CORRESPONDENCE - RFP - 7546 DIRECTIONAL BORING & TRENCING SERVICES
Change Order Form (for Work Orders) Official Purchasing Form Last updated 10/2017 CHANGE ORDER NO. 1 PROJECT TITLE: W. Drake Pkwy boring CONTRACTOR: Colorado Boring WORK ORDER NUMBER: PO NUMBER: 9184795 DESCRIPTION: 1. Reason for Change: Site dictated additional bore length 2. Description of Change: traffic control, boring length went from 600' to 890', and additional potholing 3. Change in Work Order Price: 4. Completion Date (if changed): 09 17, 2018 ORIGINAL WORK ORDER PRICE $ 11,597.80 TOTAL APPROVED CHANGE ORDER .00 TOTAL PENDING CHANGE ORDER .00 TOTAL THIS CHANGE ORDER 10,841.60 TOTAL % OF THIS CHANGE ORDER % TOTAL C.O.% OF ORIGINAL WORK ORDER 193% ADJUSTED WORK ORDER COST $ 22,439.40.00 CONTRACTOR: Colorado Boring By: Date: Name: Title: ACCEPTANCE: Date: Jill Wuertz, Project Manager REVIEWED: Date: Pat Johnson, Buyer or Senior Buyer ACCEPTANCE: Date: Dawna Gorkowski, Title ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) DocuSign Envelope ID: 3BD77B43-329D-44FC-A66A-E3E1264236D7 9/17/2018 12:00:38 PM PDT Financial Analyst 9/17/2018 12:22:39 PM PDT Managing Member 9/17/2018 12:02:43 PM PDT Jon Jacobs 9/17/2018 12:58:00 PM PDT Invoice Invoice # 15092 3813 Canal Dr. Ft.Collins, CO. 80524 970-494-1996 FAX 970-494-4449 Company City of Ft. Collins Power Date 9/10/2018 Address 700 Wood St. PO # City, State Ft. Collins, CO. 80522 Rep Phone Contact Jill W. Qty Description Unit Price Total 0 Trenching $ 7.00 $ - 0 1-2" Directional Bore $ 8.00 $ - 0 1-3" Directional Bore $ 8.00 $ - 0 2-2" Directional Bore $ 9.00 $ - 0 2-3" Directional Bore $ 10.50 $ - 0 3-2" Directional Bore $ 11.50 $ - 890 1-4" Directional Bore $ 9.00 $ 8,010.00 0 1-4" and 1-2" Directional Bore $ 10.50 $ - 0 1-4" and 2-2" Directional Bore $ 12.00 $ - 0 1-4" and 3-2" Directional Bore $ 14.50 $ - 0 2-2" and 2-3" Directional Bore $ 16.00 $ - 0 1-5" Directional Bore $ 10.00 $ - 0 2-5" Directional Bore $ 15.00 $ - 0 3-5" Directional Bore $ 17.00 $ - 0 1-6" Directional Bore $ 11.00 $ - 0 2-6" Directional Bore $ 16.00 $ - 0 3-6" Directional Bore $ 18.00 $ - 0 8-5" & 2-2" Directional Bore $ 96.00 $ - 12 Mud Control Vacuum Machine per hour $ 125.00 $ 1,500.00 7 Pothole in Paved Surfaces each $ 145.00 $ 1,015.00 46 Pothole in Unpaved Surfaces each $ 75.00 $ 3,450.00 0 Pothole Crew per day $ 950.00 $ - 7 Pavement Pothole Restoration per sq. ft. $ 12.00 $ 84.00 0 Concrete Pothole Restoration per sq. ft. $ 14.50 $ - 46 Dirt Pothole Restoration per sq. ft. $ 12.00 $ 552.00 35 Replace Sod per sq. ft. $ 1.00 $ 35.00 0 Replace Paved Asphalt Surface per cubic ft. $ 10.00 $ - 0 Replace Paved Concrete Surface per cu.ft. $ 24.00 $ - 0 Sawcut Asphalt less than 4" per ft. $ 2.10 $ - 0 Sawcut Concrete less than 4" per ft. $ 3.91 $ - 7 Core Drill Asphalt less than 4" each $ 45.00 $ 315.00 0 Core Drill Concrete less than 4" each $ 45.00 $ - 0 Install Vault 12"-18"-18" $ 45.00 $ - 0 Install Vault 14"-24"-18" $ 55.00 $ - 0 Install Vault 24"-36"-18" $ 65.00 $ - 0 Install Vault 36"-48"-30" $ 140.00 $ - 0 Install Vault 48"-96"-48" $ 25.00 $ - DocuSign Envelope ID: 3BD77B43-329D-44FC-A66A-E3E1264236D7 Page 2 Qty Description Unit Price Total 0 Locate Private Sewer Lateral $ 210.00 $ - 0 Locate Private Water Lateral $ 65.00 $ - 6 3 Man Labor Crew pr hr (large exc. Pit) $ 135.00 $ 810.00 0 2" HDPE pipe $ 0.80 $ - 890 4" HDPE pipe $ 4.56 $ 4,058.40 4 Traffic Management Day Standard $ 485.00 $ 1,940.00 0 Traffic Management Day 4 Hour Notice $ 685.00 $ - 0 Traffic Management Day Emergency $ 785.00 $ - 0 LS Additional 7pm - 7am . Weekend $ 210.00 $ - 4 Arrow Board Rental per day $ 65.00 $ 260.00 0 Flagger per hour $ 38.00 $ - 25 Cones each per day $ 4.00 $ 100.00 3 Sign Panel B per day $ 28.00 $ 84.00 2 Sign Panel A per day $ 28.00 $ 56.00 0 Sign Panel Special per day $ 31.00 $ - 0 Overnight Closure per day (no monitoring) $ 55.00 $ - 0 Mechanical/Bore Pits $ 300.00 $ - 0 Mud control (Super Vacuum) per hr. $ 375.00 $ - 0 Hydro Excavation per hr. $ 450.00 $ - 0 Pipe Spacers (material only) $ 135.00 $ - 0 Steel Banding (material only) per ft. $ 1.22 $ - 0 Assemble spacer and banding per ft. $ 5.50 $ - $ - 0 Perfromance and Payment Bonds $ - $ - 1 Ft. Collins ROW permit $ 170.00 $ 170.00 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Subtotal $ 22,439.40 Job Location Taxes Drake and Yorkshire Total $ 22,439.40 Ft. Collins, CO. Thank You DocuSign Envelope ID: 3BD77B43-329D-44FC-A66A-E3E1264236D7 PURCHASE ORDER PO Number Page 9184795 1 of 1 This number must appear on all invoices, packing slips and labels. Department Copy Date: 08/10/2018 parkshop@fcgov.com Vendor : 180828 Ship To: PARK MAINTENANCE COLORADO BORING CITY OF FORT COLLINS ATTN: JOHN JACOBS 413 S BRYAN 3813 CANAL DR FORT COLLINS CO 80521 FORT COLLINS CO 80524 Req #: 00060542 Delivery Date: 08/09/2018 Buyer: PAT JOHNSON Note: 7546 Directional Boring & Trenching Line Description Quantity Ordered UOM Unit Price Extended Price 1 W. Drake Bores for Irrigation 1 LOT LS 11,597.80 703030.564010.6025 Total $11,597.80 DocuSign Envelope ID: 3BD77B43-329D-44FC-A66A-E3E1264236D7