Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CORRESPONDENCE - BID - 7658 MISCELLANEOUS CONCRETE ANNUAL (6)
Contract: 2018 City of Fort Collins Miscellaneous Department(s): Engineering Inspectors: Nicole Hahn & Jeff Usher Location: W. Mulberry Improvements on Impala Drive Item Description Unit Qty Unit Cost Total Cost 202.01 Sawcut Concrete/Asphalt (0" < 4") LF $ 3.30 $ - 202.02 Sawcut Concrete/Asphalt (4" < 6") LF $ 3.50 $ - 202.03 Sawcut Concrete/Asphalt (6" < 8") LF 74.00 $ 3.80 $ 281.20 202.04 Sawcut Concrete/Asphalt (8" = 10") LF $ 5.50 $ - 202.05 Sawcut - Additional 1" Depth LF $ 1.20 $ - 202.06 Remove Concrete Sidewalk SF 217.80 $ 3.40 $ 740.52 202.07 Remove Concrete Curb & Gutter LF 43.40 $ 5.80 $ 251.72 202.08 Remove Monolithic Curb, Gutter & Sidewalk SF $ 3.70 $ - 202.09 Remove Concrete Driveway/Apron/Crosspan SF $ 3.95 $ - 202.10 Remove Concrete Pavement - 10" SF $ 4.70 $ - 202.11 Remove Concrete Pavement - Additional 1" Depth SF $ 1.00 $ - 202.12 Remove Asphalt - 6" SF 814.00 $ 2.60 $ 2,116.40 202.13 Remove Asphalt - Additional 1" Depth SF $ 1.00 $ - 202.14 Remove Inlet Ea $ 515.00 $ - 202.15 Remove and Haul Driveway Fillet Ea $ 50.00 $ - 202.16 Remove Flagstone SF $ 3.00 $ - 203.01 Excavation - General Less Than 50 CY CY $ 47.00 $ - 203.02 Excavation - General Over 50 CY CY $ 42.00 $ - 203.03 Excavation - Walls Only CY $ 11.50 $ - 203.04 Excavation - New Inlet Ea $ 405.00 $ - 203.05 Borrow - Less than 100 Ton Ton $ 25.00 $ - 203.06 Borrow - Over 100 Ton Ton $ 22.00 $ - 207.01 Imported Topsoil CY 2.00 $ 31.25 $ 62.50 208.01 Stormwater Protection - Rock Filled Wattle LF $ 11.50 $ - 208.02 Stormwater Protection - Recycled Rubber Filled Wattle LF 84.00 $ 16.00 $ 1,344.00 208.03 Stormwater Protection - Straw Bales Ea $ 20.00 $ - 210.01 Reset Flagstone SF $ 4.00 $ - 210.02 Reset Brick Pavers SF $ 8.00 $ - 210.03 Adjust Manhole Ea $ 100.00 $ - 210.04 Adjust Valve Box Ea $ 100.00 $ - 304.01 Aggregate Base Course/Recycled Concrete Base ≤ 5 Tons Ton 3.30 $ 39.00 $ 128.70 304.02 Aggregate Base Course/Recycled Concrete Base > 5 Tons Ton 58.20 $ 37.00 $ 2,153.40 304.03 Recycled Asphalt Base Ton $ 25.00 $ - 403.01 Temporary Asphalt Patching Ton $ 205.00 $ - 601.01 Exposed Sand Finish - Additional Charge SF $ 3.50 $ - 602.01 Reinforcing Steel Pound $ 2.15 $ - 602.02 Reinforcing Steel - Epoxy Coated Pound $ 3.20 $ - 604.01 Install New Area Inlet Ea $ 1,375.00 $ - 604.02 Area Inlet – Additional Foot Depth LF $ 130.00 $ - 604.03 Reconstruct Area Inlet Deck – Remove & Replace Ea $ 1,500.00 $ - 604.04 Reconstruct Area Inlet Deck - Additional Foot Opening – Remove & Replace LF $ 130.00 $ - 604.05 Reconstruct Catch Basin Deck - Remove & Replace Ea $ 725.00 $ - 604.06 Reconstruct Catch Basin Deck - Additional Foot Opening – Remove & Replace LF $ 144.00 $ - 604.07 Install New Curb Inlet – 4’ Opening Ea $ 1,855.00 $ - 604.08 Curb Inlet – Additional Foot Depth LF $ 110.00 $ - 604.09 Reconstruct Curb Inlet Deck – Remove and Replace Ea $ 725.00 $ - 604.10 Reconstruct Curb Inlet Deck – Additional Foot Opening – Remove and Replace LF $ 130.00 $ - 604.11 Install New Type R Inlet - 5' Opening Ea $ 3,410.00 $ - 604.12 Type R Inlet – Additional Foot Depth LF $ 165.00 $ - 604.13 Reconstruct Type R Inlet Deck – Remove and Replace Ea $ 1,225.00 $ - 604.14 Reconstruct Type R Inlet Deck – Additional Foot Opening – Remove and Replace LF $ 125.00 $ - 604.15 Install New Modified Type 13 Curb Inlet (includes new Frame, Grate & Adjustable Curb Bonnet) Ea $ 2,450.00 $ - 608.26 Enhanced Crosswalk - 10" Tile Red SF $ 12.50 $ - 608.27 Enhanced Crosswalk - 10" San Diego Buff SF $ 11.30 $ - 608.28 Enhanced Crosswalk - 10" Brick Red, Stamped SF $ 13.40 $ - 608.29 Colored Trail with Fibermesh - 5" Yosemite Brown SF $ 7.10 $ - 608.30 Mow Strip - 4" x 12" LF $ 9.75 $ - 608.31 Splashblock - 4" Exposed Aggregate SF $ 7.10 $ - 608.32 Splashblock - 4" San Diego Buff SF $ 7.45 $ - 608.33 Median Cover - 4" San Diego Buff SF $ 7.45 $ - 608.34 Fibermesh - Added to Any Item - Additional Charge Pounds /CY $ 10.25 $ - 608.35 24 Hour High Early Concrete - Added to Any Item - Additional Charge CY $ 20.00 $ - 608.36 Stamp Pattern - Added to Any Item, Additional Charge SF $ 2.75 $ - 608.37 6" Concrete Bollard Ea $ 430.00 $ - 608.38 8" Concrete Bollard Ea $ 540.00 $ - 608.39 Flowable Fill CY $ 115.00 $ - 608.40 Non-reinforced Concrete Wall - 8" Sq Face Foot $ 16.50 $ - 608.41 Non-reinforced Concrete Footer - 8" SF $ 16.50 $ - 608.42 Concrete Staining/Sealing SF $ 4.00 $ - 608.43 Expansion and Caulking LF 31.00 $ 3.95 $ 122.45 608.44 Joint Sealant (Pavement) LF $ 4.25 $ - 608.45 Irrigation Sleeve LF $ 4.25 $ - 608.46 Dump Fee EA $ 56.00 $ - 608.47 Asphalt Paving Preservation LF 74.00 $ 5.50 $ 407.00 630.01 "NO PARKING" Sign With Stand Ea Per Day $ 2.00 $ - 630.02 Vertical Panel Without Light Ea Per Day 106.00 $ 1.25 $ 132.50 630.03 Channelizing Barrels Ea Per Day 24.00 $ 1.50 $ 36.00 630.04 Type I/II Barricade Without Light Ea Per Day $ 0.65 $ - 630.05 Type III Barricade Without Light Ea Per Day 24.00 $ 3.75 $ 90.00 630.06 Size A Sign With Stand Ea Per Day 108.00 $ 1.80 $ 194.40 630.07 Size B Sign With Stand Ea Per Day 18.00 $ 2.00 $ 36.00 630.08 Size A Specialty Sign - Cost of Manufacturing Ea $ 70.00 $ - 630.09 Size B Specialty Sign - Cost of Manufacturing Ea $ 75.00 $ - 630.10 Cone With Reflective Strip Ea Per Day 86.00 $ 0.80 $ 68.80 630.11 Safety Fence Ea Per Day $ 4.25 $ - 630.12 Light Ea Per Day $ 0.50 $ - 630.13 Advance Warning Flashing or Sequencing Arrow Panel Ea Per Day $ 75.00 $ - 630.14 Variable Message Board Ea Per Day $ 175.00 $ - 630.15 Traffic Control Supervisor Per Day $ 414.00 $ - 630.16 Traffic Control Supervisor Per Hour 38.50 $ 43.00 $ 1,655.50 630.17 Flagging Hour 36.00 $ 29.50 $ 1,062.00 FA1 Laborer Hour $ 29.50 $ - FA2 Foreman Hour 3.00 $ 42.00 $ 126.00 FA3 Finisher Hour $ 38.00 $ - FA4 Form Setter Hour $ 36.50 $ - FA5 Skid Steer Hour 3.00 $ 90.00 $ 270.00 FA6 Mini Trackhoe Hour $ 95.00 $ - FA7 Dump Truck Hour 0.58 $ 80.00 $ 46.40 FA8 Backhoe Hour $ 95.00 $ - TOTAL $ 22,038.74 Total Traffic Control $ 3,275.20 Total Asphalt $ - Total Concrete $ 18,763.54 Total $ 22,038.74 FA7 Dump Truck - base differential 604.16 Modified Type 13 Curb Inlet – Additional Foot Depth LF $ 160.00 $ - 604.17 Reconstruct Modified Type 13 Curb Inlet Deck – Remove & Replace Ea $ 1,655.00 $ - 604.18 Reconstruct Modified Type 13 Curb Inlet Deck – Additional Foot Opening – Remove and Replace LF $ 240.00 $ - 604.19 Modified Type 13 Curb Inlet – Materials only - (Frame, Grate, & adjustable bonnet (East Jordan Iron Works 7 Ea $ 705.00 $ - 604.20 Concrete Sidewalk Culvert – 4’ opening Ea $ 595.00 $ - 604.21 Metal Sidewalk Culvert - 2' Opening, Remove & Replace Ea $ 580.00 $ - 604.22 Metal Sidewalk Culvert - 2' Opening, Materials Only Ea $ 1,975.00 $ - 604.23 Additional Square Foot 5/8" Plate SF $ 200.00 $ - 608.01 Driveover Curb, Gutter & 6" Sidewalk LF $ 42.00 $ - 608.02 Driveover Curb and Gutter - No Sidewalk LF $ 23.50 $ - 608.03 Vertical Curb, Gutter and 6" Sidewalk LF $ 43.40 $ - 608.04 Vertical Curb and Gutter - No Sidewalk LF 43.40 $ 27.00 $ 1,171.80 608.05 Out Fall Curb & Gutter LF $ 21.60 $ - 608.06 Hollywood Curb, Gutter and 6" Sidewalk LF $ 30.65 $ - 608.07 Hollywood Curb and Gutter - No Sidewalk LF $ 19.10 $ - 608.08 Highback Curb and Gutter - No Sidewalk LF $ 37.05 $ - 608.09 Barrier Curb - 6" x 18" LF $ 24.15 $ - 608.10 Barrier Curb - Key Way Style LF $ 24.15 $ - 608.11 Barrier Curb - Epoxy LF $ 19.25 $ - 608.12 Mountable Curb - 12" x 18" LF $ 24.75 $ - 608.13 Mountable Curb - Keyway Style LF $ 23.75 $ - 608.14 Mountable Curb – Epoxy LF $ 23.50 $ - 608.15 Pedestrian Access Ramp SF 226.32 $ 7.65 $ 1,731.35 608.16 Pedestrian Access Ramp, Highback Curb SF $ 8.65 $ - 608.17 Truncated Dome Panel SF 24.00 $ 49.00 $ 1,176.00 608.18 Apron - 8" SF $ 8.15 $ - 608.19 Crosspan - 8" SF $ 8.15 $ - 608.20 Valley Pan - 6" SF $ 7.25 $ - 608.21 Flatwork - 4" SF $ 5.00 $ - 608.22 Flatwork - 6" SF $ 5.80 $ - 608.23 Replace Flatwork - 1" Additional Depth SF $ 1.05 $ - 608.24 Concrete Pavement 8" (Joints Sealed) SF 814.00 $ 8.15 $ 6,634.10 608.25 Alley Approach - 8" SF $ 8.10 $ -