Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 7658 MISCELLANEOUS CONCRETE ANNUAL (3)WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND LIGHTFIELD ENTERPRISES WORK ORDER NUMBER: 4-400901930-18 PROJECT TITLE: Cherry and Mason Pedestrian Bulbout ORIGINAL BID/RFP NUMBER & NAME: 7658 Misc. Concrete Annual MASTER AGREEMENT EFFECTIVE DATE: 7-15-18 WORK ORDER COMMENCEMENT DATE: 9-10-18 WORK ORDER COMPLETION DATE: 9-28-18 MAXIMUM FEE: (time and reimbursable direct costs): $17,510.12 PROJECT DESCRIPTION/SCOPE OF SERVICES: Reconstruct the sidewalk ramp on the north side of the Cherry and Mason intersection. Creating a small bump out to enhance the pedestrian / bicycle crossing of Cherry Street. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of 4 (four) page(s) are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. ACCEPTANCE: REVIEWED: ACCEPTANCE: Otyof �s Aaron Iverson, Project Manager Name, Buyer or Senior Buyer Gerry Paul, Purchasing Director (if greater than $60,000) Work Order Fomi Date: _1_-_7_-_1_8'_ Date: ------- Date:------- 0/f'ICial Pun:hasing Form Last updaled 10/2017 9/10/18 202.01 Sawcut Concrete/Asphalt (0" < 4") Lineal Foot 0 $3.47 $ - 202.02 Sawcut Concrete/Asphalt (4" < 6") Lineal Foot 60 $3.68 $ 220.80 202.03 Sawcut Concrete/Asphalt (6" < 8") Lineal Foot 0 $3.99 $ - 202.04 Sawcut Concrete/Asphalt (8" ≤ 10") Lineal Foot 0 $5.78 $ - 202.05 Sawcut - Additional 1" Depth Lineal Foot 0 $1.26 $ - 202.06 Remove Concrete Sidewalk Square Foot 132 $3.57 $ 471.24 202.07 Remove Concrete Curb & Gutter Lineal Foot 19.2 $6.09 $ 116.93 202.08 Remove Monolithic Curb, Gutter & Sidewalk Square Foot 456 $3.89 $ 1,773.84 202.09 Remove Concrete Driveway/Apron/Crosspan Square Foot 0 $4.15 $ - 202.10 Remove Concrete Pavement - 10" Square Foot 0 $4.94 $ - 202.11 Remove Concrete Pavement - Additional 1" Depth Square Foot 0 $1.05 $ - 202.12 Remove Asphalt - 6" Square Foot 180 $2.73 $ 491.40 202.13 Remove Asphalt - Additional 1" Depth Square Foot 0 $1.05 $ - 202.14 Remove Inlet Each 0 $540.75 $ - 202.15 Remove and Haul Driveway Fillet Each 0 $52.50 $ - 202.16 Remove Flagstone Square Foot 0 $3.15 $ - 203.01 Excavation - General Less Than 50 CY Cubic Yard 0 $49.35 $ - 203.02 Excavation - General Over 50 CY Cubic Yard 0 $44.10 $ - 203.03 Excavation - Walls Only Cubic Yard 0 $12.08 $ - 203.04 Excavation - New Inlet Each 0 $425.25 $ - 203.05 Borrow - Less than 100 Ton Ton 0 $26.25 $ - 203.06 Borrow - Over 100 Ton Ton 0 $23.10 $ - 207.01 Imported Topsoil Cubic Yard 0 $32.81 $ - 208.01 Stormwater Protection - Rock Filled Wattle Lineal Foot 0 $12.08 $ - 208.02 Stormwater Protection - Recycled Rubber Filled Wattle Lineal Foot 0 $16.80 $ - 208.03 Stormwater Protection - Straw Bales Each 0 $21.00 $ - 210.01 Reset Flagstone Square Foot 0 $4.20 $ - 210.02 Reset Brick Pavers Square Foot 0 $8.40 $ - 210.03 Adjust Manhole Each 0 $105.00 $ - 210.04 Adjust Valve Box Each 0 $105.00 $ - 304.01 Aggregate Base Course/Recycled Concrete Base ≤ 5 Tons Ton 6 $40.95 $ 245.70 304.02 Aggregate Base Course/Recycled Concrete Base > 5 Tons Ton 0 $38.85 $ - 304.03 Recycled Asphalt Base Ton 0 $26.25 $ - 403.01 Temporary Asphalt Patching Ton 2.4 $215.25 $ 516.60 601.01 Exposed Sand Finish - Additional Charge Square Foot 0 $3.68 $ - 602.01 Reinforcing Steel Pound 0 $2.30 $ - 602.02 Reinforcing Steel - Epoxy Coated Pound 0 $3.45 $ - 604.01 Install New Area Inlet Each 0 $1,485.00 $ - 604.02 Area Inlet – Additional Foot Depth Lineal Foot 0 $136.50 $ - 604.03 Reconstruct Area Inlet Deck – Remove & Replace Each 0 $1,575.00 $ - Contract Quantity - Estimate Plus 20% Total - Estimate ADDENDUM 2 BID SCHEDULE 1 - BASE BID (Non-Federal) Item No. Description Unit Unit Price 604.04 Reconstruct Area Inlet Deck - Additional Foot Opening – Remove & Replace Lineal Foot 0 $136.50 $ - 604.05 Reconstruct Catch Basin Deck - Remove & Replace Each 0 $780.00 $ - 604.06 Reconstruct Catch Basin Deck - Additional Foot Opening – Remove & Replace Lineal Foot 0 $151.20 $ - 604.07 Install New Curb Inlet – 4’ Opening Each 0 $2,003.00 $ - 604.08 Curb Inlet – Additional Foot Depth Lineal Foot 0 $115.50 $ - 604.09 Reconstruct Curb Inlet Deck – Remove and Replace Each 0 $761.25 $ - 604.10 Reconstruct Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot 0 $136.50 $ - 604.11 Install New Type R Inlet - 5' Opening Each 0 $3,680.00 $ - 604.12 Type R Inlet – Additional Foot Depth Lineal Foot 0 $173.25 $ - 604.13 Reconstruct Type R Inlet Deck – Remove and Replace Each 0 $1,286.25 $ - 604.14 Reconstruct Type R Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot 0 $131.25 $ - 604.15 Install New Modified Type 13 Curb Inlet (includes new Frame, Grate & Adjustable Curb Bonnet) Each 0 $2,645.00 $ - 604.16 Modified Type 13 Curb Inlet – Additional Foot Depth Lineal Foot 0 $168.00 $ - 604.17 Reconstruct Modified Type 13 Curb Inlet Deck – Remove & Replace Each 0 $1,737.25 $ - 604.18 Reconstruct Modified Type 13 Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot 0 $252.00 $ - 604.19 Modified Type 13 Curb Inlet – Materials only - (Frame, Grate, & adjustable bonnet (East Jordan Iron Works 7030 or Equivalent Material) Each 0 $760.00 $ - 604.20 Concrete Sidewalk Culvert – 4’ opening Each 0 $624.75 $ - 604.21 Metal Sidewalk Culvert - 2' Opening, Remove & Replace Each 0 $625.00 $ - 604.22 Metal Sidewalk Culvert - 2' Opening, Materials Only Each 0 $2,130.00 $ - 604.23 Additional Square Foot 5/8" Plate Square Foot 0 $215.00 $ - 608.01 Driveover Curb, Gutter & 6" Sidewalk Lineal Foot 0 $44.10 $ - 608.02 Driveover Curb and Gutter - No Sidewalk Lineal Foot 0 $24.68 $ - 608.03 Vertical Curb, Gutter and 6" Sidewalk Lineal Foot 0 $45.57 $ - 608.04 Vertical Curb and Gutter - No Sidewalk Lineal Foot 90 $28.35 $ 2,551.50 608.05 Out Fall Curb & Gutter Lineal Foot 0 $22.68 $ - 608.06 Hollywood Curb, Gutter and 6" Sidewalk Lineal Foot 0 $32.18 $ - 608.07 Hollywood Curb and Gutter - No Sidewalk Lineal Foot 0 $20.06 $ - 608.08 Highback Curb and Gutter - No Sidewalk Lineal Foot 0 $38.90 $ - 608.09 Barrier Curb - 6" x 18" Lineal Foot 0 $25.36 $ - 608.10 Barrier Curb - Key Way Style Lineal Foot 0 $25.36 $ - 608.11 Barrier Curb - Epoxy Lineal Foot 0 $20.21 $ - 608.12 Mountable Curb - 12" x 18" Lineal Foot 0 $25.99 $ - 608.13 Mountable Curb - Keyway Style Lineal Foot 0 $25.36 $ - 608.14 Mountable Curb – Epoxy Lineal Foot 0 $24.68 $ - 608.15 Pedestrian Access Ramp Square Foot 264 $8.03 $ 2,119.92 608.16 Pedestrian Access Ramp, Highback Curb Square Foot 0 $9.08 $ - 608.17 Truncated Dome Panel Square Foot 43.2 $52.75 $ 2,278.80 608.18 Apron - 8" Square Foot 126 $8.56 $ 1,078.56 608.19 Crosspan - 8" Square Foot 0 $8.56 $ - 608.20 Valley Pan - 6" Square Foot 0 $7.61 $ - 608.21 Flatwork - 4" Square Foot 0 $5.25 $ - 608.22 Flatwork - 6" Square Foot 360 $6.09 $ 2,192.40 608.23 Replace Flatwork - 1" Additional Depth Square Foot 0 $1.10 $ - 608.24 Concrete Pavement 8" (Joints Sealed) Square Foot 0 $8.56 $ - 608.25 Alley Approach - 8" Square Foot 0 $8.51 $ - 608.26 Enhanced Crosswalk - 10" Tile Red Square Foot 0 $13.13 $ - 608.27 Enhanced Crosswalk - 10" San Diego Buff Square Foot 0 $11.87 $ - 608.28 Enhanced Crosswalk - 10" Brick Red, Stamped Square Foot 0 $14.07 $ - 608.29 Colored Trail with Fibermesh - 5" Yosemite Brown Square Foot 0 $7.46 $ - 608.30 Mow Strip - 4" x 12" Lineal Foot 0 $9.71 $ - 608.31 Splashblock - 4" Exposed Aggregate Square Foot 0 $7.46 $ - 608.32 Splashblock - 4" San Diego Buff Square Foot 0 $7.82 $ - 608.33 Median Cover - 4" San Diego Buff Square Foot 0 $7.82 $ - 608.34 Fibermesh - Added to Any Item - Additional Charge Pounds / Cubic Yard 0 $10.76 $ - 608.35 24 Hour High Early Concrete - Added to Any Item - Additional Charge Cubic Yard 0 $21.00 $ - 608.36 Stamp Pattern - Added to Any Item, Additional Charge Square Foot 0 $2.89 $ - 608.37 6" Concrete Bollard Each 0 $464.00 $ - 608.38 8" Concrete Bollard Each 0 $580.00 $ - 608.39 Flowable Fill Cubic Yard 0 $120.75 $ - 608.40 Non-reinforced Concrete Wall - 8" Square Face Foot 0 $17.33 $ - 608.41 Non-reinforced Concrete Footer - 8" Square Foot 0 $17.33 $ - 608.42 Concrete Staining/Sealing Square Foot 0 $4.20 $ - 608.43 Expansion and Caulking Lineal Foot 0 $4.15 $ - 608.44 Joint Sealant (Pavement) Lineal Foot 0 $4.46 $ - 608.45 Irrigation Sleeve Lineal Foot 0 $4.46 $ - 608.46 Dump Fee Ton 0 $58.80 $ - 608.47 Asphalt Pavement Preservation Lineal Foot 0 $5.78 $ - 626.01 Mobilization - Invoices Under $1000 0 630.01 "NO PARKING" Sign With Stand Per Each Per Day 0 $2.10 $ - 630.02 Vertical Panel Without Light Per Each Per Day 0 $1.31 $ - 630.03 Channelizing Barrels Per Each Per Day 24 $1.58 $ 31.60 630.04 Type I/II Barricade Without Light Per Each Per Day 0 $0.68 $ - 630.05 Type III Barricade Without Light Per Each Per Day 0 $3.94 $ - 630.06 Size A Sign With Stand Per Each Per Day 6 $1.89 $ 9.45 630.07 Size B Sign With Stand Per Each Per Day 6 $2.10 $ 10.50 630.08 Size A Specialty Sign - Cost of Manufacturing Each 0 $73.50 $ - 630.09 Size B Specialty Sign - Cost of Manufacturing Each 0 $78.75 $ - 630.10 Cone With Reflective Strip Per Each Per Day 24 $0.84 $ 16.80 630.11 Safety Fence Per Roll Per Day 3.6 $4.46 $ 13.38 630.12 Light Per Each FA1 Laborer Hour 0 $30.98 $ - FA2 Foreman Hour 0 $44.10 $ - FA3 Finisher Hour 0 $39.90 $ - FA4 Form Setter Hour 0 $38.33 $ - FA5 Skid Steer Hour 0 $94.50 $ - FA6 Mini Trackhoe Hour 0 $99.75 $ - FA7 Dump Truck Hour 0 $84.00 $ - FA8 Backhoe Hour 0 $99.75 $ - TOTAL COST $ 17,510.12 Per Day 0 $0.53 $ - 630.13 Advance Warning Flashing or Sequencing Arrow Panel Per Each Per Day 0 $78.75 $ - 630.14 Variable Message Board Per Each Per Day 0 $183.75 $ - 630.15 Traffic Control Supervisor Per Day 6 $434.70 $ 2,173.50 630.16 Traffic Control Supervisor Hour 0 $45.15 $ - 630.17 Flagging Hour 48 $29.93 $ 1,197.20 ADDITIONAL SERVICES