HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8225 MAXIMO CONSULTING SERVICESWORK ORDER
PURSUANT TO A MASTER AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
EXCERGY CORPORATION
WORK ORDER NUMBER: 13
PROJECT TITLE: Consulting Support for Asset Register and Work Order
Management System
ORIGINAL BID/RFP NUMBER & NAME: 8225 Maximo Consulting Services
MASTER AGREEMENT EFFECTIVE DATE: March 28, 2016
OWNER’S REPRESENTATIVE: Rick Morford
WORK ORDER COMMENCEMENT DATE: September 1, 2018
WORK ORDER COMPLETION DATE: December 31, 2018
MAXIMUM FEE: (time and reimbursable direct costs): $35,460.00
PROJECT DESCRIPTION/SCOPE OF SERVICES: Excergy is being asked to help improve the Water
Resources & Treatment Maximo implementation by developing Key Performance
Indicators, re-building Maximo queries, re-configuring user Start Centers, and assist Utilities
IT develop new Maximo reports.
Service Provider agrees to perform the services identified above and on the attached forms in accordance with
the terms and conditions contained herein and in the Master Agreement between the parties. In the event of
a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the
attached forms) the Master Agreement shall control.
The attached forms consisting of 8 pages are hereby accepted and incorporated herein, by this reference, and
Notice to Proceed is hereby given after all parties have signed this document.
SERVICE PROVIDER: Excergy Corporation
By: Date:
Name: __James Ketchledge Title: CEO & President
ACCEPTANCE: Date:
Rick Morford, Project Manager
DocuSign Envelope ID: 77B517DA-A58E-4434-B587-E9CDAAD4F688
8/31/2018
9/4/2018
OWNER’S ACCEPTANCE & EXECUTION:
This Work Order and the attached Contract Documents are hereby accepted and incorporated herein by this
reference.
ACCEPTANCE: Date:
Coy Althoff, Utilities Asset Manager
ACCEPTANCE: Date:
Carol Webb, Deputy Director, Utilities
REVIEWED: Date:
Pat Johnson, Senior Buyer
ACCEPTANCE: Date:
Gerry Paul, Purchasing Director
(if greater than $60,000)
Attachements added here:
DocuSign Envelope ID: 77B517DA-A58E-4434-B587-E9CDAAD4F688
9/3/2018
9/4/2018
9/4/2018
Attachment A
Work Order #13, Excergy Water Resources & Treatment Scope of Work
WR&T Project Objective:
The scope of Work Order #13 is for Key Performance Indicator (KPI) development,
configuration, and documentation for the Water Production and Water Reclamation divisions
both of which reside under the Water Resources & Treatment department (WRT). KPI
development is further defined by task in the following sections.
Timeline for Work Order #13 – KPI Development: Fort Collins Utilities staff together with
Excergy support will complete this KPI development scope by December 31,2018, per the
schedule of Figure 1.
Task 1: Project Management Support
Excergy with direction from the City of Fort Collins will provide a project plan that
contains labor hours and cost breakdown by task for each Excergy resource assigned
to a respective task for Work Order #13. Excergy, upon request from City of Fort
Collins, will provide assistance in the following areas of Project Management:
planning and oversight, maintenance of schedule, and reporting of issues which may
include risk management. Excergy will provide a consulting team labor/task invoice
report broken down by individual Excergy resource and time spent per task.
The City of Fort Collins will provide the lead project management resource as a central
point of contact. Excergy project team members will participate as needed in ad-hoc
or scheduled meetings organized by the City of Fort Collins. Verbal status reports may
be required during any ad-hoc or scheduled status meetings. In addition to verbal
reports, written status reports will be delivered weekly in the City’s preferred format.
The hours for the support above are stated below in Figure 2, Labor Costs Breakdown
table.
Excergy Deliverables for this task
• Provide assistance/support for steps required to complete all tasks listed in this
work order
• Maintain communications (email/voice/other)
• Review, edit, or provide feedback following completion of each task listed in this
work order
• Participate in/support ad-hoc or scheduled meetings as needed, which may
include teleconferences or online with appropriate staff as needed
• Execute consulting tasks and activities as required
• Manage consulting team activites and logistics
• Monthly team labor/task invoice report
• Weekly written status reports
Utility Deliverables for this task
• Provide a Utilities PM as a central point of contact and direct Excergy support as
needed
• Work with City of Fort Collins Utilities and Excergy Teams to complete all tasks
in this work order
• Participate in/support scheduled meetings, which may include
teleconferences or online with appropriate utility personnel as needed
DocuSign Envelope ID: 77B517DA-A58E-4434-B587-E9CDAAD4F688
• Provide administrative/logistics/meeting support as needed
• Maintain communications (email/voice/other)
• Review, edit, or provide feedback as necessary to finalize task deliverables
• Support/manage Utility Teams in the performance of, or activities required to
complete, tasks listed in this work order
Task 2: Bi-Weekly Meetings
The Excergy team together with the City of Fort Collins staff will participate in bi-
weekly meetings in support of Work Order #13 tasks. Excergy, upon request from the
City of Fort Collins, will provide agendas for scheduled bi-weekly support meetings.
Excergy upon request may be asked to facilitate Work Order #13 support meetings, as
well at times Excergy may be tasked with developing presentations for support
meetings.
The City of Fort Collins will be responsible for scheduling all Work Order #13 bi-weekly
support meetings. Documenting all Work Order #13 bi-weekly support meetings and
distribution of meeting notes/documentation to City of Fort Collins staff and Excergy
team members participating in support meetings will be the responsibility of the City
Project Manager. The hours for the support above are stated below in Figure 2, Labor
Costs Breakdown table.
Excergy Deliverables for this task
• Upon request develop support meeting agendas
• As needed, develop support meeting presentations
• Participate in support meetings as requested, which may include
teleconferences or online with appropriate staff as needed
• Maintain communications (email/voice/other)
• Execute consulting tasks and activities as required
Utility Deliverables for this task
• Participate in support meetings, which may include teleconferences or online
with appropriate utility personnel
• Provide administrative/logistics/meeting support
• Maintain communications (email/voice/other)
• Record and document all support meetings
• Distribute all support meeting documentation to City of Fort Collins Utilities staff
and Excergy team members participating in support meetings
Task 3: Technical Support
KPI #1 – PM/CM Ratio
The PM/CM Ratio KPI will require the following Maximo tasks be completed for the
development of this KPI. Note: All development work for KPI #1 will be done in the
Maximo DEV environment before migrating KPI #1 components to the Maximo QA
environment for testing. Once all user testing has been satisfactorily completed in the
Maximo QA environment all components required to support KPI #1 will be migrated to
the Maximo PROD environment.
1). Configure Maximo & Load Task Data
DocuSign Envelope ID: 77B517DA-A58E-4434-B587-E9CDAAD4F688
- May require the following Maximo data be available:
o Job Plan durations
o Start/Finish Constraint Offsets
o PM Active Days and Target Start Time
o PM Frequency
o Work Type cost reporting
o Escalation and Actions to determine PM Effectiveness
o Multi-Asset Routes, no defined costs
o Use of Lead Times and Alert Lead
o Meter base PMs
- The development of KPI #1 will need Excergy to support the configuration of
all Maximo applications in preparation for data from the steps outlined above.
- Following the configuration of all Maximo applications to manage the data
required for KPI #1 Excergy will load data that has been compiled by Fort
Collins Utilities staff.
2). Build Queries
- New queries need to be developed to supply data for KPI #1, Excergy will
work with Fort Collins Utilities Maximo administrators and WRT Subject
Matter Experts (SME) to develop queries needed for KPI #1.
3). Develop User Start Centers
- Excergy will assist Fort Collins Utilities Maximo administrators and WRT
SMEs in the development of new end-user Start Centers. The following is a
preliminary, but not limited to, list of steps needed for the development of
new end-user Start Centers.
o Create new Maximo security groups.
o Develop new Start Center tabs, e.g. Initiation, Planning/Scheduling,
Assigning, etc.
o Build result sets using queries developed in step #2 to support new
Start Center tabs.
o Create result sets to support KPI #1.
4). Test User Start Centers
- Fort Collins Maximo Administrators and WRT SMEs with Excergy support will
do an initial assessment of the new Start Centers followed by a WRT end-user
assessment.
o Fort Collins Maximo Administrators together with WRT SMEs will
assemble a group of WRT end-users to assess the new Start Centers.
o Feedback from WRT SMEs and end-users will be used by Fort Collins
Maximo administrators along with Excergy’s assistance to make any
adjustments necessary to complete Start Center testing.
5). Update Production User Start Centers
DocuSign Envelope ID: 77B517DA-A58E-4434-B587-E9CDAAD4F688
- Fort Collins Maximo administrators with Excergy support will migrate all
components developed for KPI #1 into Maximo PROD for release to end-
users.
o Schedule training for end-users.
o Migrate all KPI #1 components to Maximo PROD.
o Post migration adjustments for KPI #1 in Maximo PROD environment.
6). Report Development to support KPI #1
- Fort Collins Maximo administrators and WRT SMEs together with Excergy
support will develop new data reports as deemed necessary by WRT SMEs to
support KPI #1 data. The following is a, not all inclusive, list of possible
reports that may be developed by Fort Collins Maximo administrators.
o Weekly reports
o Monthly reports
o Automatically generated weekly/monthly reports
o Work Order print-outs/reports
7). Document KPI processes
- Fort Collins Utilities staff will work with Fort Collins Maximo administrators,
WRT SMEs, and end-users to document the newly developed work flow &
business processes for KPI #1 – PM/CM Ratio.
The hours for the support above are stated below in Figure 2, Labor Costs Breakdown
table.
Excergy Deliverables for KPI #1
• Provide assistance/support for steps required to complete KPI #1
• Maintain communications (email/voice/other)
• Review, edit, or provide feedback following completion of each step of KPI #1
• Participate in/support scheduled meetings, which may include teleconferences
or online with appropriate staff as needed
• Execute consulting tasks and activities as required
Utility Deliverables for this task
• Complete all steps required by KPI #1
• Participate in/support scheduled meetings, which may include
teleconferences or online with appropriate utility personnel as needed
• Maintain communications (email/voice/other)
• Review, edit, or provide feedback as necessary to finalize task deliverables
• Execute utility tasks and activities as needed
KPI #2 – Percent Critical Assets in Red Zone
The Percent Critical Assets in Red Zone KPI will require the following Maximo tasks be
completed for the development of this KPI. Note: All development work for KPI #2 will
be done in the Maximo DEV environment before migrating KPI #2 components to the
Maximo QA environment for testing. Once all user testing has been satisfactorily
DocuSign Envelope ID: 77B517DA-A58E-4434-B587-E9CDAAD4F688
completed in the Maximo QA environment all components required to support KPI #2
will be migrated to the Maximo PROD environment.
1). Configure Maximo & Load Task Data
- May require the following Maximo data be available:
o Asset Cost Reporting
o Purchase/Replacement Asset Cost Data
o YTD or Total Asset Cost Data
o Applications for Meters and Meter Groups
o Applications for Condition Monitoring
o Asset Depreciation/Value capability
o Materials Management
o Work Type Cost reporting
o Job Plans data
o Multi-Asset Routes, no defined costs
- The development of KPI #2 will need Excergy to support the configuration of
all Maximo applications in preparation for data from the steps outlined above.
- Following the configuration of all Maximo applications to manage the data
required for KPI #2 Excergy will load data that has been compiled by Fort
Collins Utilities staff.
2). Build Queries
- New queries need to be developed to supply data for KPI #2, Excergy will
work with Fort Collins Utilities Maximo administrators and WRT Subject
Matter Experts (SME) to develop queries needed for KPI #2.
3). Develop User Start Centers to support KPI #2
- Excergy will assist Fort Collins Utilities Maximo administrators and WRT
SMEs in the development of new end-user Start Centers. The following is a
preliminary, but not limited to, list of steps needed for the development of
new end-user Start Centers.
o Create new Maximo security groups.
o Develop new Start Center tabs, e.g. Initiation, Planning/Scheduling,
Assigning, etc.
o Build result sets using queries developed in step #2 to support new
Start Center tabs.
o Create result sets to support KPI #2.
4). Test User Start Centers
- Fort Collins Maximo Administrators and WRT SMEs with Excergy support will
do an initial assessment of the new Start Centers followed by a WRT end-user
assessment.
o Fort Collins Maximo Administrators together with WRT SMEs will
assemble a group of WRT end-users to assess the new Start Centers.
DocuSign Envelope ID: 77B517DA-A58E-4434-B587-E9CDAAD4F688
o Feedback from WRT SMEs and end-users will be used by Fort Collins
Maximo administrators along with Excergy assistance to make any
adjustments necessary to complete Start Center testing.
5). Update Production User Start Centers
- Fort Collins Maximo administrators with Excergy support will migrate all
components developed for KPI #2 into Maximo PROD for release to end-
users.
o Schedule training for end-users.
o Migrate all KPI #2 components to Maximo PROD.
Post migration adjustments for KPI #2 in Maximo PROD environment.
6). Report Development to support KPI #2
- Fort Collins Maximo administrators and WRT SMEs together with Excergy
support will develop new data reports as deemed necessary by WRT SMEs to
support KPI #2 data. The following is a, not all inclusive, list of possible
reports that may be need developed by Fort Collins Maximo administrators.
o Weekly reports
o Monthly reports
o Automatically generated weekly/monthly reports
o Work Order print-outs/reports
7). Document KPI processes
- Fort Collins Utilities staff will work with Fort Collins Maximo administrators,
WRT SMEs, and end-users to document the newly developed work flow &
business processes for KPI #2 – Percent Critical Assets in Red Zone.
The hours for the support above are stated below in Figure 2, Labor Costs Breakdown
table.
Excergy Deliverables for this task
• Provide assistance/support for steps required to complete KPI #2
• Maintain communications (email/voice/other)
• Review, edit, or provide feedback following completion of each step of KPI #2
• Participate in/support scheduled meetings, which may include teleconferences
or online with appropriate staff as needed
• Execute consulting tasks and activities as required
Utility Deliverables for this task
• Complete all steps required by KPI #2
• Participate in/support scheduled meetings, which may include
teleconferences or online with appropriate utility personnel as needed
• Maintain communications (email/voice/other)
• Review, edit, or provide feedback as necessary to finalize task deliverables
DocuSign Envelope ID: 77B517DA-A58E-4434-B587-E9CDAAD4F688
• Execute utility tasks and activities as needed
Attachment B
Work Order #13, Excergy Water Resources & Treatment Schedule
This Project schedule will be reviewed and updated by bi-weekly in a WRT Production
Support meeting. The period of performance for this work order is August 1, 2018 to
December 31, 2018. If changes in work order scope or a deviation from the attached schedule
are required during the performance of this work order a change order will be executed.
Figure 1 Water Resources & Treatment KPI Development Schedule
DocuSign Envelope ID: 77B517DA-A58E-4434-B587-E9CDAAD4F688
Attachment C
Work Order #13, Excergy Water Resources & Treatment Pricing
Figure 2 Labor Costs breakdown
Labor Direct Costs Total Not to Exceed
(NTE)
$35,460.00 $0.00 $35,460.00
DocuSign Envelope ID: 77B517DA-A58E-4434-B587-E9CDAAD4F688