Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CORRESPONDENCE - BID - 7658 MISCELLANEOUS CONCRETE ANNUAL (13)
10/25/18 Work Order Number: ESTIMATE Purchase Order Number: ESTIMATE Project Title: Mulberry Street Turning Movements - Gate Access Original Bid/RFP Project Number & Name: 7658 Miscellaneous Concrete Annual Project Description: Removal of Cast in Place Curb Department(s): Engineering, FC Moves Inspectors: Nicole Hahn Location: W. Mulberry St & Tyler Ave Item Description Unit Qty Unit Cost Total Cost 202.01 Sawcut Concrete/Asphalt (0" < 4") LF 150.00 $ 3.47 $ 520.50 202.02 Sawcut Concrete/Asphalt (4" < 6") LF $ 3.68 $ - 202.03 Sawcut Concrete/Asphalt (6" < 8") LF $ 3.99 $ - 202.04 Sawcut Concrete/Asphalt (8" = 10") LF $ 5.78 $ - 202.05 Sawcut - Additional 1" Depth LF $ 1.26 $ - 202.06 Remove Concrete Sidewalk SF $ 3.57 $ - 202.07 Remove Concrete Curb & Gutter LF 150.00 $ 6.09 $ 913.50 202.08 Remove Monolithic Curb, Gutter & Sidewalk SF $ 3.89 $ - 202.09 Remove Concrete Driveway/Apron/Crosspan SF $ 4.15 $ - 202.10 Remove Concrete Pavement - 10" SF $ 4.94 $ - 202.11 Remove Concrete Pavement - Additional 1" Depth SF $ 1.05 $ - 202.12 Remove Asphalt - 6" SF $ 2.73 $ - 202.13 Remove Asphalt - Additional 1" Depth SF $ 1.05 $ - 202.14 Remove Inlet Ea $ 540.75 $ - 202.15 Remove and Haul Driveway Fillet Ea $ 52.50 $ - 202.16 Remove Flagstone SF $ 3.15 $ - 203.01 Excavation - General Less Than 50 CY CY $ 49.35 $ - 203.02 Excavation - General Over 50 CY CY $ 44.10 $ - 203.03 Excavation - Walls Only CY $ 12.08 $ - 203.04 Excavation - New Inlet Ea $ 425.25 $ - 203.05 Borrow - Less than 100 Ton Ton $ 26.25 $ - 203.06 Borrow - Over 100 Ton Ton $ 23.10 $ - 207.01 Imported Topsoil CY $ 32.81 $ - 208.01 Stormwater Protection - Rock Filled Wattle LF $ 12.08 $ - 208.02 Stormwater Protection - Recycled Rubber Filled Wattle LF 60.00 $ 16.80 $ 1,008.00 208.03 Stormwater Protection - Straw Bales Ea $ 21.00 $ - 210.01 Reset Flagstone SF $ 4.20 $ - 210.02 Reset Brick Pavers SF $ 8.40 $ - 210.03 Adjust Manhole Ea $ 105.00 $ - 210.04 Adjust Valve Box Ea $ 105.00 $ - 304.01 Aggregate Base Course/Recycled Concrete Base ≤ 5 Tons Ton $ 40.95 $ - 304.02 Aggregate Base Course/Recycled Concrete Base > 5 Tons Ton $ 38.85 $ - 304.03 Recycled Asphalt Base Ton $ 26.25 $ - 403.01 Temporary Asphalt Patching Ton $ 215.25 $ - 601.01 Exposed Sand Finish - Additional Charge SF $ 3.68 $ - 602.01 Reinforcing Steel Pound $ 2.30 $ - 602.02 Reinforcing Steel - Epoxy Coated Pound $ 3.45 $ - 604.01 Install New Area Inlet Ea $ 1,485.00 $ - 604.02 Area Inlet – Additional Foot Depth LF $ 136.50 $ - 604.03 Reconstruct Area Inlet Deck – Remove & Replace Ea $ 1,575.00 $ - 604.04 Reconstruct Area Inlet Deck - Additional Foot Opening – Remove & Replace LF $ 136.50 $ - 604.05 Reconstruct Catch Basin Deck - Remove & Replace Ea $ 780.00 $ - 604.06 Reconstruct Catch Basin Deck - Additional Foot Opening – Remove & Replace LF $ 151.20 $ - 604.07 Install New Curb Inlet – 4’ Opening Ea $ 2,003.00 $ - 604.08 Curb Inlet – Additional Foot Depth LF $ 115.50 $ - 604.09 Reconstruct Curb Inlet Deck – Remove and Replace Ea $ 761.25 $ - 604.10 Reconstruct Curb Inlet Deck – Additional Foot Opening – Remove and Replace LF $ 136.50 $ - 604.11 Install New Type R Inlet - 5' Opening Ea $ 3,680.00 $ - 608.22 Flatwork - 6" SF $ 6.09 $ - 608.23 Replace Flatwork - 1" Additional Depth SF $ 1.10 $ - 608.24 Concrete Pavement 8" (Joints Sealed) SF $ 8.56 $ - 608.25 Alley Approach - 8" SF $ 8.51 $ - 608.26 Enhanced Crosswalk - 10" Tile Red SF $ 13.13 $ - 608.27 Enhanced Crosswalk - 10" San Diego Buff SF $ 11.87 $ - 608.28 Enhanced Crosswalk - 10" Brick Red, Stamped SF $ 14.07 $ - 608.29 Colored Trail with Fibermesh - 5" Yosemite Brown SF $ 7.46 $ - 608.30 Mow Strip - 4" x 12" LF $ 9.71 $ - 608.31 Splashblock - 4" Exposed Aggregate SF $ 7.46 $ - 608.32 Splashblock - 4" San Diego Buff SF $ 7.82 $ - 608.33 Median Cover - 4" San Diego Buff SF $ 7.82 $ - 608.34 Fibermesh - Added to Any Item - Additional Charge Pounds /CY $ 10.76 $ - 608.35 24 Hour High Early Concrete - Added to Any Item - Additional Charge CY $ 21.00 $ - 608.36 Stamp Pattern - Added to Any Item, Additional Charge SF $ 2.89 $ - 608.37 6" Concrete Bollard Ea $ 464.00 $ - 608.38 8" Concrete Bollard Ea $ 580.00 $ - 608.39 Flowable Fill CY $ 120.75 $ - 608.40 Non-reinforced Concrete Wall - 8" Sq Face Foot $ 17.33 $ - 608.41 Non-reinforced Concrete Footer - 8" SF $ 17.33 $ - 608.42 Concrete Staining/Sealing (100, 2" holes) SF 20.00 $ 4.20 $ 84.00 608.43 Expansion and Caulking LF $ 4.15 $ - 608.44 Joint Sealant (Pavement) LF $ 4.46 $ - 608.45 Irrigation Sleeve LF $ 4.46 $ - 608.46 Dump Fee Ton $ 58.80 $ - 608.47 Asphalt Paving Preservation LF $ 5.78 $ - 630.01 "NO PARKING" Sign With Stand Ea Per Day $ 2.10 $ - 630.02 Vertical Panel Without Light Ea Per Day 500.00 $ 1.31 $ 655.00 630.03 Channelizing Barrels Ea Per Day $ 1.58 $ - 630.04 Type I/II Barricade Without Light Ea Per Day $ 0.68 $ - 630.05 Type III Barricade Without Light Ea Per Day $ 3.94 $ - 630.06 Size A Sign With Stand Ea Per Day 60.00 $ 1.89 $ 113.40 630.07 Size B Sign With Stand Ea Per Day $ 2.10 $ - 630.08 Size A Specialty Sign - Cost of Manufacturing Ea $ 73.50 $ - 630.09 Size B Specialty Sign - Cost of Manufacturing Ea $ 78.75 $ - 630.10 Cone With Reflective Strip Ea Per Day 50.00 $ 0.84 $ 42.00 630.11 Safety Fence Ea Per Day $ 4.46 $ - 630.12 Light Ea Per Day $ 0.53 $ - 630.13 Advance Warning Flashing or Sequencing Arrow Panel Ea Per Day $ 78.75 $ - 630.14 Variable Message Board Ea Per Day $ 183.75 $ - 630.15 Traffic Control Supervisor Per Day 5.00 $ 434.70 $ 2,173.50 630.16 Traffic Control Supervisor Per Hour $ 45.15 $ - 630.17 Flagging Hour 50.00 $ 29.93 $ 1,496.50 FA1 Laborer Hour 24.00 $ 30.98 $ 743.52 FA2 Foreman Hour 8.00 $ 44.10 $ 352.80 FA3 Finisher Hour $ 39.90 $ - FA4 Form Setter Hour $ 38.33 $ - FA5 Skid Steer Hour $ 94.50 $ - FA6 Mini Trackhoe Hour $ 99.75 $ - FA7 Dump Truck Hour $ 84.00 $ - FA8 Backhoe Hour $ 99.75 $ - TOTAL $ 8,686.22 Total Traffic Control $ 4,480.40 Total Asphalt $ - Total Concrete $ 4,205.82 Total $ 8,686.22 604.12 Type R Inlet – Additional Foot Depth LF $ 173.25 $ - 604.13 Reconstruct Type R Inlet Deck – Remove and Replace Ea $ 1,286.25 $ - 604.14 Reconstruct Type R Inlet Deck – Additional Foot Opening – Remove and Replace LF $ 131.25 $ - 604.15 Install New Modified Type 13 Curb Inlet (includes new Frame, Grate & Adjustable Curb Bonnet) Ea $ 2,645.00 $ - 604.16 Modified Type 13 Curb Inlet – Additional Foot Depth LF $ 168.00 $ - 604.17 Reconstruct Modified Type 13 Curb Inlet Deck – Remove & Replace Ea $ 1,737.75 $ - 604.18 Reconstruct Modified Type 13 Curb Inlet Deck – Additional Foot Opening – Remove and Replace LF $ 252.00 $ - 604.19 Modified Type 13 Curb Inlet – Materials only - (Frame, Grate, & adjustable bonnet (East Jordan Iron Works 7030 or Equivalent Material) Ea $ 760.00 $ - 604.20 Concrete Sidewalk Culvert – 4’ opening Ea $ 624.75 $ - 604.21 Metal Sidewalk Culvert - 2' Opening, Remove & Replace Ea $ 625.00 $ - 604.22 Metal Sidewalk Culvert - 2' Opening, Materials Only Ea $ 2,130.00 $ - 604.23 Additional Square Foot 5/8" Plate SF $ 215.00 $ - 608.01 Driveover Curb, Gutter & 6" Sidewalk LF $ 44.10 $ - 608.02 Driveover Curb and Gutter - No Sidewalk LF $ 24.68 $ - 608.03 Vertical Curb, Gutter and 6" Sidewalk LF $ 45.57 $ - 608.04 Vertical Curb and Gutter - No Sidewalk LF $ 28.35 $ - 608.05 Out Fall Curb & Gutter LF $ 22.68 $ - 608.06 Hollywood Curb, Gutter and 6" Sidewalk LF $ 32.18 $ - 608.07 Hollywood Curb and Gutter - No Sidewalk LF $ 20.06 $ - 608.08 Highback Curb and Gutter - No Sidewalk LF 15.00 $ 38.90 $ 583.50 608.09 Barrier Curb - 6" x 18" LF $ 25.36 $ - 608.10 Barrier Curb - Key Way Style LF $ 25.36 $ - 608.11 Barrier Curb - Epoxy LF $ 20.21 $ - 608.12 Mountable Curb - 12" x 18" LF $ 25.99 $ - 608.13 Mountable Curb - Keyway Style LF $ 25.36 $ - 608.14 Mountable Curb – Epoxy LF $ 24.68 $ - 608.15 Pedestrian Access Ramp SF $ 8.03 $ - 608.16 Pedestrian Access Ramp, Highback Curb SF $ 9.08 $ - 608.17 Truncated Dome Panel SF $ 52.75 $ - 608.18 Apron - 8" SF $ 8.56 $ - 608.19 Crosspan - 8" SF $ 8.56 $ - 608.20 Valley Pan - 6" SF $ 7.61 $ - 608.21 Flatwork - 4" SF $ 5.25 $ -