Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8475 CIVIL ENGINEERING PROFESSIONAL ON-CALLPROJECT TITLE: CONTRACTOR: PROJECT NUMBER: PURCHASE ORDER NO. : DESCRIPTION: 1. Reason for change: 2. Description of Change: 3. Change in Contract Cost: CHANGE ORDER NO. 1 Streets Park lnterwest Consulting Group Inc. 8475 - PO 9173941 AddTt�o��sign Work Not anticipated length of design time was originally figured to allow for necessary changes requested from the Stormwater & Planning Depts. During the design of the project it was discovered that the $ existing detention pond where the park will be located was sized with outdated methods and old City Standards and needed to be completely redesigned. The design of the grading of the park and the drainage research and design necessary to satisfy current stormwater requirements was significantly underestimated with the original work order. Additionally, several changes were made to the site plan after the project was initially submitted (all relatively minor, but requiring plan revisions). It was necessary to design a new sidewalk west of the park that was not anticipated $ 9,636.00 9,636 .00 4. Change in Contract Time: no change ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDER TOTAL PENDING CHANGE ORDER TOTAL THIS CHANGE ORDER TOTAL% OF ORIGINAL CONTRACT, THIS C.O. TOTAL% OF ORIGINAL CONTRACT, ALL C. O. 'S ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: Contractor's Representative 4· .. ACCEPTED BY: --+--......,,..'-F4-t/_ __.�f0 -+----------- Project Manager REVIEWED BY: Title: APPROVED BY: Title: APPROVED BY: Purchasing Agent over $30 ,000 cc: City Clerk Contractor Project File Architect Engineer Purchasing DATE: $ 24,699.00 $ $ $ 9,39.636.01% 00 39.01% $34,335.00 9-10-18 ------- DATE: ----"9/-10 -/2018 --- DATE: ------- DATE: ------- DATE: -------