November 1, 2018
Ms. Jill Wuertz
City of Fort Collins - Parks
Ped Bridge Replacement - 2018
Project Description and Scope of Services
Dear Jill,
Description
The Fort Collins Parks department plans to replace two pedestrian bridges on their existing
abutments at Rolland Moore Park and near Glenwood Park and has requested that
Interwest and Loris/OTAK assist preparing documents for bidding and construction.
Loris performed an initial site assessment and preliminary field measurements on August
22nd. Based on this site assessment, they agree that this approach is viable. Their services
for the project are estimated as follows:
• Verify and supplement previous field measurements. (4 hrs @ $185/hr)
• Detail the existing bridge and abutments. (8 hrs @ $120/hr + 2 hrs @ $185/hr)
• Detail the proposed bridge and any required abutment modifications. (4 hrs @
$120/hr + 1 hrs @ $185/hr)
• Develop plan notes and provide pedestrian bridge specifications. (2 hrs @ $120/hr +
1 hrs @ $185/hr)
• Perform shop drawing & calculations review for the proposed bridges. (1 hr @
$185/hr + 8 hrs @ $120/hr)
• Provide assistance as-needed during construction. (2 hrs @ $185/hr)
Interwest proposes a $4,500 allowance for assisting with the bid package preparation. This
would include a site plan showing the existing crossings for use in the documents and for
any ditch crossing agreements that may be required. Interwest will also coordinate the
work between the City and Loris. We do not anticipate a need for any surveying services
for this work.
Total proposed fee for this work order - $9,500.
Please call me at 970-460-8471 if you have any questions or need any additional
information.
Thanks,
Michael Oberlander, PE
Senior Project Manager