Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8106 UTILITY INFRASTRUCTURE CONSTRUCTION SERVICES FOR WATER, WASTEWATER, AND STORMWATER FACILITIES CAPITAL IMPROVEMENTSSoil Investigation Castlerock Dr. Sanitary Sewer Repair 00950-1 SECTION 00950 CHANGE ORDER NO. PROJECT TITLE: Soil Investigation Castlerock Dr Sanitary Sewer Repair CONTRACTOR: Garney Construction Inc. PROJECT NUMBER: PO# 9177483 DESCRIPTION: 1. Reason for change: Time and materials work completed was less than schedule of values in original contract. 2. Description of Change: The final cost of several work items was less than original contract such as Mobilization and Pipe Bursting. 3. Change in Contract Cost: ($13,976.75) 4. Change in Contract Time: None ORIGINAL CONTRACT COST $ 32,000.00 TOTAL APPROVED CHANGE ORDERS 0.00 TOTAL PENDING CHANGE ORDERS 0.00 TOTAL THIS CHANGE ORDER ($13,976.75) THIS C.O. % OF ORIGINAL CONTRACT -43.68% TOTAL C.O.’S % OF ORIGINAL CONTRACT -43.68% ADJUSTED CONTRACT COST $ 18,023.25 (Assuming all change orders approved) ACCEPTED BY: DATE: Contractor's Representative ACCEPTED BY: DATE: Project Manager REVIEWED BY: DATE: Owen Randall, Chief Engineer APPROVED BY: DATE: Theresa Connor, Water Eng. & Field Ops Manager APPROVED BY: DATE: Gerry S Paul, Director of Purchasing and Risk Management If over $60,000 cc: Project File Contractor DocuSign Envelope ID: BAD9EB0A-54B2-4942-B284-58FF80DFD16C