Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CORRESPONDENCE - BID - 8197 SMALL LANDSCAPE & IRRIGATION ANNUAL (6)
Landscape Quote Date 9/17/2018 Estimate # 20854 Name / Address CITY OF FORT COLLINS ATTN: JILL WUERTZ P.O. BOX 580 FT COLLINS, CO 80521 Ship To Controller Renovations Streetscapes 2018 Korby Landscaping LLC 2406 E CTY RD 60 Wellington CO 80549 P.O. No. Terms Net 30 Due Date 10/1/2017 Project Signature Phone # Fax # E-mail Web Site Total Sales Tax (7.4%) 970.232.1127 970.568.7635 INFO@KORBYSOD.COM WWW.KORBYLANDSCAPE.COM Description Qty Cost Total 3031 Pleasant Valley Dr 1" Tap 22 Station Controller 1" Rainbird PESB-PRS Master Valve 1 160.00 160.00 1" CST Flow Sensor 1 320.00 320.00 Irrigation Parts for INstallation of Hydrometer & Master Valve 1 500.00 500.00 Irrigation Labor for Trenching & Installation of Master Valve & Flow Sensor Backflow & Flow Sensor Across Street 34 50.00 1,700.00 Cold Rolled Pedestal Weathertrak 1 650.00 650.00 Weathertrak Pro3 24 Zone Controller 1 3,100.00 3,100.00 Cold Rolled Pedestal Weathertrak 1 850.00 850.00 Irrigation Parts for Controller Installation Including sweeps physical ground and concrete pad 1 550.00 550.00 Irrigation Labor for Installation of Irrigation Controller 16 50.00 800.00 3911 Shields 1" Tap 22 Station Controller Wall Mounted No Pedestal & Pad 1" Rainbird PESB-PRS Master Valve 1 160.00 160.00 1" CST Flow Sensor 1 320.00 320.00 Irrigation Parts for INstallation of Hydrometer & Master Valve 1 500.00 500.00 Page 1 DocuSign Envelope ID: 34BA41F1-44DC-4E2F-B417-C3E9CA1BF78E Landscape Quote Date 9/17/2018 Estimate # 20854 Name / Address CITY OF FORT COLLINS ATTN: JILL WUERTZ P.O. BOX 580 FT COLLINS, CO 80521 Ship To Controller Renovations Streetscapes 2018 Korby Landscaping LLC 2406 E CTY RD 60 Wellington CO 80549 P.O. No. Terms Net 30 Due Date 10/1/2017 Project Signature Phone # Fax # E-mail Web Site Total Sales Tax (7.4%) 970.232.1127 970.568.7635 INFO@KORBYSOD.COM WWW.KORBYLANDSCAPE.COM Description Qty Cost Total Irrigation Labor for Trenching & Installation of Master Valve & Flow Sensor ( Backflow In Streetscapes across from controller) 34 50.00 1,700.00 Weathertrak Pro3 24 Zone Controller 1 3,100.00 3,100.00 Irrigation Parts for Controller Installation ( New Conduit and Physical Ground) 1 450.00 450.00 Irrigation Labor for Installation of Irrigation Controller 18 50.00 900.00 3033 S Shields ( 1" Tap 14 Zones) 1" Rainbird PESB-PRS Master Valve 1 160.00 160.00 1" CST Flow Sensor 1 320.00 320.00 Irrigation Parts for INstallation of Hydrometer & Master Valve 1 500.00 500.00 Irrigation Labor for Trenching & Installation of Master Valve & Flow Sensor 22 50.00 1,100.00 Cold Rolled Pedestal Weathertrak 1 650.00 650.00 Weathertrak Pro3 18 Zone Controller 1 2,250.00 2,250.00 Irrigation Parts for Controller Installation Including sweeps physical ground and concrete pad 1 550.00 550.00 Irrigation Labor for Installation of Irrigation Controller Pad and Pedestal 16 50.00 800.00 Page 2 _____________________________________ $22,090.00 $0.00 DocuSign Envelope ID: 34BA41F1-44DC-4E2F-B417-C3E9CA1BF78E