Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 918569711/29/18 Estimate: DATE: 10/12/2018 ESD-3637 NAME / ADDRESS City of Fort Collins PO Box 580 Fort Collins, CO 80522 Customer PO No.: PENDING Estimated Delivery Time: TBD PLEASE LET ME KNOW IF YOU HAVE ANY QUESTIONS. THANK YOU! WAYNE CASS TOTAL: Ramey Environmental Compliance, Inc. PO Box 99, Firestone, CO 80520 Office: 303-833-5505 Fax: 303-833-5535 ______________________________________________ _____________________ Authorized Signature Date EQUIPMENT SERVICES DIVISION (ESD) PROJECT If this estimate is acceptable, please sign and return by fax to (303)833-5535. *Note: All applicable Freight Charges, Taxes and Permit Fees will be added. **ESTIMATE IS VALID FOR 30 DAYS** (Subject to prior sales per manufacturer) Estimated delivery times may vary. There is no way to guarantee actual delivery dates. DESCRIPTION QTY COST TOTAL City of Fort Collins - SouthRidge Golf Course (Vertical Turbine Pump Rebuilds) Scope of work: Remove all four pumps from site in Ft Collins. Transport them to Ramey shop for teardown and inspection. Teardown the pumps and check for excessive wear. If pumps are out of tolerance customer will be informed. Replace the following components within the pumps: SS Collets, SS Shafting, SS Lineshaft Couplings, Bronze Bushings, SS Basket Strainers, SS Hardware, Bronze Sand Collar, SS Motor Shaft and Bronze Motor Shaft Nut with Key. Pumps will be sandblasted and Epoxy Based Paint will be applied to the entire wet end of the pump before reinstalling. Metron Pump Station will be tuned through the PLC and the entire system will be test ran for quality assurance. We will come back in the spring for startup. Page 1 Estimate: DATE: 10/12/2018 ESD-3637 NAME / ADDRESS City of Fort Collins PO Box 580 Fort Collins, CO 80522 Customer PO No.: PENDING Estimated Delivery Time: TBD PLEASE LET ME KNOW IF YOU HAVE ANY QUESTIONS. THANK YOU! WAYNE CASS TOTAL: Ramey Environmental Compliance, Inc. PO Box 99, Firestone, CO 80520 Office: 303-833-5505 Fax: 303-833-5535 ______________________________________________ _____________________ Authorized Signature Date EQUIPMENT SERVICES DIVISION (ESD) PROJECT If this estimate is acceptable, please sign and return by fax to (303)833-5535. *Note: All applicable Freight Charges, Taxes and Permit Fees will be added. **ESTIMATE IS VALID FOR 30 DAYS** (Subject to prior sales per manufacturer) Estimated delivery times may vary. There is no way to guarantee actual delivery dates. DESCRIPTION QTY COST TOTAL Vertical Turbine Pump Rebuild: (Qty 4) > SS Collets, SS Shafting, SS Lineshaft Couplings, Bronze Bushings, SS Basket Strainers, SS Hardware, Bronze Sand Collar, SS Motor Shaft and Bronze Motor Shaft Nut with Key. > Sandblasting and Epoxy Coatings > Field Labor to remove pumps (16hrs) > Shop Labor to teardown and inspect pumps (40hrs) > Shop Labor to rebuild pumps utilizing the above parts (48hrs) > Field Labor to install the rebuilt pumps (16hrs) 1 26,450.00 26,450.00 OPTIONAL ADDER: Motor Rebuild (Qty 4) Wash and Bake all four Motors. Replace Upper Thrust Bearings and lower Guide Bearings in each of the four Motors. Fully assemble and test run motors at shop. > Upper and Lower Bearings > Wash and Bake Stators > Perform electrical testing 1 4,544.00 4,544.00 NOTES: - Price includes "Standard" Freight/Shipping Cost - Labor rates: $75.00 per hour, per man - Spring Startup is not included in price Page 2 $30,994.00