
THANK YOU! WAYNE CASS TOTAL:
Ramey Environmental Compliance, Inc.
PO Box 99, Firestone, CO 80520
Office: 303-833-5505
Fax: 303-833-5535
______________________________________________ _____________________
Authorized Signature Date
EQUIPMENT SERVICES DIVISION (ESD) PROJECT
If this estimate is acceptable, please sign and return by fax to (303)833-5535.
*Note: All applicable Freight Charges, Taxes
and Permit Fees will be added.
**ESTIMATE IS VALID FOR 30 DAYS**
(Subject to prior sales per manufacturer) Estimated
delivery times may vary. There is no way to
guarantee actual delivery dates.
DESCRIPTION QTY COST TOTAL
City of Fort Collins - SouthRidge Golf Course
(Vertical Turbine Pump Rebuilds)
Scope of work: Remove all four pumps from site in Ft Collins. Transport
them to Ramey shop for teardown and inspection.
Teardown the pumps and check for excessive wear. If pumps are out of
tolerance customer will be informed. Replace the following components
within the pumps: SS Collets, SS Shafting, SS Lineshaft Couplings,
Bronze Bushings, SS Basket Strainers, SS Hardware, Bronze Sand Collar,
SS Motor Shaft and Bronze Motor Shaft Nut with Key.
Pumps will be sandblasted and Epoxy Based Paint will be applied to the
entire wet end of the pump before reinstalling.
Metron Pump Station will be tuned through the PLC and the entire system
will be test ran for quality assurance. We will come back in the spring for
startup.
Page 1
Estimate:
DATE: 10/12/2018
ESD-3637
NAME / ADDRESS
City of Fort Collins
PO Box 580
Fort Collins, CO 80522
Customer PO No.: PENDING
Estimated Delivery Time: TBD
PLEASE LET ME KNOW IF YOU HAVE ANY QUESTIONS.
THANK YOU! WAYNE CASS TOTAL:
Ramey Environmental Compliance, Inc.
PO Box 99, Firestone, CO 80520
Office: 303-833-5505
Fax: 303-833-5535
______________________________________________ _____________________
Authorized Signature Date
EQUIPMENT SERVICES DIVISION (ESD) PROJECT
If this estimate is acceptable, please sign and return by fax to (303)833-5535.
*Note: All applicable Freight Charges, Taxes
and Permit Fees will be added.
**ESTIMATE IS VALID FOR 30 DAYS**
(Subject to prior sales per manufacturer) Estimated
delivery times may vary. There is no way to
guarantee actual delivery dates.
DESCRIPTION QTY COST TOTAL
Vertical Turbine Pump Rebuild: (Qty 4)
> SS Collets, SS Shafting, SS Lineshaft Couplings, Bronze Bushings, SS
Basket Strainers, SS Hardware, Bronze Sand Collar, SS Motor Shaft and
Bronze Motor Shaft Nut with Key.
> Sandblasting and Epoxy Coatings
> Field Labor to remove pumps (16hrs)
> Shop Labor to teardown and inspect pumps (40hrs)
> Shop Labor to rebuild pumps utilizing the above parts (48hrs)
> Field Labor to install the rebuilt pumps (16hrs)
1 26,450.00 26,450.00
OPTIONAL ADDER: Motor Rebuild (Qty 4)
Wash and Bake all four Motors. Replace Upper Thrust Bearings and lower
Guide Bearings in each of the four Motors. Fully assemble and test run
motors at shop.
> Upper and Lower Bearings
> Wash and Bake Stators
> Perform electrical testing
1 4,544.00 4,544.00
NOTES:
- Price includes "Standard" Freight/Shipping Cost
- Labor rates: $75.00 per hour, per man
- Spring Startup is not included in price
Page 2