Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 7658 MISCELLANEOUS CONCRETE ANNUAL (15)Item Description Unit Estimated Quantity 2018 Unit Price Estimated Costs 202.03 Sawcut Concrete/Asphalt (6" < 8") Lineal Foot 10 $ 3.99 $ 39.90 202.07 Remove Concrete Curb & Gutter Lineal Foot 30 $ 6.09 $ 182.70 202.13 Remove Asphalt - Additional 1" Depth Square Foot 60 $ 1.05 $ 63.00 202.14 Remove Inlet Each 2 $ 540.75 $ 1,081.50 203.01 Excavation - General Less Than 50 CY Cubic Yard 10 $ 49.35 $ 493.50 304.01 Aggregate Base Course/Recycled Concrete Base ≤ 5 Tons Ton 10 $ 40.95 $ 409.50 403.01 Temporary Asphalt Patching Ton 2 $ 215.25 $ 430.50 604.11 Install New Type R Inlet - 5' Opening Each 2 $ 3,680.00 $ 7,360.00 608.02 Driveover Curb and Gutter - No Sidewalk Lineal Foot 20 $ 24.68 $ 493.60 608.22 Flatwork - 6" Square Foot 20 $ 6.09 $ 121.80 608.39 Flowable Fill Cubic Yard 10 $ 120.75 $ 1,207.50 608.43 Expansion and Caulking Lineal Foot 10 $ 4.15 $ 41.50 630.16 Traffic Control Supervisor Hour 10 $ 45.15 $ 451.50 630.17 Flagging Hour 10 $ 29.93 $ 299.30 Total Estimated Costs $ 12,675.80 Concrete Work - Skyview Area Asset Replacements - Pluto Ct. & Galaxy Ct. LEI Estimated Costs PO # TBD DocuSign Envelope ID: E407B650-7202-482D-8CAB-32C42CE08F0A