HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8475 CIVIL ENGINEERING PROFESSIONAL ON-CALL (8)Official Purchasing Form
Last updated 10/2017
Work Order Form
WORK ORDER FORM
PURSUANT TO A MASTER AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
INTERWEST CONSULTING GROUP
WORK ORDER NUMBER:
PROJECT TITLE: Remington Bulbout Design - 2018
ORIGINAL BID/RFP NUMBER & NAME: RFP 8475: Civil Engineering Professional On Call
MASTER AGREEMENT EFFECTIVE DATE: June 1, 2017
WORK ORDER COMMENCEMENT DATE: 11-1-2018
WORK ORDER COMPLETION DATE: 2-1-2019
MAXIMUM FEE: (time and reimbursable direct costs): $6,700
PROJECT DESCRIPTION/SCOPE OF SERVICES: See Attached
Service Provider agrees to perform the services identified above and on the attached forms in
accordance with the terms and conditions contained herein and in the Master Agreement between
the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement
and this Work Order (including the attached forms) the Master Agreement shall control.
The attached forms consisting of one (1) page are hereby accepted and incorporated herein, by
this reference, and Notice to Proceed is hereby given after all parties have signed this document.
SERVICE PROVIDER: Date: 11-1-18
Michael Oberlander, Sr. PM
ACCEPTANCE: Date:
Name, Project Manager
REVIEWED: Date:
Name, Buyer or Senior Buyer
ACCEPTANCE: Date:
Gerry Paul, Purchasing Director
(if greater than $60,000)
18-400901920-INTERWEST-01
DocuSign Envelope ID: 6453BF20-E203-4D93-BFD5-483DFB99045D
11/6/2018
Caleb Feaver
Elliot Dale
11/6/2018
029 – Remington Bulbout
November 1, 2018
Mr. Caleb Feaver
City of Fort Collins - Engineering
Remington Bulbout Design - 2018
Project Description and Scope of Services
Dear Caleb,
Description
The Fort Collins Engineering and Traffic departments want to complete the design for a
modified street crossing of Remington at the CSU Art Center (RRFB flashing signal with
push buttons).
King Surveyors will provide a topographic survey or the project area for this work. No
utility locates will be ordered as the majority of the work will just be curbs and ramps.
($1,500)
Interwest will work with you and the traffic department to develop a layout, demolition and
grading plan for the improvement (suitable for construction). This work will be done by an
on-call contractor and not bid (so not specifications or bid tabulation will be provided). The
traffic department will provide the layout for conduits, push buttons and signal poles.
($5,200)
Total proposed fee for this work order - $6,700.
Please call me at 970-460-8471 if you have any questions or need any additional
information.
Thanks,
Michael Oberlander, PE
Senior Project Manager
Interwest Consulting Group
DocuSign Envelope ID: 6453BF20-E203-4D93-BFD5-483DFB99045D