HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8475 CIVIL ENGINEERING PROFESSIONAL ON-CALLPROJECT TITLE:
CONTRACTOR:
PROJECT NUMBER:
PURCHASE ORDER NO. :
DESCRIPTION:
1. Reason for change:
2. Description of Change:
3. Change in Contract Cost:
CHANGE ORDER NO. 1
Streets Park
lnterwest Consulting Group Inc.
8475 - PO 9173941
AddTt�o��sign Work
Not anticipated length of design time was originally figured to allow for necessary
changes requested from the Stormwater & Planning Depts.
During the design of the project it was discovered that the $
existing detention pond where the park will be
located was sized with outdated methods and old City Standards
and needed to be completely redesigned. The
design of the grading of the park and the drainage research and
design necessary to satisfy current stormwater
requirements was significantly underestimated with the original
work order. Additionally, several changes
were made to the site plan after the project was initially
submitted (all relatively minor, but requiring plan
revisions). It was necessary to design a new sidewalk west of the
park that was not anticipated
$
9,636.00
9,636 .00
4. Change in Contract Time: no change
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDER
TOTAL PENDING CHANGE ORDER
TOTAL THIS CHANGE ORDER
TOTAL% OF ORIGINAL CONTRACT, THIS C.O.
TOTAL% OF ORIGINAL CONTRACT, ALL C. O. 'S
ADJUSTED CONTRACT COST (Assuming all change orders approved)
ACCEPTED BY:
Contractor's Representative 4· ..
ACCEPTED BY: --+--......,,..'-F4-t/_
__.�f0
-+-----------
Project Manager
REVIEWED BY:
Title:
APPROVED BY:
Title:
APPROVED BY:
Purchasing Agent over $30 ,000
cc: City Clerk
Contractor
Project File
Architect
Engineer
Purchasing
DATE:
$ 24,699.00
$
$
$ 9,39.636.01% 00
39.01%
$34,335.00
9-10-18
-------
DATE: ----"9/-10 -/2018 ---
DATE:
-------
DATE:
-------
DATE:
-------