Loading...
HomeMy WebLinkAboutRFP - 8829 FALL PROTECTION SYSTEMRFP 8829 Fall Protection System Page 1 of 152 REQUEST FOR PROPOSAL 8829 FALL PROTECTION SYSTEM The City of Fort Collins is requesting proposals from qualified Vendors to provide a turnkey fall protection system for four (4) City buildings. Award under this Request for Proposal (RFP) may be used at the City’s sole discretion for additional fall protection systems at other City facilities. As part of the City’s commitment to Sustainable Purchasing, proposals submission via email is preferred. Proposals shall be submitted in a single Microsoft Word or PDF file under 20MB and e-mailed to: purchasing@fcgov.com. If electing to submit a hard copy proposal we require one (1) hard copy and one (1) electronic copy on a jump drive to be received at the City of Fort Collins' Purchasing Division, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524. Proposals must be received before 3:00 p.m. (our clock) on November 27, 2018 and referenced as Proposal No. 8829. If delivered, they are to be sent to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado 80524. If mailed, the address is P.O. Box 580, Fort Collins, 80522-0580. Please note, additional time is required for bids mailed to the PO Box to be received at the Purchasing Office. The City encourages all Disadvantaged Business Enterprises (DBEs) to submit proposals in response to all requests for proposals. No individual or business will be discriminated against on the grounds of race, color, sex, or national origin. It is the City’s policy to create a level playing field on which DBEs can compete fairly and to ensure nondiscrimination in the award and administration of all contracts. A pre-proposal meeting will be held at 2:00pm MST, on November 13, 2018, in Operation Services Conference Room 1 at Operation Services Building B 300 LaPorte Ave, Fort Collins. All questions should be submitted, in writing via email, to Doug Clapp, CPPB, Senior Buyer at dclapp@fcgov.com, with a copy to Project Manager, Ethan Cozzens, no later than 5:00 PM MST (our clock) on November 15, 2018. Please format your e-mail to include: RFP 8829 in the subject line. Questions received after this deadline may not be answered. Responses to all questions submitted before the deadline will be addressed in an addendum and posted on the Rocky Mountain E-Purchasing System webpage. Rocky Mountain E-Purchasing System hosted by BidNet A copy of the RFP may be obtained at http://www.bidnetdirect.com/colorado/city-of-fort-collins. Public Viewing Copy: The City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any proposals submitted hereunder are subject to public disclosure by the City pursuant to CORA and City ordinances. Vendors may submit one (1) additional complete proposal clearly marked “FOR PUBLIC VIEWING.” In this version of the proposal, the Vendor may redact text and/or data that it deems confidential or proprietary pursuant to CORA. Such statement does not necessarily exempt such documentation from public disclosure if required by CORA, by order of a court of appropriate jurisdiction, or other applicable law. Generally, under CORA trade secrets, confidential commercial and financial Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing RFP 8829 Fall Protection System Page 2 of 152 data information is not required to be disclosed by the City. Proposals may not be marked “Confidential” or ‘Proprietary’ in their entirety. All provisions of any contract resulting from this request for proposal will be public information. New Vendors: The City requires new Vendors receiving awards from the City to fill out and submit an IRS form W-9 and to register for Direct Deposit (Electronic) payment. If needed, the W-9 form and the Vendor Direct Deposit Authorization Form can be found on the City’s Purchasing website at www.fcgov.com/purchasing under Vendor Reference Documents. Please do not submit with your proposal. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. Collusive or Sham Proposals: Any proposal deemed to be collusive or a sham proposal will be rejected and reported to authorities as such. Your authorized signature of this proposal assures that such proposal is genuine and is not a collusive or sham proposal. The City of Fort Collins reserves the right to reject any and all proposals and to waive any irregularities or informalities. Utilization of Award by Other Agencies: The City of Fort Collins reserves the right to allow other state and local governmental agencies, political subdivisions, and/or school districts to utilize the resulting award under all terms and conditions specified and upon agreement by all parties. Usage by any other entity shall not have a negative impact on the City of Fort Collins in the current term or in any future terms. The selected Vendor shall be expected to sign the City’s standard Agreement prior to commencing Services (see sample attached to this Request for Proposal). Sincerely, Gerry Paul Purchasing Director RFP 8829 Fall Protection System Page 3 of 152 I. BACKGROUND & OBJECTIVE / OVERVIEW A. Overview The City of Fort Collins is requesting proposals from qualified Vendors (also referred herein to as Contractor and Service Provider) to provide a turnkey fall protection system for four (4) City buildings. Installation of the fall protection system to be per plans & specifications included in this RFP and to include manufacturer's warranty. Award under this Request for Proposal (RFP) may be used at the City’s sole discretion for additional fall protection systems at other City facilities. II. SCOPE OF PROPOSAL A. Scope of Work 1. Contractor to ensure a clean and safe worksite at all times. 2. All applicable OSHA regulations to be followed at all times. 3. At any time, if the City determines that an individual(s) on the construction team has exhibited unacceptable personal conduct, competence, and/or safety violation, the City reserves the right to direct Service Provider personnel changes. 4. The City of Fort Collins has developed a Building Design Standards Manual. Design will follow these standards unless exempted by the City. This manual is available online and can be viewed at: http://www.fcgov.com/opserv/design-standards.php 5. Contractor is required to adhere to the City of Fort Collins Dust Prevention and Control Manual. This manual is available online and can be viewed at: https://www.fcgov.com/airquality/pdf/dust-prevention-and-control-manual.pdf 6. Contractor will be required to follow the City of Fort Collins QA/QC program, Section IX, Attachments A - D.  Please reference: i. Written QA-QC Plan ii. Preparatory Phase Checklist iii. QC Initial Checklist iv. QC Follow-Up Checklist  Materials to be inspected during the duration of the project. i. Horizontal Anchorage System ii. Cabling System 7. Contractor to fill out City provided Waste Management Plan Form, Section IX, Attachment G. RFP 8829 Fall Protection System Page 4 of 152 a. Please reference the specifications for this form – see attachment G. b. Contractor will not receive final payment until all work is satisfactorily completed and the Waste Management Plan Form has been completed with required back- up documentation and approved by the City. 8. Coordination of dumpster locations to be decided at pre-proposal meeting. 9. Contractor to reference the attached “Project Time Extensions for Abnormal Weather Conditions”, Section IX, Attachment E. This is the procedure that will be followed in determining the possibility of time extensions for abnormal weather conditions in accordance with the Contract Documents. 10. Contractor will be allowed during normal business hours to use onsite toilet facilities as necessary. Prior coordination with City of Fort Collins will be required. 11. Any damage caused to the existing buildings, parking lot, site, & landscaping during construction or through access to the construction area will be at the Contractor’s expense to repair the damaged area to existing conditions before the damage occurred. 12. Contractor is required to pull, and pay for, all required State, City, county and Fire department permits as necessary. 13. Contractor is required to coordinate all necessary State, City, county and Fire department inspections as necessary. 14. The City has established smoking restrictions in certain areas. Smoking is prohibited on all City-owned property. Unless otherwise prohibited by City Code, this shall not apply to persons lawfully smoking entirely within an enclosed privately-owned motor vehicle. Please go to: fcgov.com/smokefree for more information. 15. Installation of fall protection system to be per plans & specifications, Section VII. 16. All manufacturer’s roof warranties to remain. a. It is the Contractor’s responsibility to coordinate with the proper manufacturer of the roof warranty for approval of work, for each roof system, prior to beginning work in order to ensure roof warranties remain valid. 17. It is the Contractor’s responsibility to ensure that at the end of each day the roof system is temporarily dried-in and all materials are safely secured. a. It will be the Contractor’s responsibility to fix, and or replace, at Contractor’s expense any content that is damaged due to weather leaks from improper dry-in. RFP 8829 Fall Protection System Page 5 of 152 18. Environmental Testing: a. Streets Roof: Asbestos has been identified in the tar built-up roofing material used in the original roof. This has been encapsulated by the new TPO roof.  Please reference the attached LT Environmental inspection report, Section VIII, dated April 26, 2017 for sampling results.  It is the Contractor’s responsibility, and expense, to manage the asbestos containing material.  Describe in words how you plan to manage the asbestos containing material: ________________________________________________________________ ________________________________________________________________ ________________________________________________________________ ________________________________________________________________ ________________________________________________________________ ________________________________________________________________ ________________________________________________________________ _______________________________________________________________ . b. City Hall Roof: Asbestos has been identified in the brown felt with black tar, tan adhesive with black tar, and black tar roofing material.  Please reference the attached LT Environmental inspection report, Section VIII, dated October 5, 2018 for sampling results.  It is the Contractor’s responsibility, and expense, to manage the asbestos containing material.  Describe in words how you plan to manage the asbestos containing material: ________________________________________________________________ ________________________________________________________________ ________________________________________________________________ ________________________________________________________________ ________________________________________________________________ ________________________________________________________________ ________________________________________________________________ _______________________________________________________________. c. 215 N. Mason: Asbestos was not identified in the samples that were taken.  It is the responsibility of the Contractor to promptly notify the City of any possible suspect material that may be exposed when work is performed that may not have been samples originally.  Please reference the attached LT Environmental inspection report, Section VIII, dated October 5, 2018 for sampling results. d. Nix Farm: N/A. All standing seam metal roof. RFP 8829 Fall Protection System Page 6 of 152 B. Anticipated Schedule The following represents the City’s target schedule for the RFP. The City reserves the right to amend the target schedule at any time. • RFP issuance: November 2, 2018 • Pre-Proposal Meeting: 2:00pm MST on 11/13/18 • Question deadline: 5:00 PM MST on 11/15/18 • Proposal due date: 3:00 MST (our clock) on 11/27/18 • Interviews (tentative): Week of 12/10/18 • Award of Contract (tentative): 12/14/18 • Completion of project: March 1, 2019 C. Interviews In addition to submitting a written proposal, the top-rated Vendors may be interviewed by the RFP assessment team and asked to participate in an oral presentation to provide an overview of the company, approach to the project and to address questions. The evaluation criteria for the oral interviews will be the same as the criteria for the written evaluations and is included in Section IV. D. Subcontractors Vendors will be responsible for identifying any subcontractors in their proposal. Please note that the City will contract solely with the awarded Vendor; therefore, subcontractors will be the responsibility of the Vendor. E. Proposal Format Please limit the total length of your proposal to a maximum of twenty-five (25) double sided or fifty (50) single sided 8 ½ x 11” pages (excluding cover pages, table of contents, dividers and Vendor Statement form). Font shall be a minimum of 10 Arial and margins are limited to no less than .5” for sides and top/bottom. Extended page sizes, such as 11” x 17”, count as a single page. Please, no embedded documents. Proposals that do not conform to these requirements may be rejected. F. Current standards All work and/or materials must meet current standards in force by recognized technical and professional societies, trade and materials supply associations, institutes and organizations, bureaus and testing laboratories, and national, federal, state, county, and local laws, codes and ordinances. All work shall be performed in accordance with ANSI Z133.1 A300 and applicable OSHA and AWWA Standards. RFP 8829 Fall Protection System Page 7 of 152 G. Fees, Licenses, Permits The successful Vendor shall be responsible for obtaining any necessary licenses, fees or permits without additional expense to the City. All equipment shall be properly licensed and insured, carry the appropriate permits and be placarded as required by law. H. Laws and Regulations The Vendor agrees to comply fully with all applicable local, State of Colorado and Federal laws and regulations and municipal ordinances. I. Work Orders The awarded Vendor(s) will be expected to sign the City’s standard work order type services agreement, a sample of which is attached as Section X for reference purposes. In the event that the City has agreements with multiple Vendors for the Work, the City reserves the right to choose which Vendor to contact regarding the project, unless order of preference has been established during the contracting process. Individual work assignments will be requested and agreed to utilizing the City’s standard Work Order (included in the agreement). Each Work Order form must include a start and completion date, total cost and a general summary of work. Subsequent supporting documentation pages may include a project schedule, deliverables, hours, cost detail supporting total cost, and personnel details. Fees outlined in the Work Order will conform with those submitted in the RFP response and subsequently included in the contract. No Work Order over $5,000 will be considered valid until signed, at a minimum, by the Vendor, project manager and Purchasing Department representative. Depending on the cost and nature of the work, additional signature authorization may be required. Any changes to the dates, cost or scope of any Work Order must be agreed upon in writing utilizing the City’s Change Order (included in the agreement) and will not be considered valid until signed, at a minimum, by the Vendor, project manager and Purchasing Department representative. J. Invoicing and Payment Invoices should be emailed monthly to invoices@fcgov.com with a copy to the Project Manager. The cost of the work completed shall be paid to the Vendor each month following the submittal of a correct invoice by the Vendor indicating the project name, task description, hours worked, personnel/work type category, hourly rate for each employee/work type category, date of the work performed specific to the task, percentage of that work that has been completed by task, 3rd party supporting documentation with the same detail and a brief progress report. Payments will be made using the prices listed on the agreed-to Price Schedule. In the event a service is requested which is not listed on the Price Schedule, the Vendor and the City will negotiate an appropriate unit price for the service prior to Consultant initiating such work. The City pays invoices on Net 30 terms. RFP 8829 Fall Protection System Page 8 of 152 III. PROPOSAL SUBMITTAL For this section, Vendors are required to provide detailed written responses to the following items in the order outlined below. The responses shall be considered technical offers of what Vendors propose to provide and shall be incorporated in the contract award as deemed appropriate by the City. A proposal that does not include all the information required may be deemed non-responsive and subject to rejection. Responses must include all the items in the order listed below. It is suggested that the Vendors include each of the City’s questions with their response immediately following the question. The City of Fort Collins shall not reimburse any firm for costs incurred in the preparation and presentation of their proposal. A. Cover Letter / Executive Summary The Executive Summary should highlight the content of the proposal and features of the program offered, including a general description of the program and any unique aspects or benefits provided by your firm. Indicate your availability to participate in the interviews/demonstrations on the proposed dates as stated in the Schedule section. B. Vendor Information 1. Describe the Vendor’s business and background 2. Number of years in the business 3. Details about ownership 4. An overview of services offered and qualifications 5. Size of the firm 6. Location(s) of offices. If multiple, please identify which will be the primary for our account. 7. Primary contact information for the company including contact name(s) and title(s), mailing address(s), phone number(s), and email address(s). Complete Section V, Vendor Statement. C. Scope of Proposal 1. Provide a detailed narrative of the services proposed if awarded the contract per the scope above. The narrative should include any options that may be beneficial for the City to consider. 2. Describe how the project would be managed and who would have primary responsibility for its timely and professional completion. Include a description regarding how the analysis will be performed for the various identified areas identified, the methods and assumptions used, and the limitations of the analysis. 3. Describe the methods and timeline of communication your firm will use with the City’s Project Manager and other parties. 4. Identify what portion of work, if any, may be subcontracted. RFP 8829 Fall Protection System Page 9 of 152 5. Complete Section II, Scope of Work: I8. Environmental Testing, describing your plan to manage asbestos containing material. D. Firm Capability Provide relevant information regarding previous experience related to this or similar Projects, to include the following: 1. Provide an Organization Chart/Proposed Project Team: An organization chart containing the names of all key personnel and sub consultants with titles and their specific task assignment for this Agreement shall be provided in this section. 2. A list of qualifications for your firm and qualifications and experience of the specific staff members proposed to perform the consulting services described above. 3. Provide a minimum of three similar projects with public agencies in the last 5 years that have involved the staff proposed to work on this project. Include the owner’s name, title of project, beginning price, ending price, contact name, email and phone number, sub- consultants on the team and a brief description of the work and any change orders. 4. Provide examples of at least two projects where you’ve worked with your sub- consultants. List the sub-consultant firm(s) for this Agreement, their area(s) of expertise, and include all other applicable information herein requested for each sub-consultant. Identify what portion of work, if any, may be sub-contracted. 5. References (current contact name, current telephone number and email address) from at least three similar projects with similar requirements that have been completed within the past five (5) years and that have involved the staff proposed to work on this project. Provide a description of the work performed. The Consultant authorizes City to verify any and all information contained in the Consultant’s submittal from references contained herein and hereby releases all those concerned providing information as a reference from any liability in connection with any information they give. E. Assigned Personnel 1. List of Project Personnel: This list should include the identification of the contact person with primary responsibility for this Agreement, the personnel proposed for this Agreement, and any supervisory personnel, including partners and/or sub consultants, and their individual areas of responsibility. 2. A resume for each professional and technical person assigned to the Agreement, including partners and/or sub consultants, shall be submitted. The résumés shall include at least three individual references from previous assignments. Please limit resumes to one page. 3. Some functions of this project may require the use of sub-consultants. If you intend to utilize sub-consultants you must list each and provide resumes for their key personnel. 4. Describe the availability of project personnel to participate in this project in the context of the Contractor firm’s other commitments. 5. Provide a list of similar projects completed in the last five (5) years by the key members of the proposed team. RFP 8829 Fall Protection System Page 10 of 152 F. Availability 1. Can the work be completed in the necessary timeframe, with target start and completion dates met? 2. Are other qualified personnel available to assist in meeting the project schedule if required? 3. Is the project team available to attend meetings as required by the Scope of Work? 4. Provide an outline of the schedule for completing tasks. 5. Describe the methods and timeline of communication your firm will use with the City’s Project Manager and other parties. G. Sustainability/TBL Methodology In concise terms (no more than two pages), please describe how your organization strives to be sustainable. Address how your firm incorporates Triple Bottom Line (TBL) into the workplace. See Section IV: Review and Assessment for additional information. If possible, please highlight areas of opportunity in the project where sustainability could be applied and/or improved. H. Cost and Work Hours Using the Price Schedule provided, Section VI, please submit your Cost to provide the Scope of Work along with cost for Alternates 1 through 14. Award of the contract is based on the lump sum base bid for four (4) turnkey fall protection. At the City’s sole option, award of any of the alternates listed may be awarded. I. Additional Information Provide any information that distinguishes Vendor from its competition and any additional information applicable to this RFP that might be valuable in assessing Vendor’s proposal. Explain any concerns Vendor may have in maintaining objectivity in recommending the best solution. All potential conflicts of interest must be disclosed. Exceptions to the Scope of Services and City Agreement (a sample of which is attached in Section X) shall be documented. RFP 8829 Fall Protection System Page 11 of 152 IV. REVIEW AND ASSESSMENT CRITERIA A. Proposal and Interview Criteria Vendors will be evaluated on the following criteria. These criteria will be the basis for review and assessment of the written proposals and optional interview session. At the discretion of the City, interviews of the top-rated Vendors may be conducted. The rating scale shall be from 1 to 5, with 1 being a poor rating, 3 being an average rating, and 5 being an outstanding rating. WEIGHTING FACTOR QUALIFICATION STANDARD 3.0 Scope of Proposal Does the proposal address all elements of the RFP? Does the proposal show an understanding of the project objectives, methodology to be used and results/outcomes required by the project? Are there any exceptions to the specifications, Scope of Work, or agreement? 2.0 Firm Capability Does the firm have the resources, financial strength, capacity and support capabilities required to successfully complete the project on- time and in-budget? Has the firm successfully completed previous projects of this type and scope? 2.0 Assigned Personnel and Availability Do the persons who will be working on the project have the necessary skills and qualifications? Are sufficient people of the requisite skills and qualifications assigned to the project? Can the work be completed in the necessary time? Can the target start date and completion dates be met? Are other qualified personnel available to assist in meeting the project schedule if required? Is the project team available to attend meetings as required by the Scope of Work? 3.0 Cost & Work Hours Does the proposal include detailed cost break- down for each cost element as applicable and are the line-item costs competitive? Do the proposed cost and work hours compare favorably with the Project Manager's estimate? Are the work hours presented reasonable for the effort required by each project task or phase? RFP 8829 Fall Protection System Page 12 of 152 B. Reference Evaluation Criteria Prior to award, the Project Manager will check references using the following criteria. Negative responses from references may impact the award determination. CRITERIA STANDARD QUESTIONS Overall Performance Would you hire this Vendor again? Did they show the skills required by this project? Timetable Was the original Scope of Work completed within the specified time? Were interim deadlines met in a timely manner? Completeness Was the Vendor responsive to client needs; did the Vendor anticipate problems? Were problems solved quickly and effectively? Budget Was the original Scope of Work completed within the project budget? Job Knowledge If a study, did it meet the Scope of Work? If Vendor administered a construction contract, was the project functional upon completion and did it operate properly? Were problems corrected quickly and effectively? RFP 8829 Fall Protection System Page 13 of 152 V. VENDOR STATEMENT Vendor hereby acknowledges receipt of the City of Fort Collins Request for Proposal and acknowledges that it has read and agrees to be fully bound by all of the terms, conditions and other provisions set forth in the RFP. Additionally, Vendor hereby makes the following representations to City: a. All of the statements and representations made in this proposal are true to the best of the Vendor’s knowledge and belief. b. Vendor commits that it is able to meet the terms provided in this proposal. c. This proposal is a firm and binding offer, for a period of 90 days from the date hereof. d. Vendor further agrees that the method of award is acceptable. e. Vendor also agrees to complete the proposed Agreement with the City of Fort Collins within 30 days of notice of award. If contract is not completed and signed within 30 days, City reserves the right to cancel and award to the next highest rated firm. f. Vendor acknowledge receipt of addenda. Firm Name: Physical Address: Remit to Address: Phone: Name of Authorized Agent of Firm: Signature of Authorized Agent: Primary Contact for Project: Title: Email Address: Phone: Cell Phone: NOTE: VENDOR STATEMENT IS TO BE SIGNED & RETURNED WITH YOUR PROPOSAL. RFP 8829 Fall Protection System Page 14 of 152 VI. PRICE SCHEDULE LUMP SUM BASE PRICE: (Four (4) Turnkey Fall Protection Systems) $___________________________ IN WORDS:____________________________________________________________ ______________________________________________________________________ Add/Alternates: SCHEDULE OF ALTERNATES Alternate No. 1: Price to provide a turnkey Fall Protection system for the Streets Department Building. $______________ Lump Sum Alternate No. 2: Price to provide a turnkey Fall Protection system for the new Nix Farm garage. $______________ Lump Sum Alternate No. 3: Price to provide a turnkey Fall Protection system for the new Nix Farm 1,200 square foot shop addition. $______________ Lump Sum Alternate No. 4: Price to provide a turnkey Fall Protection system for the original Nix Farm shop roof area east of the new addition. $______________ Lump Sum Alternate No. 5: Price to provide a turnkey Fall Protection system for the 215 N. Mason building. $______________ Lump Sum Alternate No. 6: Price to provide a turnkey Fall Protection system for the City Hall Building. $______________ Lump Sum Alternate No. 7: Price for each baseplate anchor point type noted in project. $______________ each RFP 8829 Fall Protection System Page 15 of 152 Alternate No. 8: Per lineal foot price to provide cable. $______________ L.F. Alternate No. 9: Price for a self-retracting lanyard. $______________ each Alternate No. 10: Price for a personal fall limiter. $______________ each Alternate No.11: Price to provide an annual maintenance contract by the system manufacturer. $______________ per year Alternate No. 12: Price to provide skylight fall protection screen for the Streets Department skylights. $______________ each Alternate No. 13: Price to provide a third-party fall protection inspection per project. $______________ each Alternate No. 14: Price to provide roof patching based on a per baseplate anchor installation. $______________ each ADD/ ALTERNATES: AWARD OF THE CONTRACT IS BASED ON THE LUMP SUM BASE PRICE, OR AT THE CITY’S SOLE OPTION, AWARD OF ANY OF THE ALTERNATES LISTED ABOVE. RFP 8829 Fall Protection System Page 16 of 152 VII. SPECIFICATIONS SECTION 07 7300 - FALL PROTECTION DEVICES PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Roof tie-down system of fall arrest for worker safety. 2. Lanyards 3. Skylights Screens 4. Ballasted Guardrails 1.02 REFERENCES A. American Society for Testing and Materials (ASTM) B. American National Standard Institute (ANSI) 1. ANSI Z359.1-2007 - Safety Requirements for Personal Fall Arrest Systems, Subsystems and components 2. ANSI Z359.6-2009 - Specifications and Design Requirements for Active Fall Protection Systems C. Occupational Health And Safety Administration (OSHA) 1. OSHA 1926.502 - Fall Prevention Systems Criteria and Practices 1.03 SYSTEM DESCRIPTION A. General: Provide structural and fall arrest system capable of withstanding loads and stresses within limits and under conditions specified in OSHA and other applicable safety codes. B. Provide fall protection anchors permanently attached to roof structure. Provide cable lifeline system to allow continuous travel past intermediate anchors. C. Design Requirements: Anchors and accessories comprising system of following types: 1. Roof anchors, spaced as indicated by manufacturer, for safety snap connection by individual workers capable of withstanding a safety factor of 2 meeting the requirements of OSHA 1926.502(d)(8). 2. Continuous stainless steel cable lifeline restrained by swaged terminations at anchor points, suitable for multiple safety snap connections along cable between anchors. 3. Tensioning system. 4. Pass-thru technology allowing cable shuttle to run freely past intermediate anchors without the need to disconnect from the fall protection system. D. Performance Requirements: System and components tested for the resistance of the following loads: 1. Fall Arrest: 2 Users 2. Provide engineered system capable of withstanding a safety factor of 2 meeting the requirements of OSHA 1926.502(d)(8). 3. Design system to limit loads on horizontal lifeline anchors to 1,800 pounds. E. City of Fort Collins Additional Design and Performance Requirements: 1. It is the intent for all maintenance workers on the roof to be attached, and remain attached to the installed fall protection system, except while egressing from a ladder or roof hatch. 2. All city provided maintenance work should be assumed to be from the roof (leading edge work assumption for all designs). 3. The system installed is expected, at a minimum, to meet all regulatory (OSHA) requirements. 4. The system installed must be compatible with self-retracting lanyard (SRL) at flat roofs or personal fall limiters (PFL) at pitched roofs. 5. Lanyards specific to each building will be stored on-site (location at each site to be determined by owner). Each maintenance worker allowed on roofs will have their own RFP 8829 Fall Protection System Page 17 of 152 harness they will keep with them to be used at all locations, and will use the site specific lanyard per site. 1.04 SUBMITTALS A. Product Data: For each type of device specified, including manufacturer’s standard fabrication details and installation instructions. Include active product certifications which show compliance with all applicable ASTM and OSHA standards. B. Shop Drawings: Show layout, profiles, and anchorage details. Shop drawings & calculations to be stamped by a Professional Engineer registered in the State in which the project is located. C. Maintenance and Inspection Data: Written instructions for maintenance of fall prevention safety devices to be included in the operation and maintenance manual. Include requirements for annual and biannual inspections in order to maintain certification of all fall protection systems. D. Signage: Provide laminated sign showing system layout and usage notes, to be installed at roof access locations. 1.05 STRUCTURAL DESIGN VERIFICATION A. The ability of the existing building structure to support loads transferred from the fall protection system anchor points to elements of the structure will be verified by the City's on-call third-party engineer. Dimensioned anchor point locations, anchorage details, and associated load reactions shall be provided by the fall protection system designer/vendor to City's on-call third- party engineer for review. 1.06 QUALITY ASSURANCE A. Manufacturer Qualifications: Firm having at least 10 years continuous experience in manufacturing fall safety equipment similar to systems specified and exhibiting records of successful in-service acceptability and performance. Firm must employ personnel dedicated to provide regularly scheduled Authorized and Competent Person Training courses as mandated by OSHA 1926 and 1910 for owner’s authorized safety personnel. B. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in the jurisdiction where the Project is located and who is experienced in providing engineering services of the kind indicated. Engineering services are defined as those performed for installations of roof anchors that are similar to those indicated for this Project in material, design and extent. C. OSHA Standards: Comply with Occupational Safety and Health Administration Standards for the Construction Industry 29 CFR § 1926.500 Subpart M (Fall Protection), and with applicable State Administrative Code safety standards for Fall Restraint and Fall Arrest. D. Source Limitations: Obtain all roof anchors through one source from a single manufacturer. 1.07 COORDINATION A. Contractor to coordinate installation of the fall protection systems at existing building roof structures to meet recommendations and requirements of the fall protection manufacturer. B. Contractor to coordinate installation of fall protection systems with existing structural roof framing and deck, and provide supplemental supports and deck reinforcement where required. C. Contractor to coordinate installation of post-installed fall protection anchor bolts at roof structure, and meet all installation requirements of the anchor manufacturer and applicable independent anchor bolt product testing agencies (ICC ES, IAPMO). D. Contractor to coordinate placement of roofing system, insulation and flashing to ensure water- tight integrity to roof. 1.08 WARRANTY A. Provide manufacturer’s standard warranty to guarantee products will be free from defects for a period of 12 months. Warranty period shall become effective on date of substantial completion. RFP 8829 Fall Protection System Page 18 of 152 B. Ongoing Certification Program: Provide inspection schedule and inspection requirements for annual and biannual inspections in order to actively maintain certification of all fall protection systems. PART 2 - PRODUCTS 2.01 MANUFACTURER A. A. Guardian Fall Protection Inc 1. 6305 South 231 St Street, Kent, WA, 2. Phone: 800-466-6385, fax 800-670-7892, or equal. 3. Email: Julie Shoffner, JulieS@guardianfall.com B. MSA Latchways 1. 1100 Cranberry Woods Drive, Cranberry, PA 16066 2. Phone: 1-530-387-1362 3. Email: Eric Johnson, Eric.L.Johnson@msasafety.com C. Kee Safety, Inc 1. 100 Stradtman St, Buffalo, NY 14206 2. Phone: 1-800-851-5181 2.02 HORIZONTAL LIFELINE A. Basis of Design: MSA Latchways - Constant Force Post Technology B. Other Manufacturers: 1. Guardian Fall Protection Inc - Checkmate Hybrid Horizontal Lifeline System or XSPlatforms XTS 2. Kee Safety, Inc - KeeLine for Roofs C. Lifeline components: Aluminum and type 304 or 316 stainless steel 1. Tensioner Set: Tensioning unit with turnbuckle and tension indicator. 2. Intermediate supports: Intermediate straight and elbow units to attach to roof anchors, allowing cable to slide freely. 3. Terminations: Swaged terminations to attach cable to end anchors. Cable clamps are not acceptable. D. Lifeline Cable: 5/16” diameter type 316 stainless steel wire rope as tested by fall protection device manufacturer to permit worker continuous mobility and safety. E. Cable Shuttles: Detachable cable shuttle providing secure attachment to cable at any location. Type 304 or 316 stainless steel. F. Fasteners: Unless otherwise indicated, provide stainless steel fasteners or zinc-plated fasteners with coating complying with ASTM B 633 F 1941, Class Fe/ZN 5, or equivalent. Select fasteners for type, grade, and class required. 2.03 LANYARDS A. Basis of Design: MSA Latchways - Self Retracting Lanyard (SRL) or Personal Fall Limiter (PFL) B. Other Manufacturers: 1. Guardian Fall Protection Inc. 2. Kee Safety, Inc C. Performance: Provide attachment at all times during access on roofs regardless of roof slope or distance to roof edge. 1. Personal Fall Limiter (PFL) - to be used at roof pitch locations with a 3/12 pitch or greater. a. An 8-foot PFL has been assumed in the design for the project. 2. Self Retracting Lanyard (SRL) - to be used at roof pitch locations with a shallower than a 3/12 pitch. a. A 30-foot SRL has been assumed in the design for the project. 3. Manufacturer responsible for the appropriate selection of their specific PFL or SRL system. RFP 8829 Fall Protection System Page 19 of 152 D. Quantity: Provide (2) two lanyards of the appropriate type at each building location. 2.04 SKYLIGHT SCREENS A. Basis of Design: Wasco Unit Skylight Safety Screen B. Other Manufacturers: 1. Kee Safety, Inc - KeeGuard Skylight Screens, or equal. 2. Substitutions - Permitted. C. Profile: Domed safety screen. D. Finish: Galvanized. E. Performance: Meet OSHA standard 1910.23(a)(4) and 1910.23(e)(8). 2.05 BALLASTED GUARDRAIL A. Basis of Design: Guardian - G-Rail System B. Other Manufacturers: 1. MSA Latchways: Versirail 2. Kee Safety: KeeGuard Contractor 3. Peak Fall Protection:BRM - GR 4000. C. Performance: Comply with requirements of applicable local, state, and federal requirements including: 1. OSHA: 29 CFR 1926 - Safety and Health Regulations for Construction, Subpart M-Fall Protection. 2. OSHA: 29 CFR 1910.23 - Occupational Health and Safety Standards for General Industry. 3. ANSI Z359.1 - Safety Requirements for Personal Fall Arrest Systems, Subsystems and Components. 4. CSA Z259.2.1. 5. CSA Z259.16. D. Structural performance of top rails and supports: 1. Capable of withstanding a concentrated load of 200 pounds (90.6 kg), applied to the top rail at any point and in any direction. 2. Capable of withstanding a uniform load of 50 pounds per linear foot (74.3 kg/m) applied to the top rail horizontally with a simultaneous load of 100 pounds per linear foot (148.6 kg/m) applied vertically downward. 3. Design need not provide for both concentrated and uniform loads to be applied concurrently. E. Structural performance of railing infill: 1. Capable of withstanding a horizontal concentrated load of 200 pounds (90.6 kg), applied to one foot square (.093 sm) area at any point on the infill. 2. Infill includes intermediate rails, posts and other elements. 3. Design need not provide for infill loads to be applied concurrently with top rail loading. F. Railing Sections. 1. Posts/Upstands: minimum 1-5/8 inch (42 mm) O.D. by 0.128 inch (3.25 mm) wall steel HREW tubing (Fy = 42ksi min). 2. Rails: minimum 1-5/8 inch (42 mm) O.D. by 0.128 inch (3.25 mm) wall steel HREW tubing (Fy = 42ksi min) . a. Nominal Height to Rail: 42 inches (1068 mm) to 46 inches (1168 mm). 3. Intermediate/Mid Rails: minimum 7/8 inch (20 mm) O.D. by 0.75 inch (2.0 mm) wall steel HREW tubing (Fy = 42ksi min). Provide minimum (2) rails connected to posts at a spacing no greater than at third points below top rail. 4. Counterbalance Legs: minimum 1-5/8 inch (42 mm) O.D. by 0.128 inch (3.25 mm) wall HREW tubing (Fy = 42ksi min). Provide connection to base of posts. a. Nominal Length: as required for system performance. RFP 8829 Fall Protection System Page 20 of 152 5. Material Substitution: Aluminum may be substituted for steel guardrail construction provided aluminum guardrail system is designed to provide equivalent or better performance in comparison to a steel system. 6. Finish: Aluminium natural polished or powder coating for steel to manufacturer RAL colour G. Base Plates. 1. Counter balance weights: Concrete segmented sections with mechanical connector inserts. Provide with non-skid adhesive pads adhered to the bottom of weights to resist slippage. 2.06 FABRICATION A. Fabricate work true to dimension, square, plumb, level, and free from distortions or defects detrimental to appearance and performance. B. Fabricate all components prior to delivery so that only limited assembly and drilling is required on site. C. System components shall be of same material unless otherwise indicated. D. Coordinate anchorage system with supporting structure. E. Fabricate anchoring devices as recommended by the manufacturer to provide adequate support for intended use. F. Fabricate Joints in a manner to discourage water accumulation. Provide weep holes to drain any water, which could accumulate in the exposed joints. PART 3 - EXECUTION 3.01 EXAMINATION A. Examine framing and substrate and verify conditions comply with structural requirements for proper system performance. B. Proceed with installation of roof anchors only after verifying conditions are satisfactory. 3.02 INSTALLATION A. A. Provide on-site inspection and supervision of installation of anchor and lifeline components by factory-trained representative. 3.03 FIELD QUALITY CONTROL A. An independent testing agency will perform field inspections and quality control tests, as required by the Construction Documents and Chapter 17 of the IBC. Coordinate all special inspections and testing as with the City's on-call third party Inspector. 3.04 TRAINING A. Instruct Owner's designated safety engineer in proper use of fall protection safety devices. B. Adjust system devices as required by manufacturer. Replace damaged or malfunctioning items. END OF SECTION 07 7300 RFP 8829 Fall Protection System Page 21 of 152 RFP 8829 Fall Protection System Page 22 of 152 RFP 8829 Fall Protection System Page 23 of 152 RFP 8829 Fall Protection System Page 24 of 152 RFP 8829 Fall Protection System Page 25 of 152 RFP 8829 Fall Protection System Page 26 of 152 RFP 8829 Fall Protection System Page 27 of 152 RFP 8829 Fall Protection System Page 28 of 152 RFP 8829 Fall Protection System Page 29 of 152 RFP 8829 Fall Protection System Page 30 of 152 VIII. Limited Asbestos Survey RFP 8829 Fall Protection System Page 31 of 152 RFP 8829 Fall Protection System Page 32 of 152 RFP 8829 Fall Protection System Page 33 of 152 RFP 8829 Fall Protection System Page 34 of 152 RFP 8829 Fall Protection System Page 35 of 152 RFP 8829 Fall Protection System Page 36 of 152 RFP 8829 Fall Protection System Page 37 of 152 RFP 8829 Fall Protection System Page 38 of 152 RFP 8829 Fall Protection System Page 39 of 152 RFP 8829 Fall Protection System Page 40 of 152 RFP 8829 Fall Protection System Page 41 of 152 RFP 8829 Fall Protection System Page 42 of 152 RFP 8829 Fall Protection System Page 43 of 152 RFP 8829 Fall Protection System Page 44 of 152 RFP 8829 Fall Protection System Page 45 of 152 RFP 8829 Fall Protection System Page 46 of 152 RFP 8829 Fall Protection System Page 47 of 152 RFP 8829 Fall Protection System Page 48 of 152 RFP 8829 Fall Protection System Page 49 of 152 RFP 8829 Fall Protection System Page 50 of 152 RFP 8829 Fall Protection System Page 51 of 152 RFP 8829 Fall Protection System Page 52 of 152 RFP 8829 Fall Protection System Page 53 of 152 RFP 8829 Fall Protection System Page 54 of 152 RFP 8829 Fall Protection System Page 55 of 152 RFP 8829 Fall Protection System Page 56 of 152 RFP 8829 Fall Protection System Page 57 of 152 RFP 8829 Fall Protection System Page 58 of 152 RFP 8829 Fall Protection System Page 59 of 152 RFP 8829 Fall Protection System Page 60 of 152 RFP 8829 Fall Protection System Page 61 of 152 RFP 8829 Fall Protection System Page 62 of 152 RFP 8829 Fall Protection System Page 63 of 152 RFP 8829 Fall Protection System Page 64 of 152 RFP 8829 Fall Protection System Page 65 of 152 RFP 8829 Fall Protection System Page 66 of 152 RFP 8829 Fall Protection System Page 67 of 152 RFP 8829 Fall Protection System Page 68 of 152 RFP 8829 Fall Protection System Page 69 of 152 RFP 8829 Fall Protection System Page 70 of 152 RFP 8829 Fall Protection System Page 71 of 152 RFP 8829 Fall Protection System Page 72 of 152 RFP 8829 Fall Protection System Page 73 of 152 RFP 8829 Fall Protection System Page 74 of 152 RFP 8829 Fall Protection System Page 75 of 152 RFP 8829 Fall Protection System Page 76 of 152 RFP 8829 Fall Protection System Page 77 of 152 RFP 8829 Fall Protection System Page 78 of 152 RFP 8829 Fall Protection System Page 79 of 152 RFP 8829 Fall Protection System Page 80 of 152 RFP 8829 Fall Protection System Page 81 of 152 RFP 8829 Fall Protection System Page 82 of 152 RFP 8829 Fall Protection System Page 83 of 152 RFP 8829 Fall Protection System Page 84 of 152 RFP 8829 Fall Protection System Page 85 of 152 RFP 8829 Fall Protection System Page 86 of 152 RFP 8829 Fall Protection System Page 87 of 152 RFP 8829 Fall Protection System Page 88 of 152 RFP 8829 Fall Protection System Page 89 of 152 RFP 8829 Fall Protection System Page 90 of 152 RFP 8829 Fall Protection System Page 91 of 152 RFP 8829 Fall Protection System Page 92 of 152 RFP 8829 Fall Protection System Page 93 of 152 RFP 8829 Fall Protection System Page 94 of 152 RFP 8829 Fall Protection System Page 95 of 152 RFP 8829 Fall Protection System Page 96 of 152 RFP 8829 Fall Protection System Page 97 of 152 RFP 8829 Fall Protection System Page 98 of 152 RFP 8829 Fall Protection System Page 99 of 152 RFP 8829 Fall Protection System Page 100 of 152 RFP 8829 Fall Protection System Page 101 of 152 IX. Additional Documents Attachment A - Written QA-QC Plan Attachment B - Preparatory Phase Checklist Attachment C - QC Initial Checklist Attachment D - QC Follow-Up Checklist Attachment E – City of Fort Collins Extensions for Abnormal Weather Conditions Attachment F – Debris Recycling Resources Attachment G – Waste Management Plan Form RFP 8829 Fall Protection System Page 102 of 152 Attachment A RFP 8829 Fall Protection System Page 103 of 152 RFP 8829 Fall Protection System Page 104 of 152 RFP 8829 Fall Protection System Page 105 of 152 RFP 8829 Fall Protection System Page 106 of 152 RFP 8829 Fall Protection System Page 107 of 152 RFP 8829 Fall Protection System Page 108 of 152 RFP 8829 Fall Protection System Page 109 of 152 RFP 8829 Fall Protection System Page 110 of 152 RFP 8829 Fall Protection System Page 111 of 152 RFP 8829 Fall Protection System Page 112 of 152 RFP 8829 Fall Protection System Page 113 of 152 RFP 8829 Fall Protection System Page 114 of 152 RFP 8829 Fall Protection System Page 115 of 152 RFP 8829 Fall Protection System Page 116 of 152 RFP 8829 Fall Protection System Page 117 of 152 RFP 8829 Fall Protection System Page 118 of 152 RFP 8829 Fall Protection System Page 119 of 152 RFP 8829 Fall Protection System Page 120 of 152 RFP 8829 Fall Protection System Page 121 of 152 RFP 8829 Fall Protection System Page 122 of 152 RFP 8829 Fall Protection System Page 123 of 152 RFP 8829 Fall Protection System Page 124 of 152 RFP 8829 Fall Protection System Page 125 of 152 RFP 8829 Fall Protection System Page 126 of 152 RFP 8829 Fall Protection System Page 127 of 152 RFP 8829 Fall Protection System Page 128 of 152 RFP 8829 Fall Protection System Page 129 of 152 RFP 8829 Fall Protection System Page 130 of 152 RFP 8829 Fall Protection System Page 131 of 152 RFP 8829 Fall Protection System Page 132 of 152 RFP 8829 Fall Protection System Page 133 of 152 RFP 8829 Fall Protection System Page 134 of 152 Attachment C RFP 8829 Fall Protection System Page 135 of 152 Attachment D RFP 8829 Fall Protection System Page 136 of 152 Attachment E RFP 8829 Fall Protection System Page 137 of 152 Attachment F RFP 8829 Fall Protection System Page 138 of 152 RFP 8829 Fall Protection System Page 139 of 152 Attachment G Official Purchasing Document Last updated 10/2017 RFP 8829 Fall Protection System Page 140 of 152 X. SAMPLE AGREEMENT (FOR REFERENCE ONLY – DO NOT SIGN ) SERVICES AGREEMENT WORK ORDER TYPE THIS AGREEMENT made and entered into the day and year set forth below, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and hereinafter referred to as "Service Provider". WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Services to be Performed. a. This Agreement shall constitute the basic agreement between the parties for services for . The conditions set forth herein shall apply to all services performed by the Service Provider on behalf of the City and particularly described in Work Orders agreed upon in writing by the parties from time to time. Such Work Orders, a sample of which is attached hereto as Exhibit A, consisting of one (1) page and incorporated herein by this reference, shall include a description of the services to be performed, the location and time for performance, the amount of payment, any materials to be supplied by the City and any other special circumstances relating to the performance of services. No Work Order shall exceed $ . A general scope of services is attached hereto as Exhibit C, consisting of ( ) page(s), and incorporated herein by this reference. The only services authorized under this Agreement are those which are performed after receipt of such Work Order, except in emergency circumstances where oral work requests may be issued. Oral requests for emergency actions will be confirmed by issuance of a written Work Order within two (2) working days. Irrespective of references in Exhibit A to certain named third parties, Service Provider shall be solely responsible for performance of all duties hereunder. b. The City may, at any time during the term of a particular Work Order and without invalidating such Work Order, make changes to the scope of the particular services. Such changes shall be agreed upon in writing by the parties by Change Order, a sample of which is attached hereto as Exhibit B, consisting of one (1) page and incorporated herein by this reference. 2. Changes in the Work. The City reserves the right to independently bid any services rather than issuing work to the Service Provider pursuant to this Agreement. Nothing within this Agreement shall obligate the City to have any particular service performed by the Service Provider. Official Purchasing Document Last updated 10/2017 RFP 8829 Fall Protection System Page 141 of 152 3. Time of Commencement and Completion of Services. The services to be performed pursuant to this Agreement shall be initiated as specified by each written Work Order or oral emergency service request. Oral emergency service requests will be acted upon without waiting for a written Work Order. Time is of the essence. 4. Contract Period. This Agreement shall commence , 20 and shall continue in full force and effect until , 20 , unless sooner terminated as herein provided. In addition, at the option of the City, the Agreement may be extended for additional one year periods not to exceed ( ) additional one year periods. Renewals and pricing changes shall be negotiated by and agreed to by both parties. Written notice of renewal shall be provided to the Service Provider and mailed no later than thirty (30) days prior to contract end. 5. Delay. If either party is prevented in whole or in part from performing its obligations by unforeseeable causes beyond its reasonable control and without is fault or negligence, then the party so prevented shall be excused from whatever performance is prevented by such cause. To the extent that the performance is actually prevented, the Service Provider must provide written notice to the City of such condition within fifteen (15) days from the onset of such condition. 6. Early Termination by City/Notices. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Service Provider. Such notice shall be mailed at least fifteen (15) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties. All notices provided under this Agreement shall be effective when mailed, postage prepaid and sent to the following address: Service Provider: City: Copy to: Attn: City of Fort Collins Attn: PO Box 580 Fort Collins, CO 80522 City of Fort Collins Attn: Purchasing Dept. PO Box 580 Fort Collins, CO 80522 In the event of early termination by the City, the Service Provider shall be paid for services rendered to the termination date, subject only to the satisfactory performance of the Service Provider's obligations under this Agreement. Such payment shall be the Service Provider's sole right and remedy for such termination. 7. Contract Sum. This is an open-end indefinite quantity Agreement with no fixed price. The actual amount of work to be performed will be stated on the individual Work Orders. The City makes no guarantee as to the number of Work Orders that may be issued or the actual amount of services which will in fact be requested. 8. Payments. a. The City agrees to pay and the Service Provider agrees to accept as full payment for all work done and all materials furnished and for all costs and expenses incurred in Official Purchasing Document Last updated 10/2017 RFP 8829 Fall Protection System Page 142 of 152 performance of the work the sums set forth for the hourly labor rate and material costs, with markups, stated within the Bid Schedule Proposal Form, attached hereto as Exhibit , consisting of ( ) page(s), and incorporated herein by this reference. Payment shall be made by the City only upon acceptance of the work by the City and upon the Service Provider furnishing satisfactory evidence of payment of all wages, taxes, supplies and materials, and other costs incurred in connection with the performance of such work. 9. City Representative. The City's representative will be shown on the specific Work Order and shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the work requested. All requests concerning this Agreement shall be directed to the City Representative. 10. Independent Contractor. It is agreed that in the performance of any services hereunder, the Service Provider is an independent contractor responsible to the City only as to the results to be obtained in the particular work assignment and to the extent that the work shall be done in accordance with the terms, plans and specifications furnished by the City. 11. Subcontractors. Service Provider may not subcontract any of the Work set forth in the Exhibit A, Statement of Work without the prior written consent of the city, which shall not be unreasonably withheld. If any of the Work is subcontracted hereunder (with the consent of the City), then the following provisions shall apply: (a) the subcontractor must be a reputable, qualified firm with an established record of successful performance in its respective trade performing identical or substantially similar work, (b) the subcontractor will be required to comply with all applicable terms of this Agreement, (c) the subcontract will not create any contractual relationship between any such subcontractor and the City, nor will it obligate the City to pay or see to the payment of any subcontractor, and (d) the work of the subcontractor will be subject to inspection by the City to the same extent as the work of the Service Provider. 12. Personal Services. It is understood that the City enters into the Agreement based on the special abilities of the Service Provider and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Service Provider shall neither assign any responsibilities nor delegate any duties arising under the Agreement without the prior written consent of the city. 13. Acceptance Not Waiver. The City's approval or acceptance of, or payment for any of the services shall not be construed to operate as a waiver of any rights under the Agreement or of any cause of action arising out of the performance of this Agreement. 14. Warranty. a. Service Provider warrants that all work performed hereunder shall be performed with the highest degree of competence and care in accordance with accepted standards for work of a similar nature. Official Purchasing Document Last updated 10/2017 RFP 8829 Fall Protection System Page 143 of 152 b. Unless otherwise provided in the Agreement, all materials and equipment incorporated into any work shall be new and, where not specified, of the most suitable grade of their respective kinds for their intended use, and all workmanship shall be acceptable to City. c. Service Provider warrants all equipment, materials, labor and other work, provided under this Agreement, except City-furnished materials, equipment and labor, against defects and nonconformances in design, materials and workmanship/workwomanship for a period beginning with the start of the work and ending twelve (12) months from and after final acceptance under the Agreement, regardless whether the same were furnished or performed by Service Provider or by any of its subcontractors of any tier. Upon receipt of written notice from City of any such defect or nonconformances, the affected item or part thereof shall be redesigned, repaired or replaced by Service Provider in a manner and at a time acceptable to City. 15. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this Agreement, such party may be declared in default thereof. 16. Remedies. In the event a party has been declared in default, such defaulting party shall be allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail himself of any other remedy at law or equity. If the non-defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non-defaulting party for the non-defaulting party's reasonable attorney fees and costs incurred because of the default. 17. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire Agreement between the parties and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representative, successors and assigns of said parties. 18. Indemnity/Insurance. a. The Service Provider agrees to indemnify and save harmless the City, its officers, agents and employees against and from any and all actions, suits, claims, demands or liability of any character whatsoever, brought or asserted for injuries to or death of any person or persons, or damages to property arising out of, result from or occurring in connection with the performance of any service hereunder. b. The Service Provider shall take all necessary precautions in performing the work hereunder to prevent injury to persons and property. c. Without limiting any of the Service Provider's obligations hereunder, the Service Provider shall provide and maintain insurance coverage naming the City as an additional insured under this Agreement of the type and with the limits specified within Exhibit , consisting of one (1) page, attached hereto and incorporated herein by this reference. Official Purchasing Document Last updated 10/2017 RFP 8829 Fall Protection System Page 144 of 152 The Service Provider before commencing services hereunder shall deliver to the City's Purchasing Director, P. O. Box 580, Fort Collins, Colorado 80522 one copy of a certificate evidencing the insurance coverage required from an insurance company acceptable to the city. 19. Entire Agreement. This Agreement, along with all Exhibits and other documents incorporated herein, shall constitute the entire Agreement of the parties. Covenants or representations not contained in this Agreement shall not be binding on the parties. 20. Law/Severability. This Agreement shall be governed in all respect by the laws of the State of Colorado. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction such holding shall not invalidate or render unenforceable any other provision of this Agreement. 21. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101, C.R.S., et. seq., Service Provider represents and agrees that: a. As of the date of this Agreement: 1) Service Provider does not knowingly employ or contract with an illegal alien who will perform work under this Agreement; and 2) Service Provider will participate in either the e-Verify program created in Public Law 208, 104th Congress, as amended, and expanded in Public Law 156, 108th Congress, as amended, administered by the United States Department of Homeland Security (the “e-Verify Program”) or the Department Program (the “Department Program”), an employment verification program established pursuant to Section 8- 17.5-102(5)(c) C.R.S. in order to confirm the employment eligibility of all newly hired employees to perform work under this Agreement. b. Service Provider shall not knowingly employ or contract with an illegal alien to perform work under this Agreement or knowingly enter into a contract with a subcontractor that knowingly employs or contracts with an illegal alien to perform work under this Agreement. c. Service Provider is prohibited from using the e-Verify Program or Department Program procedures to undertake pre-employment screening of job applicants while this Agreement is being performed. d. If Service Provider obtains actual knowledge that a subcontractor performing work under this Agreement knowingly employs or contracts with an illegal alien, Service Provider shall: 1) Notify such subcontractor and the City within three days that Service Provider has actual knowledge that the subcontractor is employing or contracting with an illegal alien; and 2) Terminate the subcontract with the subcontractor if within three days of receiving the notice required pursuant to this section the subcontractor does not cease employing Official Purchasing Document Last updated 10/2017 RFP 8829 Fall Protection System Page 145 of 152 or contracting with the illegal alien; except that Service Provider shall not terminate the contract with the subcontractor if during such three days the subcontractor provides information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien. e. Service Provider shall comply with any reasonable request by the Colorado Department of Labor and Employment (the “Department”) made in the course of an investigation that the Department undertakes or is undertaking pursuant to the authority established in Subsection 8-17.5-102 (5), C.R.S. f. If Service Provider violates any provision of this Agreement pertaining to the duties imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this Agreement is so terminated, Service Provider shall be liable for actual and consequential damages to the City arising out of Service Provider’s violation of Subsection 8-17.5-102, C.R.S. g. The City will notify the Office of the Secretary of State if Service Provider violates this provision of this Agreement and the City terminates the Agreement for such breach. 22. Dust Control. The Service Provider shall abide by the City of Fort Collins “Dust Control and Prevention Manual,” which is available for public download at https://www.fcgov.com/airquality/pdf/dust-prevention-and-control-manual.pdf, and is incorporated herein by this reference. The City of Fort Collins has implemented this manual for all projects performed for the City of Fort Collins or located within the City of Fort Collins City limits. 23. Special Provisions. Special provisions or conditions relating to the services to be performed pursuant to this Agreement are set forth in Exhibit - Confidentiality, consisting of one (1) page, attached hereto and incorporated herein by this reference. Official Purchasing Document Last updated 10/2017 RFP 8829 Fall Protection System Page 146 of 152 THE CITY OF FORT COLLINS, COLORADO By: Gerry Paul Purchasing Director DATE: ATTEST: APPROVED AS TO FORM: SERVICE PROVIDER'S NAME By: Printed: Title: CORPORATE PRESIDENT OR VICE PRESIDENT Date: Official Purchasing Document Last updated 10/2017 RFP 8829 Fall Protection System Page 147 of 152 EXHIBIT A WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND SERVICE PROVIDER'S NAME WORK ORDER NUMBER: PROJECT TITLE: ORIGINAL BID/RFP NUMBER & NAME: MASTER AGREEMENT EFFECTIVE DATE: Original Contract Date WORK ORDER COMMENCEMENT DATE: WORK ORDER COMPLETION DATE: MAXIMUM FEE: (time and reimbursable direct costs): PROJECT DESCRIPTION/SCOPE OF SERVICES: Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of ( ) page(s) are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Date: Name, Title ACCEPTANCE: Date: Name, Project Manager REVIEWED: Date: Name, Buyer or Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) Official Purchasing Document Last updated 10/2017 RFP 8829 Fall Protection System Page 148 of 152 EXHIBIT B CHANGE ORDER NO. PROJECT TITLE: SERVICE PROVIDER: Company Name WORK ORDER NUMBER: PO NUMBER: DESCRIPTION: 1. Reason for Change: Why is the change required? 2. Description of Change: Provide details of the changes to the Work 3. Change in Work Order Price: 4. Change in Work Order Time: ORIGINAL WORK ORDER PRICE $ .00 TOTAL APPROVED CHANGE ORDER .00 TOTAL PENDING CHANGE ORDER .00 TOTAL THIS CHANGE ORDER .00 TOTAL % OF THIS CHANGE ORDER % TOTAL C.O.% OF ORIGINAL WORK ORDER % ADJUSTED WORK ORDER COST $ .00 SERVICE PROVIDER: Date: Name, Title ACCEPTANCE: Date: Name, Project Manager REVIEWED: Date: Name, Buyer or Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) Official Purchasing Document Last updated 10/2017 RFP 8829 Fall Protection System Page 149 of 152 EXHIBIT C GENERAL SCOPE OF SERVICES Official Purchasing Document Last updated 10/2017 RFP 8829 Fall Protection System Page 150 of 152 EXHIBIT (PRICE SCHEDULE/COMPENSATION) Official Purchasing Document Last updated 10/2017 RFP 8829 Fall Protection System Page 151 of 152 EXHIBIT INSURANCE REQUIREMENTS 1. The Service Provider will provide, from insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this bid, the Service Provider shall furnish the City with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies, and containing substantially the following statement: “The insurance evidenced by this Certificate will not reduce coverage or limits and will not be cancelled, except after thirty (30) days written notice has been received by the City of Fort Collins.” In case of the breach of any provision of the Insurance Requirements, the City, at its option, may take out and maintain, at the expense of the Service Provider, such insurance as the City may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Service Provider under this Agreement. The City, its officers, agents and employees shall be named as additional insureds on the Service Provider 's general liability and automobile liability insurance policies for any claims arising out of work performed under this Agreement. 2. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. The Service Provider shall maintain during the life of this Agreement for all of the Service Provider's employees engaged in work performed under this Agreement: 1. Workers' Compensation insurance with statutory limits as required by Colorado law. 2. Employer's Liability insurance with limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee. B. Commercial General & Vehicle Liability. The Service Provider shall maintain during the life of this Agreement such commercial general liability and automobile liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this Agreement. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for each coverage, Commercial General and Vehicle, shall not be less than $1,000,000 combined single limits for bodily injury and property damage. In the event any work is performed by a subcontractor, the Service Provider shall be responsible for any liability directly or indirectly arising out of the work performed under this Agreement by a subcontractor, which liability is not covered by the subcontractor's insurance. Official Purchasing Document Last updated 10/2017 RFP 8829 Fall Protection System Page 152 of 152 EXHIBIT CONFIDENTIALITY IN CONNECTION WITH SERVICES provided to the City of Fort Collins (the “City”) pursuant to this Agreement (the “Agreement”), the Service Provider hereby acknowledges that it has been informed that the City has established policies and procedures with regard to the handling of confidential information and other sensitive materials. In consideration of access to certain information, data and material (hereinafter individually and collectively, regardless of nature, referred to as “information”) that are the property of and/or relate to the City or its employees, customers or suppliers, which access is related to the performance of services that the Service Provider has agreed to perform, the Service Provider hereby acknowledges and agrees as follows: That information that has or will come into its possession or knowledge in connection with the performance of services for the City may be confidential and/or proprietary. The Service Provider agrees to treat as confidential (a) all information that is owned by the City, or that relates to the business of the City, or that is used by the City in carrying on business, and (b) all information that is proprietary to a third party (including but not limited to customers and suppliers of the City). The Service Provider shall not disclose any such information to any person not having a legitimate need-to-know for purposes authorized by the City. Further, the Service Provider shall not use such information to obtain any economic or other benefit for itself, or any third party, except as specifically authorized by the City. The foregoing to the contrary notwithstanding, the Service Provider understands that it shall have no obligation under this Agreement with respect to information and material that (a) becomes generally known to the public by publication or some means other than a breach of duty of this Agreement, or (b) is required by law, regulation or court order to be disclosed, provided that the request for such disclosure is proper and the disclosure does not exceed that which is required. In the event of any disclosure under (b) above, the Service Provider shall furnish a copy of this Agreement to anyone to whom it is required to make such disclosure and shall promptly advise the City in writing of each such disclosure. In the event that the Service Provider ceases to perform services for the City, or the City so requests for any reason, the Service Provider shall promptly return to the City any and all information described hereinabove, including all copies, notes and/or summaries (handwritten or mechanically produced) thereof, in its possession or control or as to which it otherwise has access. The Service Provider understands and agrees that the City’s remedies at law for a breach of the Service Provider’s obligations under this Confidentiality Agreement may be inadequate and that the City shall, in the event of any such breach, be entitled to seek equitable relief (including without limitation preliminary and permanent injunctive relief and specific performance) in addition to all other remedies provided hereunder or available at law.